CN208363130U - The pipeline transportation device used in pipe gallery - Google Patents
The pipeline transportation device used in pipe gallery Download PDFInfo
- Publication number
- CN208363130U CN208363130U CN201820958100.9U CN201820958100U CN208363130U CN 208363130 U CN208363130 U CN 208363130U CN 201820958100 U CN201820958100 U CN 201820958100U CN 208363130 U CN208363130 U CN 208363130U
- Authority
- CN
- China
- Prior art keywords
- pipeline transportation
- pipe gallery
- transverse bar
- pipeline
- longitudinal rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Abstract
The utility model is the pipeline transportation device used in a kind of pipe gallery, including the pipeline transportation main support that can be dismantled, pipeline transportation main support includes two longitudinal rod groups, each longitudinal rod group includes at least two intervals and horizontally disposed longitudinal rod, parallel interval and at least two transverse bar groups are removedly set between two longitudinal rod groups, each transverse bar group includes at least two intervals and horizontally disposed transverse bar, the side of each transverse bar group can dismantle and two hounds are obliquely arranged in vertical, two hounds are symmetrical set and the distance between two hounds are from top to bottom in decrement setting, transverse bar and two hounds at the top of each transverse bar group constitute the support portion of pipeline to be transported;Multiple castors are removedly arranged in the bottom of pipeline transportation main support.The pipeline transportation apparatus structure used in the pipe gallery is simple, flexible and convenient to use, is convenient for assembly and disassembly, and can reuse reduces cost input, is suitable for promoting the use of.
Description
Technical field
The pipe that the utility model relates to use in urban construction pipe gallery technical field more particularly to a kind of pipe gallery
Line transport device.
Background technique
In recent years, Urban Underground pipe gallery rapidly develops, and most cities have, piping lane high in view of its construction cost
Section as small as possible, pipeline connection and reasonable arrangement and compact in design.Especially to the design of pedestrian passage, though it is able to satisfy daily personnel
Current, inspection requires, but the relative difficulty in pipeline transportation and maintenance.The Traditional Transportation way of underground pipe gallery gut line is adopted
It manually carries, inefficiency, and is easy to happen safety accident.
In order to solve the problems, such as that underground pipe gallery gut line transports, pipe gallery gut line is transported fill in the prior art
It sets and is designed exploitation, mainly there is following five kinds of structure type:
One, a kind of underground pipe gallery pipe level transport construction method (number of patent application 201510864937.8), this method
The following steps are included: pre-embedded connecting device is arranged at the top of underground pipe gallery, suspension arrangement is installed in pre-embedded connecting device lower part, hangs
Hang device lower part is connected by rail connection frame with the rigid track of T-type, and T-steel track web side wall installs safety slide wire, T-steel
Two motor-driven carriers are installed, the idler wheel of motor-driven carrier is arranged in T-steel track surface, and motor-driven carrier driving motor passes through carbon brush on rail
It is connected with safety slide wire, vertical loading board is installed in motor-driven carrier bottom, installs jack on vertical loading board.Device manufacturing and group in this method
Dress is all more complicated, and the installation of track and transport difficult install this transport device over long distances, are not easy to the installation of pipeline itself.
Two, a kind of piping lane interior conduit transport mounting device (number of patent application 201610748329.5), which includes square
Shape bracket, rectangle support divide into four supporting legs, install idler wheel respectively, and jack, connection at the top of jack are fixed among bracket
Joist, joist are equipped with fixed -piping fixing card.The device needs a large amount of welding and cold working (fixed pin holes processing etc.);Thousand
Jin top is fixed difficult;Trolley needs entirety to be placed in piping lane from pipe gallery feeding port, and size is limited by feeding port.
Three, a kind of pipe gallery pipeline-transporting vehicle (number of patent application 201710229006.X), the piping lane pipeline-transporting vehicle
Including N number of monomer vehicle frame, monomer vehicle frame includes pipeline gripping body, beam support, and crossbeam and supporting element surround door opening, in door
The two sides in hole are equipped with the stability maintenance leverage of connection adjacent monomer vehicle frame, the installation of pipeline gripping body and below the crossbeam;In lower support
Part is equipped with the lifting hydraulic cylinder of vertical direction, which improves the horizontal transport of pipeline and vertical lifting together as one
Pipe installing efficiency.But the apparatus structure is extremely complex, each monomer door frame includes 4 hydraulic cylinders, needs hydraulic power source
It can be used.In pipeline transportation installation, multiple monomer door frames are needed, each mast apparatus is expensive, and economic benefit is poor.
Four, the Pipeline lift vehicle (number of patent application 201711050573.5) in a kind of restricted clearance, which includes bottom
Portion's walking dolly and conduit bracket, conduit bracket are arranged in the walking dolly of bottom, and bottom walking dolly includes accommodating pipe holding
The frame of frame, conduit bracket two sides are equipped with postive stop baffle, shelve conduit bracket in the frame by postive stop baffle, in pipe holding
Jack is arranged in the bottom of frame, and jack is similarly disposed in the frame of bottom walking dolly, pipeline to be hoisted is placed on
On conduit bracket, pipeline is transported to designated position by bottom walking dolly, conduit bracket is lifted by jack, reaches pipeline
To operation height.The device belongs to whole Transporting trolley, needs to fabricate, and the installation and fixation of jack are even more important.
Five, a kind of underground pipe gallery carrier (number of patent application 201711201901.7), the device include walking mechanism, rise
Descending mechanism and clamping device;Movable motor is fixed on chassis down either side, and is furnished with wheel.Multi-directional ball and its bracket are fixed on bottom
Disk front;Stepper motor is equipped with column by shaft coupling and active axis connection between upper box and lower box, dome-type roller is located at
On the positive pole bracket of column, the two sides of column are equipped with sliding rail;Synchronous belt is unilateral to be passed through in stand column cavity and two tanks
Synchronous pulley engagement, elevator equipped with cylindrical cam and synchronous band connection, equipped with reversing bullet between elevator and cylindrical cam
Spring.Driving shaft end is equipped with the bevel pinion engaged with one section of bevel gear wheel of driven shaft, and the driven shaft other end is equipped with compound cam;
It is equipped with two folder platforms on the right side of chassis, is equipped with trapezoid block beside folder platform;Each folder platform is equipped with fixture block, and fixture block is affixed with connecting rod, even
Bar and compound cam cooperate.The device has used the parts such as motor, belt wheel, bevel gear, and processing is extremely complex, with high costs.By
Numerous in its part, reliability also declines therewith.
In conclusion although existing pipe gallery gut line transport device above-mentioned can overcome pipeline to transport to a certain extent
Defeated problem, but these equipment mechanisms are complicated, use is inflexible, and the manufacture and transport of device itself are all more troublesome, no
Use easy to spread.
The present inventor based on years of experience and practice in relevant industries, proposes that a kind of pipe gallery is interior and uses as a result,
Pipeline transportation device, to overcome the deficiencies of existing technologies.
Utility model content
The purpose of this utility model is to provide the pipeline transportation devices used in a kind of pipe gallery, overcome the prior art
Present in mechanism it is complicated, inflexible for use the problems such as, the pipeline transportation apparatus structure used in the pipe gallery is simple, uses
Flexibly and easily, it is convenient for assembly and disassembly, can reuse reduces cost input, is suitable for promoting the use of.
The purpose of this utility model is achieved in that the pipeline transportation device used in a kind of pipe gallery, including energy
The pipeline transportation main support of disassembly, the pipeline transportation main support include being arranged in parallel and at interval two longitudinal rod groups, each institute
It states longitudinal rod group and includes at least two intervals and horizontally disposed longitudinal rod, between parallel between two longitudinal rod groups
Every and removedly at least two transverse bar groups are set, each transverse bar group includes at least two intervals and sets in the horizontal direction
The side of the transverse bar set, each transverse bar group can dismantle and two hounds are obliquely arranged in vertical, and two described oblique
Strut is symmetrical set and the distance between two described hounds are from top to bottom in decrement setting, each transverse bar group top
Transverse bar and two hounds constitute the support portion of pipeline to be transported;The bottom of the pipeline transportation main support can dismantle
Multiple castors are arranged in ground.
In a better embodiment of the utility model, it is in set vertically that the both ends of two longitudinal rod groups, which are respectively equipped with,
It sets and upright bar removedly.
In a better embodiment of the utility model, the castor is removedly arranged in the bottom of each upright bar.
In a better embodiment of the utility model, the castor is connected to described vertical by way of clearance fit
The bottom of bar.
In a better embodiment of the utility model, the longitudinal rod, the transverse bar, the hound and described
Upright bar is made of scaffolding steel pipe.
In a better embodiment of the utility model, the castor is universal caster wheel.
From the above mentioned, the pipeline transportation device used in the pipe gallery of the utility model has the following beneficial effects:
In the pipeline transportation device used in the pipe gallery of the utility model, each rod piece can enter synthesis in the form of loose mail
Piping lane, and on-site assembly constitutes pipeline transportation main support in pipe gallery, does not need to construct special entrance structure, not thrown
The limitation of material mouth size is conducive to the construction for simplifying pipe gallery;The pipeline transportation used in the pipe gallery of the utility model
Length dimension, width dimensions and the bearing height size of device can be adjusted according to actual use demand, applied widely, real
It is strong with property;The pipeline transportation apparatus structure used in the pipe gallery of the utility model is simple, flexible and convenient to use;This is practical new
The pipeline transportation device used in the pipe gallery of type is convenient for assembly and disassembly, in assembling process without welding and it is various cold plus
Work, it is easy to operate, be conducive to carrying of the device between different cabins, between different piping lanes;The pipe gallery of the utility model
The pipeline transportation device materials inside used are convenient and low in cost, and can reuse reduction cost input, make suitable for promoting
With.
Detailed description of the invention
Following drawings are only intended to schematically illustrate and explain the present invention, does not limit the model of the utility model
It encloses.Wherein:
Fig. 1: for the schematic diagram of the pipeline transportation device used in the pipe gallery of the utility model.
Fig. 2: for the side view of the pipeline transportation device used in the utility model pipe gallery.
Fig. 3: for the castor installation condition schematic diagram of the pipeline transportation device used in the utility model pipe gallery.
Fig. 4: for the pipeline transportation device use state diagram used in the utility model pipe gallery.
In figure:
100, the pipeline transportation device used in pipe gallery;
1, pipeline transportation main support;
11, longitudinal rod;12, transverse bar;13, hound;14, upright bar;
2, castor;
8, jack;
90, pipe gallery;
91, pipeline to be transported.
Specific embodiment
For a clearer understanding of the technical features, objectives and effects of the utility model, now compareing Detailed description of the invention
Specific embodiment of the present utility model.
As shown in Figures 1 to 4, the utility model provides the pipeline transportation device 100 used in a kind of pipe gallery, including
Can disassembly pipeline transportation main support 1, pipeline transportation main support 1 to facilitate assembly with the frame structure of disassembly;Pipeline transportation master
Bracket 1 includes being arranged in parallel and at interval two longitudinal rod groups, and each longitudinal rod group includes at least two intervals and in the horizontal direction
The longitudinal rod 11 of setting, the length direction of longitudinal rod 11 and the vertical consistency of pipe gallery, length, that is, integrated pipe of longitudinal rod 11
The length dimension L of the pipeline transportation device used in corridor, can be according to actual use demand adjustment;Between two longitudinal rod groups
Distance can be adjusted according to the size of pipeline to be transported, pipe gallery;
As shown in Figure 1 and Figure 2, parallel interval and at least two transverse bar groups are removedly set between two longitudinal rod groups,
In a specific embodiment of the utility model, the quantity of transverse bar group is 3 groups;Each transverse bar group include at least two interval and
Horizontally disposed transverse bar 12, in a specific embodiment of the utility model, each transverse bar group includes between 2 parallel
Every the transverse bar 12 of setting;The length direction of transverse bar 12 and laterally uniform, the length of the transverse bar 12 i.e. synthesis of pipe gallery
The width dimensions W of the pipeline transportation device used in piping lane, can be according to actual use demand adjustment;Between adjacent transverse bar group
Distance can according to actual use demand (length etc. of pipeline to be transported) be adjusted;The side of each transverse bar group can dismantle
And two hounds 13 are obliquely set in vertical, two hounds 13 are symmetrical set and the distance between two hounds 13
From top to bottom in decrement setting, each pair of hound 13 constitutes the cross spacing portion of pipeline 91 to be transported, between each pair of hound 13
Distance can be adjusted according to the caliber of the pipeline to be transported in practice of construction;It is located at the transverse direction at top in each transverse bar group
Bar 12 and each pair of hound 13 constitute the support portion of pipeline 91 to be transported, can stablize support pipeline to be transported;Hound simultaneously
The structural strength of pipeline transportation main support 1 can effectively be enhanced.
Multiple castors 2 are removedly arranged in the bottom of pipeline transportation main support 1, use in the realization pipe gallery of castor 2
The movement of pipeline transportation device 100.The bottom of castor 2 is with the distance between the transverse bar 12 for being located at top in each transverse bar group
The bearing height size H of transport line, the height that the transverse bar at top is located in each transverse bar group can be according to actual use need
Adjustment is asked, the distance between bottom and the top of hound of castor are the height of the pipeline transportation device used in pipe gallery
Size, the height dimension can be according to actual use demand adjustment.
In the pipeline transportation device used in the pipe gallery of the utility model, each rod piece can enter synthesis in the form of loose mail
Piping lane, and on-site assembly constitutes pipeline transportation main support in pipe gallery, does not need to construct special entrance structure, be conducive to
Simplify the construction of pipe gallery;Length dimension, the broad-ruler of the pipeline transportation device used in the pipe gallery of the utility model
Very little and bearing height size can be adjusted according to actual use demand, applied widely, practical;The utility model it is comprehensive
It is simple to close the pipeline transportation apparatus structure used in piping lane, it is flexible and convenient to use;It is used in the pipe gallery of the utility model
Pipeline transportation device is convenient for assembly and disassembly, and can reuse reduces cost input, is suitable for promoting the use of.
Further, as shown in Figure 1 and Figure 2, the both ends of two longitudinal rod groups are respectively equipped in being vertically arranged and removedly
Upright bar 14.The quantity of upright bar 14 is 4, and 4 upright bars 14 constitute the supporting leg of pipeline transportation main support 1.As shown in figure 3, in this reality
It applies in mode, aforementioned castor 2 is removedly arranged in the bottom of each upright bar 14.In a specific embodiment of the utility model, foot
Wheel 2 is connected to the bottom of upright bar 14 by way of clearance fit.
Further, longitudinal rod 11, transverse bar 12, hound 13 and upright bar 14 are made of scaffolding steel pipe, use scaffold
Steel pipe realizes the assembling of pipeline transportation main support 1 with fastener, and materials are convenient, and cost is relatively low, in an assembling process without welding and
Various cold working, assembling, convenient disassembly.
Further, castor 2 is the universal caster wheel of standard, and the multidirectional movement of energy, flexibly, materials are convenient, and cost is relatively low for activity.
In the pipe for carrying out pipeline 91 to be transported using the pipeline transportation device 100 used in the pipe gallery of the utility model
When transport, longitudinal rod 11, transverse bar 12, hound 13 and upright bar 14 are passed through to pipe gallery feeding port in the form of loose mail first
(prior art, pipe gallery open up when constructing) launches inside pipe gallery 90, will be longitudinal using scaffolding steel pipe fastener
Bar 11, transverse bar 12, hound 13 and upright bar 14 connect and compose pipeline transportation main support 1, in the bottom installation foot of 4 upright bars 14
Wheel 2.Length dimension L, the width dimensions W and bearing height size H of the pipeline transportation device 100 used in pipe gallery are according to reality
Border execution conditions (pedestrian passage width, 91 pipe diameter size of pipeline to be transported, length, the height of 91 installation sites of pipeline to be transported
Degree) it determines.
After completing the pipeline transportation device 100 used in pipe gallery assembling, it is moved at pipe gallery feeding port and receives
Pipeline 91 to be transported, pipeline 91 to be transported transport is extremely needed position to be mounted by pedestrian passage (prior art) along pipe gallery
It sets, as shown in figure 4, needing position to be mounted that jack 8 is arranged in pipeline to be transported, is lifted pipeline 91 to be transported by jack 8
To installation site, next step installation procedure is carried out.
From the above mentioned, the pipeline transportation device used in the pipe gallery of the utility model has the following beneficial effects:
In the pipeline transportation device used in the pipe gallery of the utility model, each rod piece can enter synthesis in the form of loose mail
Piping lane, and on-site assembly constitutes pipeline transportation main support in pipe gallery, does not need to construct special entrance structure, not thrown
The limitation of material mouth size is conducive to the construction for simplifying pipe gallery;The pipeline transportation used in the pipe gallery of the utility model
Length dimension, width dimensions and the bearing height size of device can be adjusted according to actual use demand, applied widely, real
It is strong with property;The pipeline transportation apparatus structure used in the pipe gallery of the utility model is simple, flexible and convenient to use;This is practical new
The pipeline transportation device used in the pipe gallery of type is convenient for assembly and disassembly, in assembling process without welding and it is various cold plus
Work, it is easy to operate, be conducive to carrying of the device between different cabins, between different piping lanes;The pipe gallery of the utility model
The pipeline transportation device materials inside used are convenient and low in cost, and can reuse reduction cost input, make suitable for promoting
With.
The above descriptions are merely exemplary embodiments of the present utility model, the model being not intended to limit the utility model
It encloses.Any those skilled in the art, made equivalent change under the premise of not departing from the conceptions and principles of the utility model
Change and modify, should belong to the range of the utility model protection.
Claims (6)
1. the pipeline transportation device used in a kind of pipe gallery, which is characterized in that including the pipeline transportation main support that can be dismantled,
The pipeline transportation main support includes being arranged in parallel and at interval two longitudinal rod groups, and each longitudinal rod group includes at least two
Interval and horizontally disposed longitudinal rod parallel interval and are removedly arranged at least two between two longitudinal rod groups
A transverse bar group, each transverse bar group include at least two intervals and horizontally disposed transverse bar, each transverse direction
The side of bar group can dismantle and two hounds are obliquely arranged in vertical, and two hounds are symmetrical set and two institutes
It states the distance between hound to be arranged in decrement from top to bottom, the transverse bar and two diagonal braces at the top of each transverse bar group
Bar constitutes the support portion of pipeline to be transported;Multiple castors are removedly arranged in the bottom of the pipeline transportation main support.
2. the pipeline transportation device used in pipe gallery as described in claim 1, which is characterized in that two longitudinal rods
The both ends of group are respectively equipped in being vertically arranged and upright bar removedly.
3. the pipeline transportation device used in pipe gallery as claimed in claim 2, which is characterized in that the bottom of each upright bar
The castor is removedly arranged in portion.
4. the pipeline transportation device used in pipe gallery as claimed in claim 3, which is characterized in that between the castor passes through
The mode of gap cooperation is connected to the bottom of the upright bar.
5. the pipeline transportation device used in pipe gallery as claimed in claim 2, which is characterized in that the longitudinal rod, institute
Transverse bar, the hound and the upright bar is stated to be made of scaffolding steel pipe.
6. the pipeline transportation device used in pipe gallery as described in claim 1, which is characterized in that the castor is universal
Castor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820958100.9U CN208363130U (en) | 2018-06-21 | 2018-06-21 | The pipeline transportation device used in pipe gallery |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820958100.9U CN208363130U (en) | 2018-06-21 | 2018-06-21 | The pipeline transportation device used in pipe gallery |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208363130U true CN208363130U (en) | 2019-01-11 |
Family
ID=64925970
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820958100.9U Withdrawn - After Issue CN208363130U (en) | 2018-06-21 | 2018-06-21 | The pipeline transportation device used in pipe gallery |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208363130U (en) |
-
2018
- 2018-06-21 CN CN201820958100.9U patent/CN208363130U/en not_active Withdrawn - After Issue
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108560591A (en) | The pipeline transportation device used in pipe gallery | |
CN201406284Y (en) | Mobile hoisting portal frame | |
CN107043070A (en) | A kind of Feeding System of Urban Rail Transit equipment installs special portal frame | |
CN203247031U (en) | Hoisting device for curtain board transporting | |
CN201264869Y (en) | Special small gantry crane for hoisting synchronous radiation light source main body apparatus | |
CN204873592U (en) | Portable planer -type jack -up hoist and mount frame | |
CN108657949B (en) | Pneumatic monorail crane installation device and method | |
CN208363130U (en) | The pipeline transportation device used in pipe gallery | |
WO2021093092A1 (en) | Train maintenance vehicle suitable for air rail transit system | |
CN209022832U (en) | A kind of ultra-wide T plate inclination transport support | |
CN207919351U (en) | Hanging basket | |
CN203742180U (en) | Truss mounting device and mounting frames thereof | |
CN205256477U (en) | Bridge expansion joint installation conveyer | |
CN215101525U (en) | Movable portal frame for installing power distribution cabinet | |
CN212101668U (en) | Novel switch board installation auxiliary frame | |
CN214527884U (en) | Electric lifting device for indoor high-altitude pipeline installation | |
CN210767825U (en) | Turnover formwork construction system | |
CN202353043U (en) | Transfer device for high-tension switch board | |
CN204002841U (en) | A kind of outrigger formula mobile formwork for support of tunnel wall pouring construction | |
CN108680377B (en) | Electric hoist energy efficiency test stand without installation | |
CN106829778A (en) | A kind of horizontal pump overhauls maintenance unit | |
CN202006361U (en) | Core extraction machine | |
CN210457284U (en) | Precast concrete trench cover plate hoisting device | |
CN220011922U (en) | Hoisting and horizontal transportation platform in building curtain wall building layer | |
CN220688444U (en) | Frame device of crane flange processing equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20190111 Effective date of abandoning: 20231003 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20190111 Effective date of abandoning: 20231003 |
|
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |