CN208347339U - A kind of roofing edge protection device - Google Patents

A kind of roofing edge protection device Download PDF

Info

Publication number
CN208347339U
CN208347339U CN201820717247.9U CN201820717247U CN208347339U CN 208347339 U CN208347339 U CN 208347339U CN 201820717247 U CN201820717247 U CN 201820717247U CN 208347339 U CN208347339 U CN 208347339U
Authority
CN
China
Prior art keywords
safety net
vertical pole
frame column
brace
cage plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820717247.9U
Other languages
Chinese (zh)
Inventor
裴龙飞
金世殊
张晓光
朱瑞超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Sheng Tai Construction Engineering Co Ltd
Original Assignee
Tianjin Sheng Tai Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Sheng Tai Construction Engineering Co Ltd filed Critical Tianjin Sheng Tai Construction Engineering Co Ltd
Priority to CN201820717247.9U priority Critical patent/CN208347339U/en
Application granted granted Critical
Publication of CN208347339U publication Critical patent/CN208347339U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a kind of roofing edge protection devices, drip irrigation device: it is arranged in floor and faces on the frame column of side position, and protective device includes horizontal safety net, bracket and the fixation device for being fixedly connected with bracket with frame column for opening and being arranged between two adjacent frame columns;The bracket includes a pair of of vertical pole that is vertical with floor lateral surface and extending horizontally outward and is fixedly connected between two vertical poles and in its vertical a pair of of cross bar and the brace being arranged in below the vertical pole, described brace one end is connected to the one end of the vertical pole far from floor, and the other end is fixed on the frame column;The safety net includes the safety net one being hung on the cross bar and two braces far from floor side, the safety net two being hung on vertical pole and brace and the safety net three being hung between the cross bar and frame column of floor side;Its advantage is that a possibility that rubble that can reduce on roofing pounds people after falling.

Description

A kind of roofing edge protection device
Technical field
The utility model relates to a kind of construction safety device, in particular to a kind of roofing edge protection device.
Background technique
With Building technology sustainable development and building site it is in short supply, the height of building is gradually increased, and high-altitude junk is made At injury also increase, side is faced to the roofing in construction site, safeguard procedures is taken to be highly desirable.
Many concrete, lime block or crushed stone are stained on housing roof in building course, these blocks of solid by Can be detached to wind, rain or other collisions with roofing, following people may be pounded after falling, caused by injure it is very big.
Utility model content
The purpose of the utility model is to provide a kind of roofing edge protection devices, its advantage is that can reduce broken on roofing A possibility that stone pounds people after falling.
To achieve the above object, the utility model provides following technical solution:
A kind of roofing edge protection device is arranged in floor and faces on the frame column of side position, and protective device includes level Open safety net, bracket and the fixation device for being fixedly connected with bracket with frame column being arranged between two adjacent frame columns; The bracket includes a pair of of vertical pole that is vertical with floor lateral surface and extending horizontally outward and is fixedly connected between two vertical poles And in its vertical a pair of of cross bar and the brace being arranged in below the vertical pole, described brace one end is connected to the vertical pole One end far from floor, the other end are fixed on the frame column;The safety net includes being hung on the cross far from floor side It safety net one on bar and two braces, the safety net two being hung on vertical pole and brace and is hung on close to floor side Safety net three between cross bar and frame column.
It by using above-mentioned technical proposal, after rubble is tumbled from floor, falls to safety net, safety net can be with access Rubble stops rubble further to fall, and reduces a possibility that rubble pounds people;Bracket is supported safety net, makes safety net Keep the state opened.Bracket is fixedly connected on frame column by fixed device, hangs up safety net steadily in the outer of floor Side.It can be opened by the safety net one, safety net two and safety net three of setting to receive rubble, meanwhile, rubble is fallen When in safety net, in the side close to floor, thus, so that preferably, the support strength of bracket is alleviated, thus to how to make With more stable in the process.
Preferably, the lower end of the safety net extends on lower layer's floor, sewed up between safety net one and safety net three, and stay Equipped with discharge port.
By using above-mentioned technical proposal, by staying the discharge port set in downside, the convenient rubble in safety net is carried out Periodic cleaning.
Preferably, the fixed device includes the two halves cage plate being socketed on frame column, two halves cage plate is fastened by bolts Connection is to be locked on frame column.
By using above-mentioned technical proposal, two halves cage plate is bolted connection, after bolt screws, between two halves cage plate Distance reduce, the surface of cage plate inner wall and frame column is inconsistent, and two halves cage plate can be locked on frame column, thus will set Plate is fixedly connected on frame column.
Preferably, the fixed device further includes being fixedly connected with cage plate bracket to be pressed abd fixed on the cage plate Locking member.
By using above-mentioned technical proposal, bracket is locked and is connected on cage plate by locking member, and cage plate and frame column are solid Fixed connection, therefore, bracket can be stably fixed and be connected on frame column.
Preferably, the locking member is semicircle clip, vertical pole is located on the outside of the inner cylinder face and cage plate of semicircle clip Between face, several semicircle clips are fastenedly connected by screw and cage plate vertical pole to be pressed abd fixed on cage plate.
By using above-mentioned technical proposal, after tightening screw, the inner cylinder of semicircle clip and the outer cylinder of vertical pole offset Touching, vertical pole is pressed on cage plate.More than two clips can be fixed the two o'clock of vertical pole, constitute one according to two o'clock The case where rotating around fixed position, is less likely to occur for the principle of straight line, vertical pole, and vertical pole can be more stably fixedly connected with cage plate.
Preferably, being equipped with space branch joint between the vertical pole and cross bar, vertical pole and cross bar connect with space branch respectively Head interference grafting.
By using above-mentioned technical proposal, when mounting bracket, as long as by cross bar and vertical pole insertion space branch joint, due to Cross bar and vertical pole and space branch joint are interference fit, and therefore, vertical pole and cross bar can be kept fixed connection.
Preferably, the jib head is fixedly connected with vertical pole far from one end of frame column by space branch joint, tiltedly The lower end of bar is fixedly connected with the cage plate being arranged on frame column by semicircle clip.
It is to the pressure of vertical pole bigger in safety net after the more rubble of access by using above-mentioned technical proposal, it indulges Bar is by biggish Moment power.Brace is supported vertical pole far from one end of frame column, improves the bending strength of vertical pole.
Preferably, the bracket further includes the pull rod between the vertical pole and the brace, interference is socketed on brace There are breeches joint, pull rod one end and breeches joint interference grafting, the pull rod other end and the cage plate being arranged on frame column pass through semicircle Shape clip is fixedly connected.
By using above-mentioned technical proposal, after vertical pole is by biggish pressure, one end far from frame column is bent downwardly, tiltedly Bar supports, while jib head is rotated around lower end towards the direction far from frame column, intermediate position of the pull rod to brace Drawing support is carried out, the moment of flexure torque arm length that brace is subject to reduces, and therefore, the Moment power that brace is subject to reduces, bending deformation Degree reduce, improve the stability of bracket.
In conclusion the utility model has the following beneficial effects:
1, it after rubble is tumbled from floor, falls to safety net, safety net can stop rubble further with access rubble It falls, reduces a possibility that rubble pounds people;Bracket is supported safety net, and safety net is made to keep the state opened.It is fixed Bracket is fixedly connected on frame column by device, hangs up safety net steadily in the outside of floor.Pass through the safety net of setting One, safety net two and safety net three can be opened to receive rubble, meanwhile, when rubble is fallen in safety net, in close The side of floor, thus, so that preferably, alleviate the support strength of bracket, thus to how in use process it is more stable;
2, by staying the discharge port set in downside, the convenient rubble in safety net carries out periodic cleaning;
3, two halves cage plate is bolted connection, and after bolt screws, the distance between two halves cage plate reduces, cage plate inner wall Inconsistent with the surface of frame column, two halves cage plate can be locked on frame column, so that cage plate is fixedly connected on frame column On.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of this fact Example;
Fig. 2 is the enlarged drawing of A structure in Fig. 1;
Fig. 3 is the schematic diagram for embodying discharge port;
Fig. 4 is the schematic diagram for embodying space branch joint structure;
Fig. 5 is the schematic diagram for embodying T connector structure;
Fig. 6 is the schematic diagram for embodying fixture structure;
Fig. 7 is the schematic diagram for embodying semicircle yoke configurations;
Fig. 8 is the schematic diagram for embodying breeches joint structure.
Appended drawing reference: 1, floor;2, frame column;3, protective device;31, bracket;311, vertical pole;312, cross bar;313, tiltedly Bar;314, first support bar;315, second support bar;32, safety net;321, safety net one;322, safety net two;323, safety Net three;324, discharge port;325, feeding inlet;33, fixed device;331, cage plate;3311, link block;332, bolt;333, semicircle Shape clip;334, screw;34, T connector;35, space branch joint;36, breeches joint.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing, wherein the identical attached drawing of identical components Label indicates.It should be noted that word "front", "rear" used in the following description, "left", "right", "up" and "down", " bottom Face " and " top surface " refer to that the direction in attached drawing, word "inner" and "outside" are referred respectively to towards or away from particular elements geometry The direction at center.
Embodiment: a kind of roofing edge protection device, as shown in Figure 1, in general, roofing includes floor 1 and carries out to floor 1 The frame column 2 of support.Protective device 3 includes the bracket 31 being arranged on frame column 2 and the safety net for being supported on 31 upper end of bracket 32, the size of mesh opening of safety net 32 can be 2mm~5mm, under rubble of the size greater than 5mm can be stopped by 32 access of safety net Come, safety net 32 is opened by bracket 31, for the rubble that access is fallen from floor 1, is reduced after rubble falls and is pounded people's Possibility.
Bracket 31 includes horizontally disposed a pair of of vertical pole 311 and a pair of of cross bar 312, and cross bar 312 and vertical pole 311 surround rectangle Mount structure, vertical pole 311 are suspended in the outside of floor 1, and 312 both ends of cross bar are fixedly connected with two vertical poles 311 respectively.
Brace 313 is arranged below in vertical pole 311, and 313 upper end of brace is fixedly connected with vertical pole 311 far from one end of frame column 2.
In conjunction with shown in Fig. 1 and Fig. 3, safety net 32 includes being hung on cross bar 312 and two braces 313 far from 1 side of floor On safety net 1, the safety net 2 322 that is hung on vertical pole 311 and brace 313 and be hung on close to 1 side of floor Cross bar 312 and frame column 2 between safety net 3 323.Safety net 1 and safety net 2 322 are close to the side of brace 313 Connection, safety net 2 322 and safety net 3 323 are connected in the side close to frame column 2, and connection type can be for using iron wire Connection is tightened, snap connection or fastens connection etc. with rope.At the same time, in the lower end of safety net 1 and safety net 3 323 It extends on lower layer's floor 1, and is connected between safety net 1 and safety net 3 323, and be installed with discharge port 324, thus, Feeding inlet 325 is formed between vertical pole 311 and cross bar 312, and rubble is fallen in safety net 32, meanwhile, pass through peace Connection between the whole network 1, safety net 2 322 and safety net 3 323, so that internal form one to the inclined splicing of floor Region, meanwhile, by the discharge port 324 of setting, it can be convenient and rubble is purged.
As shown in Figure 1 and Figure 4, vertical pole 311, brace 313 and 312 junction of cross bar are equipped with space branch joint 35, space Point straight joint 35 tool is equipped with interface on the end face of each branch there are three branch.Vertical pole 311, cross bar 312 and brace 313 divide Not with three interface grafting of space branch joint 35, vertical pole 311, cross bar 312 and brace 313 with 35 mistake of space branch joint It is full of cooperation, space branch joint 35 is fixedly connected vertical pole 311, cross bar 312 and brace 313.
As shown in Figure 1 and Figure 5, vertical pole 311 is socketed with T connector 34 close to one end of frame column 2, and vertical pole 311 connects with T-type First 34 interference fit, 312 both ends of cross bar respectively with 34 grafting of T connector that is arranged on vertical pole 311, cross bar 312 and T connector 34 interference fits.
As shown in Figure 2 and Figure 6, frame column 2 and 311 corresponding position of vertical pole are equipped with fixed device 33, and fixed device 33 includes Cage plate 331, cage plate 331 are rectangular tubular structure, and cage plate 331 is from intermediate split dimidiation.331 docking location one of two halves cage plate Body is connected with link block 3311, and link block 3311 is fastenedly connected by bolt 332, and after bolt 332 screws, two halves cage plate 331 can To be locked on frame column 2.Vertical pole 311 is fixedly connected by cage plate 331 with frame column 2, to stablize to safety net 32 Ground support.
As shown in Figure 2 and Figure 7, cage plate 331 is equipped with a pair of semicircle clip 333, and vertical pole 311 is located at semicircle clip Between 333 inner cylinder and cage plate 331, semicircle clip 333 is fastenedly connected by screw 334 with cage plate 331, and screw 334 revolves Next, semicircle 333 inner cylinder of clip and vertical pole 311 are inconsistent, and vertical pole 311 is pressed on cage plate 331, two semicircles Clip 333 can be fixed the two o'clock of vertical pole 311, and vertical pole 311 can be more stably fixed on cage plate 331.
As shown in Figure 1, it is fixedly connected with cage plate 331 close to one end corresponding position of floor 1 in brace 313 on frame column 2, Brace 313 passes through semicircle clip 333 with cage plate 331 close to one end of floor 1 and is fixedly connected.Access is more in safety net 32 Rubble after, bigger to the pressure of vertical pole 311, vertical pole 311 is by biggish Moment power.Brace 313 is remote to vertical pole 311 One end from frame column 2 is supported, and improves the bending strength of vertical pole 311.
As shown in Figure 1, being equipped with pull rod 314 between brace 313 and vertical pole 311, pull rod 314 is horizontally disposed, on frame column 2 with 314 corresponding position of pull rod is fixedly connected with cage plate 331, and pull rod 314 passes through semicircle clip 333 and is fixedly connected with cage plate 331.
As illustrated in figures 1 and 8, the one end of pull rod 314 far from frame column 2 is connect with brace 313, brace 313 and pull rod 314 Corresponding position is socketed with breeches joint 36, and brace 313 and breeches joint 36 are interference fitted.Pull rod 314 and 36 grafting of breeches joint are drawn Bar 314 and breeches joint 36 are interference fitted, and pull rod 314 is fixedly connected with brace 313 by breeches joint 36.
As shown in Figure 1, one end far from frame column 2 is bent downwardly, and brace 313 is right after vertical pole 311 is by biggish pressure It is supported, while 313 upper end of brace is rotated around lower end towards the direction far from frame column 2, and pull rod 314 is in brace 313 Between position carry out drawing support, moment of flexure torque arm length that brace 313 is subject to reduces, and therefore, the Moment power that brace 313 is subject to subtracts Small, the degree of bending deformation reduces, and improves the stability of bracket 31.
The course of work: it after the rubble above safety net 32 falls downwards, is mutually collided with safety net 32, safety net 32 Shaking by a relatively large margin is generated, the kinetic energy of rubble is absorbed.Feeding inlet of the rubble on safety net is fallen in safety net, safety net After the more rubble of 32 accesss, rubble is cleared up by discharge port, thus, more have and effectively alleviates vertical pole, brace Pressure, thus, when in use, more conveniently, safely.

Claims (8)

1. a kind of roofing edge protection device is arranged on the frame column (2) that floor (1) faces side position, it is characterized in that: protection Device (3) includes horizontal opening the safety net (32) being arranged between two adjacent frame columns (2), bracket (31) and by bracket (31) the fixation device (33) being fixedly connected with frame column (2);
The bracket (31) includes a pair of of vertical pole (311) that is vertical with floor (1) lateral surface and extending horizontally outward and fixes It is connected between two vertical poles (311) and in its vertical a pair of of cross bar (312) and setting below the vertical pole (311) Brace (313), described brace (313) one end are connected to the one end of the vertical pole (311) far from floor (1), and the other end is fixed on On the frame column (2);
The safety net (32) includes the safety net being hung on the cross bar (312) and two braces (313) far from floor (1) side One (321) are hung on vertical pole (311) and safety net two (322) on brace (313) and are hung on close to floor (1) side Cross bar (312) and frame column (2) between safety net three (323).
2. roofing edge protection device according to claim 1, it is characterized in that:
The lower end of the safety net (32) extends on lower layer's floor (1), stitches between safety net one (321) and safety net three (323) It connects, and is installed with discharge port (324).
3. roofing edge protection device according to claim 1, it is characterized in that:
The fixed device (33) includes the two halves cage plate (331) being socketed on frame column (2), and two halves cage plate (331) passes through spiral shell Bolt (332) is fastenedly connected to be locked on frame column (2).
4. roofing edge protection device according to claim 3, it is characterized in that:
The fixed device (33) further includes being fixedly connected with cage plate (331) bracket (31) is pressed abd fixed on the cage plate (331) locking member on.
5. roofing edge protection device according to claim 4, it is characterized in that:
The locking member is semicircle clip (333), and vertical pole (311) is located at the inner cylinder face and cage plate of semicircle clip (333) (331) between lateral surface, several semicircle clips (333) are fastenedly connected by screw (334) and cage plate (331) with by vertical pole (311) it is pressed abd fixed on cage plate (331).
6. roofing edge protection device according to claim 1, it is characterized in that:
Space branch joint (35) are equipped between the vertical pole (311) and cross bar (312), vertical pole (311) and cross bar (312) are respectively With space branch joint (35) interference grafting.
7. roofing edge protection device according to claim 1, it is characterized in that:
The one end of brace (313) upper end by space branch joint (35) and vertical pole (311) far from frame column (2) is fixed to be connected It connects, the lower end of brace (313) passes through semicircle clip (333) with the cage plate (331) being arranged on frame column (2) and is fixedly connected.
8. roofing edge protection device according to claim 1, it is characterized in that:
The bracket (31) further includes the pull rod (314) between the vertical pole (311) and the brace (313), brace (313) interference is socketed with breeches joint (36) on, pull rod (314) one end and breeches joint (36) interference grafting, and pull rod (314) is another It holds and is fixedly connected with the cage plate (331) being arranged on frame column (2) by semicircle clip (333).
CN201820717247.9U 2018-05-14 2018-05-14 A kind of roofing edge protection device Expired - Fee Related CN208347339U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820717247.9U CN208347339U (en) 2018-05-14 2018-05-14 A kind of roofing edge protection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820717247.9U CN208347339U (en) 2018-05-14 2018-05-14 A kind of roofing edge protection device

Publications (1)

Publication Number Publication Date
CN208347339U true CN208347339U (en) 2019-01-08

Family

ID=64889530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820717247.9U Expired - Fee Related CN208347339U (en) 2018-05-14 2018-05-14 A kind of roofing edge protection device

Country Status (1)

Country Link
CN (1) CN208347339U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112663980A (en) * 2020-12-27 2021-04-16 广东正升建筑有限公司 High-rise building construction protection device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112663980A (en) * 2020-12-27 2021-04-16 广东正升建筑有限公司 High-rise building construction protection device
CN112663980B (en) * 2020-12-27 2022-06-10 广东正升建筑有限公司 High-rise building construction protection device

Similar Documents

Publication Publication Date Title
CN208347339U (en) A kind of roofing edge protection device
CN208604846U (en) A kind of architectural design roof cornice water-tight device
CN206607964U (en) A kind of construction site multifunctional guard railing device
CN206530078U (en) A kind of support meanss
CN207245222U (en) Roofing edge protection device
CN209653189U (en) Extension type curtain wall connecting node construction
CN209244865U (en) A kind of trailer-type water pump station
CN209509655U (en) A kind of project installation protection fence
CN207700656U (en) One kind being used for electric mounting supporting rack
CN208564161U (en) Road construction multifunction guard rail
CN206971501U (en) A kind of curtain wall link code component
CN207245045U (en) A kind of fence stairwell protection network
CN205591507U (en) Scaffold frame of easily dismantling
CN212583074U (en) Protection canopy for building engineering
CN208748926U (en) A kind of device for hanging installation for curtain wall and point
CN207823807U (en) Straightening protection device for coiled steel bars
CN216445958U (en) Device for preventing grouting slurry from blocking pipe
CN207519318U (en) A kind of solar energy irrigation equipment
CN211817915U (en) Template scaffold convenient to dismouting
CN205444959U (en) Safety protection device for building
CN217233037U (en) Safety protection device for constructional engineering construction
CN205960598U (en) Novel cable adapter for electric power engineering
CN218678909U (en) Solar power generation device installed by combining parapet wall
CN205894809U (en) Single armed formula bicycle shed
CN211037765U (en) Hanging basket for construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190108

Termination date: 20200514