A kind of unloading unit based on express highway waveform girder steel plate
Technical field
The utility model relates to expressway traffic safety facilities field of engineering technology, more particularly to a kind of base
In the unloading unit of express highway waveform girder steel plate.
Background technique
As highway constantly carries out five change standardized managements, construction product will reach high-quality, vital want
It asks, more important meaning of being worked with great care to working procedure.
Existing express highway waveform girder steel plate passes through the Freight Transport of 9m or more, and highway waveform joist steel protects
Breast board does zinc coat protection, and is generally unloaded using artificial lift when unloading at present, or by fork truck assistance unloading, but passes through
The physical strength for manually lifting the mode unloaded not only easy consumption worker, causes to consume a large amount of labour, and manually lift the efficiency ratio unloaded
It is lower to easily cause personal injury, and consume the plenty of time;And highway waveform can be damaged in such a way that fork truck assists unloading
The zinc coat of joist steel guardrail plate surface, to influence appearance identification and quality testing.
Therefore, manufacture it is a kind of raising unload effect and meanwhile avoid to personal injury and to highway waveform joist steel
The scuffing of guardrail board Zinc coat, the unloading unit based on express highway waveform girder steel plate be those skilled in the art urgently
Problem to be solved.
Utility model content
In view of this, the present invention provides a kind of unloading unit based on express highway waveform girder steel plate, knots
Structure is simple, facilitates combination disassembly storage, and cost is relatively low, can not only save the labour of worker, improves effect, and can have
Effect avoids the scuffing of the injury to worker and the Zinc coat of express highway waveform girder steel plate, be beneficial to appearance identification and
Quality testing.
To achieve the goals above, the utility model adopts the following technical solution:
A kind of unloading unit based on express highway waveform girder steel plate, including mobile jib, bracket and protective device, make institute
State the weight of mobile jib Yu the bracket shared express highway waveform girder steel plate, and the bracket two sides and the mobile jib
It is slidably connected, so as to flexible conversion working condition and realizes the effect for being convenient for storing, and can be according to highway
The size of corrugated beam steeled protection fence plate adjusts the width of unloading unit described in the utility model in time, enhances the flexibility used, institute
It states protective device to be fixedly connected with the mobile jib, prevents the surface for damaging express highway waveform girder steel plate during unloading
Zinc coat is beneficial to appearance identification and quality testing, and the protective device is made of channel steel, batten and plastic band, and described
Channel steel is welded on the mobile jib, and the batten is filled in the groove of the channel steel, the plastic band coat the channel steel and
The batten, not only make the utility model the unloading unit have lighter quality, but also strengthen the mobile jib and
The intensity of the bracket to not only facilitate the unloading unit of the utility model of taking at any time, but also extends it and uses the time,
And since plastic band has preferable flexible and elasticity, surface is smooth, unloading resistance is reduced, so as to effectively avoid damage to height
The Zinc coat of fast wave beams of highway steel guard rail plate;Or protective device the mobile jib directly coated by the plastic band and
At not only it is possible to prevente effectively from the Zinc coat of damage express highway waveform girder steel plate and reduction unloading resistance, go back
It can make simple and compact for structure.
Preferably, the channel steel is welded by reinforcing bar and the mobile jib, so as to reinforce the channel steel and the mobile jib
Weld strength.
Preferably, the bracket is arranged in a crossed manner by least two length adjustment rod piece, not only makes compact-sized, is conducive to increase
The intensity of strong structure, and the bracket is facilitated to slide relative to the mobile jib, be conducive to flexible conversion working condition and reality
Now convenient for the effect of storage, and the utility model institute can be adjusted according to the size of express highway waveform girder steel plate in time
The width for stating unloading unit enhances the flexibility used.
Preferably, each length adjustment rod piece is retractable structure, including the adjusting being slidably connected with the mobile jib
Lead screw and the steel tube member bar that connection is matched with the adjusting screw are adjusted by adjusting the length of the length adjustment rod piece
Length of the adjusting screw relative to the steel tube member bar is saved, so as to according to the ruler of express highway waveform girder steel plate
The very little working width for adjusting the bracket in time, enhances the popularity of application.
Preferably, the both ends of each adjusting screw are respectively arranged with sliding block, and are provided with limit hole on the sliding block,
The effect for making the bracket in the mobile jib with respect to sliding is realized by the sliding block.
Preferably, sliding slot is provided on the mobile jib, and the sliding slot is in axial direction, to provide cunning for the sliding block
Dynamic rail road, and the sliding slot is slidably connected with the sliding block, to realize the effect that the bracket and the mobile jib are slidably connected.
Preferably, multiple location holes are evenly arranged on the mobile jib, and the location hole is radially, and by fixed
Position pin with the limit hole matches setting, when finding bracket institute relatively accurately according to the size of express highway waveform girder steel plate
When stating the required position of mobile jib, the positioning pin is passed through into the location hole and the limit hole, is realized the bracket is fixed
Effect on the mobile jib, to avoid due to influencing unloading work with respect to sliding between the bracket and the mobile jib
Make.
Preferably, at least two traveling wheel is arranged in described mobile jib one end, enables the unloading unit of the utility model
Mobile with lorry, fast and easy is transformed into next close on and unloads a little, improves working efficiency, and each traveling wheel has
Self-locking structure and automatic unlocking structure avoid the unloading unit of the utility model from moving at work, influence working efficiency.
Preferably, the mobile jib other end is provided with lorry connecting pin, so that realizing will unload described in the utility model
The lorry foundation of device and transport express highway waveform girder steel plate contacts, thus the dress of unloading for passing through the utility model
The work smoothly carried out and unload express highway waveform girder steel plate from lorry is set, and is provided on the lorry connecting pin
Multiple connecting holes and fastener can select the connection of the fastener matching connection according to different size of lorry
Hole, so as to be suitable for connecting the lorry of different size, and the connecting hole is detachably connected with the fastener, is completed
After work, realization facilitates the effect for dismantling the unloading unit of the utility model from lorry.
It can be seen via above technical scheme that compared with prior art, the utility model, which discloses, provides one kind based on height
The unloading unit of fast wave beams of highway steel guard rail plate, may be implemented following technical effect:
1. being provided with protective device on mobile jib, prevent from damaging express highway waveform girder steel plate during unloading
Zinc coat is beneficial to appearance identification and quality testing;
2. being slidably connected by bracket with mobile jib and bracket being arranged in a crossed manner by least two length adjustment rod piece, Mei Gechang
It is retractable structure that degree, which adjusts rod piece, to realize flexible conversion working condition and the effect convenient for storage, and can basis
The size of express highway waveform girder steel plate adjusts the width of the utility model unloading unit in time, enhances the flexibility used
With the popularity of application;
3. the mobile jib other end is provided with lorry connecting pin, to realize the unloading unit of the utility model and transport high speed
The lorry of wave beams of highway steel guard rail plate establishes connection, so that conveniently smoothly being carried out by the unloading unit of the utility model will be high
The work that fast wave beams of highway steel guard rail plate is unloaded from lorry, and multiple connecting holes and fastener are provided on connecting pin, it can
To select the connecting hole of fastener matching connection according to different size of lorry, so as to be suitable for connecting the goods of different size
Vehicle, connecting hole are fixed on lorry by fastener, after completing work, facilitate the unloading unit of the utility model from lorry
The effect of disassembly.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
It is the embodiments of the present invention, for those of ordinary skill in the art, without creative efforts, also
Other attached drawings can be obtained according to the attached drawing of offer.
Fig. 1 attached drawing is a kind of embodiment 1 of the unloading unit based on express highway waveform girder steel plate of the utility model
Schematic perspective view;
Fig. 2 attached drawing is a kind of embodiment 1 of the unloading unit based on express highway waveform girder steel plate of the utility model
Protective device sectional view;
Fig. 3 attached drawing is a kind of embodiment 2 of the unloading unit based on express highway waveform girder steel plate of the utility model
Schematic perspective view;
Fig. 4 attached drawing is a kind of embodiment 2 of the unloading unit based on express highway waveform girder steel plate of the utility model
Protective device sectional view;
Fig. 5 attached drawing is a kind of embodiment 1 of the unloading unit based on express highway waveform girder steel plate of the utility model
With the front view of embodiment 2.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
A kind of unloading unit based on express highway waveform girder steel plate, including mobile jib 1, bracket 2 and protective device, support
2 two sides of frame are slidably connected with mobile jib 1, and protective device 4 is fixedly connected with mobile jib 1, and protective device 4 is by channel steel 43,41 and of batten
Plastic band 42 forms, and channel steel 43 is welded on mobile jib 1, and batten 41 is filled in the groove of channel steel 43, and plastic band 42 coats slot
Steel 43 and batten 41;Or protective device 4 is formed by the directly cladding mobile jib 1 of plastic band 42.
In order to further optimize the above technical scheme, channel steel 43 is welded by reinforcing bar and mobile jib 1.
In order to further optimize the above technical scheme, bracket 2 is arranged in a crossed manner by least two length adjustment rod piece.
In order to further optimize the above technical scheme, each length adjustment rod piece is retractable structure, including sliding with mobile jib 1
The adjusting screw 22 of dynamic connection and the steel tube member bar 21 that connection is matched with adjusting screw 22.
In order to further optimize the above technical scheme, the both ends of each adjusting screw 22 are respectively arranged with sliding block 211, and sliding
Limit hole is provided on block 211.
In order to further optimize the above technical scheme, sliding slot 111 is provided on mobile jib 1, and sliding slot 111 is in axial direction,
And it is slidably connected with sliding slot 111.
In order to further optimize the above technical scheme, multiple location holes 112, and location hole 112 are evenly arranged on mobile jib 1
Radially, and by positioning pin 123 setting is matched with limit hole.
In order to further optimize the above technical scheme, at least two traveling wheel 3 is arranged in 1 one end of mobile jib, and each walking is slided
Wheel 3 has self-locking structure and automatic unlocking structure.
In order to further optimize the above technical scheme, 1 other end of mobile jib is provided with lorry connecting pin 13, lorry connecting pin 13
On be provided with multiple connecting holes 131 and fastener 132, and connecting hole 131 is detachably connected with fastener 132.
Embodiment 1:
The utility model embodiment discloses a kind of unloading unit based on express highway waveform girder steel plate, including master
Bar 1, bracket 2 and traveling wheel 3, traveling wheel 3 is installed in 1 one end of mobile jib, and traveling wheel 3 is at least 2, and each walking is slided
Wheel 3 has self-locking structure and automatic unlocking structure, and 1 other end of mobile jib is provided with lorry connecting pin 13, sets on lorry connecting pin 13
It is equipped with multiple connecting holes 131 and fastener 132, and connecting hole 131 is detachably connected with fastener 132, bracket 2 is by least 2
A length adjustment rod piece is arranged in a crossed manner, and each length adjustment rod piece is retractable structure, and includes in each length adjustment rod piece
The adjusting screw 22 that is slidably connected with mobile jib 1 and the steel tube member bar 21 connecting, each adjusting screw are matched with adjusting screw 22
22 both ends are respectively arranged with sliding block 211, and limit hole is provided on sliding block 211, and mobile jib 1 is located at 2 two sides of bracket, on mobile jib 1
It is provided with sliding slot 111, and sliding slot 111 is in axial direction, is slidably connected by sliding block 211 and sliding slot 111 and realizes bracket 2 and mobile jib
1 is slidably connected, and multiple location holes 112 are also evenly arranged on mobile jib 1, and location hole 112 radially, and can pass through
Positioning pin 123 matches setting with limit hole, and protective device 4 is provided on mobile jib 1, and protective device 4 is by channel steel 43, batten 41
It is formed with plastic band 42, and channel steel 43 is welded on mobile jib 1, batten 41 is filled in the groove of channel steel 43, and plastic band 42 coats
Channel steel 43 and batten 41.
Firstly, determining the width of the utility model unloading unit according to the size of express highway waveform girder steel plate, look for
The appropriate position A of the opposite mobile jib 1 of quasi- bracket 2, is slidably connected by sliding block 211 and sliding slot 111 and realizes the cunning of bracket 2 Yu mobile jib 1
Dynamic connection, thus when sliding block 211 along the chute 111 slide to appropriate position A when, positioning pin 123 is passed through into location hole 112 and limit
Hole, realization bracket 2 is installed at the position A on mobile jib 1, thus avoid due between bracket 2 and mobile jib 1 with respect to sliding and
Unloaded operation is influenced, and at the same time adjusting the length of rod piece, that is, adjusts length of the adjusting screw 22 relative to steel tube member bar 21, from
And jointly by the width adjustment of the utility model unloading unit to specified width, which width;
Secondly, by the multiple connecting holes 131 and fastener 132 that are arranged on lorry connecting pin 13, by fastener 132 with
Connecting hole 131 and lorry matching connection, so that the unloading unit of the utility model to be fixed on to the railway carriage side of lorry, and are opened
Self-locking structure on dynamic traveling wheel 3 is fixed by traveling wheel 3, and the unloading unit of the utility model is avoided to move at work,
Working efficiency is influenced, after completing all preparations, express highway waveform girder steel plate is slided along mobile jib 1 and bracket 2, and
Due to being provided with protective device 4 in mobile jib 1, it is possible to avoid damaging highway waveform joist steel during completing unloading
The Zinc coat of guardrail board is beneficial to appearance identification and quality testing;
Wherein, after unloaded operation is completed in a job site, the system of traveling wheel 3 is released by automatic unlocking structure
It is dynamic, so that traveling wheel 3 is followed the movement of lorry and is moved, until being moved to next break bulk point, then passes through self-locking structure
Traveling wheel 3 is fixed, improve rate of discharging.
Finally, release fastener 132 after completing all unloading work, disconnect connecting hole 131 with lorry,
It pulls out the positioning pin 123 across location hole 112 and limit hole again, releases the relatively fixed of bracket 2 and mobile jib 1, make bracket 2 can be with
The opposite sliding of opposite mobile jib 1, closes up the mobile jib 1 of 2 two sides of bracket, while releasing length adjustment rod piece by auto-unlocking device
Fixation, by the length adjustment of length adjustment rod piece to most short, so that the volume of the unloading unit of the utility model is adjusted to
Minimum facilitates storage.
Embodiment 2:
The utility model embodiment discloses a kind of unloading unit based on express highway waveform girder steel plate, including master
Bar 1, bracket 2 and traveling wheel 3, traveling wheel 3 is installed in 1 one end of mobile jib, and traveling wheel 3 is at least 2, and each walking is slided
Wheel 3 has self-locking structure and automatic unlocking structure, and 1 other end of mobile jib is provided with lorry connecting pin 13, sets on lorry connecting pin 13
It is equipped with multiple connecting holes 131 and fastener 132, and connecting hole 131 is detachably connected with fastener 132, bracket 2 is by least 2
A length adjustment rod piece is arranged in a crossed manner, and each length adjustment rod piece is retractable structure, and includes in each length adjustment rod piece
The adjusting screw 22 that is slidably connected with mobile jib 1 and the steel tube member bar 21 connecting, each adjusting screw are matched with adjusting screw 22
22 both ends are respectively arranged with sliding block 211, and limit hole is provided on sliding block 211, and mobile jib 1 is located at 2 two sides of bracket, on mobile jib 1
It is provided with sliding slot 111, and sliding slot 111 is in axial direction, is slidably connected by sliding block 211 and sliding slot 111 and realizes bracket 2 and mobile jib
1 is slidably connected, and multiple location holes 112 are also evenly arranged on mobile jib 1, and location hole 112 radially, and can pass through
Positioning pin 123 matches setting with limit hole, and protective device 4 is provided on mobile jib 1, and protective device 4 is direct by plastic band 42
Cladding mobile jib 1 forms.
Firstly, determining the width of the utility model unloading unit according to the size of express highway waveform girder steel plate, look for
The appropriate position A of the opposite mobile jib 1 of quasi- bracket 2, is slidably connected by sliding block 211 and sliding slot 111 and realizes the cunning of bracket 2 Yu mobile jib 1
Dynamic connection, thus when sliding block 211 along the chute 111 slide to appropriate position A when, positioning pin 123 is passed through into location hole 112 and limit
Hole, realization bracket 2 is installed at the position A on mobile jib 1, thus avoid due between bracket 2 and mobile jib 1 with respect to sliding and
Unloaded operation is influenced, and at the same time adjusting the length of rod piece, that is, adjusts length of the adjusting screw 22 relative to steel tube member bar 21, from
And jointly by the width adjustment of the utility model unloading unit to specified width, which width;
Secondly, by the multiple connecting holes 131 and fastener 132 that are arranged on lorry connecting pin 13, by fastener 132 with
Connecting hole 131 and lorry matching connection, so that the unloading unit of the utility model to be fixed on to the railway carriage side of lorry, and are opened
Self-locking structure on dynamic traveling wheel 3 is fixed by traveling wheel 3, and the unloading unit of the utility model is avoided to move at work,
Working efficiency is influenced, after completing all preparations, express highway waveform girder steel plate is slided along mobile jib 1 and bracket 2, and
Due to being provided with protective device 4 in mobile jib 1, it is possible to avoid damaging highway waveform joist steel during completing unloading
The Zinc coat of guardrail board is beneficial to appearance identification and quality testing;
Wherein, after unloaded operation is completed in a job site, the system of traveling wheel 3 is released by automatic unlocking structure
It is dynamic, so that traveling wheel 3 is followed the movement of lorry and is moved, until being moved to next break bulk point, then passes through self-locking structure
Traveling wheel 3 is fixed, improve rate of discharging.
Finally, release fastener 132 after completing all unloading work, disconnect connecting hole 131 with lorry,
It pulls out the positioning pin 123 across location hole 112 and limit hole again, releases the relatively fixed of bracket 2 and mobile jib 1, make bracket 2 can be with
The opposite sliding of opposite mobile jib 1, closes up the mobile jib 1 of 2 two sides of bracket, while releasing length adjustment rod piece by auto-unlocking device
Fixation, by the length adjustment of length adjustment rod piece to most short, so that the volume of the unloading unit of the utility model is adjusted to
Minimum facilitates storage.Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are
With the difference of other embodiments, the same or similar parts in each embodiment may refer to each other.Embodiment is disclosed
Device for, since it is corresponded to the methods disclosed in the examples, so be described relatively simple, related place is referring to method
Part illustrates.
The foregoing description of the disclosed embodiments can be realized professional and technical personnel in the field or using originally practical new
Type.Various modifications to these embodiments will be readily apparent to those skilled in the art, and determine herein
The General Principle of justice can be realized in other embodiments without departing from the spirit or scope of the present utility model.Cause
This, the present invention will not be limited to the embodiments shown herein, and is to fit to and principles disclosed herein
The widest scope consistent with features of novelty.