A kind of underground water pipeline ventilation well construction
Technical field
The utility model relates to underground sewer field more particularly to a kind of underground water pipeline ventilation well constructions.
Background technique
The major function of urban sewage pipe is to collect the sewage of area along the line, and be delivered to downstream main pipe or sewage treatment
Factory.Sewer system includes: pipeline, inspection shaft, branch pipe and pipe-line system corollary apparatus.Enter corridor sewer system normal
Requirement is strictly closed to piping lane space under operation, and the exhaust gas in pipe-line system directly sends out piping lane by snorkel.Previous
Ventilation well construction operation not easy to overhaul, and it is unsatisfactory for the municipal sewage treatment demand increasingly increased.
Utility model content
The purpose of this utility model is that it is in view of the drawbacks of the prior art and insufficient, a kind of underground water pipeline ventilation knot is provided
Exhaust gas in pipe-line system can be discharged into piping lane by structure, the structure, meet pipe-line system requirement, and structure is simple, easy for construction.
A kind of in order to achieve the above purposes, the technical solution adopted by the utility model is: underground water pipeline ventilates well construction, institute
Ventilation well construction is stated to include concrete foundation bed course, concrete foundation, sewage conduct, ventilation well, anti-corrosion gasket, well lid, lead to
Tracheae, vent cap;Building on the concrete foundation bed course has concrete foundation, which is that top is equipped with semicircle
Groove;For the sewage conduct through in the semicircle groove of concrete foundation, which is the transport of underground water pipeline sewage
Plastic conduit;The ventilation well vertically build with sewage conduct on concrete foundation corresponding position, the ventilation well and sewage pipe
It is connected between road by spheroidal graphite cast-iron equal tee;The anti-corrosion gasket is layed at logical gas well mouth;The well lid is installing
Leading to the flange blind cover structure at gas well mouth on anti-corrosion gasket, which is provided with hole;The snorkel is bottom company
The steel-tube construction on well lid center hole is connect, piping lane position is connected at the top of the snorkel and is installed with vent cap.
The well preferably, sewage conduct is ventilated at 200m setting one.
The beneficial effects of the utility model are: the exhaust gas in pipe-line system can be discharged into piping lane by the structure, meet pipeline
System requirements, and structure is simple, it is easy for construction.
Detailed description of the invention
Attached drawing described herein is to be used to provide a further understanding of the present invention, and constitutes one of the application
Point, but do not constitute the restriction to the utility model.
Fig. 1 is ventilation well construction diagrammatic cross-section, and Fig. 2 is ventilation well construction elevational schematic view.
Wherein: 1 is concrete foundation bed course, and 2 be concrete foundation, and 3 be sewage conduct, and 4 be ventilation well, and 5 be anti-corrosion pad
Piece, 6 be well lid, and 7 be snorkel, and 8 be vent cap.
Specific embodiment
In conjunction with attached drawing, the utility model is described in further detail.
The well construction as shown, a kind of underground water pipeline is ventilated, the ventilation well construction includes concrete foundation bed course
1, concrete foundation 2, sewage conduct 3, ventilation well 4, anti-corrosion gasket 5, well lid 6, snorkel 7, vent cap 8;The concrete
Building on blinding layer 1 has concrete foundation 2, which is that top is equipped with semicircle groove;The sewage conduct 3 passes through
It is through in the semicircle groove of concrete foundation 2, which is that underground water pipeline sewage transports plastic conduit;The ventilation
Well 4 is vertically built and, with 2 corresponding position of concrete foundation, passes through ball between the ventilation well 4 and sewage conduct 3 on sewage conduct 3
Black cast iron equal tee connection;The anti-corrosion gasket 5 is layed at ventilation 4 well head of well;The well lid 6 is to be installed in ventilation well 4
Flange blind cover structure at well head on anti-corrosion gasket 5,6 center of well lid are provided with hole;The snorkel 7 is that bottom is connected to well
Steel-tube construction on 6 center hole of lid is connected to piping lane position at the top of the snorkel 7 and is installed with vent cap 8.
The well when it is implemented, sewage conduct 3 is ventilated at 200m setting one.
When practice of construction, concrete foundation 2 first is built by design requirement position on existed concrete bridge blinding layer 1, it should
2 jacking sewage conduct 3 of concrete foundation, and ventilation well 4 is built above sewage conduct 3, ventilation well 4 passes through with sewage conduct 3
Equal tee connection tries tritonope lid in ventilation 4 pithead position lid of well and does well lid 6, and installs between well lid 6 and ventilation well 4
Anti-corrosion gasket 5, finally the hole at 6 center of well lid connects upper snorkel 7 and the vent cap 8 in ventilation pipe end.