CN208380599U - Construction joint of tunnel waterproof system - Google Patents
Construction joint of tunnel waterproof system Download PDFInfo
- Publication number
- CN208380599U CN208380599U CN201820830016.9U CN201820830016U CN208380599U CN 208380599 U CN208380599 U CN 208380599U CN 201820830016 U CN201820830016 U CN 201820830016U CN 208380599 U CN208380599 U CN 208380599U
- Authority
- CN
- China
- Prior art keywords
- water
- fin
- occlusion
- construction joint
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model provides a kind of construction joint of tunnel waterproof system, waterstop and multiple buried water strips are pasted including multiple back, between two neighboring back patch waterstop there is back to amplexiform head, back amplexiforms head and intercepts water fin and the reserved end of the first overlap joint with first, first intercept water fin be inserted into it is two neighboring back patch waterstop between gap in, connector is buried in having between two neighboring buried water strip, in bury connector and intercept water fin with second, the reserved end of second overlap joint, multiple first occlusion fins and multiple second occlusion fins, the side of buried water strip has multiple first segment water bars and multiple second water-saving items, second fin that intercepts water is inserted into the gap between two neighboring buried water strip, first occlusion fin is located at the lower section of first segment water bar, second occlusion fin is located at the top of the second water-saving item.The overlap joint of construction joint of tunnel waterproof system is simple and fast, good water-proof effect, reduces the percolating water hidden danger that circular construction joint is indulged in tunnel.
Description
Technical field
The utility model relates to constructing tunnel guarded drainage technical fields, more particularly, to a kind of anti-water system of construction joint of tunnel
System.
Background technique
With the development of national economy, ratio shared by Tunnel Engineering is incrementally increased in road construction.In railway tunnel
In construction, with cognition universal in the industry, since necessity of construction is divided into inverted arch and arch wall lining cutting two parts, short abutment wall is made for lining cutting
A kind of customized noun is formed to the part structure between inverted arch and two linings in the construction process for unit in charge of construction, thus also
Longitudinal construction joint is produced, in the guarded drainage technical measures in tunnel, construction joint is all made of the double-deck Water stop structure, i.e. back sticking type
+ middle buried water stop.Construction joint is the weak link of tunnel water proofing, and waterstop is necessarily mounted at the centre of lining thickness due to it
And must assure that installation quality, mounting height, straight degree and verticality are required to very stringent, the direct shadow of quality of installation quality
Tunnel water proofing quality is rung, in terms of the railway tunnel traffic-operating period that the current country has been completed, there are still percolating water phenomenons, influence tunnel
Traffic safety and hole in equipment normal use.
The rubber fastening band generallyd use in lining construction is main raw material(s) with natural rubber and various rubber.
However being limited since waterproof/drainage structure is designed with waterstop web length for lining cutting position, it is necessarily buried in appearance, back sticking type sealing
Band overlapped require.Since the tow sides surface of middle buried water stop has fin, the front face surface of back-adhering waterstop has
Have fin, docking when existing method there are two types of: one is use heat cure mold carry out heat connect, one is using bonding agent into
Row cold junction.Live heat connect vulcanization docking, be using with the matched heat cure mold of waterstop and the situ vulcanized heat of raw stock
It connects, difficulty of construction is big, but docks effect ideal, is suitble to require construction quality stringent project, is not suitable for being widely used to promote.
It is that the section sanding machine of connector needs waterstop using the dedicated cold joint glue of rubber fastening band using bonding agent cold junction
5~10 centimetres, cementing compacting are polished, has the advantages that intensity is high, solidification is fast, can reach common engineering quality requirement.
But using in the method for bonding agent cold junction at the construction field (site) use process, since the fin at banjo fixing butt jointing needs to carry out
Neat cutting and whole polishing, the cumbersome and quality that operates control is not easy, and then leaves more percolating water hidden danger in joint,
The weak spot of percolating water is finally formed at construction joint, and then causes very big security risk for the operation security in tunnel later period.
Summary of the invention
In order to realize the main purpose of the utility model, the utility model provides a kind of overlap joint simple and fast and waterproof effect
Good construction joint of tunnel waterproof system.
In order to realize the main purpose of the utility model, the utility model provides a kind of construction joint of tunnel waterproof system, tunnel
Road construction joint has longitudinal construction joint by being formed between secondary lining and inverted arch, and construction joint of tunnel waterproof system includes multiple back
Waterstop and multiple buried water strips are pasted, back patch waterstop is located at the side of secondary lining and inverted arch at longitudinal construction joint,
Buried water strip is embedded to the inside of secondary lining and inverted arch at longitudinal construction joint, has between two neighboring back patch waterstop
Back amplexiforms head, and back amplexiforms head and intercepts water fin and the reserved end of the first overlap joint with first, and first fin that intercepts water is reserved with the first overlap joint
Hold T-shaped setting, the first end face at the reserved end of the first overlap joint be bonded with the side of back patch waterstop, and the first overlap joint reserves the held
Biend is bonded with the splash guard in tunnel, first intercept water fin be inserted into it is two neighboring back patch waterstop between gap in, it is adjacent
Bury connector in having between two buried water strips, in bury connector and intercept water fin, the reserved end of the second overlap joint, Duo Ge with second
One occlusion fin and multiple second occlusion fins, second intercepts water, and fin and the second overlap joint are reserved holds T-shaped setting, and multiple first
Occlusion fin respectively symmetrically is arranged in the second two sides for intercepting water fin, and multiple second occlusions fins respectively symmetrically are arranged in the
Two two sides for intercepting water fin, the side of buried water strip have multiple first segment water bars and a multiple second water-saving items, and multiple first
Water-saving item is abreast located at the upper part of buried water strip side, and multiple second water-saving items are abreast located at buried water strip side
Lower part, second fin that intercepts water is inserted into the gap between two neighboring buried water strip, and the first occlusion fin is located at first
The lower section of water-saving item, the second occlusion fin are located at the top of the second water-saving item.
Buried in it can be seen that connector first occlusion fin and second occlusion fin respectively with the first segment of buried water strip
Water bar and the second water-saving item mutually " occlusion " connect, it is ensured that the two-step pouring concrete at longitudinal construction joint effectively combines, and guarantees
The waterproof effect of junction.Also, by back amplexiform head and in bury connector and make back patch waterstop and buried water strip overlapped
It does not need deliberately to carry out neat cutting and whole polishing for each fin in the process, and overlapping mode is simple and fast, improves
The integral waterproofing effect of construction joint of tunnel thoroughly solves the security risk of construction joint of tunnel percolating water.Meanwhile back amplexiform head and
In bury connector and be in big T-type setting, the water-stagnating effect at construction joint can be greatly improved, reduce the infiltration that circular construction joint is indulged in tunnel
Leakage hidden trouble plays huge guarantee to the operation security in later period tunnel.
Further scheme is, the first occlusion fin and the second occlusion fin intercept water with second respectively, and fin is vertical to be set
It sets.
Further scheme is, the height that the first occlusion fin and the second occlusion fin intercept water fin extending direction second
Degree is respectively less than the second height for intercepting water fin.
Further scheme is that the quantity of the first occlusion fin and the second occlusion fin is respectively six, and first is water-saving
The quantity of item and the second water-saving item is respectively three.
Further scheme is that the distance between two neighboring first occlusion fin is equal, two neighboring second occlusion
The distance between fin is equal.
Further scheme is that it is Nian Jie by bonding agent with back patch waterstop that back amplexiforms head.
Further scheme is, in bury connector with buried water strip to pass through bonding agent Nian Jie.
It can be seen that back amplexiform head and in bury connector pass through respectively bonding agent and back patch waterstop and buried water strip progress
Bonding, can fast and effeciently strong bond.
Further scheme is that also there is construction joint of tunnel the circumferential direction by being formed between preliminary bracing and secondary lining to apply
Work seam, circular construction joint are embedded with circumferential back patch waterstop.
Further scheme is, secondary lining and inverted arch are embedded with circumferential buried water strip in circumferential direction.
Detailed description of the invention
Fig. 1 is the transverse sectional view of the utility model tunnel embodiment.
Fig. 2 is the first partial cross-sectional view of the utility model construction joint of tunnel waterproof system embodiment.
Fig. 3 is the second partial sectional view of the utility model construction joint of tunnel waterproof system embodiment.
Fig. 4 is the main view that back amplexiforms head in the utility model construction joint of tunnel waterproof system embodiment.
Fig. 5 is the top view that back amplexiforms head in the utility model construction joint of tunnel waterproof system embodiment.
Fig. 6 is the schematic diagram of two neighboring back patch waterstop in the utility model construction joint of tunnel waterproof system embodiment.
Fig. 7 is cross-sectional view of the Fig. 6 at A-A.
Fig. 8 is the shape that back amplexiforms head and back patch waterstop cooperation in the utility model construction joint of tunnel waterproof system embodiment
State figure.
Fig. 9 is cross-sectional view of the Fig. 8 at B-B.
Figure 10 is cross-sectional view of the Fig. 8 at C-C.
Figure 11 be in the utility model construction joint of tunnel waterproof system embodiment in bury the main view of connector.
Figure 12 be in the utility model construction joint of tunnel waterproof system embodiment in bury the top view of connector.
Figure 13 is the schematic diagram of two neighboring buried water strip in the utility model construction joint of tunnel waterproof system embodiment.
Figure 14 is cross-sectional view of the Figure 13 at D-D.
Figure 15 be in the utility model construction joint of tunnel waterproof system embodiment in bury connector and buried water strip and cooperate
State diagram.
Figure 16 is cross-sectional view of the Figure 15 at E-E.
Figure 17 is cross-sectional view of the Figure 15 at F-F.
The following is a further explanation of the present invention with reference to the accompanying drawings and embodiments.
Specific embodiment
Referring to Fig. 1 to Fig. 3, tunnel 1 radially successively includes the preliminary bracing 2 for being located at outer layer, non-woven fabrics 9, splash guard
10, the inverted arch 4 positioned at the secondary lining of internal layer 3 and positioned at 3 lower section of secondary lining is formed longitudinal between secondary lining 3 and inverted arch 4
Construction joint 8, the circular construction joint formed between preliminary bracing 2 and secondary lining 3.Circular construction joint is embedded with circumferential back patch sealing
Band 11, between splash guard 10 and secondary lining 3, secondary lining 3 and inverted arch 4 are embedded with circumferential direction back patch waterstop 11 in circumferential direction
Circumferential buried water strip 5.The waterproof system of longitudinal construction joint 8 includes that multiple back paste waterstops 60 and multiple buried water strips 70,
Back patch waterstop 60 is located at the side of secondary lining 3 and inverted arch 4 at longitudinal construction joint 8, and buried water strip 70 is applied in longitudinally
The inside of secondary lining 3 and inverted arch 4 is embedded at work seam 8.
Referring to fig. 4 to Figure 10, two neighboring back pastes between waterstop 60, and there is back to amplexiform first 6, and back, which amplexiforms first 6, has first
Intercept water fin 62 and the reserved end 61 of the first overlap joint, first intercept water fin 62 with the first overlap joint is reserved holds 61 T-shaped settings, first takes
The first end face 612,613 for connecing reserved end 61 is bonded with the side of two neighboring back patch waterstop 60 respectively, and the first overlap joint is reserved
The second end face 611 at end 61 is bonded with splash guard 10, and first fin 62 that intercepts water is inserted into two neighboring back and pastes between waterstop 60
In gap 601.Back amplexiforms first 6 Nian Jie by bonding agent with back patch waterstop 60, and it is firm fast and effeciently can to paste waterstop 60 with back
It adheres and connects.
Referring to Figure 11 to Figure 17, have between two neighboring buried water strip 70 in bury connector 7, in bury connector 7 and have the
Two intercept water, and the overlap joint of fin 72, second reserves end 71, multiple first occlusion fins 74 and multiple second are engaged fin 73, and second intercepts water
Fin 72 and the second overlap joint 71 T-shaped settings of reserved end, multiple first occlusion fins 74 respectively symmetrically are arranged in second and intercept water
The second two sides for intercepting water fin 72 respectively symmetrically are arranged in the two sides of fin 72, multiple second occlusions fins 73.In bury sealing
Side with 70 has multiple first segment water bars 701 and multiple second water-saving items 702, multiple first segment water bars 701 status side by side
In the upper part of 70 side of buried water strip, multiple second water-saving items 702 are abreast located at the lower part of 70 side of buried water strip
Point.Second fin 72 that intercepts water is inserted into the gap 701 between two neighboring buried water strip 70, and the first occlusion fin 74 is located at the
The lower section of one water-saving item 701, the second occlusion fin 73 are located at the top of the second water-saving item 702.In bury connector 7 and buried water strip
70 are bonded by bonding agent, can fast and effeciently strong bond.
The present embodiment first is engaged fin 74 and the second occlusion fin 73 fin 72 that intercepts water respectively with second is vertically arranged, and
And first occlusion fin 74 and the second occlusion fin 73 height for intercepting water 72 extending direction of fin second be respectively less than second and intercept water
The height of fin 72.In addition, the quantity of the first occlusion fin 74 and the second occlusion fin 73 is respectively six, first segment water bar
701 and second water-saving item 702 quantity also be respectively three.Equal, the phase of the distance between two neighboring first occlusion fin 74
The distance between adjacent two second occlusion fins 73 are equal.
In bury connector 7 first occlusion fin 74 and second occlusion fin 73 it is water-saving with the first of buried water strip 70 respectively
Item 701 and the second water-saving item 702 mutual " occlusion " connect, it is ensured that and the two-step pouring concrete at longitudinal construction joint 8 effectively combines,
Guarantee the waterproof effect of junction.The present embodiment back patch waterstop 60 and buried water strip 70 do not need to carve during overlapped
Meaning carries out neat cutting and whole polishing for each fin, and overlapping mode is simple and fast, improves construction joint of tunnel
Integral waterproofing effect thoroughly solves the security risk of construction joint of tunnel percolating water.Meanwhile back amplexiform first 6 and in bury connector 7 and be in
Big T-type setting, can greatly improve the water-stagnating effect at construction joint, reduce the percolating water hidden danger that circular construction joint is indulged in tunnel, right
The operation security in later period tunnel plays huge guarantee.
Above embodiments, only preferred embodiments of the utility model, be not to limit the utility model practical range, therefore it is all
According to the equivalent change or modification that the structure, feature and principle of present utility model application the scope of the patents is done, this reality should be included in
With in new patent application range.
Claims (9)
1. construction joint of tunnel waterproof system, construction joint of tunnel has longitudinal construction joint by being formed between secondary lining and inverted arch,
The construction joint of tunnel waterproof system includes multiple back patch waterstops and multiple buried water strips, and the back patch waterstop is in described
It is located at the side of the secondary lining and the inverted arch at longitudinal construction joint, the buried water strip is in longitudinal construction joint
Place ground is embedded to the inside of the secondary lining and the inverted arch, it is characterised in that:
There is back to amplexiform head, the back amplexiforms head and intercepts water fin and first with first between two neighboring back patch waterstop
The reserved end of overlap joint, described first intercepts water fin with the reserved T-shaped setting in end of first overlap joint, and first overlap joint reserves end
First end face is bonded with the side of the back patch waterstop, the second end face at the reserved end of the first overlap joint and the splash guard in tunnel
Fitting, described first intercept water fin be inserted into it is two neighboring it is described back patch waterstop between gap in;
Bury connector in having between the two neighboring buried water strip, it is described in bury connector and intercept water fin, second with second
The reserved end of overlap joint, multiple first occlusion fins and multiple second occlusion fins, described second fin that intercepts water are taken with described second
Connecing the reserved T-shaped setting in end, the described second two sides for intercepting water fin respectively symmetrically are arranged in multiple first occlusions fins,
The described second two sides for intercepting water fin respectively symmetrically are arranged in multiple second occlusions fins;
The side of the buried water strip has multiple first segment water bars and multiple second water-saving items, multiple first segment water bars
Abreast it is located at the upper part of the buried water strip side, multiple second water-saving items, which are abreast located in described, buries sealing
Lower part with side;
Described second fin that intercepts water is inserted into the gap between the two neighboring buried water strip, first occlusion fin position
In the lower section of the first segment water bar, the second occlusion fin is located at the top of the described second water-saving item.
2. construction joint of tunnel waterproof system according to claim 1, it is characterised in that:
The first occlusion fin and the second occlusion fin fin that intercepts water respectively with described second are vertically arranged.
3. construction joint of tunnel waterproof system according to claim 2, it is characterised in that:
The height that the first occlusion fin and the second occlusion fin intercept water fin extending direction described second is respectively less than
Described second height for intercepting water fin.
4. construction joint of tunnel waterproof system according to claim 3, it is characterised in that:
The quantity of the first occlusion fin and the second occlusion fin is respectively six, the first segment water bar and described the
The quantity of two water-saving items is respectively three.
5. construction joint of tunnel waterproof system according to claim 4, it is characterised in that:
The distance between the two neighboring first occlusion fin is equal, the distance between two neighboring described second occlusion fin
It is equal.
6. construction joint of tunnel waterproof system according to any one of claims 1 to 5, it is characterised in that:
It is Nian Jie by bonding agent with back patch waterstop that the back amplexiforms head.
7. construction joint of tunnel waterproof system according to claim 6, it is characterised in that:
It is Nian Jie by bonding agent with the buried water strip that connector is buried in described.
8. construction joint of tunnel waterproof system according to claim 7, it is characterised in that:
The construction joint of tunnel also has the circular construction joint by being formed between preliminary bracing and secondary lining, the circumferential construction
Seam is embedded with circumferential back patch waterstop.
9. construction joint of tunnel waterproof system according to claim 8, it is characterised in that:
The secondary lining and the inverted arch are embedded with circumferential buried water strip in circumferential direction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820830016.9U CN208380599U (en) | 2018-05-30 | 2018-05-30 | Construction joint of tunnel waterproof system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820830016.9U CN208380599U (en) | 2018-05-30 | 2018-05-30 | Construction joint of tunnel waterproof system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208380599U true CN208380599U (en) | 2019-01-15 |
Family
ID=64968703
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820830016.9U Active CN208380599U (en) | 2018-05-30 | 2018-05-30 | Construction joint of tunnel waterproof system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208380599U (en) |
-
2018
- 2018-05-30 CN CN201820830016.9U patent/CN208380599U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111734457B (en) | Construction method of tunnel water-drainage-preventing system | |
CN105019919B (en) | Tunnel and its construction method for transmitting fluid | |
CN208363127U (en) | A kind of retaining wall structure of combined type high-speed rail platform | |
CN109440951A (en) | New-old concrete works intersection stitches waterproof construction and construction technology | |
CN208416571U (en) | A kind of waterproof structure for deformation seams for coping with the active fault changing of the relative positions | |
CN109706966A (en) | A kind of flexible prefabricated part and the method using the progress piping lane construction of flexible prefabricated part | |
CN108412506A (en) | Ground fissure region tunnel lining structure based on shield tunnel and its construction method | |
CN109372024A (en) | A kind of sole plate waterproof structure for deformation seams and construction method | |
CN211174142U (en) | Waterproof structure of shield tunnel and station interface | |
CN208380599U (en) | Construction joint of tunnel waterproof system | |
CN107476340A (en) | A kind of subway tunnel and the new Joining Structure and its construction method at enlarging station | |
CN208040386U (en) | A kind of ground fissure region tunnel lining structure based on shield tunnel | |
CN110630297A (en) | Method for treating water leakage of segment joint in shield tunnel in operation period | |
CN109026083A (en) | Big cross section rectangle pipe jacking tube coupling waterproof construction | |
CN107338765A (en) | The surface preform structure and its construction method of a kind of expansion joint sealing | |
CN209277909U (en) | A kind of large section rectangular top pipe originates portal dynamic water-proof device | |
CN209397743U (en) | New-old concrete works intersection stitches waterproof construction | |
CN208380597U (en) | Middle buried water stop connector | |
CN109751066A (en) | A kind of tunnel anchor pole crosses splash guard water stop construction method | |
CN107152037B (en) | Poured band of outer wall of basement construction method | |
CN208380598U (en) | Back-adhering waterstop connector | |
CN206408654U (en) | A kind of underground engineering prearrangement of deformation amount stitches connecting interface structure | |
CN214143829U (en) | Drainable externally-attached water stop with pasting timeliness | |
CN212296413U (en) | Back-pasting type pi-shaped rubber water stop for tunnel engineering | |