CN208408004U - A kind of underground sewage collection interception system - Google Patents

A kind of underground sewage collection interception system Download PDF

Info

Publication number
CN208408004U
CN208408004U CN201820456989.0U CN201820456989U CN208408004U CN 208408004 U CN208408004 U CN 208408004U CN 201820456989 U CN201820456989 U CN 201820456989U CN 208408004 U CN208408004 U CN 208408004U
Authority
CN
China
Prior art keywords
wall
intercepting
capturing
collects
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820456989.0U
Other languages
Chinese (zh)
Inventor
刘瀚和
胡虎
曾宪坤
汪金卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nerin Engineering Co Ltd
Original Assignee
China Nerin Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nerin Engineering Co Ltd filed Critical China Nerin Engineering Co Ltd
Priority to CN201820456989.0U priority Critical patent/CN208408004U/en
Application granted granted Critical
Publication of CN208408004U publication Critical patent/CN208408004U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

A kind of underground sewage provided by the utility model collects interception system, including intercepts and captures wall, collects well and connecting tube, and the wall of intercepting and capturing is the slot for excavating stratum and being formed;For the collection well location in the intercepting and capturing wall center, bottom depth is lower than the intercepting and capturing wall, offers aperture on the collection well borehole wall;The connecting tube passes through the aperture opened up on the collection well borehole wall and extends to the intercepting and capturing wall, and is sealed by sealing rod.System provided by the utility model, gang of wells, drainage pipe facility compared to the prior art, with more preferably collecting function, especially when sewage water-bearing layer is the poor stratum of the water penetrations such as silty clay or clay, capacity gauge of the capacity gauge up to the existing utilities hundreds of times such as gang of wells, drainage pipe.Underground sewage provided by the utility model, which collects interception system, can be used the completion of digging up and filling in form, and connecting tube uses reservation mode, construction is simple, short time limit, and low cost is easy to industrialization promotion.

Description

A kind of underground sewage collection interception system
Technical field
The utility model relates to environment protection fields, more particularly to one kind is used for Industrial Wasteland, solid waste focuses on field, Refuse landfill and stratum permeability is poor, sewage collecting of the more consistent contaminated site in seepage action of ground water direction is intercepted and captured System.
Background technique
Since reform and opening-up, China's economy is always maintained at higher growth rate, but develops due to failing to be effectively treated Contradiction between economical and environmentally friendly, environmental pollution is also increasingly severe, and soil pollution and underground water pollution problem become increasingly conspicuous.Its In, typical contaminated site includes that industrial (chemical industry, mining industry, Metallurgy Industry) discards ground, solid waste centrally disposes place, Rare Earth Mine Area etc..
China increasingly reinforces the improvement to environment in recent years, and the improvement reparation of contaminated site is increasingly paid attention to by all circles, Middle underground water pollution and the technology of reparation are also together in groping and developing.At present in underground water pollution control engineer application, Through downstream, then existing frequently with vertical seepage control body (such as grout curtain, mud wall, plastic concrete wall) barrier subsurface flow Its internal setting pumped well collects interception system as underground sewage.
Conventional underground sewage is collected interception system and is mainly formed by individually permeating well or gang of wells, in some engineer applications Also using radiation drainage pipe as a measure for expanding its capacity gauge.As the poor (k=10- of underground sewage permeability of aquifer 5cm/s rank) when, the capacity gauge of this conventional collection interception system is extremely limited.
Summary of the invention
In order to solve the above technical problems, the utility model provides a kind of underground sewage collection interception system, including intercept and capture Wall collects well and connecting tube, and the wall of intercepting and capturing is the slot for excavating stratum and being formed;The collection well location is in the intercepting and capturing wall center Position, bottom depth are lower than the intercepting and capturing wall, offer aperture on the collection well borehole wall;The connecting tube passes through the collection The aperture opened up on the well borehole wall extends to the intercepting and capturing wall, and is sealed by sealing rod.
Wherein, the collection interception system and the system combined use of vertical impermeable wall, are set to the vertical impermeable wall system At 3 ~ 8 meters of upstream of system.
Wherein, the intercepting and capturing wall width is 40 ~ 80cm, and depth is 5 ~ 8m, and bottom is arranged slope aspect and collects the well gradient, slope ratio It is 2% ~ 5%.
Wherein, the intercepting and capturing are filled with coarse granule sandy gravel or gravel rubble within the walls.
Wherein, the intercepting and capturing are additionally provided with one layer of non-woven geotextile within the walls.
Wherein, the collection well internal diameter is 2 ~ 3m, and bottom depth is lower than the intercepting and capturing wall 2 ~ 5m of bottom.
Wherein, for the connecting tube along the collection well short transverse arranged for interval, spacing distance is 1 ~ 2m.
Wherein, the connecting tube uses high density polyethylene (HDPE) material.
The utility model has the beneficial effects that
Underground sewage collection interception system provided by the utility model, gang of wells, drainage pipe facility compared to the prior art, With more preferably collecting function, especially when sewage water-bearing layer is the poor stratum of the water penetrations such as silty clay or clay, receive Capacity gauge of the collection ability up to the existing utilities hundreds of times such as gang of wells, drainage pipe.Underground sewage provided by the utility model is collected Interception system can be used digging up and filling in form completion, connecting tube use reservation mode, construction is simple, short time limit, low cost, easily In industrialization promotion.
Detailed description of the invention
It, below will be to needing attached drawing to be used in embodiment in order to illustrate more clearly of the technical solution of the utility model It is briefly described, it should be apparent that, the accompanying drawings in the following description is only some embodiments of the utility model, corresponds to this For the those of ordinary skill in field, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing.
Fig. 1 is the schematic diagram of the section structure that underground sewage provided by the embodiment of the utility model collects interception system;
Wall is intercepted and captured in Fig. 2 underground sewage collection interception system provided by the embodiment of the utility model and the part of collection well is put Big structure schematic diagram;
Title corresponding to appended drawing reference in attached drawing are as follows: 1- intercepts and captures wall, and 2- collects well, 3- connecting tube, 4- sealing rod.
Specific embodiment
It is preferred embodiments of the present invention below, it is noted that for those skilled in the art For, without departing from the principle of this utility model, several improvements and modifications can also be made, these improvements and modifications It is considered as the protection scope of the utility model.
Embodiment 1
The utility model provides a kind of underground sewage collection interception system, as depicted in figs. 1 and 2, including intercepting and capturing wall 1, Well 2 and connecting tube 3 are collected, the wall 1 of intercepting and capturing is the slot for excavating stratum and being formed, and 1 width of intercepting and capturing wall is 60cm, and depth is 5m, bottom are arranged slope aspect and collect the well gradient, and slope ratio is 3%, is filled with coarse granule sandy gravel or gravel rubble in the intercepting and capturing wall 1;Institute It states collection well 2 and is located at 1 center of intercepting and capturing wall, internal diameter 2m, bottom depth is lower than the 1 bottom 3m of intercepting and capturing wall, described It collects and offers aperture on 2 borehole wall of well;The aperture that the connecting tube 3 opens up on collection 2 borehole wall of well extends to described Wall 1 is intercepted and captured, along the 2 short transverse arranged for interval of collection well, spacing distance 1.2m, and is sealed by sealing rod 4, the company 3 caliber of adapter tube is DN110, and length 1m, material is high density polyethylene (HDPE).
It is described collect interception system construction method the following steps are included:
A. the waste material in pollution of surface place and plain fill are removed and is properly banked up, excavate 1.5m, the earth material being excavated It is backfilled for the later period;
B. opening up width is 60cm, and the slot that depth is 5m is received as wall 1,1 bottom of the intercepting and capturing wall setting slope aspect is intercepted and captured Collect the well gradient, slope ratio is 3%, using steel plate retaining wall when opening up slot;
C. sand gravel body, then backfill are first backfilled after slot opens up, while backfilling part graded sand in groove top upright position Gravel guarantees that sand gravel overall height is not less than 7m;
D. it in 1 center of intercepting and capturing wall, is constructed using drop shaft sinking and collects well 2, the collection well 2 is reinforced concrete Structure, internal diameter 2m, bottom depth are lower than the 1 bottom 3m of intercepting and capturing wall, offer aperture on 2 borehole wall of collection well;
E. connecting tube 3 passes through the aperture opened up on collection 2 borehole wall of well and extends to the intercepting and capturing wall 1, uses at aperture Sealing rod 4 seals, and the connecting tube 3 is along the 2 short transverse arranged for interval of collection well, spacing distance 1.2m;
F. it after the completion of constructing, is backfilled using the earth material that step A is excavated, while backfilling sand gravel Water permeable body.
Embodiment 2
The utility model provides a kind of underground sewage collection interception system, as depicted in figs. 1 and 2, including intercepting and capturing wall 1, Well 2 and connecting tube 3 are collected, the wall 1 of intercepting and capturing is the slot for excavating stratum and being formed, and 1 width of intercepting and capturing wall is 50cm, and depth is 6m, bottom are arranged slope aspect and collect the well gradient, and slope ratio is 2%, is filled with coarse granule sandy gravel or gravel rubble in the intercepting and capturing wall 1;Institute It states collection well 2 and is located at 1 center of intercepting and capturing wall, internal diameter 2.5m, bottom depth is lower than the 1 bottom 4m of intercepting and capturing wall, institute It states to collect and offers aperture on 2 borehole wall of well;The connecting tube 3 passes through the aperture opened up on collection 2 borehole wall of well and extends to institute It states and intercepts and captures wall 1, along the 2 short transverse arranged for interval of collection well, spacing distance 1m, and sealed by sealing rod 4, the company 3 caliber of adapter tube is DN110, and length 1m, material is high density polyethylene (HDPE).
It is described collect interception system construction method the following steps are included:
A. the waste material in pollution of surface place and plain fill are removed and is properly banked up, excavate 2m, the earth material being excavated is used It is backfilled in the later period;
B. opening up width is 50cm, and the slot that depth is 6m is received as wall 1,1 bottom of the intercepting and capturing wall setting slope aspect is intercepted and captured Collect the well gradient, slope ratio is 2%, using steel plate retaining wall when opening up slot;
C. sand gravel body, then backfill are first backfilled after slot opens up, while backfilling part graded sand in groove top upright position Gravel guarantees that sand gravel overall height is not less than 7m;
D. it in 1 center of intercepting and capturing wall, is constructed using drop shaft sinking and collects well 2, the collection well 2 is reinforced concrete Structure, internal diameter 2.5m, bottom depth are lower than the 1 bottom 4m of intercepting and capturing wall, offer aperture on 2 borehole wall of collection well;
E. connecting tube 3 passes through the aperture opened up on collection 2 borehole wall of well and extends to the intercepting and capturing wall 1, uses at aperture Sealing rod 4 seals, and the connecting tube 3 is along the 2 short transverse arranged for interval of collection well, spacing distance 1m;
F. it after the completion of constructing, is backfilled using the earth material that step A is excavated, while backfilling sand gravel Water permeable body.
Embodiment 3
The utility model provides a kind of underground sewage collection interception system, as depicted in figs. 1 and 2, including intercepting and capturing wall 1, Well 2 and connecting tube 3 are collected, the wall 1 of intercepting and capturing is the slot for excavating stratum and being formed, and 1 width of intercepting and capturing wall is 40cm, and depth is 7m, bottom are arranged slope aspect and collect the well gradient, and slope ratio is 4%, is filled with coarse granule sandy gravel or gravel rubble in the intercepting and capturing wall 1;Institute It states collection well 2 and is located at 1 center of intercepting and capturing wall, internal diameter 3m, bottom depth is lower than the 1 bottom 3.5m of intercepting and capturing wall, institute It states to collect and offers aperture on 2 borehole wall of well;The connecting tube 3 passes through the aperture opened up on collection 2 borehole wall of well and extends to institute It states and intercepts and captures wall 1, along the 2 short transverse arranged for interval of collection well, spacing distance 1.8m, and sealed by sealing rod 4, it is described 3 caliber of connecting tube is DN110, and length 1m, material is high density polyethylene (HDPE);The collection interception system and vertical impermeable wall system System is used in combination, and is set at 5 meters of the vertical impermeable wall system upstream.
It is described collect interception system construction method the following steps are included:
A. the waste material in pollution of surface place and plain fill are removed and is properly banked up, excavate 2.5m, the earth material being excavated It is backfilled for the later period;
B. opening up width is 40cm, and the slot that depth is 7m is received as wall 1,1 bottom of the intercepting and capturing wall setting slope aspect is intercepted and captured Collect the well gradient, slope ratio is 4%, using steel plate retaining wall when opening up slot;
C. sand gravel body, then backfill are first backfilled after slot opens up, while backfilling part graded sand in groove top upright position Gravel guarantees that sand gravel overall height is not less than 7m;
D. it in 1 center of intercepting and capturing wall, is constructed using drop shaft sinking and collects well 2, the collection well 2 is reinforced concrete Structure, internal diameter 3m, bottom depth are lower than the 1 bottom 3.5m of intercepting and capturing wall, offer aperture on 2 borehole wall of collection well;
E. connecting tube 3 passes through the aperture opened up on collection 2 borehole wall of well and extends to the intercepting and capturing wall 1, uses at aperture Sealing rod 4 seals, and the connecting tube 3 is along the 2 short transverse arranged for interval of collection well, spacing distance 1.8m;
F. it after the completion of constructing, is backfilled using the earth material that step A is excavated, while backfilling sand gravel Water permeable body.
Embodiment 4
The utility model provides a kind of underground sewage collection interception system, as depicted in figs. 1 and 2, including intercepting and capturing wall 1, Well 2 and connecting tube 3 are collected, the wall 1 of intercepting and capturing is the slot for excavating stratum and being formed, and 1 width of intercepting and capturing wall is 65cm, and depth is 6.5m, bottom are arranged slope aspect and collect the well gradient, and slope ratio is 3%, are filled with coarse granule sandy gravel or gravel rubble in the intercepting and capturing wall 1, It is additionally provided with one layer of non-woven geotextile simultaneously;The collection well 2 is located at 1 center of intercepting and capturing wall, internal diameter 3m, bottom depth Lower than the 1 bottom 3.5m of intercepting and capturing wall, aperture is offered on 2 borehole wall of collection well;The connecting tube 3 passes through the collection The aperture opened up on 2 borehole wall of well extends to the intercepting and capturing wall 1, and along the 2 short transverse arranged for interval of collection well, spacing distance is 1.6m, and sealed by sealing rod 4,3 caliber of connecting tube is DN110, and length 1m, material is high density polyethylene (HDPE).
It is described collect interception system construction method the following steps are included:
A. the waste material in pollution of surface place and plain fill are removed and is properly banked up, excavate 1.8m, the earth material being excavated It is backfilled for the later period;
B. opening up width is 65cm, and slope aspect is arranged as wall 1,1 bottom of intercepting and capturing wall is intercepted and captured in the slot that depth is 6.5m The well gradient is collected, slope ratio is 3%, using steel plate retaining wall when opening up slot;
C. sand gravel body, then backfill are first backfilled after slot opens up, while backfilling part graded sand in groove top upright position Gravel guarantees that sand gravel overall height is not less than 7m;
D. it in 1 center of intercepting and capturing wall, is constructed using drop shaft sinking and collects well 2, the collection well 2 is reinforced concrete Structure, internal diameter 3m, bottom depth are lower than the 1 bottom 3.5m of intercepting and capturing wall, offer aperture on 2 borehole wall of collection well;
E. connecting tube 3 passes through the aperture opened up on collection 2 borehole wall of well and extends to the intercepting and capturing wall 1, uses at aperture Sealing rod 4 seals, and the connecting tube 3 is along the 2 short transverse arranged for interval of collection well, spacing distance 1.6m;
F. it after the completion of constructing, is backfilled using the earth material that step A is excavated, while backfilling sand gravel Water permeable body.
Embodiment 5
The utility model provides a kind of underground sewage collection interception system, as depicted in figs. 1 and 2, including intercepting and capturing wall 1, Well 2 and connecting tube 3 are collected, the wall 1 of intercepting and capturing is the slot for excavating stratum and being formed, and 1 width of intercepting and capturing wall is 50cm, and depth is 7m, bottom are arranged slope aspect and collect the well gradient, and slope ratio is 4%, is filled with coarse granule sandy gravel or gravel rubble in the intercepting and capturing wall 1, together When be additionally provided with one layer of non-woven geotextile;The collection well 2 is located at 1 center of intercepting and capturing wall, internal diameter 2m, and bottom depth is low In offering aperture on the 1 bottom 4m of intercepting and capturing wall, 2 borehole wall of collection well;The connecting tube 3 passes through the collection Jing2Jing The aperture opened up on wall extends to the intercepting and capturing wall 1, along the 2 short transverse arranged for interval of collection well, spacing distance 1m, and It is sealed by sealing rod 4,3 caliber of connecting tube is DN110, and length 1m, material is high density polyethylene (HDPE);Described collect is cut System and the system combined use of vertical impermeable wall are obtained, is set at 5 meters of the vertical impermeable wall system upstream.
It is described collect interception system construction method the following steps are included:
A. the waste material in pollution of surface place and plain fill are removed and is properly banked up, excavate 2.2m, the earth material being excavated It is backfilled for the later period;
B. opening up width is 50cm, and the slot that depth is 7m is received as wall 1,1 bottom of the intercepting and capturing wall setting slope aspect is intercepted and captured Collect the well gradient, slope ratio is 4%, using steel plate retaining wall when opening up slot;
C. sand gravel body, then backfill are first backfilled after slot opens up, while backfilling part graded sand in groove top upright position Gravel guarantees that sand gravel overall height is not less than 7m;
D. it in 1 center of intercepting and capturing wall, is constructed using drop shaft sinking and collects well 2, the collection well 2 is reinforced concrete Structure, internal diameter 2m, bottom depth are lower than the 1 bottom 4m of intercepting and capturing wall, offer aperture on 2 borehole wall of collection well;
E. connecting tube 3 passes through the aperture opened up on collection 2 borehole wall of well and extends to the intercepting and capturing wall 1, uses at aperture Sealing rod 4 seals, and the connecting tube 3 is along the 2 short transverse arranged for interval of collection well, spacing distance 1m;
F. it after the completion of constructing, is backfilled using the earth material that step A is excavated, while backfilling sand gravel Water permeable body.
Underground sewage provided by the utility model is collected in interception system and is provided with pumping system, by the underground being collected into dirt Water extraction centralized processing.
Above embodiments only express the several embodiments of the utility model, and the description thereof is more specific and detailed, but simultaneously Therefore it cannot be interpreted as that a limitation on the scope of the patent of the present invention.It should be pointed out that for the ordinary skill of this field For personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these all belong to The protection scope of the utility model.Therefore, the scope of protection shall be subject to the appended claims for the utility model patent.

Claims (8)

1. a kind of underground sewage collects interception system, including intercepts and captures wall, collects well and connecting tube, it is characterised in that: the intercepting and capturing Wall is the slot for excavating stratum and being formed;The collection well location is lower than the intercepting and capturing in the intercepting and capturing wall center, bottom depth Wall offers aperture on the collection well borehole wall;The connecting tube passes through the aperture opened up on the collection well borehole wall and extends to The intercepting and capturing wall, and sealed by sealing rod.
2. a kind of underground sewage according to claim 1 collects interception system, it is characterised in that: the collection interception system With the system combined use of vertical impermeable wall, it is set at 3 ~ 8 meters of the vertical impermeable wall system upstream.
3. a kind of underground sewage according to claim 1 collects interception system, it is characterised in that: the intercepting and capturing wall width is 40 ~ 80cm, depth are 5 ~ 8m, and bottom is arranged slope aspect and collects the well gradient, and slope ratio is 2% ~ 5%.
4. a kind of underground sewage according to claim 1 collects interception system, it is characterised in that: the intercepting and capturing are filled within the walls Coarse granule sandy gravel or gravel rubble.
5. a kind of underground sewage according to claim 4 collects interception system, it is characterised in that: the intercepting and capturing are also set within the walls There is one layer of non-woven geotextile.
6. a kind of underground sewage according to claim 1 collects interception system, it is characterised in that: the collection well internal diameter is 2 ~ 3m, bottom depth are lower than the intercepting and capturing wall 2 ~ 5m of bottom.
7. a kind of underground sewage according to claim 1 collects interception system, it is characterised in that: the connecting tube is described in Well short transverse arranged for interval is collected, spacing distance is 1 ~ 2m.
8. a kind of underground sewage according to claim 1 collects interception system, it is characterised in that: the connecting tube is using high Density polyethylene material.
CN201820456989.0U 2018-04-03 2018-04-03 A kind of underground sewage collection interception system Active CN208408004U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820456989.0U CN208408004U (en) 2018-04-03 2018-04-03 A kind of underground sewage collection interception system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820456989.0U CN208408004U (en) 2018-04-03 2018-04-03 A kind of underground sewage collection interception system

Publications (1)

Publication Number Publication Date
CN208408004U true CN208408004U (en) 2019-01-22

Family

ID=65118451

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820456989.0U Active CN208408004U (en) 2018-04-03 2018-04-03 A kind of underground sewage collection interception system

Country Status (1)

Country Link
CN (1) CN208408004U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108687096A (en) * 2018-04-03 2018-10-23 中国瑞林工程技术有限公司 A kind of underground sewage collects interception system and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108687096A (en) * 2018-04-03 2018-10-23 中国瑞林工程技术有限公司 A kind of underground sewage collects interception system and its construction method

Similar Documents

Publication Publication Date Title
Li et al. Case studies of groundwater flow into tunnels and an innovative water-gathering system for water drainage
CN110195430A (en) A kind of anti-stacking pressure construction of soft soil treatment method of multidimensional sealing space vacuum water diversion
Holtz et al. Stabilization of soil slopes
CN109593957A (en) A kind of active method for extracting of in-situ leaching ion type rareearth ore
CN110485436A (en) Engineering slurry and dregs alternating layers backfill pit foundation structure and reconstruction ground based method
CN103967015B (en) A kind of water seal for deep foundation pit excavation method and structure thereof
Mrvík et al. Experience with treatment of road structure landslides by innovative methods of deep drainage
CN208408004U (en) A kind of underground sewage collection interception system
CN107165181A (en) It is a kind of that there is the subway foundation pit dewatering well for monitoring depressurization
CN105951860A (en) Slanting freezing bottom-making water stop structure for interior and side faces of underground excavated foundation pit and method
CN103276717B (en) The method of composite earthwork synthetic materials reinforcement cushion soft soil foundation
CN105112652A (en) Structure of channel for recovering in-situ leaching mother solution of rare earth ore
CN203602980U (en) Flake rubble stack reinforced soil composite embankment structure
CN106120827A (en) Freeze to make end water-bound and method inside a kind of sensitizing range, city tunneling foundation ditch
CN201778330U (en) Clay water-stop curtain wall
CN204418232U (en) A kind of leakage preventing structure being applied to petroleum chemical industry sewage reservoir
CN215290068U (en) Large-area electroosmosis separation well point dewatering system for soft soil foundation
CN204919578U (en) Vacuum tubular well precipitation system under special geological conditions
CN108687096A (en) A kind of underground sewage collects interception system and its construction method
CN114293596A (en) Vertical seepage-proofing process for large garbage mountain
Urciuoli et al. Subsurface drainage for slope stabilization
CN205907697U (en) City sensitizing range is secretly dug foundation ditch inside and is freezed to make end water structure
Alexandris et al. Remediation of the Pissouri landslide in Cyprus
CN207193993U (en) A kind of subway foundation pit dewatering well with monitoring depressurization
Yin et al. Analysis of rainfall erosion and protective measures for the aeolian sand subgrade slope of the wuma expressway

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant