CN208359436U CN201820909785.8U CN201820909785U CN208359436U CN 208359436 U CN208359436 U CN 208359436U CN 201820909785 U CN201820909785 U CN 201820909785U CN 208359436 U CN208359436 U CN 208359436U
Authority
CN
China
Prior art keywords
water
water tank
plastic pipe
line equipment
burning optimization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820909785.8U
Other languages
Chinese (zh)
Inventor
丁良玉
王百提
龙攀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhongcai Pipes Science and Technology Co Ltd
Original Assignee
Zhejiang Zhongcai Pipes Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhongcai Pipes Science and Technology Co Ltd filed Critical Zhejiang Zhongcai Pipes Science and Technology Co Ltd
Priority to CN201820909785.8U priority Critical patent/CN208359436U/en
Application granted granted Critical
Publication of CN208359436U publication Critical patent/CN208359436U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing And Handling Of Plastics And Other Materials For Molding In General (AREA)

Abstract

The utility model discloses a kind of plastic pipe burning optimization on line equipment and techniques, belong to technical field of heat treatment, it is therefore intended that overcome the lower defect of prior art efficiency.Plastic pipe burning optimization on line equipment includes water tank, and the both ends of the water tank have the through-hole passed through for plastic pipe, inlet and outlet on the water tank, the interior setting heater of the water tank and temperature inductor.Plastic pipe burning optimization on line equipment and technique provided by the utility model, are directly heat-treated, without first cooling down when plastic pipe is extruded, it is high in machining efficiency, the production cycle is reduced, the residual temperature of plastic pipe itself can also provide heat, the specific heat capacity of water is larger, reduces heat treatment energy consumption.

Description

Plastic pipe burning optimization on line equipment
Technical field
The utility model belongs to technical field of heat treatment, is related to a kind of plastic pipe burning optimization on line equipment and technique.
Background technique
Plastic pipe (especially PPR pipe) is produced by the way of high speed extrusion, sub-cooled sizing at present, in tubing The a large amount of internal stress of portion's remaining, at this moment tubing leads to plastic pipe poor toughness, easily occurs non-plastic fracture, booster in use Quality problems;The production method of comparative maturity at present are as follows: after product is offline, it is neatly put into high-temperature heat treatment baking oven, is protected Warm a period of time, be then slowly cooled to room temperature, the problem of to improve plastic pipe poor toughness, but this processing mode efficiency compared with It is low, energy consumption is larger, the period is longer.
Summary of the invention
In view of the problems of the existing technology the utility model proposes a kind of plastic pipe burning optimization on line equipment and technique, Aim to overcome that the lower defect of prior art efficiency.
The utility model is realized in this way:
Plastic pipe burning optimization on line equipment, which is characterized in that including water tank, the both ends of the water tank have for plastic tube The through-hole that material passes through, inlet and outlet on the water tank, setting heater and temperature inductor in the water tank.
Under normal conditions, the through-hole that the plastic pipe being extruded directly passes through water tank one end enters water tank, and by another The through-hole at end is pierced by water tank, and in heat treatment process, plastic pipe continues to pass through water tank.Water in water tank is heated by heater, just The waste heat of the plastic pipe of extrusion itself also provides a part of heat, can save the energy, and the water temperature in water tank is maintained at pre- If value realizes heat treatment.Water in water tank is added by water inlet, is released by water outlet.
Preferably, the lower end of the water tank has flash chamber, and the water inlet and the water outlet are located at the dilatation On case.Flash chamber is capable of increasing the volume of water tank, is also convenient for discharging water.
Preferably, overflow pipe is set on the water tank.Overflow pipe can limit the height of water level in water tank, avoid in water tank Water level it is excessively high.
Preferably, water tank is arranged in the lower section of the water tank, and the overflow pipe is connected to the water tank and water tank.It overflows in this way Water energy out is enough stored in water tank to be recycled.
Preferably, drip tray is arranged in the both ends of the water tank, and the drip tray is connected to by recovery tube with the water tank. In plastic pipe traveling process, inevitably there is water spilling in through hole, and drip tray can recycle spilling water, and be fallen spilling water by recovery tube Enter water tank to realize the recycling of water resource.
Preferably, the water tank is connected to by circulation pipe with the water tank, and the circulation pipe setting can be by water tank In water be pumped into the water pump of water tank.The water pump recovery tank of recycling can be realized that water resource is recycled, when water in water tank by water pump When temperature is excessively high, cooling purpose can be realized by the way that the water at low temperature in water tank is pumped into water tank.
Preferably, water supply pipe is set on the water tank, water compensating valve is set on the water supply pipe.Water in water tank is being circulated throughout It is inevitably lost in journey, when water level is lower than preset value in water tank, moisturizing can be carried out to water tank by water supply pipe, when water in water tank When temperature is excessively high, it can also be cooled down by water supply pipe feed-tank moisturizing.
Preferably, spray tube is set in the water tank, and the spray tube is connected to the circulation pipe, water supply pipe.Spray tube When can guarantee cooling moisturizing, the water energy of supplement is enough to be uniformly sprayed in water tank, and localized hyperthermia is avoided, this is also not have to water inlet The reason of carrying out moisturizing.
Preferably, sealing ring is arranged in the through hole.Sealing ring improves the leakproofness between water tank and plastic pipe, reduces Water leakage.
Preferably, the Equipment for Heating Processing further includes controller, and the controller is connected with heater, temperature inductor. Heater can be operated by manual control, can be realized the automation of control by controller, when temperature inductor induction Water temperature is lower than preset value, and controller controls heater heating.
Preferably, water level sensor is set in the water tank, and the water level sensor is connected with the controller, the water Pump is connected with the controller.When the water temperature that the water level of water level sensor detection is detected lower than preset value or temperature inductor is higher than Preset value, controller control pump working, the water in water tank are pumped into water tank.
Preferably, the water compensating valve is solenoid valve, and the water compensating valve is connected with the controller.When the water temperature in water tank is high In preset value, controller controls water compensating valve and opens, and allows water supply pipe for water tank moisturizing cooling.
Preferably, pressure inductor, inlet valve is arranged in the water inlet, and the inlet valve is solenoid valve, the pressure Inductor, inlet valve are all connected with the controller.When to water tank plus water, by the hydraulic pressure in pressure inductor monitoring water tank, when When reaching preset value, controller controls inlet valve and closes.
Plastic pipe burning optimization on line technique, which comprises the following steps:
It is filled the water into water tank, and the water in heating water tank;
It is passed through water tank after plastic tube extrusion and passes through water tank;
The temperature that temperature inductor detects is lower than predetermined value, control heater heating;When temperature is higher than predetermined value, opening Water inlet, water pump or water compensating valve add cold water in water tank.
Water level is more than predetermined value in water tank, is overflowed in water tank by overflow pipe;When water level is lower than predetermined value, pass through Water inlet adds water.
By the leak of drip tray return water tank through hole, leak flows back into water tank by recovery tube.
Plastic pipe is controlled by the time of water tank at 100-140 seconds.
Water temperature in water tank is controlled at 50-80 DEG C.
Plastic pipe burning optimization on line equipment and technique provided by the utility model, it is direct when plastic pipe is extruded It is heat-treated, it is high in machining efficiency without first cooling down, the production cycle is reduced, the residual temperature of plastic pipe itself can also provide heat, The specific heat capacity of water is larger, reduces heat treatment energy consumption.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of Equipment for Heating Processing.
Attached drawing mark explanation: 100. water tanks, 110. flash chambers, 120. water inlets, 130. water outlets, 140. inlet valves, 150. spray tubes, 160. heaters, 170. overflow pipes, 200. water tanks, 210. recovery tubes, 220. drip trays, 230. circulation pipes, 240. water pumps, 300. water supply pipes, 310. water compensating valves, 400. controllers, 500. plastic pipes.
Specific embodiment
Just attached drawing in conjunction with the embodiments below, is described in further detail specific embodiment of the present utility model, so that this Utility model technical solution is more readily understood, grasps.It should be appreciated that specific embodiment described herein is only to explain this reality With novel, it is not used to limit the utility model.
A kind of plastic pipe burning optimization on line equipment is present embodiments provided, as shown in Figure 1, including water tank 100, water tank 100 both ends have the through-hole passed through for plastic pipe 500, and sealing ring is arranged in through hole, and the lower end of water tank 100 has dilatation Case 110 has water inlet 120 and water outlet 130, setting heater 160 and temperature inductor in water tank 100 on flash chamber 110.
Overflow pipe 170 is set on water tank 100, and water tank 200,170 joining water box of overflow pipe is arranged in the lower section of water tank 100 100 and water tank 200.Drip tray 220 is arranged in the both ends of water tank 100, and drip tray 220 is connected by recovery tube 210 and water tank 200 It is logical.Water tank 200 is connected to by circulation pipe 230 with water tank 100, and the setting of circulation pipe 230 can be by the water pump in water tank 200 240 enter the water pump 240 of water tank 100.Water supply pipe 300 is set on water tank 100, water compensating valve 310 is set on water supply pipe 300.Water tank 100 Interior setting spray tube 150, spray tube 150 are connected to circulation pipe 230, water supply pipe 300.
Equipment for Heating Processing further includes controller 400, water level sensor, pressure inductor, inlet valve 140,310 He of water compensating valve Inlet valve 140 is all solenoid valve, controller 400 while and heater 160, temperature inductor, water level sensor, pressure sensitive Device, inlet valve 140, water compensating valve 310, water pump 240, inlet valve 140 connect.
500 burning optimization on line technique of plastic pipe the following steps are included:
1, it is filled the water by water inlet 120 into water tank 100, and passes through the water in 160 heating water tank 100 of heater;
2, plastic pipe 500 is passed through water tank 100 and passes through water tank 100 after squeezing out, and gradually passes through water tank 100, plastic tube Material 500 is controlled by the time of water tank 100 at 100-140 seconds.Water tank 100 may be one or more cabinets;When water tank 100 is When multiple, by total time be about 120 seconds.
3, the temperature that temperature inductor detects is lower than predetermined value, and preset temperature is preferably 50-80 DEG C, controls heater 160 heating;When temperature is higher than predetermined value, opening water inlet 120, water pump 240 or water compensating valve 310 add cold water in water tank 100, excellent It is selected as carrying out by water supply pipe 300 plus water is cooling.
4, water level is more than predetermined value in water tank 100, is overflowed in water tank 200 by overflow pipe;When water level is lower than predetermined When value, pass through water inlet 120 plus water.
By the leak of 220 return water tank of drip tray, 100 through hole, leak flows back into water tank by recovery tube 210 200.In 500 moving process of plastic pipe, water exudation is inevitably had, the step is in entire process flow.

Claims (8)

1. plastic pipe burning optimization on line equipment, which is characterized in that including water tank (100), the both ends of the water tank (100) have For the through-hole that plastic pipe passes through, there are water inlet (120) and water outlet, setting in the water tank (100) on the water tank (100) Heater (160) and temperature inductor.
2. plastic pipe burning optimization on line equipment according to claim 1, which is characterized in that under the water tank (100) End has flash chamber (110), and the water inlet (120) and the water outlet are located on the flash chamber (110).
3. plastic pipe burning optimization on line equipment according to claim 1, which is characterized in that set on the water tank (100) It sets overflow pipe (170), water tank (200) are arranged in the lower section of the water tank (100), and the overflow pipe (170) is connected to the water tank (100) and water tank (200).
4. plastic pipe burning optimization on line equipment according to claim 3, which is characterized in that the two of the water tank (100) End setting drip tray (220), the drip tray (220) are connected to by recovery tube (210) with the water tank (200).
5. plastic pipe burning optimization on line equipment according to claim 3, which is characterized in that the water tank (200) is logical It crosses circulation pipe (230) to be connected to the water tank (100), circulation pipe (230) setting can be by the water pump in water tank (200) (240) enter the water pump (240) of water tank (100).
6. plastic pipe burning optimization on line equipment according to claim 5, which is characterized in that set on the water tank (100) It sets water supply pipe (300), water compensating valve (310) is set on the water supply pipe (300), spray tube is set in the water tank (100) (150), the spray tube (150) is connected to the circulation pipe (230), water supply pipe (300).
7. plastic pipe burning optimization on line equipment according to claim 1, which is characterized in that the through hole setting sealing Circle.
8. plastic pipe burning optimization on line equipment according to claim 6, which is characterized in that the Equipment for Heating Processing is also wrapped It includes controller (400), the controller (400) connects with heater (160), temperature inductor, setting in the water tank (100) Water level sensor, the water level sensor and the controller (400) connection, the water pump (240) and the controller (400) Connection, the water compensating valve (310) are solenoid valve, the water compensating valve (310) and the controller (400) connection, the water inlet (120) pressure inductor, inlet valve (140) are set at, and the inlet valve (140) is solenoid valve, the pressure inductor, water inlet Valve (140) is all connected with the controller (400).
CN201820909785.8U 2018-06-12 2018-06-12 Plastic pipe burning optimization on line equipment Active CN208359436U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820909785.8U CN208359436U (en) 2018-06-12 2018-06-12 Plastic pipe burning optimization on line equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820909785.8U CN208359436U (en) 2018-06-12 2018-06-12 Plastic pipe burning optimization on line equipment

Publications (1)

Publication Number Publication Date
CN208359436U true CN208359436U (en) 2019-01-11

Family

ID=64928863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820909785.8U Active CN208359436U (en) 2018-06-12 2018-06-12 Plastic pipe burning optimization on line equipment

Country Status (1)

Country Link
CN (1) CN208359436U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108749045A (en) * 2018-06-12 2018-11-06 浙江中财管道科技股份有限公司 Plastic pipe burning optimization on line equipment and technique

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108749045A (en) * 2018-06-12 2018-11-06 浙江中财管道科技股份有限公司 Plastic pipe burning optimization on line equipment and technique

Similar Documents

Publication Publication Date Title
CN208914409U (en) A kind of oil temperature machine with automatic repairing function
CN208359436U (en) Plastic pipe burning optimization on line equipment
CN104667855A (en) Heat-conducting oil transport system for reaction kettle
CN108749045A (en) Plastic pipe burning optimization on line equipment and technique
CN207271256U (en) Cycles, economized heat-conducting oil system for hot melt adhesive production line
CN203726785U (en) Efficient mold temperature control machine
CN205247250U (en) Media rotation formula temperature controller energy storage voltage regulator device
CN104315755A (en) Wet process type tanning multi-section heating system and control method
CN206242444U (en) Die heater
CN207293087U (en) A kind of hot-water cylinder electronic temperature controller of improvement
CN105830896A (en) Temperature control method for water culture device
CN202656436U (en) Water type high temperature mold temperature control system
CN106738729A (en) Die heater and its temprature control method
CN204438549U (en) A kind of slaughtering animal hot water switch and the closed recuperated cycle system formed thereof
CN206755770U (en) A kind of superheated water closed cycle vacuum drying system
CN219905481U (en) Antifreezing heating device for oil tank
CN207449031U (en) Energy saving and energy remote control rapid heat cycle multifunctional steam die heater
CN204054422U (en) A kind of self-loopa water-cooled die heater
CN204172299U (en) A kind of cold, hot two-purpose oil circulation die heater
CN207438900U (en) A kind of Oil Guide heating unit of plasthetics processing
CN204076583U (en) The air-cooled die heater of a kind of self-loopa
CN206739646U (en) A kind of high-efficiency solar constant-temperature water supply device
CN206510393U (en) A kind of plastic mould heater
CN214354438U (en) Control system of mold temperature controller
CN205631381U (en) Head is extruded to 3D printer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant