CN207961865U - Petroleum pipeline connecting hoop Fast Installation structure - Google Patents

Petroleum pipeline connecting hoop Fast Installation structure Download PDF

Info

Publication number
CN207961865U
CN207961865U CN201721823138.7U CN201721823138U CN207961865U CN 207961865 U CN207961865 U CN 207961865U CN 201721823138 U CN201721823138 U CN 201721823138U CN 207961865 U CN207961865 U CN 207961865U
Authority
CN
China
Prior art keywords
tube body
connecting hoop
annular
conical limit
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721823138.7U
Other languages
Chinese (zh)
Inventor
王�华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jinfeng Petroleum Machinery Manufacturing Co Ltd
Original Assignee
Jiangsu Jinfeng Petroleum Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Jinfeng Petroleum Machinery Manufacturing Co Ltd filed Critical Jiangsu Jinfeng Petroleum Machinery Manufacturing Co Ltd
Priority to CN201721823138.7U priority Critical patent/CN207961865U/en
Application granted granted Critical
Publication of CN207961865U publication Critical patent/CN207961865U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joints Allowing Movement (AREA)

Abstract

The utility model discloses a kind of petroleum pipeline connecting hoop Fast Installation structures, including:Connecting hoop tube body and the oil pipe for being symmetricly set on connecting hoop tube body both ends, it is provided in the inside middle portion of the connecting hoop tube body and reinforces straight tube body, it is provided with interface channel in the reinforcement straight tube body, it is symmetrically arranged with conical limit chamber in the connecting hoop tube body at the reinforcement straight tube body both ends, it is provided with open recess in an axial direction on the connecting hoop tube body of conical limit chamber both sides, it is respectively arranged with and the mutually matched conical limit head of conical limit chamber in the end of the oil pipe, the oil channel being interconnected with interface channel is provided in the conical limit head and oil pipe, it is respectively arranged with the sliding chamber of annular at the both ends for reinforcing straight tube body, the sliding intracavitary sliding of the annular is provided with ring packing skidding, one end that the sliding chamber of annular is stretched into the ring packing skidding is connected by spring with connecting hoop tube body.

Description

Petroleum pipeline connecting hoop Fast Installation structure
Technical field
The utility model is related to a kind of oil equipment more particularly to a kind of petroleum pipeline connecting hoop Fast Installation structures.
Background technology
Oil needs to be conveyed using petroleum pipeline during exploration and development, and is typically all between petroleum pipeline It is fixedly connected by connecting hoop.Connecting hoop majority used at present uses screw connection structure, when connection to need to have stone in arms Oil-piping is rotated, and labor intensity is big, and connection speed is slow, and working efficiency is low, meanwhile, existing connecting hoop poor sealing performance, It is easy to cause Oil spills, ambient enviroment is impacted.
Utility model content
Technical problem to be solved in the utility model is:A kind of petroleum pipeline connecting hoop that connection speed is fast is provided quickly to pacify Assembling structure.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model is:Petroleum pipeline connecting hoop Fast Installation Structure, including:Connecting hoop tube body and the oil pipe for being symmetricly set on connecting hoop tube body both ends, in the middle part of the connecting hoop tube body Side, which is provided with, reinforces straight tube body, and interface channel is provided in the reinforcement straight tube body, the company at the reinforcement straight tube body both ends It is symmetrically arranged with conical limit chamber in coupling pipe body, is provided in an axial direction on the connecting hoop tube body of conical limit chamber both sides Open recess, the end of the oil pipe be respectively arranged with the mutually matched conical limit head of conical limit chamber, described The oil channel being interconnected with interface channel is provided in conical limit head and oil pipe, at the both ends for reinforcing straight tube body It is respectively arranged with the sliding chamber of annular, the sliding intracavitary sliding of the annular is provided with ring packing skidding, the ring packing skidding is stretched The one end for entering the sliding chamber of annular is connected by spring with connecting hoop tube body, and the another of the sliding chamber of annular is stretched out in the ring packing skidding It holds the end face with conical limit head to offset, annular slot group, institute is symmetrically arranged on the outside of the both ends of the connecting hoop tube body It includes several annular slots being uniformly arranged to state annular slot group, and circumferential clasp is respectively arranged in the annular slot group Group, the circumferential clasp group include three circumferential clasps being separately positioned in annular slot, between two neighboring circumferential clasp It is connected by connecting rod.
The utility model has the advantages that:Above-mentioned petroleum pipeline connecting hoop Fast Installation structure, structure novel are bored using petroleum pipeline The conical limit intracavitary of connecting hoop is directly inserted on shape limit head, and carries out quickly fixed limit, labour by circumferential clasp group Intensity is small, and connection speed is fast, and work efficiency is high, while being carried out to conical limit head end using ring packing skidding and spring Elastic packing, sealing effect is good, effectively prevent Oil spills, protects ambient enviroment.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model petroleum pipeline connecting hoop Fast Installation structure.
In figure:1, connecting hoop tube body, 2, oil pipe, 3, reinforce straight tube body, 4, interface channel, 5, conical limit chamber, 6, opening Groove, 7, conical limit head, 8, oil channel, 9, the sliding chamber of annular, 10, ring packing skidding, 11, spring, 12, annular slot Group, 121, annular slot, 13, circumferential clasp group, 131, circumferential clasp, 132, connecting rod.
Specific implementation mode
The particular content of the utility model is described in detail in the following with reference to the drawings and specific embodiments.
As shown in Figure 1, petroleum pipeline connecting hoop Fast Installation structure, including:Connecting hoop tube body 1 and it is symmetricly set on connecting hoop The oil pipe 2 at 1 both ends of tube body is provided in the inside middle portion of the connecting hoop tube body 1 and reinforces straight tube body 3, in the reinforcement straight tube It is provided with interface channel 4 in body 3, conical limit chamber is symmetrically arranged in the connecting hoop tube body 1 at 3 both ends of reinforcement straight tube body 5, it is provided with open recess 6 in an axial direction on the connecting hoop tube body 1 of 5 both sides of conical limit chamber, in the end of the oil pipe 2 Be respectively arranged with 5 mutually matched conical limit head 7 of conical limit chamber, set in the conical limit head 7 and oil pipe 2 It is equipped with the oil channel 8 being interconnected with interface channel 4, the sliding chamber of annular is respectively arranged at the both ends of the reinforcement straight tube body 3 9, the sliding 9 interior sliding of chamber of the annular is provided with ring packing skidding 10, annular sliding chamber 9 is stretched into the ring packing skidding 10 One end is connected by spring 11 with connecting hoop tube body 1, and the other end and cone that annular slides chamber 9 are stretched out in the ring packing skidding 10 The end face on shape limit head 7 offsets, and annular slot group 12 is symmetrically arranged on the outside of the both ends of the connecting hoop tube body 1, described Annular slot group 12 includes several annular slots 121 being uniformly arranged, and annular is respectively arranged in the annular slot group 12 Snap ring group 13, the circumferential clasp group 13 include being separately positioned on three circumferential clasps 131 in annular slot 121, and adjacent two It is connected by connecting rod 132 between a circumferential clasp 131.
When above-mentioned petroleum pipeline connecting hoop Fast Installation structure installation, between connecting hoop tube body 1 is placed in two oil pipes 2, Under the action of open recess 6 into two with one's hands, the both ends of connecting hoop tube body 1 can be broken to the conical limit that can make 2 end of oil pipe respectively Head 7 is successfully inserted in conical limit chamber 5, unclamps the both ends of connecting hoop tube body 1, by the two of 1 middle part outside of connecting hoop tube body Group circumferential clasp group 13 is respectively moved in the annular slot 121 on the outside of 1 both ends of connecting hoop tube body, thus by conical limit head 7 are fixed in conical limit chamber 5, at this time under the action of spring 11, the end face of ring packing skidding 10 and conical limit head 7 It offsets, ensures leakproofness.
Above-mentioned petroleum pipeline connecting hoop Fast Installation structure, structure novel are directly inserted in using petroleum pipeline conical limit head The conical limit intracavitary of connecting hoop, and quickly fixed limit is carried out by circumferential clasp group, labor intensity is small, and connection speed is fast, Work efficiency is high, while carrying out elastic packing, sealing effect to conical limit head end using ring packing skidding and spring It is good, it is effectively prevent Oil spills, protects ambient enviroment.

Claims (1)

1. petroleum pipeline connecting hoop Fast Installation structure, it is characterised in that:Including:Connecting hoop tube body(1)It is connected with being symmetricly set on Banded penstock body(1)The oil pipe at both ends(2), in the connecting hoop tube body(1)Inside middle portion be provided with reinforce straight tube body(3), institute It states and reinforces straight tube body(3)Inside it is provided with interface channel(4), in the reinforcement straight tube body(3)The connecting hoop tube body at both ends(1)It is interior right Title is provided with conical limit chamber(5), in the conical limit chamber(5)The connecting hoop tube body of both sides(1)On be provided with out in an axial direction Port recess(6), in the oil pipe(2)End be respectively arranged with and conical limit chamber(5)Mutually matched conical limit head (7), on the conical limit head(7)And oil pipe(2)It is inside provided with and interface channel(4)Interconnected oil channel(8), In the reinforcement straight tube body(3)Both ends be respectively arranged with the sliding chamber of annular(9), in the sliding chamber of the annular(9)Interior sliding is provided with Ring packing skidding(10), the ring packing skidding(10)Stretch into the sliding chamber of annular(9)One end pass through spring(11)With connect Banded penstock body(1)It is connected, the ring packing skidding(10)Stretch out the sliding chamber of annular(9)The other end and conical limit head(7) End face offset, in the connecting hoop tube body(1)Both ends on the outside of be symmetrically arranged with annular slot group(12), the annular slot Group(12)Including several annular slots being uniformly arranged(121), in the annular slot group(12)Inside it is respectively arranged with annular snap Ring group(13), the circumferential clasp group(13)Including being separately positioned on annular slot(121)Three interior circumferential clasps(131), Two neighboring circumferential clasp(131)Between pass through connecting rod(132)It is connected.
CN201721823138.7U 2017-12-24 2017-12-24 Petroleum pipeline connecting hoop Fast Installation structure Expired - Fee Related CN207961865U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721823138.7U CN207961865U (en) 2017-12-24 2017-12-24 Petroleum pipeline connecting hoop Fast Installation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721823138.7U CN207961865U (en) 2017-12-24 2017-12-24 Petroleum pipeline connecting hoop Fast Installation structure

Publications (1)

Publication Number Publication Date
CN207961865U true CN207961865U (en) 2018-10-12

Family

ID=63729741

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721823138.7U Expired - Fee Related CN207961865U (en) 2017-12-24 2017-12-24 Petroleum pipeline connecting hoop Fast Installation structure

Country Status (1)

Country Link
CN (1) CN207961865U (en)

Similar Documents

Publication Publication Date Title
CN207813595U (en) Down-hole distributor
CN207961865U (en) Petroleum pipeline connecting hoop Fast Installation structure
CN207621554U (en) Multichannel quick coupling is combined
CN103629445B (en) A kind of composite pipe Hydraulic expansion method and producing device and the composite pipe obtained thereof
CN207527184U (en) Hose exempts from tired prick and quickly connects water outlet joint
CN204829008U (en) Warp and compress tightly clamp formula coupling
CN107883096A (en) Petroleum pipeline connecting hoop Fast Installation structure
CN208365015U (en) A kind of novel double flange limit expansion joints
CN204243702U (en) A kind of sealing ring of protecting pipe
CN208997536U (en) Capillary return connector
CN209245529U (en) A kind of snapping connector of good airproof performance
CN203395449U (en) Metal hose convenient in insertion connecting
CN204239927U (en) The steam inlet tube of textile industry
CN207841371U (en) A kind of vacuum chuck device
CN208365021U (en) A kind of single-flange force transmission joint
CN203463835U (en) Corrugated pipe device
CN207777833U (en) A kind of novel high-efficiency pipeline connector
CN208982834U (en) A kind of PVC single armed pipe that sealing effect is good
CN207005502U (en) Chemical tube docking facilities
CN207334033U (en) A kind of split type SAE flanges with good seal performance
CN208381433U (en) A kind of disassembly and assembly structure of inlet valve water route component
CN202546084U (en) Portable hose coupler
CN213420179U (en) Steel wire braided steam rubber pipe assembly
CN214412143U (en) Cable pipeline hole plugging device
CN203240167U (en) Drop irrigation hose joint

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181012

Termination date: 20181224