CN208383449U - A kind of leaving water temperature pressure initial value debugging system of thermostatic valve - Google Patents

A kind of leaving water temperature pressure initial value debugging system of thermostatic valve Download PDF

Info

Publication number
CN208383449U
CN208383449U CN201821096573.9U CN201821096573U CN208383449U CN 208383449 U CN208383449 U CN 208383449U CN 201821096573 U CN201821096573 U CN 201821096573U CN 208383449 U CN208383449 U CN 208383449U
Authority
CN
China
Prior art keywords
water
cold
hot
manufacturing machine
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821096573.9U
Other languages
Chinese (zh)
Inventor
邓杰华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kaao Trading Shanghai Co ltd
Original Assignee
Heshan Mai Cevine Sanitary Ware Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heshan Mai Cevine Sanitary Ware Co Ltd filed Critical Heshan Mai Cevine Sanitary Ware Co Ltd
Priority to CN201821096573.9U priority Critical patent/CN208383449U/en
Application granted granted Critical
Publication of CN208383449U publication Critical patent/CN208383449U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of leaving water temperature pressure initial value debugging systems of thermostatic valve, including circulating water loop, the circulating water loop includes test point water outlet, water storage box, water pump and the cooling tower concatenated with pipeline, for chilled water system, described includes cold water manufacturing machine, the cold water booster pump and cold for water tap of pipeline concatenation for chilled water system;Hot-water supply system, the hot-water supply system include the hot water manufacturing machine concatenated with pipeline, hot water booster pump and heat for water tap;The water pump is connect by second pipe with hot water manufacturing machine, and the cooling tower is connect by first pipe with cold water manufacturing machine.The leaving water temperature pressure initial value debugging system of the thermostatic valve, recirculated water path are changed to after flowing back to reservoir, and part is directly used for water heating machine, and the water conservancy project cooling-water machine for only entering cooling tower processing uses, and keep test macro more energy saving.

Description

A kind of leaving water temperature pressure initial value debugging system of thermostatic valve
Technical field
The utility model belongs to thermostatic valve parameter regulation the field of test technology, and in particular to a kind of leaving water temperature of thermostatic valve Pressure initial value debugging system.
Background technique
The thermostatic valve adjusted for hot and cold water reaches constant state when leaving the factory, and the water inlet of cold water and hot water respectively reaches Under scheduled temperature, hydraulic pressure, after thermostatic valve mixes, water outlet reaches certain hydraulic pressure and steady temperature, if the temperature of water outlet Degree, hydraulic pressure reaches range of set value, then is qualified products, otherwise the adjusting nut at the top of thermostatic valve is rotated and adjusted by staff If examination, still not up to standard through adjusting nut rotation debugging, is classified as waste product until up to standard.
Detection debugging system in the prior art, heat for water tap, it is cold for water tap and test point water outlet respectively with it is to be tested Thermostatic valve quick-make after tested, the hot water that test point water outlet is flowed out directly flows back to total reservoir, then by water pump Control into cold and hot water inlet system and take recirculated water from cooling tower so that the heat of recirculated water does not make full use of, again plus The hot water of test needs to reheat when the cooling water by cooling tower output when hot, could not be using caused by last test The heat of recirculated water causes the waste of heat.
Utility model content
The purpose of this utility model is to provide a kind of leaving water temperature pressure initial value debugging systems of thermostatic valve, to solve Power saving mentioned above in the background art.
To achieve the above object, the utility model provides the following technical solutions: at the beginning of a kind of leaving water temperature pressure of thermostatic valve Initial value debugging system, including
Circulating water loop, the circulating water loop include the test point water outlet concatenated with pipeline, water storage box, water pump and cold But water tower, for chilled water system, it is described for chilled water system include pipeline concatenation cold water manufacturing machine, cold water booster pump and cold water supply Nozzle;
Hot-water supply system, the hot-water supply system include that the hot water manufacturing machine concatenated with pipeline, hot water booster pump and heat supply Water tap;
The water pump is connect by second pipe with hot water manufacturing machine, the cooling tower pass through first pipe (24) with it is cold The connection of water manufacturing machine.
Further, the cold water booster pump and cold for being equipped with cold water pressure sensor on the pipeline that connects between water tap And cold water temperature sensor, the hot water booster pump and heat are for being equipped with hot water pressure sensor on the pipeline that connects between water tap And hot water temperature sensor, and cold water booster pump is connect by conducting wire with cold water frequency converter, hot water booster pump crosses conducting wire and hot water Frequency converter connection, the test point water outlet are equipped with leaving water temperature sensors and water flow sensor.
Further, the cold water manufacturing machine, hot water manufacturing machine, cold water frequency converter, hot water frequency converter, cold water pressure sensing Device, hot water pressure sensor, cold water temperature sensor, hot water temperature sensor, leaving water temperature sensors and water flow sensing Device passes through conducting wire and PLC is electrically connected.
Further, there is switch respectively on the first pipe and second pipe.
The technical effect and advantage of the utility model: the leaving water temperature pressure initial value debugging system of the thermostatic valve, circulation Water route is changed to after flowing back to reservoir, and part is directly used for water heating machine, only enters the water conservancy project cold water of cooling tower processing Machine uses, and keeps test macro more energy saving.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
In figure: 1 water pump, 2 water storage boxes, 3 cooling towers, 4 cold water manufacturing machines, 5 hot water manufacturing machines, 6 cold water frequency converters, 7 cold Water booster pump, 8 hot water booster pumps, 9 hot water frequency converters, 10 cold water pressure sensors, 11 hot water pressure sensors, 12 cold water temperatures Sensor, 13 hot water temperature sensors, 14 debugging products, 15 leaving water temperature sensors, 16PLC, water flow sensor 17.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe.
The utility model provides a kind of leaving water temperature pressure initial value debugging system of thermostatic valve as shown in Figure 1, packet Circulating water loop is included, which includes test point water outlet 21, water storage box 2, water pump 1 and the cooling water concatenated with pipeline Tower 3;
For chilled water system, this is for cold water manufacturing machine 4, cold water booster pump 7 and the cold confession that chilled water system includes that pipeline concatenates Water tap 22;Hot-water supply system, the hot-water supply system include that the hot water manufacturing machine 5 concatenated with pipeline, hot water booster pump 8 and heat supply water Nozzle 23;Water pump 1 is connect by second pipe 25 with hot water manufacturing machine 5, and cooling tower 3 passes through first pipe 24 and cold water manufacturing machine 4 connections.
Cold water booster pump 7 and cold for being equipped with cold water pressure sensor 10 and cold water temperature on the pipeline that connects between water tap 22 Sensor 12 is spent, hot water booster pump 8 and heat are for being equipped with hot water pressure sensor 11 and heat on the pipeline that connects between water tap 23 Water temperature sensor 13, cold water booster pump 7 connect by conducting wire with cold water frequency converter 6, hot water booster pump 8) mistake conducting wire and hot water Frequency converter 9 connects, and test point water outlet 21 is equipped with leaving water temperature sensors 15 and water flow sensor 17.
Cold water manufacturing machine 4, hot water manufacturing machine 5, cold water frequency converter 6, hot water frequency converter 9, cold water pressure sensor 10, hot water Pressure sensor 11, cold water temperature sensor 12, hot water temperature sensor 13, leaving water temperature sensors 15 and water flow sensing Device 17 is electrically connected by conducting wire and PLC16.
There is switch 27 respectively on first pipe 24 and second pipe 25.
Cold water outlet, hot water mouth and the water outlet of thermostatic valve 26 to be tested respectively with it is cold for water tap 22, heat for water tap 23 and Water outlet 21 connects:
12 ± 0.5L/min of water flow, recirculated water path are changed to after flowing back to reservoir, part directly for water heating machine use, only into The water for entering cooling tower processing is used for cooling-water machine, keeps test macro more energy saving.
Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention, it is not limited to this Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic It is equivalently replaced, within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on, It should be included within the scope of protection of this utility model.

Claims (4)

1. a kind of leaving water temperature pressure initial value debugging system of thermostatic valve, including
Circulating water loop, the circulating water loop include the test point water outlet (21) concatenated with pipeline, water storage box (2), water pump (1) and cooling tower (3);
For chilled water system, described includes cold water manufacturing machine (4), the cold water booster pump (7) and cold of pipeline concatenation for chilled water system For water tap (22);
Hot-water supply system, the hot-water supply system include hot water manufacturing machine (5), hot water booster pump (8) and the heat concatenated with pipeline For water tap (23);
It is characterized by:
The water pump (1) is connect by second pipe (25) with hot water manufacturing machine (5), and the cooling tower (3) passes through the first pipe Road (24) is connect with cold water manufacturing machine (4).
2. a kind of leaving water temperature pressure initial value debugging system of thermostatic valve according to claim 1, it is characterised in that: institute State cold water booster pump (7) and cold for being equipped with cold water pressure sensor (10) and cold water temperature on the pipeline that connects between water tap (22) It spends sensor (12), the hot water booster pump (8) and heat are for being equipped with heat hydraulic pressure's biography on the pipeline that connects between water tap (23) Sensor (11) and hot water temperature sensor (13), the cold water booster pump (7) are connect by conducting wire with cold water frequency converter (6), institute It states hot water booster pump (8) to connect by conducting wire with hot water frequency converter (9), the test point water outlet (21) is equipped with leaving water temperature Sensor (15) and water flow sensor (17).
3. a kind of leaving water temperature pressure initial value debugging system of thermostatic valve according to claim 2, it is characterised in that: institute State cold water manufacturing machine (4), hot water manufacturing machine (5), cold water frequency converter (6), hot water frequency converter (9), cold water pressure sensor (10), Hot water pressure sensor (11), cold water temperature sensor (12), hot water temperature sensor (13), leaving water temperature sensors (15) and Water flow sensor (17) is electrically connected by conducting wire and PLC (16).
4. a kind of leaving water temperature pressure initial value debugging system of thermostatic valve according to any one of claims 1 to 3, special Sign is: having switch (27) respectively on the first pipe (24) and second pipe (25).
CN201821096573.9U 2018-07-11 2018-07-11 A kind of leaving water temperature pressure initial value debugging system of thermostatic valve Expired - Fee Related CN208383449U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821096573.9U CN208383449U (en) 2018-07-11 2018-07-11 A kind of leaving water temperature pressure initial value debugging system of thermostatic valve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821096573.9U CN208383449U (en) 2018-07-11 2018-07-11 A kind of leaving water temperature pressure initial value debugging system of thermostatic valve

Publications (1)

Publication Number Publication Date
CN208383449U true CN208383449U (en) 2019-01-15

Family

ID=64964059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821096573.9U Expired - Fee Related CN208383449U (en) 2018-07-11 2018-07-11 A kind of leaving water temperature pressure initial value debugging system of thermostatic valve

Country Status (1)

Country Link
CN (1) CN208383449U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111238801A (en) * 2020-03-23 2020-06-05 上海飞龙新能源汽车部件有限公司 Thermal management control valve endurance test device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111238801A (en) * 2020-03-23 2020-06-05 上海飞龙新能源汽车部件有限公司 Thermal management control valve endurance test device

Similar Documents

Publication Publication Date Title
CN205352721U (en) Heat pump set comprehensive properties testing system
CN106880291B (en) Regenerative temperature-adjustable water boiler and control method thereof
CN106871428A (en) A kind of antifreeze boosting type gas heater
CN207262801U (en) A kind of compound cooling water system
CN111878889A (en) Heat exchange station system capable of reducing fluctuation of flow of heat supply main pipe network
CN208383449U (en) A kind of leaving water temperature pressure initial value debugging system of thermostatic valve
CN202485208U (en) Energy-saving double-water-tank constant-temperature continuous water supply system
CN103673295A (en) Directly-heating type water tank water heating flow path system and control method thereof
CN103423916B (en) Low-grade heat energy recycling device
CN205939817U (en) Air can water temperature control unit and is used its water bath system
CN208952511U (en) A kind of constant pressure water supply type industry cooling water circulation system that band bypass is adjusted
CN204854097U (en) Water -cooled cooling water set test system
CN103884210B (en) Total heat recovery hot-water system
CN208633904U (en) A kind of storage ammonia and ammonia metering injection system having electric heating and engine exhaust heat heating
CN206637822U (en) A kind of antifreeze boosting type gas heater
CN109780886A (en) A kind of heat pipe-type dry and wet joint cooling device suitable for desert area nuclear power plant
CN212777617U (en) Heat exchange station system capable of reducing fluctuation of flow of heat supply main pipe network
CN208846798U (en) A kind of water route constant temperature system
CN203478688U (en) Low-grade heat energy recycling utilization device
CN204853625U (en) Energy -conserving heating system
CN105498019B (en) Two-way Cycle water for injection system
CN207354642U (en) The double heating control apparatus of move media
CN207473437U (en) A kind of double mode handover control system of automatic steam control and electric heating control
CN206755336U (en) A kind of heat supply regulating system for gas fired-boiler energy-conservation
CN207975721U (en) Turbine low pressure cylinder cooling device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210707

Address after: Room v015, 6th floor, 396 Jinling East Road, Huangpu District, Shanghai

Patentee after: Kaao Trading (Shanghai) Co.,Ltd.

Address before: 529729 A District, Dongxi development area, Heshan Town, Jiangmen, Guangdong

Patentee before: HESHAN METHVEN BATHROOM Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190115

Termination date: 20210711

CF01 Termination of patent right due to non-payment of annual fee