CN208366325U - A kind of building monitoring settlement observation mark protective device - Google Patents

A kind of building monitoring settlement observation mark protective device Download PDF

Info

Publication number
CN208366325U
CN208366325U CN201820919754.0U CN201820919754U CN208366325U CN 208366325 U CN208366325 U CN 208366325U CN 201820919754 U CN201820919754 U CN 201820919754U CN 208366325 U CN208366325 U CN 208366325U
Authority
CN
China
Prior art keywords
protective device
building
shell
immediately ahead
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820919754.0U
Other languages
Chinese (zh)
Inventor
吴凯祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Baiguan Engineering Testing Co Ltd
Original Assignee
Guangxi Baiguan Engineering Testing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Baiguan Engineering Testing Co Ltd filed Critical Guangxi Baiguan Engineering Testing Co Ltd
Priority to CN201820919754.0U priority Critical patent/CN208366325U/en
Application granted granted Critical
Publication of CN208366325U publication Critical patent/CN208366325U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

The utility model discloses a kind of building monitoring settlement observations to identify protective device, its structure includes protective plate, brick, mark rod, identification point, fixed block, protective device, building body, it is connected immediately ahead of protective plate with fixed block trailing flank, it fits immediately ahead of brick trailing flank and building body, it is connected immediately ahead of mark rod rear end and fixed block, protective device is equipped in structure, push button, driven rod is driven to match with spring, spring is pressurized to the right, driven rod is driven to move right, then drive pressure ram mobile, pressure ram squeezes its through-hole, then release button, spring reset, it is fixed on driven rod on card slot, pressure ram is driven to reset, make in gas flow cavity body, then it is flowed in gas recovery device by gas recovery pipe, gas recovery device flows to air collecting chamber, finally it is discharged from check-valves, inhale vacuum Disk is fixed in building, and protective device is fixedly mounted on mark installation place, is prevented mark from being collided, is improved the accuracy of the data detected.

Description

A kind of building monitoring settlement observation mark protective device
Technical field
The utility model is a kind of building monitoring settlement observation mark protective device, belongs to protective device field.
Background technique
Building monitoring is that whether the working condition built in order to prevent in design period is healthy, while setting for later building Meter construction etc. provides scientific basis and engineering experience, is in general divided into settlement observation and deformation observation, and there are also cracks certainly The a series of monitoring of width etc..
Prior art discloses identified to protect with settlement observation application No. is a kind of: building monitoring of CN201711091505.3 Protection unit, protective device include the first cabinet, the first chamber door, handle, rubber ring and fixed block, and the rear side of the first cabinet is with before Side is opened type setting, has been connected by hinge the first chamber door, the leading flank of the first chamber door on the left of the leading flank of the first cabinet Handle has been bolted in right side, and the periphery of handle is connected with rubber ring, and the right flank middle part of the first chamber door is connected by bolt It is connected to fixed block, the right flank middle part of the first cabinet is arranged in fixed device, but the prior art is generally straight observation mark It connects and is placed in building, in building construction process, construction material can collide mark, make to identify from deviating from the position, cause to monitor Data out generate deviation.
Utility model content
It is identified in view of the deficienciess of the prior art, the utility model aim is to provide a kind of building monitoring with settlement observation Protective device is directly placed in building with solving existing generally observation is identified, in building construction process, construction material Mark can be collided, makes to identify from deviating from the position, the data detected is caused to lead to the problem of deviation.
To achieve the goals above, the utility model is achieved through the following technical solutions: a kind of monitoring of building is used Settlement observation identifies protective device, and structure includes protective plate, brick, mark rod, identification point, fixed block, protective device, building Body, the protective plate front are connected with fixed block trailing flank, fit immediately ahead of the brick trailing flank and building body, institute It states and is connected immediately ahead of mark rod rear end and fixed block, the identification point is installed on immediately ahead of mark rod and mutually welds, the guarantor Protection unit includes gas recovery device, gas recovery pipe, cavity body, through-hole, vacuum chuck, shell, pressure ram, check-valves, gas collection Chamber, spring, card slot, button, driven rod, the gas recovery device set there are two and are installed on cavity body two sides, and the gas returns It is connected at the top of closed tube with gas recovery device bottom, the cavity body is installed on vacuum chuck outer surface and fits, described logical Hole is located at cavity body right side side and is connected with vacuum chuck right end, and the vacuum chuck is installed on right end on the inside of shell, described Pressure ram is set to and cavity external surface and fits with spring right end, the check-valves be installed on air collecting chamber inside bottom and with it is outer Shell bottom is connected, and the air collecting chamber is set on the inside of shell, is connected on the left of the spring with driven rod right end, the card slot and Driven rod lower surface fits, and the button is installed on shell inside left-end and is connected with driven rod left end, the driven rod Set on shell inside left-end.
Further, the button is by for cylindrical structure and diameter is 6cm.
Further, the fixed block is located at protective device left side side.
Further, the protective device is installed on immediately ahead of protective plate and is connected.
Further, it fits immediately ahead of the shell and protective plate.
Further, the mark rod, which is made of stainless steel, makes it have anti-rust action.
Further, the vacuum chuck outer surface is made of rubber.
Beneficial effect
A kind of building monitoring of the utility model identifies protective device with settlement observation, and protective device is equipped in structure, is pressed Button is pressed, driven rod is driven to match with spring, spring is pressurized to the right, drives driven rod to move right, then drives pressure ram Mobile, pressure ram squeezes its through-hole, and then release button, spring reset are fixed on driven rod on card slot, drives pressure ram It resets, makes then to flow in gas recovery device by gas recovery pipe, gas recovery device flows to gas collection in gas flow cavity body Chamber is finally discharged from check-valves, is fixed on vacuum chuck in building, and protective device is fixedly mounted on mark installation place, prevents Mark is collided, and the accuracy of the data detected is improved.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other spies of the utility model Sign, objects and advantages will become more apparent upon:
Fig. 1 is the structural schematic diagram that a kind of building monitoring settlement observation of the utility model identifies protective device;
Fig. 2 is the protective device structural representation that a kind of building monitoring settlement observation of the utility model identifies protective device Figure.
In figure: protective plate -1, brick -2, mark rod -3, identification point -4, fixed block -5, protective device -6, building body -7, Gas recovery device -601, cavity body -603, through-hole -604, vacuum chuck -605, shell -606, squeezes gas recovery pipe -602 Bar -607, check-valves -608, air collecting chamber -609, spring -610, card slot -611, button -612, driven rod -613.
Specific embodiment
To be easy to understand the technical means, creative features, achievement of purpose, and effectiveness of the utility model, below In conjunction with specific embodiment, the utility model is further described.
Fig. 1, Fig. 2 are please referred to, the utility model provides a kind of building monitoring settlement observation mark protective device technical side Case: its structure includes protective plate 1, brick 2, mark rod 3, identification point 4, fixed block 5, protective device 6, building body 7, the protection 1 front of plate is connected with 5 trailing flank of fixed block, fits immediately ahead of 2 trailing flank of brick and building body 7, the mark It is connected immediately ahead of 3 rear end of bar and fixed block 5, the identification point 4 is installed on 3 front of mark rod and mutually welds, the protection Device 6 includes gas recovery device 601, gas recovery pipe 602, cavity body 603, through-hole 604, vacuum chuck 605, shell 606, squeezes Compression bar 607, check-valves 608, air collecting chamber 609, spring 610, card slot 611, button 612, driven rod 613, the gas recovery device 601 set there are two and are installed on 603 two sides of cavity body, and 602 top of gas recovery pipe is connected with 601 bottom of gas recovery device It connects, the cavity body 603 is installed on 605 outer surface of vacuum chuck and fits, and the through-hole 604 is located at 603 right side of cavity body 605 right end of Fang Bingyu vacuum chuck is connected, and the vacuum chuck 605 is installed on 606 inside right end of shell, the pressure ram 607 are set to 603 outer surface of cavity body and fit with 610 right end of spring, and the check-valves 608 is installed on 609 inside of air collecting chamber Bottom is simultaneously connected with 606 bottom of shell, and the air collecting chamber 609 is set to 606 inside of shell, 610 left side of spring and drive 613 right end of bar is connected, and the card slot 611 fits with 613 lower surface of driven rod, and the button 612 is installed in shell 606 Side left end is simultaneously connected with 613 left end of driven rod, the driven rod 613 be set to 606 inside left-end of shell, the button 612 by For cylindrical structure and diameter is 6cm, and the fixed block 5 is located at 6 left side side of protective device, and the protective device 6 is installed on 1 front of protective plate is simultaneously connected, and fits immediately ahead of the shell 606 and protective plate 1, the mark rod 3 is by stainless steel At anti-rust action is made it have, 605 outer surface of vacuum chuck is made of rubber.
Shell 606 described in this patent be physical structure, with bearing, connection motor, transmission mechanism, switch, handle and Auxiliary equipment makes the outermost layer structural member of a complete electric tool entity, and the spring 610 is a kind of to utilize bullet Property carry out the machine components of work, deformation occurs under external force for the part made of elastic material, restores again after removing external force Original state is also made " spring ", is generally made of spring steel, the complicated multiplicity of the type of spring, by shape point, mainly have helical spring, Scroll spring, flat spring, heterotypic spring etc..
Carry out using when push button 612, drive driven rod 613 matched with spring 610, spring 610 is pressurized to the right, It drives driven rod 613 to move right, then drives pressure ram 607 mobile, pressure ram 607 squeezes its through-hole 604, then unclamps Button 612, spring 610 reset, and are fixed on driven rod 613 on card slot 611, and pressure ram 607 is driven to reset, and keep gas flow empty In cavity 603, then flowed in gas recovery device 601 by gas recovery pipe 602, gas recovery device 601 flows to air collecting chamber 609, it is finally discharged from check-valves 608, is fixed on vacuum chuck 605 in building.
The utility model, which solves, to be generally directly placed at observation mark in building, in building construction process, building Material can collide mark, make to identify from deviating from the position, cause the data detected to lead to the problem of deviation, the utility model passes through Above-mentioned component is combined with each other, and protective device is equipped in structure, and push button drives driven rod to match with spring, spring It is pressurized to the right, driven rod is driven to move right, then drive pressure ram mobile, pressure ram squeezes its through-hole, then unclamps and presses Button, spring reset are fixed on driven rod on card slot, drive pressure ram to reset, make then to pass through gas in gas flow cavity body Body recovery tube flows in gas recovery device, and gas recovery device flows to air collecting chamber, is finally discharged from check-valves, fixes vacuum chuck In building, protective device is fixedly mounted on mark installation place, prevents mark from being collided, improves the accurate of the data detected Property.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above, for For those skilled in the art, it is clear that the present invention is not limited to the details of the above exemplary embodiments, and without departing substantially from this In the case where the spirit or essential attributes of utility model, the utility model can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the utility model is by institute Attached claim rather than above description limit, it is intended that will fall within the meaning and scope of the equivalent elements of the claims All changes are embraced therein.It should not treat any reference in the claims as limiting related right It is required that.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (5)

1. a kind of building monitoring identifies protective device with settlement observation, it is characterised in that: its structure includes protective plate (1), brick (2), mark rod (3), identification point (4), fixed block (5), protective device (6), building body (7), immediately ahead of the protective plate (1) with Fixed block (5) trailing flank is connected, and fits immediately ahead of brick (2) trailing flank and building body (7), the mark rod (3) It is connected immediately ahead of rear end and fixed block (5), the identification point (4) is installed on immediately ahead of mark rod (3) and mutually welds, the guarantor Protection unit (6) includes gas recovery device (601), gas recovery pipe (602), cavity body (603), through-hole (604), vacuum chuck (605), shell (606), pressure ram (607), check-valves (608), air collecting chamber (609), spring (610), card slot (611), button (612), driven rod (613), the gas recovery device (601) set there are two and are installed on cavity body (603) two sides, the gas It is connected at the top of recovery tube (602) with gas recovery device (601) bottom, the cavity body (603) is installed on vacuum chuck (605) Outer surface simultaneously fits, and the through-hole (604) is located at cavity body (603) right side side and is connected with vacuum chuck (605) right end, The vacuum chuck (605) is installed on right end on the inside of shell (606), and the pressure ram (607) is set to cavity body (603) outer surface And fit with spring (610) right end, the check-valves (608) be installed on air collecting chamber (609) inside bottom and with shell (606) Bottom is connected, and the air collecting chamber (609) is set on the inside of shell (606), right with driven rod (613) on the left of the spring (610) End is connected, and the card slot (611) fits with driven rod (613) lower surface, and the button (612) is installed on shell (606) Inside left-end is simultaneously connected with driven rod (613) left end, and the driven rod (613) is set to shell (606) inside left-end.
2. a kind of building monitoring according to claim 1 identifies protective device with settlement observation, it is characterised in that: described to press Button (612) is by for cylindrical structure and diameter is 6cm.
3. a kind of building monitoring according to claim 1 identifies protective device with settlement observation, it is characterised in that: described solid Determine block (5) and is located at protective device (6) left side side.
4. a kind of building monitoring according to claim 1 identifies protective device with settlement observation, it is characterised in that: the guarantor Protection unit (6) is installed on immediately ahead of protective plate (1) and is connected.
5. a kind of building monitoring according to claim 1 identifies protective device with settlement observation, it is characterised in that: described outer It fits immediately ahead of shell (606) and protective plate (1).
CN201820919754.0U 2018-06-13 2018-06-13 A kind of building monitoring settlement observation mark protective device Expired - Fee Related CN208366325U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820919754.0U CN208366325U (en) 2018-06-13 2018-06-13 A kind of building monitoring settlement observation mark protective device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820919754.0U CN208366325U (en) 2018-06-13 2018-06-13 A kind of building monitoring settlement observation mark protective device

Publications (1)

Publication Number Publication Date
CN208366325U true CN208366325U (en) 2019-01-11

Family

ID=64928920

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820919754.0U Expired - Fee Related CN208366325U (en) 2018-06-13 2018-06-13 A kind of building monitoring settlement observation mark protective device

Country Status (1)

Country Link
CN (1) CN208366325U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113238296A (en) * 2021-07-12 2021-08-10 深圳市勘察研究院有限公司 Intelligent ground collapse exploration and detection platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113238296A (en) * 2021-07-12 2021-08-10 深圳市勘察研究院有限公司 Intelligent ground collapse exploration and detection platform

Similar Documents

Publication Publication Date Title
CN208366325U (en) A kind of building monitoring settlement observation mark protective device
CN103737494A (en) Battery plate edge brushing machine produced in clean manner
CN104234109A (en) Hydraulic breaking hammer
CN204080903U (en) A kind of hydraulic breaking hammer
CN106475917A (en) A kind of blade shot-peening protection device
CN208400991U (en) A kind of device for lithium ion battery safety detection
CN105604115A (en) Breaking hammer with material recovery and dust collection devices
CN206492553U (en) A kind of viscous glutinous thing cleaning plant in crusher roller surface
CN204211799U (en) For pressure control device and the titanium sponge conversion unit of titanium sponge conversion unit
CN205056610U (en) Ore crusher's dust extraction
CN207538107U (en) A kind of crushing hammar drill rod structure
CN207620847U (en) A kind of mounting structure for the mining explosion flue dust alarm being easily installed
CN201220865Y (en) Dust collecting hood for preventing hopper from raising dust when unloading
CN216520147U (en) Oil chamber state monitoring device of on-load tap-changer
CN204182433U (en) The hydraulic pressure opening device of Reversable back-hammering disintegrator
CN209364035U (en) A kind of provision for disengagement for water pump
CN207800709U (en) A kind of anticollision housing of power cell
CN217489902U (en) Factory sewage treatment equipment with solid-liquid separation function
CN214213027U (en) Safe and reliable's closing device is used in processing of stainless steel round pin axle
CN215036603U (en) Sand blasting device for stainless steel processing
CN204412830U (en) A kind of mixing bender
CN209220332U (en) A kind of accurate neurology percussion hammer of detection
CN206255462U (en) A kind of factory's box of recycling old and useless articles
CN209194027U (en) A kind of device using reduction magnesium slag waste heat presmelting crude magnesium
CN214766416U (en) Liquid recovery device is used in processing of high efficiency plug

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190111

Termination date: 20190613