CN208430429U - A kind of drainage arrangement of bridge on highway - Google Patents
A kind of drainage arrangement of bridge on highway Download PDFInfo
- Publication number
- CN208430429U CN208430429U CN201820706198.9U CN201820706198U CN208430429U CN 208430429 U CN208430429 U CN 208430429U CN 201820706198 U CN201820706198 U CN 201820706198U CN 208430429 U CN208430429 U CN 208430429U
- Authority
- CN
- China
- Prior art keywords
- fixedly installed
- bridge
- cylinder
- fixed
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
It is not easy to the problem quickly drained to bridge when in use purpose of the utility model is to solve existing device, disclose a kind of drainage arrangement of bridge on highway, including cylinder, the second fixed cover, through-hole, water absorption layer, guide ring, the second helical spring, guide cylinder, transverse slat, the first fixed cover, blower, cross bar, first sleeve, vertical bar, fixed ring, supporting leg, the supporting leg lower end is fixedly installed with U-frame, the U-frame is fixedly connected with the first helical spring, and the U-frame temples is fixedly installed with idler wheel.The utility model passes through setting blower, consequently facilitating being blown to the ponding on bridge surface, it is blowed convenient for road pavement, to accelerate the air circulation on road surface, fast implements the drying of bridge pavement, road is rolled by setting, consequently facilitating worker arbitrarily moves the position of device, and structure is simple, and design is reasonable, it is easy to operate, it is worthy to be popularized.
Description
Technical field
The utility model relates to bridge technical field of drainage more particularly to a kind of drainage arrangements of bridge on highway.
Background technique
With the rapid development of Chinese society doctrine market economy, China increases infrastructure cause and invests, China
Communication enters a fast-developing period, and bridge is not only to be erected at rivers lake surface sea, makes traffic etc.
The building that can smoothly pass through is built, and bridge has been extended to across mountain stream, unfavorable geology or has met other transport needs and set up
Make current more convenient and fast building, existing highway bridge is rolled by extraneous vehicle heavy burden load for a long time, and accumulating over a long period will make
There is hollow phenomenon in bridge pavement, and when encountering rainwater weather, it will the ponding on road surface is caused, if road pavement not in time
Ponding is drained, it will the leakage for causing rainwater influences the service life of bridge, and brings to the traveling of vehicle very big
Security risk, existing device is when draining bridge pavement ponding, although can all be equipped with draining when building bridge
Device, but rainwater will be stopped on the road surface of hollow, being difficult device rainwater being discharged in time, also makes
Used time is generally cleaned using cleaner, pushes arm to sweep ponding for a long time in worker, and then to hollow
Internal ponding is discharged, to increase worker's fatigue degree, has setting protective device in device also, in the process of sweeping
In be easy to splash ponding with worker, to be polluted to worker's clothing, and in worker to the ponding of other positions
When being cleared up, worker is needed to carry burnisher, to increase the labour physical strength of worker, device also is being used
When, ponding directly sweep scattering by worker, is not easy to plash bottom surface be blowed drying, and bridge pavement is done in reduction
The dry time, and worker is also not easy to be collected ponding recycling, and so that waste of resources is caused, therefore, it is necessary to set
A kind of drainage arrangement of bridge on highway is counted to solve the above problems.
Utility model content
Purpose of the utility model is to solve the deficiencies in the prior art, provide a kind of draining of bridge on highway
Device.
The utility model is achieved through the following technical solutions:
A kind of drainage arrangement of bridge on highway, including cylinder, the cylinder lower end is fixedly installed with to be connected therewith
The second fixed cover, cylinder side upper end is symmetrically provided with through-hole, and the cylinder inboard wall is uniformly fixedly installed with water suction
Layer, the cylinder top surface middle part is fixedly installed with guide ring, is fixedly installed with the second helical spring on the upside of the guide ring, described
Guide cylinder is socketed inside second helical spring, the guide cylinder surface is fixedly installed with transverse slat, the fixed peace in the guide cylinder lower end
Equipped with the first fixed cover being connected therewith, the guide cylinder upper end is fixedly installed with the blower being connected therewith, the blower
It being fixedly connected with the second helical spring, the blower surface is fixedly installed with cross bar, and the cross bar right end is fixedly installed with handle,
The blower two sides are symmetrically fixedly installed with fixed block, are fixedly installed with connecting rod on the outside of the fixed block, the connecting rod is another
One end is fixedly installed with first sleeve, and fixing sleeve is connected to vertical bar inside the first sleeve, is fixedly installed on the downside of the vertical bar
Fixed ring, the fixed ring downside are symmetrically arranged with block, are provided with fixed link, the fixed link other end on the downside of the block
It is fixedly installed with second sleeve, is fixedly installed with the first helical spring on the downside of the second sleeve, in first helical spring
Portion is socketed with supporting leg, and the supporting leg lower end is fixedly installed with U-frame, and the U-frame is fixedly connected with the first helical spring,
Idler wheel is fixedly installed with inside the U-frame.
As the optimal technical scheme of the utility model, the fixed ring and cylinder sleeve connection.
As the optimal technical scheme of the utility model, the water absorption layer is made of sponge material.
As the optimal technical scheme of the utility model, the width of the transverse slat is equal to the radius of cylinder.
As the optimal technical scheme of the utility model, the cylinder is fixedly connected with block and fixed link respectively.
As the optimal technical scheme of the utility model, the second sleeve and supporting leg sliding are socketed.
As the optimal technical scheme of the utility model, the guide ring and guide cylinder sleeve connection.
As the optimal technical scheme of the utility model, the described second fixed cover is made of rubber material.
Compared with prior art, the utility model has the beneficial effects that
The utility model is by setting cylinder, thus convenient close with external world's progress when draining to inner barrel rainwater
Envelope, avoids internal rainwater from splashing with construction personnel, more preferably protects to construction personnel, by the way that blower is arranged, consequently facilitating
The ponding on bridge surface is blown, is blowed convenient for road pavement, to accelerate the air circulation on road surface, fast implements bridge
The drying on beam road surface avoids rainwater from penetrating into inside bridge, increases the use of bridge to preferably realize the protection to bridge
Service life, in the cooperation for adding water absorption layer, consequently facilitating quickly absorption collection is carried out to ponding, to preferably realize to rainwater
Recycling, more environmentally-friendly energy conservation is more laborsaving by being blown using wind-force to rainwater, by be arranged idler wheel, thus
It is arbitrarily moved convenient for position of the worker to device, carries out drain operation convenient for the ponding to bridge pavement different location, from
And the use when property of device being improved, and structure is simple, reasonable design, easy operation is worthy to be popularized.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
In figure: 1, blower, 2, fixed block, 3, connecting rod, 4, first sleeve, 5, cross bar, 6, handle, 7, vertical bar, 8, cylinder,
9, through-hole, 10, fixed ring, 11, block, 12, fixed link, 13, second sleeve, the 14, first helical spring, 15, supporting leg, 16, U
Shape frame, 17, idler wheel, the 18, first fixed cover, the 19, second fixed cover, 20, water absorption layer, 21, transverse slat, 22, guide cylinder, 23, guiding
Ring, the 24, second helical spring.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Referring to Fig. 1, the utility model provides a kind of technical solution:
A kind of drainage arrangement of bridge on highway, including cylinder 8,8 lower end of cylinder is fixedly installed with to connect therewith
The fixed cover 19 of logical second, the described second fixed cover 19 are made of rubber material, and the 8 side upper end of cylinder is symmetrically provided with
Through-hole 9,8 inner wall of cylinder are uniformly fixedly installed with water absorption layer 20, and the water absorption layer 20 is made of sponge material, the cylinder
Guide ring 23 is fixedly installed in the middle part of 8 top surfaces, is fixedly installed with the second helical spring 24 on the upside of the guide ring 23, described second
Guide cylinder 22 is socketed inside helical spring 24, the guide ring 23 and 22 sleeve connection of guide cylinder, 22 surface of guide cylinder are solid
Dingan County is equipped with transverse slat 21, and the width of the transverse slat 21 is equal to the radius of cylinder 8, and 22 lower end of guide cylinder is fixedly installed with therewith
The fixed cover 18 of first to be connected, 22 upper end of guide cylinder are fixedly installed with the blower 1 being connected therewith, the blower 1 with
Second helical spring 24 is fixedly connected, and 1 surface of blower is fixedly installed with cross bar 5, and 5 right end of cross bar is fixedly installed with hand
Handle 6,1 two sides of blower are symmetrically fixedly installed with fixed block 2, and connecting rod 3 is fixedly installed on the outside of the fixed block 2, described
3 other end of connecting rod is fixedly installed with first sleeve 4, and the 4 inside fixing sleeve of first sleeve is connected to vertical bar 7, under the vertical bar 7
Side is fixedly installed with fixed ring 10, the fixed ring 10 and 8 sleeve connection of cylinder, is symmetrically arranged with gear on the downside of the fixed ring 10
Block 11 is provided with fixed link 12 on the downside of the block 11, and the cylinder 8 is fixedly connected with block 11 and fixed link 12 respectively, institute
It states 12 other end of fixed link and is fixedly installed with second sleeve 13, be fixedly installed with the first helical spring on the downside of the second sleeve 13
14, supporting leg 15 is socketed with inside first helical spring 14, the second sleeve 13 is socketed with the sliding of supporting leg 15, described
15 lower end of supporting leg is fixedly installed with U-frame 16, and the U-frame 16 is fixedly connected with the first helical spring 14, the U-frame 16
Inside is fixedly installed with idler wheel 17.
Working principle: carrying out to device in use, worker pushes device, thus make idler wheel 17 on the ground into
Row rolls, convenient to move to the position of device, and device is pushed on the upside of bridge pavement puddle by worker, makes the second fixed cover
19 are located at right above puddle, and idler wheel 17 is located at puddle marginal position, and worker presses down on fixed link 12 at this time, make second to fix
Cover 19 and puddle EDGE CONTACT, since the second fixed cover 19 is made of rubber material, to make cylinder 8 seal with extraneous, then
Worker's one hand is held handle 6 and is pressed downwards, makes cross bar 5 that blower 1 be driven to move downward, so that blower 1 be made to push guide cylinder 22
It moves downward, makes guide cylinder 22 that the first fixed cover 18 be driven to be moved downwardly to the position with ponding face contact, worker is by wind at this time
The external power supply nearby of machine 1, so that blower 1 be made to work, the distinguished and admirable guide cylinder 22 that passes through blown out inside blower 1 is by first
When fixed cover 18 is blown to the ground, so that the impact force downward to puddle inside increases, it will impulse force is generated to ponding, it will
Ponding can be blown to 8 internal motion of cylinder, be internally provided with water absorption layer 20 plus cylinder 8, convenient for being absorbed to ponding, and
And ponding is blown by blower 1, the air-dried dynamics of road pavement is also preferably increased, it is more practical, it is received to ponding
After collection, device is shifted onto the position for needing water resource by worker, then rotational handle 6, and cross bar 5 will will drive blower 1 at this time
It horizontally rotates, while rotates guide cylinder 22 with motion plate 21, the position contacted with water absorption layer 20 is gone in transverse slat 21
It when setting, squeezes transverse slat 21 to water absorption layer 20, the ponding of internal gathering is discharged.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (8)
1. a kind of drainage arrangement of bridge on highway, including cylinder (8), it is characterised in that: the fixed peace in cylinder (8) lower end
Equipped with the second fixed cover (19) being connected therewith, cylinder (8) the side upper end is symmetrically provided with through-hole (9), the cylinder
Body (8) inner wall is uniformly fixedly installed with water absorption layer (20), is fixedly installed with guide ring (23), institute in the middle part of cylinder (8) top surface
It states and is fixedly installed with the second helical spring (24) on the upside of guide ring (23), guide cylinder is socketed inside second helical spring (24)
(22), guide cylinder (22) surface is fixedly installed with transverse slat (21), and guide cylinder (22) lower end is fixedly installed with phase therewith
The fixed cover (18) of first connected, guide cylinder (22) upper end is fixedly installed with the blower (1) being connected therewith, the blower
(1) it is fixedly connected with the second helical spring (24), blower (1) surface is fixedly installed with cross bar (5), and the cross bar (5) is right
End is fixedly installed with handle (6), and blower (1) two sides are symmetrically fixedly installed with fixed block (2), on the outside of the fixed block (2)
It is fixedly installed with connecting rod (3), connecting rod (3) other end is fixedly installed with first sleeve (4), the first sleeve (4)
Internal fixing sleeve is connected to vertical bar (7), is fixedly installed with fixed ring (10) on the downside of the vertical bar (7), on the downside of the fixed ring (10)
It is symmetrically arranged with block (11), is provided with fixed link (12) on the downside of the block (11), fixed link (12) other end is fixed
It is equipped with second sleeve (13), is fixedly installed with the first helical spring (14) on the downside of the second sleeve (13), first spiral shell
It is socketed with supporting leg (15) inside rotation spring (14), supporting leg (15) lower end is fixedly installed with U-frame (16), the U-shaped
Frame (16) is fixedly connected with the first helical spring (14), is fixedly installed with idler wheel (17) inside the U-frame (16).
2. a kind of drainage arrangement of bridge on highway according to claim 1, it is characterised in that: the fixed ring (10)
With cylinder (8) sleeve connection.
3. a kind of drainage arrangement of bridge on highway according to claim 1, it is characterised in that: the water absorption layer (20)
It is made of sponge material.
4. a kind of drainage arrangement of bridge on highway according to claim 1, it is characterised in that: the transverse slat (21)
Width is equal to the radius of cylinder (8).
5. a kind of drainage arrangement of bridge on highway according to claim 1, it is characterised in that: the cylinder (8) point
It is not fixedly connected with block (11) and fixed link (12).
6. a kind of drainage arrangement of bridge on highway according to claim 1, it is characterised in that: the second sleeve
(13) it is socketed with supporting leg (15) sliding.
7. a kind of drainage arrangement of bridge on highway according to claim 1, it is characterised in that: the guide ring (23)
With guide cylinder (22) sleeve connection.
8. a kind of drainage arrangement of bridge on highway according to claim 1, it is characterised in that: the described second fixed cover
(19) it is made of rubber material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820706198.9U CN208430429U (en) | 2018-05-11 | 2018-05-11 | A kind of drainage arrangement of bridge on highway |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820706198.9U CN208430429U (en) | 2018-05-11 | 2018-05-11 | A kind of drainage arrangement of bridge on highway |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208430429U true CN208430429U (en) | 2019-01-25 |
Family
ID=65102661
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820706198.9U Expired - Fee Related CN208430429U (en) | 2018-05-11 | 2018-05-11 | A kind of drainage arrangement of bridge on highway |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208430429U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113774940A (en) * | 2021-10-21 | 2021-12-10 | 浙江恒山建设有限公司 | Deep foundation pit dewatering construction device and construction method |
-
2018
- 2018-05-11 CN CN201820706198.9U patent/CN208430429U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113774940A (en) * | 2021-10-21 | 2021-12-10 | 浙江恒山建设有限公司 | Deep foundation pit dewatering construction device and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110403537B (en) | Multifunctional floor cleaner | |
CN206448209U (en) | A kind of town road guard bar washing device of rinse water recycling | |
CN210712687U (en) | Multifunctional floor cleaner | |
CN201186742Y (en) | Water surface refuse cleaning and collecting boat | |
CN206552004U (en) | A kind of cleaning device of New-energy electric vehicle | |
CN204950822U (en) | Reverse self -cleaning formula ground cleaning cart | |
CN112376675A (en) | Sponge city seepage and drainage structure and water circulation system | |
CN103142193A (en) | Simple self-cleaning mopping cart | |
CN208430429U (en) | A kind of drainage arrangement of bridge on highway | |
CN210795986U (en) | Rainwater collection device of green building | |
CN206202264U (en) | A kind of urban environmental protection slag-soil truck roof automatic dust removing apparatus | |
CN212357911U (en) | Road surface curing means is used in bridge construction | |
CN210529584U (en) | Road and bridge belt cleaning device | |
CN211107339U (en) | Water-saving wheel washing machine | |
CN209277063U (en) | A kind of high-pressure wash is automobile-used to sweep dirt device | |
CN107100125A (en) | A kind of Novel transverse axial winding drum formula road surface cleaning device | |
CN205627260U (en) | Filter is collected to environmental protection rainwater | |
CN211340963U (en) | Rainwater collection and comprehensive utilization equipment | |
CN213142903U (en) | Highway guardrail belt cleaning device | |
CN211340604U (en) | Conveying mechanism of electric sweeper | |
CN209072415U (en) | The connection of the multiple rows of solar energy photovoltaic panel of walking robot becomes rail mechanism | |
CN113445453A (en) | Blind road cleaning equipment based on automatic water conservation of axis of rotation | |
CN217949215U (en) | Environment-friendly building economizer | |
CN216026917U (en) | Automatic reverse rotation and cleaning device for garbage can | |
CN214256218U (en) | Swing type solar photovoltaic panel self-cleaning device with rainwater collection mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190125 Termination date: 20200511 |
|
CF01 | Termination of patent right due to non-payment of annual fee |