CN208396335U - A kind of high-building frame-climbing safety hook - Google Patents
A kind of high-building frame-climbing safety hook Download PDFInfo
- Publication number
- CN208396335U CN208396335U CN201820981309.7U CN201820981309U CN208396335U CN 208396335 U CN208396335 U CN 208396335U CN 201820981309 U CN201820981309 U CN 201820981309U CN 208396335 U CN208396335 U CN 208396335U
- Authority
- CN
- China
- Prior art keywords
- fixed link
- guide rail
- platform
- fixedly connected
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of high-building frame-climbing safety hooks, including guide rail, the side side wall of the guide rail is fixedly connected with wall, the roof of the wall is connected with hydraulic pump in turn in the horizontal direction, brake, controller and fixed block, fixed link one is connected between the roof and fixed block of the guide rail, side wall of the guide rail far from fixed link one is connected with fixed link two and haul platform in turn along the vertical direction, pressure inductor is installed in the fixed link one and fixed link two, the guide rail and fixed link two, the junction of haul platform is connected separately with sliding block one and sliding block two, guardrail is fixedly connected at the top of the haul platform, the junction of the guardrail and fixed link two is fixedly connected with link.The utility model structure is simple, easy to operate, realizes the construction platform function to different floors, and automatic to convey construction material safeguard work personnel safety, overweight monitoring protects construction platform to stablize.
Description
Technical field
The utility model relates to building safety equipment technical fields more particularly to a kind of skyscraper platform to prevent the dress that falls
It sets.
Background technique
In the construction of tier building, after floor structure sizing, it is still necessary to convey construction material, general feelings to each floor
It is transported by tower crane to construction platform under condition, but multiple floors require construction material, this is difficult to be arranged simultaneously more
Locate construction platform, reduces working efficiency.
Current construction platform is fixed and after construction material transport up, conveys the trouble compared, it is easy to
Construction equipment is caused to fall the even injures and deaths that cause damages, and current construction platform load-bearing does not have real-time monitoring, it is easy to super
Accident occurs for weight, and the biggish construction material of some weight is easy to damage platform, while also very inconvenient when discharging,
Staff will take action on one's own, and have very big security risk.
According to the above problem, it is flat that the utility model designs a kind of building with vibration damping, protection, monitoring and transportation function
Platform.
Utility model content
Purpose of the utility model is to solve the problems that overweight transport in the prior art and construction platform are fixed, and mention
A kind of high-building frame-climbing safety hook out.
To achieve the goals above, the utility model adopts the technical scheme that
The side side wall of a kind of high-building frame-climbing safety hook, including guide rail, the guide rail is fixedly connected with wall
Body, the roof of the wall are connected with hydraulic pump, brake, controller and fixed block in turn in the horizontal direction, the guide rail
Fixed link one is connected between roof and fixed block, side wall of the guide rail far from fixed link one is connected in turn along the vertical direction
Fixed link two and haul platform are installed with pressure inductor, the guide rail and fixation in the fixed link one and fixed link two
Bar two, haul platform junction be connected separately with sliding block one and sliding block two, be fixedly connected with shield at the top of the haul platform
The junction of column, the guardrail and fixed link two is fixedly connected with link, and the bottom wall of the haul platform is fixedly connected with transmission
Band, the inner wall of the conveyer belt are fixedly connected with multiple equidistant springs perpendicular to conveyer belt bottom wall, and the haul platform is remote
Side wall from guide rail is fixedly connected with motor.
Preferably, the controller uses 80C51 programmable single chip computer, the output end and hydraulic pump of the controller, system
The input terminal of motivation, pressure inductor and motor is electrically connected.
Preferably, the top of the haul platform is uniformly distributed fixed ring equipped with multiple, connects in each fixed ring
It is connected to safety rope.
Preferably, contractile protective net is installed at the top of the guardrail.
Preferably, the stiffness factor of the spring is every meter of 200-500 ox.
In the utility model, by the use of conveyer belt, realize the automation of transport, reduce manual cleaning there may be
Safety accident realize the buffering that counterweight object generates immense pressure, it is flat to effectively protect building by the use of spring
Platform effectively maintains the stabilization of construction platform by the use of fixed link one and fixed link two, to increase the safety of transport
Property, it by the design of guide rail, realizes the transportation function of construction platform, and the construction platform function of different floors, passes through pressure
The use of inductor realizes the detection to construction platform load-carrying, realizes the stability of transport, by the use of conveyer belt, mention
Conevying efficiency prevents construction material from falling by the use of guardrail and protective net, increases security performance, passes through fixed ring
Use with safety rope can not only be fixed construction material, while protection work people staff can be fixed
The safety of member.And it is not directed to part in the device and is the same as those in the prior art or can be realized by using the prior art, this reality
It is simple with new structure, it is easy to operate, realize the construction platform function to different floors, it is automatic to convey construction material safeguard work
Personnel safety, overweight monitoring, protection construction platform are stablized.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of high-building frame-climbing safety hook plan view;
Fig. 2 be the utility model proposes a kind of high-building frame-climbing safety hook top view.
In figure: 1 guide rail, 2 walls, 3 hydraulic pumps, 4 brakes, 5 controllers, 6 fixed blocks, 7 fixed links one, 8 fixed links two,
9 haul platforms, 91 fixed rings, 92 safety ropes, 10 pressure inductors, 11 sliding blocks one, 12 sliding blocks two, 13 guardrails, 14 links, 15 pass
Send band, 16 springs, 17 motors.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.
In the description of the present invention, it should be understood that term " on ", "lower", "front", "rear", "left", "right",
The orientation or positional relationship of the instructions such as "top", "bottom", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only
For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific
Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
Referring to Fig.1-2, the side side wall of a kind of high-building frame-climbing safety hook, including guide rail 1, guide rail 1 is fixed
It is connected with wall 2, the roof of wall 2 is connected with hydraulic pump 3, brake 4, controller 5 and fixed block 6 in turn in the horizontal direction,
Be connected with fixed link 1 between the roof and fixed block 6 of guide rail 1, side wall of the guide rail 1 far from fixed link 1 along the vertical direction according to
Secondary to be connected with fixed link 28 and haul platform 9, the top of haul platform 9 is uniformly distributed fixed ring 91, each fixation equipped with multiple
It is respectively connected with safety rope 92 on ring 91, construction material can not only be consolidated by the use of fixed ring 91 and safety rope 92
It is fixed, while the safety of protection staff staff can be fixed, it is installed in fixed link 1 and fixed link 28
There is pressure inductor 10, by the use of pressure inductor 10, realizes the detection to 9 load-carrying of construction platform, realize the steady of transport
It is qualitative, by the use of fixed link 1 and fixed link 28, effectively maintain the stabilization of construction platform 9, guide rail 1 and fixed link
28, the junction of haul platform 9 is connected separately with sliding block 1 and sliding block 2 12, and the top of haul platform 9 is fixedly connected with shield
Column 13, the top of guardrail 13 are installed in contractile protective net figure and are not drawn into, by the use of guardrail 13 and protective net, prevent
Construction material is fallen, and increases security performance, and the junction of guardrail 13 and fixed link 28 is fixedly connected with link 14, and haul is flat
The bottom wall of platform 9 is fixedly connected with conveyer belt 15, by the use of conveyer belt 15, realizes the automation of transport, reduction is manually unloaded
Expect issuable safety accident, the inner wall of conveyer belt 15 is fixedly connected with multiple equidistant bullets perpendicular to 15 bottom wall of conveyer belt
Spring 16 realizes the buffering that counterweight object generates immense pressure, effectively protects construction platform 9, bullet by the use of spring 16
The stiffness factor of spring 16 is every meter of 200-500 ox, and haul platform 9 is fixedly connected with motor 17, controller far from the side wall of guide rail 1
5 use 80C51 programmable single chip computer, the output end and hydraulic pump 3, brake 4, pressure inductor 10 and motor 17 of controller 5
Input terminal be electrically connected.
Working principle: in use, controlling the lifting of haul platform 9 by hydraulic pump 3, haul is supported by fixed link 8
Platform 9 realizes the stabilization of haul platform 9, realizes accurately parking for haul platform 9 by brake 4, haul platform 9 arrives at ground
Face transports to construction material on construction platform, and guardrail 13 stops cargo, and protective net prevents construction material from falling, fixed
Ring 91 and safety rope 92 also can guarantee the stabilization of construction material, and haul platform 9 is controlled via hydraulic pump 3, rise to formulation floor
When, brake 4 is braked, and the transport of material is realized by conveyer belt 15, and when overweight, spring 16 is buffered, and protects haul platform
9,10 early warning of pressure inductor, it is therefore prevented that the generation of safety accident.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not
It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this
Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model
Within enclosing.
Claims (5)
1. a kind of high-building frame-climbing safety hook, including guide rail (1), which is characterized in that the side side of the guide rail (1)
Wall is fixedly connected with wall (2), the roof of the wall (2) be connected in turn in the horizontal direction hydraulic pump (3), brake (4),
Controller (5) and fixed block (6) are connected with fixed link one (7) between the roof and fixed block (6) of the guide rail (1), described to lead
Rail (1) is connected with fixed link two (8) and haul platform (9) in turn far from the side wall of fixed link one (7) along the vertical direction, described solid
It is installed in fixed pole one (7) and fixed link two (8) pressure inductor (10), the guide rail (1) and fixed link two (8), haul
The junction of platform (9) is connected separately with sliding block one (11) and sliding block two (12), is fixedly connected at the top of the haul platform (9)
Have guardrail (13), the junction of the guardrail (13) and fixed link two (8) is fixedly connected with link (14), the haul platform
(9) bottom wall is fixedly connected with conveyer belt (15), the inner wall of the conveyer belt (15) be fixedly connected with it is multiple it is equidistant perpendicular to
The spring (16) of conveyer belt (15) bottom wall, the haul platform (9) are fixedly connected with motor (17) far from the side wall of guide rail (1).
2. a kind of high-building frame-climbing safety hook according to claim 1, which is characterized in that the controller
(5) 80C51 programmable single chip computer, the output end and hydraulic pump (3), brake (4), pressure sensitive of the controller (5) are used
The input terminal of device (10) and motor (17) is electrically connected.
3. a kind of high-building frame-climbing safety hook according to claim 1, which is characterized in that the haul platform
(9) top is uniformly distributed fixed ring (91) equipped with multiple, is respectively connected with safety rope (92) on each fixed ring (91).
4. a kind of high-building frame-climbing safety hook according to claim 1, which is characterized in that the guardrail (13)
Top be installed with contractile protective net.
5. a kind of high-building frame-climbing safety hook according to claim 1, which is characterized in that the spring (16)
Stiffness factor be every meter of 200-500 ox.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820981309.7U CN208396335U (en) | 2018-06-25 | 2018-06-25 | A kind of high-building frame-climbing safety hook |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820981309.7U CN208396335U (en) | 2018-06-25 | 2018-06-25 | A kind of high-building frame-climbing safety hook |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208396335U true CN208396335U (en) | 2019-01-18 |
Family
ID=65132155
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820981309.7U Expired - Fee Related CN208396335U (en) | 2018-06-25 | 2018-06-25 | A kind of high-building frame-climbing safety hook |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208396335U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113684937A (en) * | 2021-09-13 | 2021-11-23 | 王娅 | Assembled building external wall insulation board |
-
2018
- 2018-06-25 CN CN201820981309.7U patent/CN208396335U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113684937A (en) * | 2021-09-13 | 2021-11-23 | 王娅 | Assembled building external wall insulation board |
CN113684937B (en) * | 2021-09-13 | 2022-11-22 | 苏州百联节能科技股份有限公司 | Assembled building external wall insulation board |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202144437U (en) | Standing type single-person hanging seat device | |
CN102381611B (en) | Vertically-lifting hanging basket | |
CN105151942A (en) | Cage-separating type miner safety protection device and method for vertical shaft lifter rope-breakage cage-crashing accident | |
CN208396335U (en) | A kind of high-building frame-climbing safety hook | |
CN208814562U (en) | A kind of visualization formula glass curtain wall plate vertical transit system | |
CN104973544A (en) | Movable type single lifting basket | |
CN200985238Y (en) | Single column type single and double cage passenger-cargo two-purpose elevator | |
CN208249732U (en) | A kind of engineering gantry crane | |
CN103967263A (en) | Novel hydraulic automatic climbing discharging platform | |
CN208815411U (en) | Protection operation hoistable platform for the installation of round end type solid pier hanging basket | |
CN110593582A (en) | High-rise curtain wall installation auxiliary assembly with safety facility | |
CN213087488U (en) | Portable high elasticity construction safety protection network of supporting | |
CN104527656B (en) | Novel cargo ropeway protective screen device and control method thereof | |
CN202625671U (en) | Standard knot introduction platform of tower frame and tower frame provided with the same | |
CN105174094A (en) | Climbing assisting safety device of construction tower crane | |
CN205034952U (en) | Building site is with dismantling safe hanging flower basket | |
CN204980736U (en) | Dedicated pair of cage elevator of building site construction | |
CN205257685U (en) | Control system for elevator is fully loaded with straight | |
CN107973196A (en) | A kind of dual-purpose building hoist of traction-type people goods | |
CN202139007U (en) | Single hanging seat for overhead work | |
CN208500144U (en) | Bridge crane | |
CN203922500U (en) | The fall arrest horizontal safety rope device of operation on a kind of bridge crane track beam | |
CN208120498U (en) | A kind of counterweight system for elevator | |
CN207142602U (en) | A kind of steel cable guide Simple lifter for train loading building | |
CN206634949U (en) | A kind of building tower crane cat ladder and safeguard |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190118 Termination date: 20190625 |