CN208430611U - A kind of Dual-sealing waterproof construction for toilet floor drain - Google Patents

A kind of Dual-sealing waterproof construction for toilet floor drain Download PDF

Info

Publication number
CN208430611U
CN208430611U CN201820635510.XU CN201820635510U CN208430611U CN 208430611 U CN208430611 U CN 208430611U CN 201820635510 U CN201820635510 U CN 201820635510U CN 208430611 U CN208430611 U CN 208430611U
Authority
CN
China
Prior art keywords
floor drain
waterproof
sealant
downcomer
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820635510.XU
Other languages
Chinese (zh)
Inventor
潘玉庆
王军
董山虎
刘岩
郭玉绵
刘瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Fukai Construction Group Co Ltd
Original Assignee
Tianjin Fukai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Fukai Construction Group Co Ltd filed Critical Tianjin Fukai Construction Group Co Ltd
Priority to CN201820635510.XU priority Critical patent/CN208430611U/en
Application granted granted Critical
Publication of CN208430611U publication Critical patent/CN208430611U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The purpose of the utility model is to provide a kind of Dual-sealing waterproof constructions for toilet floor drain.The technical solution of the utility model are as follows: be made of floor drain, downcomer, waterproof ring, waterproof layer, floor, screed-coat and surface layer, the first sealant, the second sealant and hoop are equipped on the outside of floor drain;The use waterproof fine-stone concrete of waterproof ring, and carry out tamping and accumulate, it is solid and reliable, it prevents not rigorous at the link position of floor drain and downcomer, avoids being oozed out with water;Waterproof layer is used as infiltration protective layer using polyurethane or styrofoam, and is close to waterproof ring, plays good waterproof, heat insulation effect;The blocking member that the structure uses double density sealing to seep water as toilet floor drain, and it is reinforced in the engaging portion of double density sealing, to guarantee the qualification rate that ground waterproof is once checked and accepted, it saves and reprocesses cost, globality is more reasonable, overall structure is solid securely, simplifies laying step, improves construction efficiency.

Description

A kind of Dual-sealing waterproof construction for toilet floor drain
Technical field
The utility model relates to field of house buildings more particularly to a kind of Dual-sealing waterproof knots for toilet floor drain Structure.
Background technique
With the continuous promotion of people's living standard, the fine or not also weight by the public common people of house fitting-up and decoration quality Depending on.In building structure, the structure of toilet floor drain is extremely important, and seepage in toilet is also a disaster in household decoration Topic, is not only common people's household, all there is the case where floor drain infiltration in the toilet of all kinds of mechanisms, such as enterprises and institutions, machine It closes in the numerous areas engineerings such as unit, alert instruction base, underground parking, Science Institute, can all there is more or less floor drain Seep water phenomenon, especially after completion and during use, it is possible that different parts are reprocessed, discovery toilet Waterproof problem is not more note that infiltration is easy to happen more in surface construction.The structure and waterproof measure of previous toilet floor drain are all non- Often simple, this conventional construction method diameter is easy to produce hidden leakage defect.If preventing brought quality problems in construction, subtract It does over again and reprocesses less, avoid because reprocessing schedule delays and increasing construction cost, being only really improves accomodation ground leakage problems Effective way.
Utility model content
The purpose of the utility model is to provide a kind of blocking member to be seeped water using double density sealing as toilet floor drain, And it is reinforced in the engaging portion of double density sealing, to guarantee the qualification rate that ground waterproof is once checked and accepted, cost is reprocessed in saving Toilet floor drain Dual-sealing waterproof construction.
The technical solution of the utility model are as follows: a kind of Dual-sealing waterproof construction for toilet floor drain, feature exist In: it is made of floor drain, downcomer, waterproof ring, waterproof layer, floor, screed-coat and surface layer, the downcomer is located under floor drain Portion, the downcomer and floor drain are to be fixedly connected, and the waterproof ring is located at the junction of floor drain and downcomer, the waterproof ring and Floor drain is to be fixedly connected with downcomer, and the waterproof layer is located at the top of downcomer, and the waterproof layer and downcomer are fixed connect It connects, the floor is located at the top of waterproof layer, and the floor is to be fixedly connected with waterproof layer, and the screed-coat is located at the upper of floor Portion, the screed-coat are to be fixedly connected with floor, and the surface layer is located at the top of screed-coat, and the surface layer and screed-coat are to fix Connection.
Further, the first sealant, the second sealant and hoop are additionally provided on the floor drain, first sealant is located at The outside of floor drain, first sealant are to be fixedly connected with floor drain, and second sealant is located at the outside of floor drain, and position In the lower part of the first sealant, second sealant and floor drain and the first sealant are to be fixedly connected, and the hoop is located at the The junction of one sealant and the second sealant, the hoop are to be fixedly connected with the first sealant and the second sealant.
Further, first sealant and the second sealant are rubber material.
Further, the hoop is stainless steel ring.
Further, the material of the waterproof ring is waterproof fine-stone concrete.
Further, the material of the waterproof layer is polyurethane or styrofoam.
Further, the screed-coat is cement mortar.
Further, the surface layer is floor tile.
The utility model has the beneficial effects that: the obstruction member that the structure is seeped water using double density sealing as toilet floor drain Part, and reinforced in the engaging portion of double density sealing, to guarantee the qualification rate that ground waterproof is once checked and accepted, saves and reprocess Cost.First sealant and the second sealant are using rubber material, and are that superposing type is wrapped in floor drain upper and lower two respectively The position of a easy infiltration will be carried out effective by a hoop at the link position of the first sealant and the second sealant It is fixed, form an entirety with entire floor drain, the structure of this double density sealing can fully wrapped around floor drain, make the performance of its waterproof More preferably, it is also equipped with a waterproof ring at the link position of floor drain and downcomer, the use waterproof fine-stone concrete of the waterproof ring, and Tamping is carried out to accumulate, it is solid and reliable, it prevents not rigorous at the link position of floor drain and downcomer, avoids being oozed out with water; Waterproof layer is used as infiltration protective layer using polyurethane or styrofoam, and is close to waterproof ring, plays good waterproof, heat preservation Effect;Screed-coat uses cement mortar, and can all sides of following laying be carried out with the amendment of flatness, and the structure thinking is clear Clear, laying exquisiteness is effectively solved and is improved at many easy infiltration node locations such as ground drain edge leaks and tube circumference leaks The many problems of bring, globality is more reasonable, and overall structure is solid securely, simplifies laying step, improves construction efficiency.
Detailed description of the invention
Fig. 1 is the main view of the utility model.
Fig. 2 is that the floor drain of the utility model seals disassemblying structure schematic diagram.
Wherein: 1, floor drain 2, the first sealant 3, the second sealant
4, hoop 5, downcomer 6, waterproof ring
7, waterproof layer 8, floor 9, screed-coat
10, surface layer
Specific embodiment
Brief description is made to specific embodiment of the present utility model with reference to the accompanying drawing.
A kind of Dual-sealing waterproof construction for toilet floor drain as shown in Figure 1 and Figure 2, it is characterised in that: by floor drain 1, Downcomer 5, waterproof ring 6, waterproof layer 7, floor 8, screed-coat 9 and surface layer 10 form, and are additionally provided with the first sealant on the floor drain 1 2, the second sealant 3 and hoop 4, first sealant 2 are located at the outside of floor drain 1, and first sealant 2 is with floor drain 1 It is fixedly connected, second sealant 3 is located at the outside of floor drain 1, and is located at the lower part of the first sealant 2, and described second is close Sealing 3 is to be fixedly connected with floor drain 1 and the first sealant 2, and the hoop 4 is located at the company of the first sealant 2 and the second sealant 3 Place is met, the hoop 4 is to be fixedly connected with the first sealant 2 and the second sealant 3, and the downcomer 5 is located under floor drain 1 Portion, the downcomer 5 are to be fixedly connected with floor drain 1, and the waterproof ring 6 is located at the junction of floor drain 1 and downcomer 5, described anti- Water ring 6 is to be fixedly connected with floor drain 1 and downcomer 5, and the waterproof layer 7 is located at the top of downcomer 5, and the waterproof layer 7 is under Water pipe 5 is to be fixedly connected, and the floor 8 is located at the top of waterproof layer 7, and the floor 8 is to be fixedly connected with waterproof layer 7, described Screed-coat 9 is located at the top of floor 8, and the screed-coat 9 is to be fixedly connected with floor 8, and the surface layer 10 is located at the upper of screed-coat 9 Portion, the surface layer 10 are to be fixedly connected with screed-coat 9.First sealant 2 and the second sealant 3 are rubber material.Institute Stating hoop 4 is stainless steel ring.The material of the waterproof ring 6 is waterproof fine-stone concrete.The material of the waterproof layer 7 be polyurethane or Styrofoam.The screed-coat 9 is cement mortar.The surface layer 10 is floor tile.
Working method: the blocking member that the structure uses double density sealing to seep water as toilet floor drain, and in double containment The engaging portion of layer is reinforced, to guarantee the qualification rate that ground waterproof is once checked and accepted, is saved and is reprocessed cost.The structure is main It is made of floor drain 1, downcomer 5, waterproof ring 6, waterproof layer 7, floor 8, screed-coat 9 and surface layer 10, is wrapped up in the outside of floor drain 1 One layer of first sealant 2 and one layer of second sealant 3, first sealant 2 and the second sealant 3 are to use rubber material, And it is that superposing type is wrapped in floor drain 1 upper and lower two position for being easy infiltration respectively, it is close by first by a hoop 4 It carries out effectively fixing at the link position of sealing 2 and the second sealant 3, forms an entirety, this double containment with entire floor drain 1 The structure of layer can fully wrapped around floor drain 1, keep the performance of its waterproof more preferable, can allow being directly entered in floor drain 1 with water in this way Into downcomer 5, a waterproof ring 6, the use waterproof of the waterproof ring 6 are also equipped at the link position of floor drain 1 and downcomer 5 Fine-stone concrete, and carry out tamping and accumulate, it is solid and reliable, prevent it is not rigorous at the link position of floor drain 1 and downcomer 5, It avoids being oozed out with water;In addition, being laid with one layer of waterproof layer 7 on the top of downcomer 5, which uses polyurethane or polyphenyl Plate is close to waterproof ring 6 as infiltration protective layer, plays good waterproof, heat insulation effect;Then, on 7 top of waterproof layer Be laid with floor 8, and be connected and fixed, be laid with screed-coat 9 on the top of floor 8, which uses cement mortar, can to All sides of lower laying carry out the amendment of flatness, so that surface layer 10 can be good at being laid on the upper surface of screed-coat 9, thus It completes to be laid with.The structure clear thinking is laid with exquisiteness, effectively solves and improve ground drain edge leakage and tube circumference leakage etc. The many problems of bring at many easy infiltration node locations, globality is more reasonable, and overall structure is solid securely, simplifies laying Step improves construction efficiency.
One embodiment of the utility model is described in detail above, but the content is only the utility model Preferred embodiment should not be considered as limiting the scope of the present invention.It is all to be made according to application scope of the utility model All the changes and improvements etc., should still belong within the patent covering scope of the utility model.

Claims (8)

1. a kind of Dual-sealing waterproof construction for toilet floor drain, it is characterised in that: by floor drain, downcomer, waterproof ring, prevent Water layer, floor, screed-coat and surface layer composition, the downcomer are located at the lower part of floor drain, and the downcomer and floor drain are fixed connect It connects, the waterproof ring is located at the junction of floor drain and downcomer, and the waterproof ring is to be fixedly connected with floor drain and downcomer, described Waterproof layer is located at the top of downcomer, and the waterproof layer is to be fixedly connected with downcomer, and the floor is located at the top of waterproof layer, The floor is to be fixedly connected with waterproof layer, and the screed-coat is located at the top of floor, and the screed-coat and floor are fixed connect It connects, the surface layer is located at the top of screed-coat, and the surface layer is to be fixedly connected with screed-coat.
2. a kind of Dual-sealing waterproof construction for toilet floor drain according to claim 1, it is characterised in that: describedly The first sealant, the second sealant and hoop are additionally provided in leakage, first sealant is located at the outside of floor drain, and described first is close Sealing is to be fixedly connected with floor drain, and second sealant is located at the outside of floor drain, and is located at the lower part of the first sealant, institute It states the second sealant and floor drain and the first sealant is to be fixedly connected, the hoop is located at the first sealant and the second sealant Junction, the hoop are to be fixedly connected with the first sealant and the second sealant.
3. a kind of Dual-sealing waterproof construction for toilet floor drain according to claim 2, it is characterised in that: described One sealant and the second sealant are rubber material.
4. a kind of Dual-sealing waterproof construction for toilet floor drain according to claim 2, it is characterised in that: the ring Hoop is stainless steel ring.
5. a kind of Dual-sealing waterproof construction for toilet floor drain according to claim 1, it is characterised in that: described anti- The material of water ring is waterproof fine-stone concrete.
6. a kind of Dual-sealing waterproof construction for toilet floor drain according to claim 1, it is characterised in that: described anti- The material of water layer is polyurethane or styrofoam.
7. a kind of Dual-sealing waterproof construction for toilet floor drain according to claim 1, it is characterised in that: described to look for Leveling is cement mortar.
8. a kind of Dual-sealing waterproof construction for toilet floor drain according to claim 1, it is characterised in that: the face Layer is floor tile.
CN201820635510.XU 2018-05-01 2018-05-01 A kind of Dual-sealing waterproof construction for toilet floor drain Expired - Fee Related CN208430611U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820635510.XU CN208430611U (en) 2018-05-01 2018-05-01 A kind of Dual-sealing waterproof construction for toilet floor drain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820635510.XU CN208430611U (en) 2018-05-01 2018-05-01 A kind of Dual-sealing waterproof construction for toilet floor drain

Publications (1)

Publication Number Publication Date
CN208430611U true CN208430611U (en) 2019-01-25

Family

ID=65103216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820635510.XU Expired - Fee Related CN208430611U (en) 2018-05-01 2018-05-01 A kind of Dual-sealing waterproof construction for toilet floor drain

Country Status (1)

Country Link
CN (1) CN208430611U (en)

Similar Documents

Publication Publication Date Title
CN110878700B (en) Tunnel waterproof structure and construction method thereof
CN106836516B (en) A kind of integrated water-proof chassis of toilet pipeline
CN205617426U (en) Cast -in -place bottom plate of utility tunnel and prefabricated outer panel connection structure
CN103572808A (en) Building toilet caisson waterproof device and construction method
CN106013471A (en) Anti-seepage construction method for expansion joint
CN107012893A (en) A kind of basement bottom wall board post poured band waterproof construction and its construction method
CN108894256A (en) A kind of advanced plugging construction method of poured band of outer wall of basement
CN103410318B (en) Washroom pipe well water-leakage construction method
CN208430611U (en) A kind of Dual-sealing waterproof construction for toilet floor drain
CN103206093B (en) Leakage repairing and preventing method for roof settlement joint
CN208718112U (en) Novel anti-ponding structure based on toilet geothermal heating ground surface finishing
CN208380085U (en) The draining pipe-through floor slab structure of a kind of ground leak
CN205954651U (en) Concrete open caisson back cover structure
CN206607675U (en) A kind of basement composite external wall anti-cracking and seepage control structure construction
CN206521812U (en) A kind of anti-leakage structure of toilet
CN205369917U (en) Bathroom antiseep built -in fitting
CN212001647U (en) There is peripheral seepage prevention structure of sleeve pipe floor pipe
CN207599156U (en) Adjustable sealing casing bit
CN106193121A (en) A kind of immersed tube tunnel tube coupling antipriming
CN106836462A (en) Basement extends out the processing method and waterproof construction of structure construction seam
CN207376843U (en) Expansion joint leakage-proof structure
CN107419739B (en) A kind of building bottom plate dewatering construction method
CN216865519U (en) Shower area waterproof construction is newly increased in timber construction bearing room
CN206036410U (en) Pre -buried leak protection water is direct
CN206035043U (en) Prefabricated assembled rectangle underground granary of outer steel plated echelonment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190125