CN208345188U - Discharge mechanism for construction waste recyclable device - Google Patents

Discharge mechanism for construction waste recyclable device Download PDF

Info

Publication number
CN208345188U
CN208345188U CN201820574402.6U CN201820574402U CN208345188U CN 208345188 U CN208345188 U CN 208345188U CN 201820574402 U CN201820574402 U CN 201820574402U CN 208345188 U CN208345188 U CN 208345188U
Authority
CN
China
Prior art keywords
passage
tube body
mounting
mounting plate
construction waste
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820574402.6U
Other languages
Chinese (zh)
Inventor
胡云帆
刘久华
刘方园
林前在
徐军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Guo Yu Construction Co Ltd
Original Assignee
Sichuan Guo Yu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Guo Yu Construction Co Ltd filed Critical Sichuan Guo Yu Construction Co Ltd
Priority to CN201820574402.6U priority Critical patent/CN208345188U/en
Application granted granted Critical
Publication of CN208345188U publication Critical patent/CN208345188U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of discharge mechanism for construction waste recyclable device, comprising: the bottom end of vertical plate, construction waste recyclable device recovery tube is closed with vertical plate, and vertical plate is located on vertical direction;First passage, is connected to layered component, and the first passage is parallel with layered component, and the first passage passes through vertical plate, and angle is acute angle between plane where the first passage and vertical plate, and the first passage is hollow cylindrical;And second passage, below the first passage of installation, the second passage is installed in the junction of vertical plate and recovery tube, and the second passage is connected to recovery tube, has angle between the first passage and the second passage.Discharge mechanism for construction waste recyclable device solves the problems, such as that pre- sub-material work is caused to cannot achieve due to fine grained material is not separated discharge with coarse granule material when discharge in the prior art.

Description

Discharge mechanism for construction waste recyclable device
Technical field
The utility model relates to build waste disposal in construction process, and in particular to one kind is used for construction waste recyclable device Discharge mechanism.
Background technique
Chinese patent discloses that a kind of application No. is the construction waste recyclable devices and building of CN201720560711.3 Waste recovery systems, the construction waste recovery system include pulverizer, recycling band and construction waste recyclable device, the construction waste Recyclable device includes recovery tube, more diversion pipes, multiple cast hoppers and layered component, and recovery tube is for being fixedly connected on building Wall face and be obliquely installed.One end of each diversion pipe is connected to recovery tube, and multiple cast hoppers are led with more correspondingly Flow tube connection.Layered component is fixedly connected in recovery tube and recovery channel is divided into first passage and second channel, layering group There are multiple sieve pores, so that construction waste is layered in recovery channel on part.Although the construction waste recyclable device is in recovery tube In realize preliminary layered shaping carried out to construction waste, but the shortcomings that the construction waste recyclable device still has are as follows:
Since the material between the material and layered component and recovery tube in layered component not being divided in the discharge gate of recovery tube The phenomenon that beginning to rehearse out, the fine grained material for occurring having been separated from discharge and coarse granule material is caused still to mix appearance.
Utility model content
The utility model will provide a kind of discharge mechanism for construction waste recyclable device, solve in the prior art because of row The problem of fine grained material is not separated into discharge with coarse granule material when material and pre- sub-material work is caused to cannot achieve.
To achieve the above object, the utility model uses the following technical solution:
A kind of discharge mechanism for construction waste recyclable device, comprising:
The bottom end of vertical plate, construction waste recyclable device recovery tube is closed with vertical plate, and vertical plate is located on vertical direction;
First passage, is connected to layered component, and the first passage is parallel with layered component, and the first passage passes through perpendicular Angle is acute angle between plane where straight panel, the first passage and vertical plate, and the first passage is hollow cylindrical;And
The second passage is installed in the junction of second passage, the first passage of installation lower section, vertical plate and recovery tube, Second passage is connected to recovery tube, has angle between the first passage and the second passage.
Compared with the prior art, the utility model has the following beneficial effects:
By the way that vertical plate is arranged, so that thering is waste material in the recovery tube of angle to will not continue to go ahead with vertical direction, and perpendicular Particulate material is washed when straight panel blocking fine grained material to be easy to slide from vertical plate, and fine grained material is avoided to be detained on stop member;By Angle between the first passage and vertical plate is small, is easy card fine granular materials, in order to avoid fine granular materials are trapped in the It is more between one passage and vertical plate, therefore it is hollow cylindrical that the first passage, which is arranged, so that fine granular materials are led from first Between expects pipe and vertical plate smoothly, it avoids too many fine granular materials from being trapped in recovery tube the waste for leading to waste material, saves About raw material, are conducive to energy saving, meet ecological requirements;By having angle between the first passage of setting and the second passage Degree, fine grained material and coarse granule material mix again when avoiding exclusion, avoid also needing to separate and lead when recycling The waste in enable source, is good for the environment.
The further advantage, target and feature of the utility model will be partially reflected by the following instructions, and part will also pass through Research and practice to the utility model and be understood by the person skilled in the art.
Detailed description of the invention
Fig. 1 is the schematic diagram after splitting at discharge mechanism in construction waste recyclable device;
Fig. 2 is the enlarged drawing at discharge mechanism;
Fig. 3 is the enlarged drawing in Fig. 2 at A.
Appended drawing reference: vertical plate 1, the first passage 2, the second passage 3, recovery tube 4, layered component 5, upper segment 51, Lower section 52, the first tube body 521, the second tube body 522, connection frame 523, rotating ring 61, cleaning brush 62, installing mechanism 63, first Mounting plate 631, the second mounting plate 632, the first screw rod 633, guide rod 634, locating piece 641, the second screw rod 642, connector 643, the first spring 644, drivening piece 645, mounting portion 646, telescopic rod 71, mounting ring 72, sleeve 73, second spring 74, limit Arm 75, baffle 76.
Specific embodiment
In order to make technological means of the utility model, creation characteristic, reach purpose and effect is more clear and is easy to Understand, the utility model be further elaborated with reference to the accompanying drawings and detailed description:
As shown in Figure 1, Figure 2 and shown in Fig. 3, the present embodiment proposes a kind of material discharging machine for construction waste recyclable device Structure, comprising:
The bottom end of vertical plate 1, construction waste recyclable device recovery tube 4 is closed with vertical plate 1, and vertical plate 1 is located at vertical side Upwards;
First passage 2 is connected to layered component 5 (being equivalent to the central tube with filter hole), the first passage 2 with Layered component 5 is parallel, and the first passage 2 passes through vertical plate 1, and angle is sharp between 1 place plane of the first passage 2 and vertical plate Angle, the first passage 2 are hollow cylindrical;And
The junction installation second of second passage 3,2 lower section of the first passage of installation, vertical plate 1 and recovery tube 4 is led Expects pipe 3, the second passage 3 are connected to recovery tube 4, have angle between the first passage 2 and the second passage 3.
In order to avoid fine grained material is accumulated on the first passage 2 and layered component 5 when having a large amount of waste materials to be discharged into, although the One passage 2 is that hollow cylindrical to a certain extent hinders less the landing of fine grained material, but accumulation can inevitably be led throughout the year Fine grained material is caused to block recovery tube 4, in order to avoid this phenomenon, therefore done following design: this is used for construction waste recyclable device Discharge mechanism further include: the row's of helping component for secondary discharge;
Recovery tube 4 includes: upper segment 51 and lower section 52, and upper segment 51 is threadedly coupled with lower section 52;Lower section 52 It include: the connection frame 523 of the first tube body 521, the second tube body 522 and at least two n shapes, the first tube body 521 is used for and upper segment 51 are threadedly coupled, and the second tube body 522 is used to fix with vertical plate 1, pass through connection between the first tube body 521 and the second tube body 522 Frame 523 connects, and has spacing between adjacent two connection frame 523, so that rotating ring 61 can expose adjacent connection frame 523, makes In driving can the dynamic rotating ring 61 between connection frame 523 of hand push so that rotating ring 61 is able to drive cleaning brush It is completely de- due to the design of rotating ring 61 to avoid the first tube body 521 and the second tube body 522 for 62 rotations, the setting of connection frame 523 From;
The row's of helping component includes: rotating ring 61 and cleaning brush 62, the gap between the first tube body 521 and the second tube body 522 Closed by rotating ring 61, rotating ring 61 can opposite first tube body 521 and the second tube body 522 rotate, 61 outer wall of rotating ring exposing the One tube body 521 and the second tube body 522,61 inner wall of rotating ring are equipped with the cleaning brush being close to the first passage 2 and layered component 5 62。
Since cleaning brush 62 is close to the first passage 2 and layered component 5 for a long time when cleaning brush 62 rotates, lead to cleaning brush 62 It is easily damaged, entirely the row's of helping component can not be used after damaging in order to avoid cleaning brush 62: the row's of helping component further include: installing mechanism 63, rotating ring 61 is detachably connected by installing mechanism 63 with the first tube body 521 or the second tube body 522, and the first passage 2 can be with Vertical plate 1 is detached from, and lower section 52 is detached from upper segment 51, takes out cleaning brush 62 to facilitate.
In order to which design structure is simple and installing mechanism 63 easy to use, installing mechanism 63 realizes that rotating ring 61 is managed with first The detachable installation of body 521 and the second tube body 522, installing mechanism 63 include: the first mounting plate 631, the second mounting plate 632, One screw rod 633 and guide rod 634 are fixed with vertical with the first tube body 521 on the first tube body 521 or the second tube body 522 First mounting plate 631 is equipped with second mounting plate 632 parallel with the first tube body 521, the second mounting plate by first mounting plate 631 There is distance between 632 to the first tube body 521 and the second tube body 522, the first mounting plate 631 is threaded with the first screw rod 633, the One screw rod 633 passes through the second mounting plate 632, and the first screw rod 633 is only capable of rotating relative to the second mounting plate 632, in the first mounting plate The guide rod 634 parallel with the first mounting plate 631 is installed, guide rod 634 passes through the second mounting plate 632, in guide rod on 631 634, which are oriented to lower second mounting plate 632, is only capable of moving upwards in the side vertical with the first tube body 521;
Rotating ring 61 is detachably connected by bindiny mechanism with cleaning brush 62, can make after the first screw rod of turn 633 Cleaning brush 62 is close to the first passage 2 and layered component 5 and rotating ring 61 is close to the second mounting plate 632, can also to revolve Change 61 is detached from the second mounting plate 632, the first tube body 521 and the second tube body 522.
In order to design bindiny mechanism easy for installation, and in order to avoid leading to mounting portion 646 because of the rotation of rotating ring 61 It is inaccurate with the positioning of drivening piece 645, bindiny mechanism include: locating piece 641, the second screw rod 642, connector 643, the first spring 644, Drivening piece 645 and mounting portion 646, rotating ring 61 are recessed to form a mounting groove and stretch away from 631 side of the first mounting plate Slot, telescopic chute are connected to mounting groove, and the second mounting plate 632 is recessed to form locating slot away from 631 side of the first mounting plate, flexible One locating piece 641 that can be stretched in locating slot is installed, locating piece 641 is connected to the connector in mounting groove in slot 643, connector 643 is fixed to 74 one end of second spring away from the side of the second mounting groove, and 74 other end of second spring is fixed to Mounting groove inner wall, connector 643 are fixed to drivening piece 645 away from the side of the second mounting groove, and mounting portion 646 is cleaned for connecting Brush 62, is able to maintain that locating piece 641 stretches in locating slot and drivening piece 645 does not stretch to mounting portion simultaneously under spring force In 646, the second screw rod 642 that can be stretched in mounting groove is threaded on the second mounting plate 632, in the second screw rod 642 Squeezing lower drivening piece 645 can stretch in a mounting portion 646.
In order to keep cleaning brush 62 that can can jump when encountering some small obstacles with the first passage 2 and also, to protect Protect mounting portion 646 extend mounting portion 646 service life, mounting portion 646 include: telescopic rod 71, mounting ring 72, sleeve 73 and Second spring 74,71 one end of telescopic rod are connected with mounting ring 72 and offer the drive hole protruded into for drivening piece 645, mounting ring 72 For being close to rotating ring 61,71 other end of telescopic rod is stretched in a sleeve 73, and telescopic rod 71, which passes through, second spring 74, the Two springs, 74 one end and mounting ring 72 are fixed, and 74 other end of second spring is fixed to sleeve 73, when rotating ring 61 and mounting ring 72 Be close to and cleaning brush 62 when being close to the first passage 2 second spring 74 be in confined state.
In order to avoid disassembly when because second spring 74 elastic force due to cause the length of telescopic rod 71 and sleeve 73 too long, in turn It avoids because the length of telescopic rod 71 and sleeve 73 is too long leading to that cleaning brush 62 is hindered to be difficult to be discharged out of first tube body 521, pacify Dress portion 646 further include: position limit arm 75 and baffle 76, position limit arm 75 and mounting ring 72 are fixed, and baffle 76 is fixed on sleeve 73, Position limit arm 75 can catch on baffle 76 from baffle 76 away from 71 side of telescopic rod, the mounting portion 646 when position limit arm 75 catches on baffle 76 It can be excluded from the first tube body 521 with cleaning brush 62.
The working principle of the present embodiment: when needing to dismantle cleaning brush 62, firstly, the first tube body of turn 521, so that first Tube body 521 and upper segment 51 are detached from;Then, the second screw rod of turn 642 realizes the locating piece 641 under 644 elastic force of the first spring It stretches in locating slot, drivening piece 645 is entirely retracted to rotating ring 61, this when can topple over out of first tube body 521 Cleaning brush 62 and mounting portion 646 out;After again, the first screw rod of turn 633 so that second the 632 to the first tube body of mounting plate 521 away from From sufficiently large, it can allow for rotating ring 61 to move out and stitched between the second mounting plate 632 and the first tube body 521 or the second tube body 522 Gap;Finally, disassembly rotating ring 61, can also replace rotating ring 61.
When installing new cleaning brush 62, firstly, cleaning brush 62 and mounting portion 646 are placed on the first tube body 521 and the second pipe In body 522;Then, hand stretches in the first tube body 521 and the second tube body 522 that (521 length of the first tube body is sufficiently small, hand energy Stretch to the junction of the first tube body 521 and the second tube body 522) so that the drive hole on telescopic rod 71 is aligned with locating slot, hand Keep this alignment;After again, rotating ring 61 is squeezed between the first tube body 521 and the second tube body 522, and make locating piece 641 are aligned with mounting groove, to guarantee that subsequent drivening piece 645 can stretch in drivening piece 645;After again, the first screw rod 633 is rotated, So that the second mounting plate 632 is close to the first mounting plate 631, and second spring 74 is made to occur elastic deformation, mounting ring 72 with 61 inner wall of rotating ring is close to, and cleaning brush 62 is close to the first passage 2;Finally, the second screw rod 642 of rotation, the second screw rod 642 are logical It crosses a cushion block to be close to connector 643, forcing the first spring 644, deformation occurs, and final drivening piece 645, which is press-fit into, drives hole It is interior, realize installation.First screw rod includes: thread segment for stretching in the first mounting plate, for across the second mounting plate Round and smooth section and the locating part that is moved upwards for limiting annulus Duan Yu thread segment parallel lines side, locating part and annulus section side wall Connection, annulus section end are fixed with thread segment, and round and smooth section is only capable of rotating relative to the second mounting plate.
Finally, it is stated that above embodiments are merely intended for describing the technical solutions of the present application, but not for limiting the present application, although ginseng The utility model is described in detail according to preferred embodiment, those skilled in the art should understand that, it can be to this The technical solution of utility model is modified or replaced equivalently, without departing from the objective and model of technical solutions of the utility model It encloses, should all cover in the scope of the claims of the utility model.

Claims (7)

1. a kind of discharge mechanism for construction waste recyclable device characterized by comprising
The bottom end of vertical plate, construction waste recyclable device recovery tube is closed with vertical plate, and vertical plate is located on vertical direction;
First passage, is connected to layered component, and the first passage is parallel with layered component, and the first passage passes through vertical Angle is acute angle between plane where plate, the first passage and vertical plate, and the first passage is hollow cylindrical;And
The second passage of junction installation of second passage, the first passage of installation lower section, vertical plate and recovery tube, second Passage is connected to recovery tube, has angle between the first passage and the second passage.
2. the discharge mechanism according to claim 1 for construction waste recyclable device, which is characterized in that further include: it uses In the row's of helping component of secondary discharge;
Recovery tube includes: upper segment and lower section, and upper segment is threadedly coupled with lower section;Lower section includes: the first tube body, The connection frame of two tube bodies and at least two n shapes, the first tube body with upper segment for being threadedly coupled, and the second tube body is used for and vertical plate It is fixed, it is connected between the first tube body and the second tube body by connection frame, and have spacing between adjacent two connection frame;
The row's of helping component includes: rotating ring and cleaning brush, and the gap between the first tube body and the second tube body is by rotation ring seal, rotation Change can be rotated relative to the first tube body and the second tube body, and rotating ring outer wall exposes the first tube body and the second tube body, rotating ring inner wall The cleaning brush being close to the first passage and layered component is installed.
3. the discharge mechanism according to claim 2 for construction waste recyclable device, which is characterized in that the row's of helping component is also It include: installing mechanism, rotating ring is detachably connected by installing mechanism and the first tube body or the second tube body, and the first passage can be with Vertical plate is detached from.
4. the discharge mechanism according to claim 3 for construction waste recyclable device, which is characterized in that installing mechanism packet Include: the first mounting plate, the second mounting plate, the first screw rod and guide rod are fixed with and the on the first tube body or the second tube body The first vertical mounting plate of one tube body, the first mounting plate side are equipped with second mounting plate parallel with the first tube body, the second mounting plate To there is distance between the first tube body and the second tube body, the first mounting plate is threaded with the first screw rod, and the first screw rod passes through second Mounting plate, the first screw rod are only capable of rotating relative to the second mounting plate, be equipped on the first mounting plate parallel with the first mounting plate Guide rod, guide rod pass through the second mounting plate, and the second mounting plate is only capable of in the side vertical with the first tube body under guide rod guiding It moves upwards;
Rotating ring is detachably connected by bindiny mechanism and cleaning brush, after the first screw rod of turn, can make cleaning brush and One passage and layered component are close to and rotating ring is close to the second mounting plate, can also make the second mounting plate of rotating ring disengaging, First tube body and the second tube body.
5. the discharge mechanism according to claim 4 for construction waste recyclable device, which is characterized in that bindiny mechanism's packet Include: locating piece, the second screw rod, connector, the first spring, drivening piece and mounting portion, rotating ring deviate from the first mounting plate side Recess forms a mounting groove and telescopic chute, telescopic chute are connected to mounting groove, and the second mounting plate is recessed away from the first mounting plate side It falls into and forms locating slot, a locating piece that can be stretched in locating slot is installed in telescopic chute, locating piece, which is connected to, is located at installation Connector in slot, connector are fixed to second spring one end away from the side of the second mounting groove, and the second spring other end is fixed To mounting groove inner wall, connector is fixed to drivening piece away from the side of the second mounting groove, and mounting portion is for connecting cleaning brush, in bullet It is able to maintain that locating piece stretches in locating slot and drivening piece does not stretch in mounting portion simultaneously under spring force, on the second mounting plate It is threaded with the second screw rod that can be stretched in mounting groove, drivening piece can stretch to a mounting portion under the second screw extruding It is interior.
6. the discharge mechanism according to claim 5 for construction waste recyclable device, which is characterized in that mounting portion packet Include: telescopic rod, mounting ring, sleeve and second spring, telescopic rod one end are connected with mounting ring and offer and protrude into for drivening piece Drive hole, for being close to rotating ring, the telescopic rod other end stretches in a sleeve mounting ring, and telescopic rod is across there is the second bullet Spring, second spring one end are fixed with mounting ring, and the second spring other end is fixed to sleeve, when rotating ring is close to and clear with mounting ring Second spring is in confined state when brush is close to the first passage.
7. the discharge mechanism according to claim 6 for construction waste recyclable device, which is characterized in that mounting portion also wraps Include: position limit arm and baffle, position limit arm are fixed with mounting ring, and baffle is fixed on sleeve, and position limit arm can be from baffle away from flexible Baffle is caught in bar side, and when position limit arm catches on baffle, mounting portion and cleaning brush can be excluded from the first tube body.
CN201820574402.6U 2018-04-20 2018-04-20 Discharge mechanism for construction waste recyclable device Expired - Fee Related CN208345188U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820574402.6U CN208345188U (en) 2018-04-20 2018-04-20 Discharge mechanism for construction waste recyclable device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820574402.6U CN208345188U (en) 2018-04-20 2018-04-20 Discharge mechanism for construction waste recyclable device

Publications (1)

Publication Number Publication Date
CN208345188U true CN208345188U (en) 2019-01-08

Family

ID=64886979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820574402.6U Expired - Fee Related CN208345188U (en) 2018-04-20 2018-04-20 Discharge mechanism for construction waste recyclable device

Country Status (1)

Country Link
CN (1) CN208345188U (en)

Similar Documents

Publication Publication Date Title
CN105107741A (en) Tea winnower
CN108905334B (en) Self-circulation sewage treatment plant
CN204934013U (en) tea winnower
CN109847489B (en) Dust remover
CN209334139U (en) A kind of centrifugal screening plant
CN110395048A (en) A kind of ink in printing press recyclable device
CN208345188U (en) Discharge mechanism for construction waste recyclable device
CN209146418U (en) A kind of valve body with filtering function
CN109105448B (en) Machine is got rid of to continuous type fish scale that can adjust
CN207551102U (en) A kind of powder conveying apparatus
CN109319722A (en) Medicine bottle cleans filling production lines and its working method
CN204769494U (en) Material screening plant of formula is prevented blockking up by improved generation
CN210315952U (en) Reducing municipal sewage pipeline cleaning device
CN107854894A (en) Swinging grid sewage-removing machine
CN210171876U (en) Sand and stone separator
CN110054385A (en) Roller screen formula solid-liquid separating machine
CN214918107U (en) Plane rotary classifying screen for producing granular feed
CN112827704A (en) Paint spraying processing equipment for automobile front cover plate
CN215917754U (en) Stone reducing mechanism and dust collector thereof
CN209662704U (en) A kind of disassembly mechanism of commode sewage filter net
CN211465343U (en) Sealing washer rigging equipment
CN220877895U (en) Anti-blocking mechanism
CN209022428U (en) A kind of extruder of TPR rubber fuel gas conduit production
CN117298744B (en) Mortar reflux device for sand line cutting machine
CN214287237U (en) Quick detach formula dust removal is strained a section of thick bamboo

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190108