CN208343497U - A kind of PE film Re-stress pretreatment system - Google Patents
A kind of PE film Re-stress pretreatment system Download PDFInfo
- Publication number
- CN208343497U CN208343497U CN201820905184.XU CN201820905184U CN208343497U CN 208343497 U CN208343497 U CN 208343497U CN 201820905184 U CN201820905184 U CN 201820905184U CN 208343497 U CN208343497 U CN 208343497U
- Authority
- CN
- China
- Prior art keywords
- film
- milling
- column
- roll
- milling roller
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Perforating, Stamping-Out Or Severing By Means Other Than Cutting (AREA)
Abstract
The utility model discloses a kind of PE film Re-stress pretreatment systems, including pedestal, No.1 column and No. two columns, the No.1 column is fixedly welded on base upper surface one end, No. two columns are fixedly welded on the base upper surface other end, let off roll is fixedly connected at the top of the No.1 column, it is fixedly connected with wind-up roll at the top of No. two columns, No.1 column side is fixedly installed No.1 bracket, and No. two column sides are fixedly installed No. two brackets.The utility model No.1 milling roller inner cavity is fixedly installed heating pole, PE film is heated by heating pole, the effect of softening can be played to PE film, and squeezed by milling roller, internal stress can be removed rapidly, and cool down to PE film by the semiconductor chilling plate of No. three milling roller inner cavities, by the further sizing for accelerating PE film, working efficiency can be effectively increased, while also mitigating the labor intensity of operator, is suitble to be widely popularized and used.
Description
Technical field
The utility model relates to a kind of Re-stress device devices, in particular to a kind of PE film Re-stress pretreatment system
System.
Background technique
So-called internal stress, refers to after external loads are removed, and still remains in the stress of interior of articles.It is due to material
Internal macroscopic view or microcosmic tissue have occurred non-uniform volume change and generate, and object is due to external cause (stress, humidity variation
Deng) and when deforming, in the internal force for generating interaction in object between each section, to resist the effect of this external cause, and try hard to
Object is set to be returned to the position before deformation from deformed position.Internal force on the section certain point unit area investigated claims
For stress.Vertical with section is known as direct stress or normal stress
But in PE film during carrying out internal stress elimination, existing device is that pressurization is rolled and eliminated, this
Sample is easy to cause to damage to PE film, for this purpose, it is proposed that a kind of PE film Re-stress pretreatment system when being eliminated.
Utility model content
The main purpose of the utility model is to provide a kind of PE film Re-stress pretreatment system, No.1 milling roller inner cavities
It is fixedly installed heating pole, PE film is heated by heating pole, the effect of softening can be played to PE film, and pass through milling roller
It is squeezed, internal stress can be removed rapidly, and cool down to PE film by the semiconductor chilling plate of No. three milling roller inner cavities, it will
The further sizing for accelerating PE film, can effectively increase working efficiency, while also mitigating the labor intensity of operator, be suitble to quilt
It is widely popularized and uses, can effectively solve the problems in background technique.
To achieve the above object, the technical solution that the utility model is taken are as follows:
A kind of PE film Re-stress pretreatment system, including pedestal, No.1 column and No. two columns, the No.1 column are solid
Surely it is welded on base upper surface one end, No. two columns are fixedly welded on the base upper surface other end, No.1 column top
Portion is fixedly connected with let off roll, and wind-up roll, the fixed setting of No.1 column side are fixedly connected at the top of No. two columns
There is No.1 bracket, No. two column sides are fixedly installed No. two brackets, and No.1 bracket side is fixedly connected with No.1
Milling roller and No. two milling rollers, and No. two milling rollers are located above No.1 milling roller, No. two bracket sides are fixedly connected with
No. three milling rollers and No. four milling rollers, and No. four milling rollers are located above No. three milling rollers, No.1 milling roller inner cavity is fixed
It is provided with heating pole, No. three milling roller inner cavities are fixedly installed semiconductor chilling plate.
Further, the let off roll and wind-up roll one end are fixedly connected to No. two motors.
Further, the No.1 milling roller and No. two milling rollers pass through with No. three milling rollers and No. four milling roller one end
Chain is connected with No.1 motor.
Further, No. two milling rollers and No. four milling roller other ends are fixedly connected to pull rod, the pull rod top
Portion extends through No.1 bracket and No. two cradle tops.
Further, it is movably set with runner at the top of the pull rod, and runner is located at No.1 bracket and No. two top of support
Portion.
Compared with prior art, the utility model has the following beneficial effects:
1. coiled PE film is placed on let off roll, and PE film is worn at the top of No. two milling rollers and No. four milling rollers
It crosses, and is wrapped on wind-up roll, and drive let off roll and wind-up roll to synchronize rotation by No. two motors respectively, to realize
To the synchronization blowing of PE film and rewinding, can effectively avoid because of revolving speed difference, and cause PE film when carrying out except internal stress excessively pine or
Person's tension all can cause to damage to the structural strength of PE film.
2. driving No.1 milling roller and No. two milling rollers and No. three milling rollers and No. four milling rollers to carry out by No.1 motor
Rotation, and by mutual extrusion between milling roller, to play the effect for eliminating internal stress to PE film, wherein No. two milling rollers and
No. four milling roller one end are fixedly connected to pull rod, by rotating wheel can work to No. two milling rollers and No. four milling rollers it is high
Degree is adjusted, to realize that the pressure that rolls to PE film is adjusted, thus make the present apparatus be suitble to different-thickness and it is different at
The internal stress of the PE film divided is eliminated, and it is more convenient to use.
3. No.1 milling roller inner cavity is fixedly installed heating pole, PE film is heated by heating pole, PE film can be risen
It is squeezed to the effect of softening, and by milling roller, internal stress can be removed rapidly, and pass through partly leading for No. three milling roller inner cavities
Body cooling piece cools down to PE film, by the further sizing for accelerating PE film, can effectively increase working efficiency, while also mitigating
The labor intensity of operator.
Detailed description of the invention
Fig. 1 is a kind of overall structure diagram of PE film Re-stress pretreatment system of the utility model.
Fig. 2 is a kind of No. two milling roller the schematic diagram of the section structure of PE film Re-stress pretreatment system of the utility model.
Fig. 3 is a kind of No. three milling roller the schematic diagram of the section structure of PE film Re-stress pretreatment system of the utility model.
In figure: 1, pedestal;2, No.1 column;3, No. two columns;4, let off roll;5, wind-up roll;6, No.1 bracket;7, No. two
Bracket;8, No.1 milling roller;9, No. two milling rollers;10, No. three milling rollers;11, No. four milling rollers;12, pull rod;13, runner;
14, No.1 motor;15, heating pole;16, semiconductor chilling plate;17, No. two motors.
Specific embodiment
To be easy to understand the technical means, creative features, achievement of purpose, and effectiveness of the utility model, below
In conjunction with specific embodiment, the utility model is further described.
As shown in Figure 1-3, a kind of PE film Re-stress pretreatment system, including pedestal 1, No.1 column 2 and No. two columns
3, the No.1 column 2 is fixedly welded on 1 upper surface one end of pedestal, and it is another that No. two columns 3 are fixedly welded on 1 upper surface of pedestal
One end is fixedly connected with let off roll 4 at the top of the No.1 column 2, is fixedly connected with wind-up roll 5, institute at the top of No. two columns 3
It states 2 side of No.1 column and is fixedly installed No.1 bracket 6,3 side of No. two columns is fixedly installed No. two brackets 7, described
6 side of No.1 bracket is fixedly connected with No.1 milling roller 8 and No. two milling rollers 9, and No. two milling rollers 9 are located at No.1 milling roller 8
Top, 7 side of No. two brackets is fixedly connected with No. three milling rollers 10 and No. four milling rollers 11, and No. four milling rollers 11 are located at
No. three 10 tops of milling roller, 8 inner cavity of No.1 milling roller are fixedly installed heating pole 15, and 10 inner cavity of No. three milling rollers is solid
Surely it is provided with semiconductor chilling plate 16.
In the present embodiment (as shown in Figure 1), can make let off roll 4 and wind-up roll 5 at work can synchronize rotated.
Wherein, the let off roll 4 and 5 one end of wind-up roll are fixedly connected to No. two motors 17.
In the present embodiment (as shown in Figure 1), No.1 milling roller 8 and No. two milling rollers 9 and No. three milling rollers 10 and four can be made
Number milling roller 11 can synchronize at work to be rotated.
Wherein, the No.1 milling roller 8 and No. two milling rollers 9 and No. three milling rollers 10 and No. four 11 one end of milling roller are logical
It crosses chain and is connected with No.1 motor 14.
In the present embodiment (as shown in Figure 1), No. two milling rollers 9 and No. four 11 working depths of milling roller can be adjusted,
To which the convenient PE film to different-thickness carries out internal stress elimination.
Wherein, No. two milling rollers 9 and No. four 11 other ends of milling roller are fixedly connected to pull rod 12, the pull rod 12
Top extends through No.1 bracket 6 and No. two 7 tops of bracket.
In the present embodiment (as shown in Figure 1), runner 13 can make to adjust more laborsaving.
Wherein, 12 top of pull rod is movably set with runner 13, and runner 13 is located at No.1 bracket 6 and No. two brackets
7 tops.
It should be noted that the utility model is a kind of PE film Re-stress pretreatment system, when work, by coiled PE
Film is placed on let off roll 4, and PE film is passed through at the top of No. two milling rollers 9 and No. four milling rollers 11, and be wrapped in wind-up roll 5
On, and drive let off roll 4 and wind-up roll 5 to synchronize rotation by No. two motors 17 of 5IK120RGN-CF type respectively, thus
It realizes to the synchronization blowing of PE film and rewinding, can effectively avoid because of revolving speed difference, and cause PE film mistake when carrying out except internal stress
Pine or tension, all can cause to damage to the structural strength of PE film, while pass through 14 band of No.1 motor of 5IK120RGN-CF type
Dynamic No.1 milling roller 8 and No. two milling rollers 9 are rotated with No. three milling rollers 10 and No. four milling rollers 11, and pass through milling roller it
Between mutual extrusion, thus to PE film play eliminate internal stress effect, wherein No. two milling rollers 9 and No. four 11 one end of milling roller are equal
It is fixedly connected with pull rod 12, the working depth of No. two milling rollers 9 and No. four milling rollers 11 can be adjusted by rotating wheel 13
Section, to realize that the pressure rolled to PE film is adjusted, to make the PE film of the present apparatus suitable different-thickness and heterogeneity
Internal stress eliminate, it is more convenient to use, and 8 inner cavity of No.1 milling roller is fixedly installed heating pole 15, passes through AQMI type
Heating pole 15 heats PE film, and the effect of softening can be played to PE film, and is squeezed by milling roller, can remove rapidly
Internal stress, and cooled down by the semiconductor chilling plate 16 of the TEC1-12706 type of No. three 10 inner cavities of milling roller to PE film, it will
The further sizing for accelerating PE film, can effectively increase working efficiency, while also mitigating the labor intensity of operator.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above.Current row
The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments
Only illustrate the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model is also
It will have various changes and improvements, these various changes and improvements fall within the scope of the claimed invention.The utility model
Claimed range is defined by the appending claims and its equivalent thereof.
Claims (5)
1. a kind of PE film Re-stress pretreatment system, including pedestal (1), No.1 column (2) and No. two columns (3), described one
Number column (2) is fixedly welded on pedestal (1) upper surface one end, and it is another that No. two columns (3) are fixedly welded on pedestal (1) upper surface
One end, it is characterised in that: it is fixedly connected with let off roll (4) at the top of the No.1 column (2), it is solid at the top of No. two columns (3)
Surely it is connected with wind-up roll (5), No.1 column (2) side is fixedly installed No.1 bracket (6), No. two columns (3) one
Side is fixedly installed No. two brackets (7), and No.1 bracket (6) side is fixedly connected with No.1 milling roller (8) and No. two are rolled
Roller (9), and No. two milling rollers (9) are located above No.1 milling roller (8), No. two brackets (7) side is fixedly connected with No. three
Milling roller (10) and No. four milling rollers (11), and No. four milling rollers (11) are located above No. three milling rollers (10), the No.1 is ground
Pressure roller (8) inner cavity is fixedly installed heating pole (15), and No. three milling rollers (10) inner cavity is fixedly installed semiconductor chilling plate
(16).
2. a kind of PE film Re-stress pretreatment system according to claim 1, it is characterised in that: the let off roll (4)
No. two motors (17) are fixedly connected to wind-up roll (5) one end.
3. a kind of PE film Re-stress pretreatment system according to claim 1, it is characterised in that: the No.1 milling roller
(8) pass through chain with No. two milling rollers (9) with No. three milling rollers (10) and No. four milling roller (11) one end and be connected with No.1 electricity
Machine (14).
4. a kind of PE film Re-stress pretreatment system according to claim 1, it is characterised in that: No. two milling rollers
(9) it is fixedly connected to pull rod (12) with No. four milling roller (11) other ends, extends through No.1 branch at the top of the pull rod (12)
At the top of frame (6) and No. two brackets (7).
5. a kind of PE film Re-stress pretreatment system according to claim 4, it is characterised in that: pull rod (12) top
Portion is movably set with runner (13), and runner (13) is located at the top of No.1 bracket (6) and No. two brackets (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820905184.XU CN208343497U (en) | 2018-06-12 | 2018-06-12 | A kind of PE film Re-stress pretreatment system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820905184.XU CN208343497U (en) | 2018-06-12 | 2018-06-12 | A kind of PE film Re-stress pretreatment system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208343497U true CN208343497U (en) | 2019-01-08 |
Family
ID=64883068
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820905184.XU Expired - Fee Related CN208343497U (en) | 2018-06-12 | 2018-06-12 | A kind of PE film Re-stress pretreatment system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208343497U (en) |
-
2018
- 2018-06-12 CN CN201820905184.XU patent/CN208343497U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105500940B (en) | A kind of improved vehicle wheel rolling presses carving device | |
CN106269874A (en) | A kind of electro plasticity cross wedge rolling machine | |
CN209175920U (en) | A kind of die-cutting machine for fast imprint | |
CN204381994U (en) | The bar-shaped zero firmware aligning sanding apparatus of automobile mechanical | |
CN208343497U (en) | A kind of PE film Re-stress pretreatment system | |
CN208629148U (en) | A kind of abrasive belt plate edge polisher | |
CN212707680U (en) | Roller cooling device of plastic calender | |
CN108973246A (en) | A kind of adjustable marking press of corrugated paper production | |
CN112172118A (en) | Mobile phone film processing equipment | |
CN210150391U (en) | Winding mechanism for producing cold compress patch coating machine | |
CN107537906A (en) | A kind of metal stretching and molding machine | |
CN207548830U (en) | Note distribution idler wheel rubber ring cutting device | |
CN209207724U (en) | A kind of press device for high density fiberboard production | |
CN209337831U (en) | A kind of active actinobacillus frame | |
CN207325678U (en) | The workpiece grip mechanism of bending roll machine | |
CN207105101U (en) | A kind of veneer foamed board punching machine | |
CN213939580U (en) | White tea ball forming device | |
CN207344370U (en) | A kind of polishing workbench of automotive hub casting mold | |
CN207577120U (en) | A kind of novel cold rolling mechanism | |
CN207533699U (en) | Drawbench decoiling equipment | |
CN202519396U (en) | Pendulous device of yarn guide roller | |
CN206899859U (en) | A kind of cardboard cake box production gluing machine | |
CN214652313U (en) | Winding mechanism of splitting machine | |
CN212049884U (en) | Multi-roller collecting mechanism of silk separating equipment | |
CN221067177U (en) | Double-layer film blowing machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190108 |
|