CN208342767U - Heavy stay column sets hydraulic generator stator installation carriage - Google Patents

Heavy stay column sets hydraulic generator stator installation carriage Download PDF

Info

Publication number
CN208342767U
CN208342767U CN201820821513.2U CN201820821513U CN208342767U CN 208342767 U CN208342767 U CN 208342767U CN 201820821513 U CN201820821513 U CN 201820821513U CN 208342767 U CN208342767 U CN 208342767U
Authority
CN
China
Prior art keywords
bracket
hydraulic generator
stator
generator stator
stay column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820821513.2U
Other languages
Chinese (zh)
Inventor
晋健
汪文元
熊剑鸣
何世平
董靖
李龙华
郑圣义
薛天龙
黄金龙
潘杰
雷正义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guoneng Dadu River shaping Power Generation Co.,Ltd.
Original Assignee
GUODIAN DADU RIVER SHAPING HYDROPOWER CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUODIAN DADU RIVER SHAPING HYDROPOWER CONSTRUCTION Co Ltd filed Critical GUODIAN DADU RIVER SHAPING HYDROPOWER CONSTRUCTION Co Ltd
Priority to CN201820821513.2U priority Critical patent/CN208342767U/en
Application granted granted Critical
Publication of CN208342767U publication Critical patent/CN208342767U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacture Of Motors, Generators (AREA)

Abstract

The utility model discloses heavy stay column sets hydraulic generator stator installation carriages, including trolley body, bracket, fastening nut, the trolley body includes vehicle wheel component and the bearing platform that is fixedly mounted on vehicle wheel component, the first circular hole of at least four is evenly arranged on the bearing platform, the bracket is arranged in pairs and the center line symmetrical setting relative to bearing platform, its bottom vertical downward direction is fixedly installed and the first consistent standing screw of circular hole quantity, bracket passes through the standing screw that welds together with its bottom, the assembly connection of first circular hole and fastening nut is fixed in trolley body;The bracket is box-structure, and the radius of curvature of top planes is consistent with out frame outer diameter.The installation carriage of the utility model can make stator hoisting stress more reasonable, greatly reduce the deformation that stator generates in hoisting process.

Description

Heavy stay column sets hydraulic generator stator installation carriage
Technical field
The utility model belongs to technical field of hydroelectric generation, is related to hydro-electric power generating equipment maintenance dismounting, specifically a kind of use Installation carriage is dismounted in the big component of the stator of heavy stay column sets turbine-generator units.
Background technique
China's water conservancy is fast-developing in recent years, has built the tubular power station of large quantities of low water head big flows.Through-flow Formula unit equipment volume is big, and structure is complicated.To ensure that unit is stable and power generation production safety, Hydropower Plant not timing are big Repairing is a routine work, and overhaul removes and installs the stator of hydrogenerator and other components are the links that need not can lack. Every unit has the big component such as stator,, need to be by all parts since hole for hoist size is limited in unit equipment installation process It successively hangs in runner, then is assembled respectively.The components such as stator, rotor, the light bulb head of bulb-type tubular hydro set are all to pass through lifting Hole hangs in what runner was installed.Since flow channel space is limited, component hangs in sequence and is followed successively by light bulb head, rotor, stator, then Rotor, stator installation are successively carried out, finally light bulb head assembly is installed in place.
For the hydraulic generator stator internal diameter of one of large-scale bulb-type tubular hydro set fixation member up to several meters of even more than ten rice, weight is high Up to over one hundred ton.Unilateral general only more than ten millimeters of the air gap of stator and rotatable parts rotor.After rotor is in place, workshop is utilized The specific purpose tool that bridge machine hangs out frame outer wall slowly transfers stator.Stator must the progress of horizontal direction downstream rotor side when installing It is mobile, to be set with rotor.As the stator of hollow structure, its base outer wall is hung for a long time and easily occurs being permanently deformed in turn Influence stator circularity.The slight shaking of stator easily causes stator and rotor collision to damage stator core and rotor magnetic in suit Pole.To guarantee the air gap between generator stator and rotor, stator circularity need to carry out shaping with tens of groups of jack after suit, fixed Son and rotor suit process time-consuming are very long, thus expend a large amount of working hours, and installation quality is not easy to guarantee.
Traditional lifting mode is: the specific purpose tool of stator outer wall suspended in midair using workshop bridge machine and rotor is set with, The stator of hollow structure is unavoidably deformed, and the wirerope movement for suspending stator in midair has shaking, therefore stator and rotor Suit process it is very slow, and stator and rotor the air gap situation need to be monitored at any time.Generally it will appear after stator installation is in place The case where circularity changes must be adjusted stator circularity after the completion of suit.It, need to be with greatly when adjusting stator and rotor the air gap The jack pair stator circularity of amount carries out shaping, and adjustment process is very difficult, and time-consuming, more important is be difficult to ensure stator Installation quality.
Traditional lifting adjusts the position of the lifting big component of stator, for ruler using the method for steel wire hang completely Extremely difficult control when lifting of very little and big weight stator component, needs that stator component could be hung to pre-determined bit by adjustment repeatedly It sets, thereby results in stator component suspention overlong time, easily generation deformation.
Utility model content
To solve the above-mentioned problems, the utility model provides a kind of for heavy stay column sets hydrogenerator The big component tool specially for attaching and detaching of stator makes the bracket stress of one fixed spacing of band using installation carriage, ensures stator hoisting stress more Rationally, installation carriage track elevation is adjusted in advance, and thus directly stator and rotor can be set with, shorten erector Phase greatly reduces the deformation that stator generates in hoisting process.
To achieve the above object, the present invention adopts the following technical scheme:
Heavy stay column sets hydraulic generator stator installation carriage, including trolley body, bracket, fastening nut, The trolley body includes vehicle wheel component and the bearing platform that is fixedly mounted on vehicle wheel component, is uniformly set on the bearing platform It is equipped with the first circular hole of at least four, the bracket is arranged in pairs and the center line symmetrical setting relative to bearing platform, bottom Vertical downward direction be fixedly installed with the first consistent standing screw of circular hole quantity, bracket with its bottom by welding together Standing screw, the first circular hole and fastening nut assembly connection be fixed in trolley body;The bracket is box-structure, The radius of curvature of its top planes is consistent with out frame outer diameter.
Above-mentioned heavy stay column sets hydraulic generator stator installation carriage further includes and bearing platform center line Vertically arranged stretching screw, the bracket side offer the second circular hole, the stretching screw from left to right successively with left side Fastening nut, the fastening nut connection on the right side of 2 the second circular holes being correspondingly arranged of a pair of of bracket.
Above-mentioned heavy stay column sets hydraulic generator stator installation carriage, the bracket have 2, and described first Circular hole is 4.
Above-mentioned heavy stay column sets hydraulic generator stator installation carriage, the vehicle wheel component include wheel and Bearing assembly.
Above-mentioned heavy stay column sets hydraulic generator stator installation carriage, the vehicle wheel component have 4 sets.
Above-mentioned heavy stay column sets hydraulic generator stator installation carriage, the stretching screw have 4.
Above-mentioned heavy stay column sets hydraulic generator stator installation carriage is individually at least arranged on the bracket There are 4 the second circular holes, a pair of bracket can at least be connect with 4 stretching screws.
Above-mentioned heavy stay column sets hydraulic generator stator installation carriage, the bearing platform of the trolley body Front end is provided with traction drag hook.
The beneficial effects of the utility model are:
(1) installation carriage of the utility model is according to heavy stay column sets stator hoisting design feature and stress feelings Condition, the bracket being arranged symmetrically using installation carriage keep stator hoisting stress more reasonable, greatly reduce stator in hoisting process and produce Raw deformation;Stator and rotor, can directly be set with by prior coarse adjustment installation carriage elevation, and when installation reduces shaking and bridge Machine suspends the time in midair, greatly reduces the collision generated by shaking, and installation is more stable, and stator erector has been greatly shortened Phase improves installation effectiveness, has ensured installation quality;
(2) the installation carriage structure of the utility model is simple, compact, easy to operate, efficiently solves large-scale bulb through-flow The big component installation suspension overlong time of formula generator unit, easy the problems such as deforming.
Detailed description of the invention
Fig. 1 is the schematic view of the front view of the utility model;
Fig. 2 is the left view structural representation of the utility model.
The meaning of appended drawing reference in figure are as follows: 1, trolley body, 2, vehicle wheel component, 3, bracket, 4, stretching screw, 5, fastening spiral shell Mother, 6, traction drag hook, 7, track.
Specific embodiment
In order to make those skilled in the art better understand the technical solutions in the application, below in conjunction with the application reality The attached drawing in example is applied, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described implementation Example is merely a part but not all of the embodiments of the present application.Based on the embodiment in the application, this field is common The application protection all should belong in technical staff's every other embodiment obtained without making creative work Range.
As shown in Figure 1 to Figure 2, the installation carriage of the utility model, including trolley body 1, bracket 3, fastening nut 5 are small Vehicle ontology 1 includes vehicle wheel component 2 and the bearing platform that is fixedly mounted on vehicle wheel component 2, be evenly arranged on bearing platform to Few 4 the first circular holes, bracket 3 is arranged in pairs and the center line symmetrical setting relative to bearing platform, and bottom is vertically downward Direction, which is fixedly installed, passes through the fixation that welds together with its bottom with the first consistent standing screw of circular hole quantity, bracket 3 The assembly connection of screw rod, the first circular hole and fastening nut 5 is fixed in trolley body 1;Bracket 3 is box-structure, top The radius of curvature of plane is consistent with out frame outer diameter.
Further, stator is overweight in order to prevent and the horizontal shear that generates causes bracket 3 to be collapsed by pressure to fly out, this is practical new The installation carriage of type further includes the stretching screw 4 with bearing platform central axis arrangement, and 3 side of bracket offers the second circle Hole, (left and right in the application is gone from the visual angle of Fig. 2) the successively fastening nut 5, one with left side from left to right of stretching screw 4 The fastening nut 5 of 2 the second circular holes, right side that are correspondingly arranged to bracket 3 connects.The use of fastening nut 5 is exactly to hold in the palm Frame 3 tightens together with trolley body 1, bracket 3 with stretching screw 4, and avoiding being pressurized is subjected to displacement and collapses.
Preferably, bracket 3 has 2, and the first circular hole is 4, also can according to need, installed on bearing platform two pairs or Two pairs or more of bracket.
Further, vehicle wheel component 2 has 4 sets, and vehicle wheel component 2 includes wheel and bearing assembly.
Further, at least provided with 4 the second circular holes on single bracket 3, a pair of of bracket 3 can be tensed at least with 4 Screw rod 4 connects.
Preferably, stretching screw 4 has 4, is evenly arranged, and can preferably tense a pair of of bracket, prevents bracket from being pressed and collapses It flies out.
For the ease of traction, the bearing platform front end of trolley body 1 is provided with traction drag hook 6.
The utility model use process is as follows:
When installing stator, stator is slowly transferred by hole for hoist to the installation carriage of the utility model using workshop bridge machine Bracket 3 on, bear stator weight together with the wirerope that bridge machine suspension hook is hung using the installation carriage of the utility model, thus Stator deformability can be effectively reduced;The installation carriage of the utility model will be placed together with bridge machine under the traction of downstream side guide chain Stator on the utility model is slowly downstream moved along track 7, to provide safeguard for stator Fast Installation.Due to rail Road 7 and installation carriage adjust elevation in advance, and the weight of the big component of stator is common by bridge machine and the utility model when lifting Stator and rotor are set with, significantly by suspention, support there is no need to pass through a large amount of, many and diverse adjustment using the utility model The suspention time of stator installation, center adjustment is shortened, and the utility model is according to the warp such as stator component structural shape and weight By force analysis, design, the laundry of lifting thereon when stress it is relatively reasonable, greatly reduce stator assembling process Deformation;When stator is installed, the utility model is directly moved horizontally together with bridge machine, process is stablized, and avoids because bridge machine is outstanding Hang wirerope shaking and the collision between the stator and rotor magnetic pole of generation, process is easy to operate, stablizes.The design improves lifting Environment shortens installation period, ensure that installation quality.
Above are merely preferred embodiments of the utility model, it is noted that for the ordinary skill people of the art Member for, without deviating from the technical principle of the utility model, several improvements and modifications can also be made, these improve and Modification also should be regarded as the protection scope of the utility model.

Claims (8)

1. heavy stay column sets hydraulic generator stator installation carriage, it is characterised in that: including trolley body, bracket, Fastening nut, the trolley body include vehicle wheel component and the bearing platform that is fixedly mounted on vehicle wheel component, and the load-bearing is flat It is evenly arranged with the first circular hole of at least four on platform, the bracket is arranged in pairs and center line relative to bearing platform is symmetrical Setting, bottom vertical downward direction welds together with bracket base, it is consistent solid with the first circular hole quantity to be fixedly installed Determine screw rod, bracket is fixed in trolley body by the assembly connection of standing screw, the first circular hole and fastening nut;The support Frame is box-structure, and the radius of curvature of top planes is consistent with out frame outer diameter.
2. heavy stay column sets hydraulic generator stator installation carriage according to claim 1, it is characterised in that: It further include the stretching screw with bearing platform central axis arrangement, the bracket side offers the second circular hole, the tension The fastening nut on the right side of 2 the second circular holes that screw rod is successively correspondingly arranged with the fastening nut in left side, a pair of of bracket from left to right Connection.
3. heavy stay column sets hydraulic generator stator installation carriage according to claim 1, it is characterised in that: The bracket has 2, and first circular hole is 4.
4. heavy stay column sets hydraulic generator stator installation carriage according to claim 1, it is characterised in that: The vehicle wheel component includes wheel and bearing assembly.
5. heavy stay column sets hydraulic generator stator installation carriage according to claim 1, it is characterised in that: The vehicle wheel component has 4 sets.
6. heavy stay column sets hydraulic generator stator installation carriage according to claim 2, it is characterised in that: The stretching screw has 4.
7. heavy stay column sets hydraulic generator stator installation carriage according to claim 2, it is characterised in that: At least provided with 4 the second circular holes on the single bracket, a pair of bracket can at least be connect with 4 stretching screws.
8. heavy stay column sets hydraulic generator stator installation carriage according to claim 1, it is characterised in that: The bearing platform front end of the trolley body is provided with traction drag hook.
CN201820821513.2U 2018-05-30 2018-05-30 Heavy stay column sets hydraulic generator stator installation carriage Active CN208342767U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820821513.2U CN208342767U (en) 2018-05-30 2018-05-30 Heavy stay column sets hydraulic generator stator installation carriage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820821513.2U CN208342767U (en) 2018-05-30 2018-05-30 Heavy stay column sets hydraulic generator stator installation carriage

Publications (1)

Publication Number Publication Date
CN208342767U true CN208342767U (en) 2019-01-08

Family

ID=64891513

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820821513.2U Active CN208342767U (en) 2018-05-30 2018-05-30 Heavy stay column sets hydraulic generator stator installation carriage

Country Status (1)

Country Link
CN (1) CN208342767U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111266856A (en) * 2020-03-20 2020-06-12 中铁二十局集团第六工程有限公司 Bulb head and cone hoisting method of bulb tubular water turbine generator set

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111266856A (en) * 2020-03-20 2020-06-12 中铁二十局集团第六工程有限公司 Bulb head and cone hoisting method of bulb tubular water turbine generator set
CN111266856B (en) * 2020-03-20 2021-12-17 中铁二十局集团第六工程有限公司 Bulb head and cone hoisting method of bulb tubular water turbine generator set

Similar Documents

Publication Publication Date Title
CN204884510U (en) Portable advertisement banner supports stores pylon device
CN101845912A (en) Segmental-body assembly type emergency communication tower
CN203160133U (en) Three-dimensional combined accurate positioning device for stayed-cable bridge body cable duct
CN103321416A (en) Construction method for prestress of cable-stayed grid structure
CN203128000U (en) Hoisting device for direct-driven wind power generator set
CN208342767U (en) Heavy stay column sets hydraulic generator stator installation carriage
CN204677371U (en) Floating type wind-power generating system
CN205001124U (en) Wind power generation device
CN113315318A (en) Inspection device and inspection method suitable for large-scale hydraulic generator stator and rotor
CN208496910U (en) Heavy stay column sets hydrogenerator light bulb head installation carriage
CN201826581U (en) Segmental-body assembly type emergency communication tower
CN205253790U (en) Tube bending machine
CN205986726U (en) Tension elasticity photovoltaic support device
CN201666027U (en) Liftable communication tower
CN109531086A (en) One kind is for Big Diameter Flange bolt hole guiding alignment mechanical device and method
CN205614530U (en) A flange device for making aerogenerator's blade
CN205064389U (en) Air cooling fan crane span structure installation base
CN207095958U (en) A kind of building bar stress test machine
CN209024045U (en) A kind of hoisting structure of wind power generation plant
CN203649701U (en) Manipulator suspending device
CN217434235U (en) A operation frock for wind-powered electricity generation blade root
CN208342740U (en) Heavy stay column sets guide vanes of water turbine installation special tool
CN205023754U (en) Heavily loaded cable loop wheel machine is striden greatly to high strength
CN214686436U (en) Adjustable driftage brake caliper changes device
CN204545822U (en) The pivoted arm of rotary wheel of water turbine and the dismounting supporting seat of pivot

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 614300 No.94 Jingyang Road, shaping Town, Ebian County, Leshan City, Sichuan Province

Patentee after: Guoneng Dadu River shaping Power Generation Co.,Ltd.

Address before: 614300 No.94 Jingyang Road, shaping Town, Ebian County, Leshan City, Sichuan Province

Patentee before: GUODIAN DADU RIVER SHAPING HYDROPOWER CONSTRUCTION Co.,Ltd.

CP01 Change in the name or title of a patent holder