CN208379368U - A kind of reinforced sewer structure of rockfilling for road center isolation strip - Google Patents

A kind of reinforced sewer structure of rockfilling for road center isolation strip Download PDF

Info

Publication number
CN208379368U
CN208379368U CN201820726849.0U CN201820726849U CN208379368U CN 208379368 U CN208379368 U CN 208379368U CN 201820726849 U CN201820726849 U CN 201820726849U CN 208379368 U CN208379368 U CN 208379368U
Authority
CN
China
Prior art keywords
bottom plate
loaded filter
plate
wall
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820726849.0U
Other languages
Chinese (zh)
Inventor
申富林
郭咏辉
何学科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Railway Polytechnic
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820726849.0U priority Critical patent/CN208379368U/en
Application granted granted Critical
Publication of CN208379368U publication Critical patent/CN208379368U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides a kind of reinforced sewer structure of rockfilling for road center isolation strip, includes bottom plate, concrete cover, loaded filter, the wall that intercepts water, confining bed, slabstone binds, seep water filled layer;The bottom plate is the concrete enclosing plate built in sewer bottom;The concrete cover is the slotted hole concrete slab for the groove top that seamless coverage is formed in the lower plate of bottom plate;The wall that intercepts water is the concrete wall built on lower plate straight flange;The loaded filter is divided into microlith loaded filter and rubble loaded filter, which builds in upper plate far from bottom plate center one end, and microlith fitting is laid on rubble loaded filter far from sewer face;The confining bed is to build in loaded filter and intercept water on wall, which is clay splash guard;The mortar flag stone that the slabstone binds for build in confining bed top surface binds;Infiltration filled layer is filled in bottom plate, loaded filter, the hollow region to intercept water between wall, confining bed for building stones and is formed.

Description

A kind of reinforced sewer structure of rockfilling for road center isolation strip
Technical field
The utility model relates to road drainage technical fields more particularly to a kind of for the reinforced of road center isolation strip It rockfills sewer structure.
Background technique
With the rapid development of our national economy, car ownership in the quickening of urbanization process and China's city scope Increase, requirement of the people to indexs such as the grades, speed, width of urban road is higher and higher, outside city expressway or city The roads such as loop wire have more strict requirements to these indexs, and higher standard path proposes the draining of urban road Higher requirement.Previous road drainage system is asked since the problem of construction and material all can't resolve further serious draining Topic, needs a large amount of cost to be safeguarded and repaired.
Utility model content
The purpose of this utility model is that it is in view of the drawbacks of the prior art and insufficient, it provides a kind of for road center isolation The reinforced sewer structure of rockfilling of band, the structure effectively can collect the infiltration of central partition and discharge, and avoid seeping phenomenon, Suitable for heavy rain water flow road, and structure is simple, easy for construction.
In order to achieve the above purposes, the technical solution adopted by the utility model is: a kind of adding for road center isolation strip Strong type rockfills sewer structure, includes bottom plate, concrete cover, loaded filter, the wall that intercepts water, confining bed, slabstone binds, infiltration is filled Layer;The bottom plate is the concrete enclosing plate built in sewer bottom, which is divided into two parts, and a part is subsurface flow upstream The upper plate of side, the upper plate are tilted down from far from bottom plate center one end to bottom plate center position, and another part is underground The lower plate of water flow downstream side, the lower plate form chamfer trapezoidal groove diagonally downward from bottom plate center;The coagulation Earth mulch plate is the slotted hole concrete slab for the groove top that seamless coverage is formed in the lower plate of bottom plate;It is described to intercept water wall to build Concrete wall on lower plate straight flange;The loaded filter is divided into microlith loaded filter and rubble loaded filter, which repairs It builds in upper plate far from bottom plate center one end, microlith fitting is laid on rubble loaded filter far from sewer face;The confining bed is It builds in loaded filter and intercepts water on wall, which is clay splash guard;The slabstone binds to build in confining bed top surface Mortar flag stone binds;Infiltration filled layer is that building stones are filled in bottom plate, loaded filter, the hollow region shape to intercept water between wall, confining bed At.
Preferably, the upper plate of the bottom plate tilts down 10 ° to center position from far from bottom plate center one end.
Preferably, the slot maximum gauge of the concrete cover is less than the building stones filler particles of infiltration filled layer most Minor diameter.
Preferably, the infiltration filling layer height is not less than 0.3m, and it is higher than level of ground water.
The beneficial effects of the utility model are: the structure effectively can collect the infiltration of central partition and discharge, avoid Seeping phenomenon is suitable for heavy rain water flow road, and structure is simple, easy for construction.
Detailed description of the invention
Attached drawing described herein is to be used to provide a further understanding of the present invention, and constitutes one of the application Point, but do not constitute the restriction to the utility model.
Fig. 1 is sewer structural schematic diagram.
Wherein: 1 is bottom plate, and 2 be concrete cover, and 3 be loaded filter, and 4 be the wall that intercepts water, and 5 be confining bed, and 6 bind for slabstone, 7 be infiltration filled layer.
Specific embodiment
In conjunction with attached drawing, the utility model is described in further detail.
As shown, a kind of reinforced sewer structure of rockfilling for road center isolation strip, includes bottom plate, concrete Cover board, loaded filter, the wall that intercepts water, confining bed, slabstone binds, seep water filled layer;The bottom plate is the coagulation built in sewer bottom Grave closing plate, the bottom plate are divided into two parts, and a part is the upper plate of subsurface flow upstream side, and the upper plate is from far from bottom plate Heart one end is tilted down to bottom plate center position, and another part is the lower plate of subsurface flow downstream side, and the lower plate is the bottom of from Chamfer trapezoidal groove is formed at plate center diagonally downward;The concrete cover is that seamless coverage is formed in the lower plate of bottom plate Groove top slotted hole concrete slab;The wall that intercepts water is the concrete wall built on lower plate straight flange;The anti-filter Layer is divided into microlith loaded filter and rubble loaded filter, which builds in upper plate far from bottom plate center one end, microlith patch Conjunction is laid on rubble loaded filter far from sewer face;The confining bed is to build in loaded filter and intercept water on wall, which is Clay splash guard;The mortar flag stone that the slabstone binds for build in confining bed top surface binds;Filled layer seep water as building stones filling It is formed in bottom plate, loaded filter, the hollow region between wall, confining bed that intercepts water.
When it is implemented, the upper plate of the bottom plate tilts down 10 ° to center position from far from bottom plate center one end.
When it is implemented, the slot maximum gauge of the concrete cover is less than the building stones filler particles of infiltration filled layer Minimum diameter.
When it is implemented, the infiltration filling layer height is not less than 0.3m, and it is higher than level of ground water.
When practice of construction, to make bottom of trench be unlikely to generate mud accumulation, 1 Longitudinal Slope Design of bottom plate should ensure that flow velocity is not more than 1m/s。

Claims (4)

1. a kind of reinforced sewer structure of rockfilling for road center isolation strip, it is characterised in that: include bottom plate, concrete Cover board, loaded filter, the wall that intercepts water, confining bed, slabstone binds, seep water filled layer;The bottom plate is the coagulation built in sewer bottom Grave closing plate, the bottom plate are divided into two parts, and a part is the upper plate of subsurface flow upstream side, and the upper plate is from far from bottom plate Heart one end is tilted down to bottom plate center position, and another part is the lower plate of subsurface flow downstream side, and the lower plate is the bottom of from Chamfer trapezoidal groove is formed at plate center diagonally downward;The concrete cover is that seamless coverage is formed in the lower plate of bottom plate Groove top slotted hole concrete slab;The wall that intercepts water is the concrete wall built on lower plate straight flange;The anti-filter Layer is divided into microlith loaded filter and rubble loaded filter, which builds in upper plate far from bottom plate center one end, microlith patch Conjunction is laid on rubble loaded filter far from sewer face;The confining bed is to build in loaded filter and intercept water on wall, which is Clay splash guard;The mortar flag stone that the slabstone binds for build in confining bed top surface binds;Filled layer seep water as building stones filling It is formed in bottom plate, loaded filter, the hollow region between wall, confining bed that intercepts water.
2. a kind of reinforced sewer structure of rockfilling for road center isolation strip according to claim 1, feature exist In: the upper plate of the bottom plate tilts down 10 ° to center position from far from bottom plate center one end.
3. a kind of reinforced sewer structure of rockfilling for road center isolation strip according to claim 1, feature exist In: the slot maximum gauge of the concrete cover is less than the minimum diameter of the building stones filler particles of infiltration filled layer.
4. a kind of reinforced sewer structure of rockfilling for road center isolation strip according to claim 1, feature exist In: the infiltration filling layer height is not less than 0.3m, and is higher than level of ground water.
CN201820726849.0U 2018-05-14 2018-05-14 A kind of reinforced sewer structure of rockfilling for road center isolation strip Expired - Fee Related CN208379368U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820726849.0U CN208379368U (en) 2018-05-14 2018-05-14 A kind of reinforced sewer structure of rockfilling for road center isolation strip

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820726849.0U CN208379368U (en) 2018-05-14 2018-05-14 A kind of reinforced sewer structure of rockfilling for road center isolation strip

Publications (1)

Publication Number Publication Date
CN208379368U true CN208379368U (en) 2019-01-15

Family

ID=64971210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820726849.0U Expired - Fee Related CN208379368U (en) 2018-05-14 2018-05-14 A kind of reinforced sewer structure of rockfilling for road center isolation strip

Country Status (1)

Country Link
CN (1) CN208379368U (en)

Similar Documents

Publication Publication Date Title
CN105256876A (en) Siphon type draining system of superhigh excavation section of road
CN104846712B (en) Hard road construction method by naturally recharging underground water
CN107700299B (en) Overpass lower-layer ground road structure and construction method thereof
CN205134481U (en) Highway superelevation excavation highway section hydrocone type drainage system
CN202323612U (en) Dank floor tile
CN107842038A (en) A kind of pipe gallery node location road subtracts sink device
CN206359995U (en) Reinforced concrete cast-in-situ retaining wall
CN210596882U (en) Pedestrian road
CN208379368U (en) A kind of reinforced sewer structure of rockfilling for road center isolation strip
CN207469190U (en) A kind of infitration galleries structure of efficient draining
CN208501425U (en) A kind of plain type for road center isolation strip rockfills sewer structure
CN206503213U (en) Scattered collection mating type waterproof and water drainage system for highway median strip
CN208501424U (en) A kind of sewer structure of rockfilling for road center isolation strip
CN108179677A (en) Sponge urban water-through pavement
CN209010891U (en) A kind of multi-functional lobby drainage facility
CN208717941U (en) A kind of no toe board buttress type road shoulder retaining wall structure
CN209010890U (en) A kind of triangular concrete gutter structure for highway drainage
CN107386053A (en) A kind of construction method on pavement
CN209723194U (en) Drainage system of freeway
CN209114263U (en) A kind of waterproof anti-settling highway subgrade
CN203834313U (en) Impound strap for highway pavement
CN202530356U (en) Side stone for asphalt pavement
CN205839502U (en) A kind of permeable road structure
CN207701171U (en) A kind of french drain formula tunnel arch angle drainage system
CN204690908U (en) There is the rain inlet structure getting rid of subgrade and pavement inner product water function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200706

Address after: 510430, 100, Qinglong Road, Shijing street, Baiyun District, Guangdong, Guangzhou

Patentee after: GUANGZHOU RAILWAY POLYTECHNIC (GUANGZHOU RAILWAY MACHINERY SCHOOL)

Address before: 510460 Guangzhou Railway Vocational and Technical College, No. 100 Qinglong Middle Road, Shijing Street, Baiyun District, Guangzhou City, Guangdong Province

Patentee before: Shen Fulin

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190115