A kind of disassembly and assembly structure of inlet valve water route component
Technical field
The utility model relates to a kind of disassembly and assembly structures of inlet valve water route component.
Background technique
Water route component is usually fixedly installed on inside the intake tunnel of inlet valve by traditional inlet valve, when needing to water route
It when component is dismantled, needs first to remove inlet valve, then is protruded into intake tunnel by special tool and pull out water route component, by
In mode of operation inconvenience, the prior art proposes a kind of structure convenient for disassembly and assembly, by the way that water route component is set to above inlet valve,
It is additionally provided with a lifting piece, and is connect by lifting piece with water route component, and then conveniently water route component is dismantled, but this knot
The inlet valve of structure, if lifting piece is fixedly connected with water route component, the part for exposing to inlet valve will lead to the volume of inlet valve
Increase, in order to reduce the volume of inlet valve, usually be arranged to removably connect with water route component by lifting piece, when needing to water
When road component is dismantled, needs first to remove lifting piece, then be attached with water route component to be dismantled, this mode, grasp
It is still not convenient enough to make.
Utility model content
The utility model is to solve the above problems, provide a kind of disassembly and assembly structure of inlet valve water route component.
To achieve the above object, the technical solution adopted in the utility model are as follows:
The intake tunnel of a kind of disassembly and assembly structure of inlet valve water route component, inlet valve is equipped with water route component, the water inlet
The water in channel flow to exhalant canal after the water route component filters, and/or, the water route component is by the water of the intake tunnel
It is divided into main waterway and secondary water route, the inlet valve is additionally provided with spliced eye, and the water route component is dismounted by the spliced eye,
It further include a lifting piece, the lifting piece and the water route component are sequentially connected, and the lifting piece can the relatively described water route
Component is rotated between position and folding work position organizing work.
Preferably, the lifting piece is equipped with the clamping portion being mutually engaged by clamping with the inlet valve, when the lifting piece and institute
When stating inlet valve and being mutually clamped, the lifting piece is fixedly installed on the inlet valve, when the clamping portion and the inlet valve phase
When separation, the lifting piece can be rotated relative to the water route component to be driven the water route component.
Preferably, the lifting piece is equipped with link slot, and the water route component is equipped with the connecting shaft being pivotally connected with the link slot.
Preferably, the link slot forms the bit space that allows for lifting piece movement, so that the lifting piece can be opposite
The water route component moves between first position and the second position, the lifting piece at the first position, the lifting piece
Mutually be clamped with the inlet valve, the lifting piece in the second position, the lifting piece can the relatively described water route component into
Row rotation.
Preferably, the inlet valve upper end is equipped with guide groove, and it is T-shaped that the guide groove with the spliced eye cooperatively forms one
Channel, the lifting piece move between the first position and the second position along the guide groove.
Preferably, for the lifting piece when station is unfolded, the lifting piece and the water route component are coaxially arranged, described to mention
Draw piece is in 60 ° ~ 120 ° between the lifting piece and the water route component at folding work position.
The beneficial effects of the utility model are:
The intake tunnel of a kind of disassembly and assembly structure of inlet valve water route component of the utility model, inlet valve is equipped with water route group
The water of part, the intake tunnel flow to exhalant canal after the water route component filters, and/or, the water route component will be described
For the moisture of intake tunnel at main waterway and secondary water route, the inlet valve is additionally provided with spliced eye, and the water route component is inserted by described
It connects hole to be dismounted, further includes a lifting piece, the lifting piece and the water route component are sequentially connected, and the lifting piece can
It is rotated between position and folding work position relative to the water route component organizing work, this programme can be realized lifting piece and not dismantle
Folding storage function under state can reduce the volume of product after folding, save space, and easy to operate, can optimize significantly
User usage experience.
Detailed description of the invention
Attached drawing described herein is used to provide a further understanding of the present invention, and constitutes one of the utility model
Point, the exemplary embodiment of the utility model and the description thereof are used to explain the utility model, does not constitute to the utility model
Improper restriction.In the accompanying drawings:
Fig. 1 is what a kind of water route component of the disassembly and assembly structure of inlet valve water route component of the utility model was mutually separated with inlet valve
Perspective view;
Fig. 2 is a kind of perspective view of the lifting piece of the disassembly and assembly structure of inlet valve water route component of the utility model;
Fig. 3 is a kind of perspective view of the water route component of the disassembly and assembly structure of inlet valve water route component of the utility model;
Fig. 4 is standing when a kind of lifting piece of the disassembly and assembly structure of inlet valve water route component of the utility model is in first position
Body figure;
Fig. 5 is cuing open when a kind of lifting piece of the disassembly and assembly structure of inlet valve water route component of the utility model is in first position
View;
Fig. 6 is standing when a kind of lifting piece of the disassembly and assembly structure of inlet valve water route component of the utility model is in the second position
Body figure;
Fig. 7 is cuing open when a kind of lifting piece of the disassembly and assembly structure of inlet valve water route component of the utility model is in the second position
View;
Fig. 8 is that a kind of lifting piece of the disassembly and assembly structure of inlet valve water route component of the utility model is in when organizing work
Perspective view;
Fig. 9 is that a kind of lifting piece of the disassembly and assembly structure of inlet valve water route component of the utility model is in when organizing work
Cross-sectional view.
Specific embodiment
In order to be clearer and more clear technical problem to be solved in the utility model, technical solution and beneficial effect, with
Under in conjunction with the accompanying drawings and embodiments, the present invention will be further described in detail.It should be appreciated that specific reality described herein
Example is applied only to explain the utility model, is not used to limit the utility model.
As shown in Figures 1 to 9, the intake tunnel of the disassembly and assembly structure of a kind of inlet valve water route component, inlet valve 1 is equipped with water
The water of road component 10, the intake tunnel flow to exhalant canal after the water route component 10 filtering, and/or, the water route group
For part 10 by the moisture of the intake tunnel at main waterway and secondary water route, the inlet valve 1 is additionally provided with spliced eye 30, the water route group
Part 10 is dismounted by the spliced eye 30, further includes a lifting piece 20, and the lifting piece 20 is passed with the water route component 10
Dynamic connection, and the lifting piece 20 can be rotated between position and folding work position relative to the water route component 10 organizing work.
In the present embodiment, the lifting piece 20 is equipped with the clamping portion 21 being engaged by clamping with 1 phase of inlet valve, mentions when described
When draw piece 20 is clamped with 1 phase of inlet valve, the lifting piece 20 is fixedly installed on the inlet valve 1, when the clamping portion
21 with 1 phase of inlet valve when separating, and the lifting piece 20 can be rotated relative to the water route component 10 to be driven the water route group
Part 10.
In the present embodiment, the lifting piece 20 is equipped with link slot 22, and the water route component 10 is equipped with and the link slot 22
The connecting shaft 11 of pivot joint.
In the present embodiment, the link slot 22 forms the bit space that allows for the lifting piece 20 movement, so that the lifting
Part 20 can move between first position and the second position relative to the water route component 10, and the lifting piece 20 is in the first position
When, the lifting piece 20 is clamped with 1 phase of inlet valve, the lifting piece 20 in the second position, the lifting piece 20
It can be rotated relative to the water route component 10.
In the present embodiment, 1 upper end of inlet valve is equipped with guide groove 40, and the guide groove 40 cooperates with the spliced eye 30
A T-shaped channel is formed, the lifting piece 20 moves between the first position and the second position along the guide groove 40,
So that the lifting piece 20 can limit the water route component 10, prevent water route component 10 in the intake pressure of intake tunnel
Under go out.
In the present embodiment, for the lifting piece 20 when station is unfolded, the lifting piece 20 and the water route component 10 are coaxial
Arrangement, the lifting piece 20 are in 60 ° ~ 120 ° between the lifting piece 20 and the water route component 10 at folding work position, tool
Body, the lifting piece 20 is in 90 ° between the lifting piece 20 and the water route component 10 at folding work position.
The preferred embodiment of the utility model has shown and described in above description, as previously described, it should be understood that this is practical new
Type is not limited to forms disclosed herein, and should not be regarded as an exclusion of other examples, and can be used for various other groups
Conjunction, modification and environment, and above-mentioned introduction or the technology of related fields can be passed through within the scope of the inventive concept described herein
Or knowledge is modified.And changes and modifications made by those skilled in the art do not depart from the spirit and scope of the utility model, then
It all should be in the protection scope of the appended claims for the utility model.