CN208330417U - Shield tunnel shearing resistance formula whirl spraying is freezed to block iterative structure - Google Patents

Shield tunnel shearing resistance formula whirl spraying is freezed to block iterative structure Download PDF

Info

Publication number
CN208330417U
CN208330417U CN201820973947.4U CN201820973947U CN208330417U CN 208330417 U CN208330417 U CN 208330417U CN 201820973947 U CN201820973947 U CN 201820973947U CN 208330417 U CN208330417 U CN 208330417U
Authority
CN
China
Prior art keywords
wall
whirl spraying
freezing
jurisdiction
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820973947.4U
Other languages
Chinese (zh)
Inventor
陈培帅
翟世鸿
谭啸峰
黄威
许超
孔茜
高如超
刘东军
罗会武
杨睿
余磊
李德杰
蒋道东
江鸿
胡乘恺
袁青
蔡超君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201820973947.4U priority Critical patent/CN208330417U/en
Application granted granted Critical
Publication of CN208330417U publication Critical patent/CN208330417U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Freeze to block iterative structure the utility model discloses shield tunnel shearing resistance formula whirl spraying, comprising: whirl spraying wall is set to intact section of jurisdiction side, and the height of the whirl spraying wall is not less than section of jurisdiction internal diameter;Freeze wall, it is also set to intact section of jurisdiction side, and it is described freeze wall and the whirl spraying wall overlapping and in section of jurisdiction formed whirl spraying freeze wall, the height for freezing wall is greater than the height of the whirl spraying wall, it is described freeze wall along tunnel longitudinal direction thickness be less than the whirl spraying wall along tunnel longitudinal direction thickness, it is described freeze wall along tunnel circumferential direction width greater than the whirl spraying wall along tunnel circumferential direction width;And freezing the freezing pipe in wall is double-deck pipe body structure.The utility model shearing strength height, thickness of wall body is small compared with conventional articulated gravity wall, promotion work efficiency, reduces the difficulty that later period block wall is removed, and by reinforcing to freezing pipe pre-pouring grout, and stratum settlement after the better control freezing method construction of energy reduces the influence to construction environment.

Description

Shield tunnel shearing resistance formula whirl spraying is freezed to block iterative structure
Technical field
The utility model relates to constructing tunnel fields.More specifically, the utility model relates to the rotations of shield tunnel shearing resistance formula Spray is freezed to block iterative structure.
Background technique
City underground is greatly developed, and is brought convenience fast to urban development, while its construction also cause it is more and more Safety problem.Since subway is located in city busiest section, surrounding buildings dense distribution, underground utilities are numerous, once engineering occurs Accident will generate significant impact, attract extensive attention.In recent years, there is shield on the ground such as Shanghai, Hangzhou, Nanjing, Tianjin, Guangzhou The relevant report of structure constructing tunnel landslide.
Shield tunnel buried depth is larger, once Tunnel Landslide occurs, reparation difficulty is larger, and tunnel blocks the reliable of water sealing structure Property be influence later period tunnel dredging safety key factor, handle it is bad easily initiation second accident.Therefore it needs to design one kind Shield tunnel shearing resistance formula whirl spraying is freezed to block iterative structure and method, it is ensured that tunnel dredging repair safely and fast carries out, should Structure and construction method application value with higher.
Utility model content
Freeze to block iterative structure the purpose of the utility model is to provide shield tunnel shearing resistance formula whirl spraying, first passes through whirl spraying Cavity that may be present in wall structure filling section of jurisdiction creates basic condition for consolidation by freezing, then in whirl spraying wall knot Consolidation by freezing is carried out in structure, solves plugging structure seepage problem, and freezes main water and soil when wall undertakes subsequent tunnel dredging Pressure, safety coefficient is higher, shield tunnel shearing resistance formula whirl spraying described in the utility model freeze block iterative structure shearing strength compared with Height, for conventional articulated gravity formula wall, thickness of wall body is greatly reduced, and improves work efficiency, while also being reduced later period block wall and being removed Difficulty.
In order to realize these purposes and other advantages according to the present utility model, shield tunnel shearing resistance formula whirl spraying jelly is provided Knot blocks iterative structure, comprising:
Whirl spraying wall, is set to intact section of jurisdiction side, and the height of the whirl spraying wall is not less than section of jurisdiction internal diameter;
Freeze wall, be set to intact section of jurisdiction side, and the wall that freezes is with whirl spraying wall overlapping and in section of jurisdiction It forms whirl spraying and freezes wall, and the height for freezing wall is greater than the height of the whirl spraying wall, the wall that freezes is along tunnel The thickness of road longitudinal direction is less than the whirl spraying wall along the thickness of tunnel longitudinal direction, and the wall that freezes is greater than along the width of tunnel circumferential direction Width of the whirl spraying wall along tunnel circumferential direction.
Preferably, the wall that freezes exceeds section of jurisdiction vault in its short transverse respectively and encircles bottom outer profile at least 2m, It is described that freeze wall at it be more than section of jurisdiction two sides at least 1m along the horizontal width direction of tunnel circumferential direction respectively.
Preferably, the shield tunnel shearing resistance formula whirl spraying is freezed to block iterative structure to further include freezing pipe, described to freeze Pipe is located at the inside for freezing wall, and spacing of the freezing pipe along tunnel longitudinal direction is not more than 1.2m, along the row of tunnel circumferential direction Away from no more than 1.4m.
Preferably, the freezing pipe includes cryovial, grout outlet and drill bit, and the grout outlet spacer sleeve is set to described cold Frozen pipe is outer and the two axis is overlapped, and one end of the grout outlet is located at ipsilateral opening with cryovial and is connected by sealing bottom surface, The drill bit is pyramidal structure, and cone-shaped cavity is connect and formed between bottom surface with the bottom surface, and along week on the bottom surface To several logical slurry holes are equipped with, the cavity freezed between pipe outer wall and pulp inside pipe wall is connected to the cone-shaped cavity, it is described It is additionally provided with several slurry outlets on grout outlet, several slots are additionally provided on the drill bit.
The utility model is include at least the following beneficial effects:
1, the present invention first passes through cavity that may be present in rotary churning pile structure filling section of jurisdiction, creates base for consolidation by freezing Then plinth condition carries out consolidation by freezing in whirl spraying wall structure, solves plugging structure seepage problem, and freeze after wall undertakes Main Water And Earth Pressures when continuous tunnel dredging, safety coefficient are higher;
2, it is higher to freeze iterative structure shearing strength for the whirl spraying that uses of the present invention, for conventional articulated gravity formula wall, wall Thickness greatly reduces, and improves work efficiency, while also reducing the difficulty that later period block wall is removed;
3, the freezing pipe with double-deck pipe body structure is used in the present invention, it can be by Grouting Pipe to freezing pipe and outside The soil body carries out pre-pouring grout reinforcing, easy to operate, and stratum settlement after better control freezing method construction reduces the shadow to construction environment It rings.
The further advantage, target and feature of the utility model will be partially reflected by the following instructions, and part will also pass through Research and practice to the utility model and be understood by the person skilled in the art.
Detailed description of the invention
Fig. 1 is that shield tunnel shearing resistance formula whirl spraying of the present invention is freezed to block the floor map of iterative structure;
Fig. 2 is the structural schematic diagram of the B-B section of Fig. 1 in the present invention;
Fig. 3 is the structural schematic diagram of the C-C section of Fig. 1 in the present invention;
Fig. 4 is the structural schematic diagram of freezing pipe of the present invention;
Fig. 5 is the structural schematic diagram of the A-A section of Fig. 4 in the present invention.
Description of symbols:
1- grout outlet;2- cryovial;3- drill bit;4- Grouting Pipe;5- slurry outlet;The bottom surface 6-;The logical slurry hole 7-;The section of jurisdiction 27-; 28- breakage section of jurisdiction side;The intact section of jurisdiction side 29-;30- freezing hole;31- whirl spraying stake holes;32- freezing pipe;33- whirl spraying wall;34- freezes Tie wall;Wall is freezed in 35- whirl spraying.
Specific embodiment
The following describes the utility model in further detail with reference to the accompanying drawings, to enable those skilled in the art referring to explanation Book text can be implemented accordingly.
It should be noted that in the description of the present invention, term " transverse direction ", " longitudinal direction ", "upper", "lower", " preceding ", The orientation or positional relationship of the instructions such as " rear ", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" be based on Orientation or positional relationship shown in the drawings, is merely for convenience of describing the present invention and simplifying the description, and is not instruction or dark Show that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as pair The limitation of the utility model.
Freeze to block iterative structure, packet as shown in Figure 1-3, the utility model provides the shield tunnel shearing resistance formula whirl spraying It includes:
Whirl spraying wall 33, is set to intact section of jurisdiction side 29, and the height of the whirl spraying wall 33 is not less than 27 internal diameter of section of jurisdiction;
Freeze wall 34, be set to intact section of jurisdiction side 29, and the wall 34 that freezes overlaps simultaneously with the whirl spraying wall 33 Whirl spraying is formed in section of jurisdiction 27 and freezes wall 35, and the height for freezing wall 34 is greater than the height of the whirl spraying wall 33, It is described freeze wall 34 along tunnel longitudinal direction thickness be less than the whirl spraying wall 33 along tunnel longitudinal direction thickness, it is described to freeze wall 34 along tunnel circumferential direction width be greater than the whirl spraying wall 33 along tunnel circumferential direction width.
In the above-mentioned technical solutions, L value is calculated according to the damaged position in section of jurisdiction 27, calculation formula is L=F/ π R2Ra, Middle F is the lateral pressure of water and soil, and a coefficient of friction between plugging structure and section of jurisdiction, R is the internal diameter of section of jurisdiction, and r is the appearance of plugging structure Weight, length of the whirl spraying wall 33 along tunnel longitudinal direction are more than or equal to L, and the height of whirl spraying wall 33 is not less than 27 internal diameter of section of jurisdiction, To block 27 breakage of tunnel duct piece completely, and the whirl spraying wall 33 is set to intact section of jurisdiction side 29, to bear damaged section of jurisdiction The shearing of side 28, the wall 34 that freezes also are set to intact section of jurisdiction side 29, freeze middle section and the whirl spraying wall 33 of wall 34 Middle section overlap to form whirl spraying and freeze wall 35, whirl spraying wall 33 is filled with cavity that may be present in section of jurisdiction 27, to freeze Knot is reinforced and creates basic condition, and consolidation by freezing is then carried out in whirl spraying wall 33, solves plugging structure seepage problem, and Freeze main Water And Earth Pressures when wall 34 undertakes subsequent tunnel dredging, safety coefficient is higher;And the height for freezing wall 34 Degree is greater than the height of the whirl spraying wall 33, it is described freeze wall 34 along tunnel longitudinal direction thickness less than 33 edge of whirl spraying wall The thickness of tunnel longitudinal direction, it is described freeze wall 34 along tunnel circumferential direction width be greater than the whirl spraying wall 33 along tunnel circumferential direction width Degree, shearing strength is higher to be formed, the more reasonable whirl spraying block wall 35 of structure, and for conventional articulated gravity formula wall, wall is thick Degree greatly reduces, and improves work efficiency, while also reducing the difficulty of later period block wall removing.
In another technical solution, the wall 34 that freezes exceeds 27 vault of section of jurisdiction in its short transverse respectively and encircles bottom Outer profile at least 2m, it is described freeze wall 34 its along the horizontal width direction of tunnel circumferential direction be more than respectively 27 two sides of section of jurisdiction at least Tunnel duct piece 27 is completely encapsulated in and freezes in wall 34 by 1m, prevents plugging structure infiltration, destroys.
In another technical solution, the shield tunnel shearing resistance formula whirl spraying is freezed to block iterative structure to further include freezing pipe 32, the freezing pipe 32 is located at the inside for freezing wall 34, and spacing of the freezing pipe 32 along tunnel longitudinal direction is not more than 1.2m, the array pitch along tunnel circumferential direction are not more than 1.4m.
As illustrated in figures 4-5, in another technical solution, the freezing pipe 32 includes cryovial 2, grout outlet 1 and drill bit 3,1 spacer sleeve of grout outlet is set to outside the cryovial 2 and the two axis is overlapped, one end of the grout outlet 1 and cryovial 2 It is tightly connected positioned at ipsilateral opening by bottom surface 6, the drill bit 3 is pyramidal structure, and connect with the bottom surface 6 simultaneously and bottom surface Cone-shaped cavity is formed between 6, and circumferentially arranged with several logical slurry holes 7 on the bottom surface 6, by 2 outer wall of cryovial and grout outlet 1 Cavity between inner wall is connected to the cone-shaped cavity, and several slurry outlets 5 are additionally provided on the grout outlet 1, are gone back on the drill bit 3 Equipped with several slots.
In the above-mentioned technical solutions, before frozen construction, the spiral winding on the outer wall of its cryovial 2 of freezing pipe 32 Grouting Pipe 4 carries out pre-pouring grout reinforcing to freezing pipe 32 by Grouting Pipe 4, in advance after the freezing pipe 32 is squeezed into freezing hole 30 Grouting Pipe 4 is fully drawn out from freezing pipe 32 after the completion of slip casting, then leads to cold liquid to freezing pipe 32, is carried out frozen construction and is formed Freeze wall 34;Specifically, the freezing pipe 32 is the structure of double-deck pipe body, pass through between the cryovial 2 and grout outlet 1 of internal layer The support connection of bottom surface 6, and spiral winding has Grouting Pipe 4 between cryovial 2 and grout outlet 1, when by Grouting Pipe 4 to freezing pipe 32 Carry out slip casting when, mortar can by being flowed out in the slurry outlet 5 on grout outlet 1, by the outer wall of freezing pipe 32 in conjunction with surrounding soil, Mortar can also be entered in the cone-shaped cavity of drill bit 3 by the logical slurry hole 7 on bottom surface 6, and pass through the slot stream on drill bit 3 Out, the end and 30 bottom soil body of freezing hole for making freezing pipe 32 are firmly combined, and can lead in the cavity at 2 center of cryovial cold Liquid is to freeze surrounding soil, it is preferred that the slurry outlet 5 is uniformly distributed in along the length direction circumferential direction of freezing pipe 32 The outer wall of the grout outlet 1, circumferential direction of the logical slurry hole 7 along the bottom surface 6 are uniformly distributed, and the slot is multiple, and along institute The circumferential direction for stating drill bit 3 is uniformly distributed, before pre-pouring grout, by the Grouting Pipe 4 along the length direction uniform spiral of the freezing pipe 32 Winding;Carrying out frozen construction step using the freezing pipe 32 is to be positioned first according to the arrangement requirement of freezing hole 30 with drilling machine Then aperture pierces freezing pipe 32, carry out pre-pouring grout by Grouting Pipe 4, makes for freezing pipe 32 and surrounding soil to be firmly combined, most Afterwards to cold liquid is led in cryovial 2, carries out frozen construction formation and freeze wall 34, wherein during pre-pouring grout, on one side to note Slurry pipe 4 carries out logical slurry, on one side gradually extracts Grouting Pipe 4 from freezing pipe 32, so that the mortar in Grouting Pipe 4 is from freezing pipe 32 Bottom be gradually filled up completely in the cavity between cryovial 2 and grout outlet 1 to top, reinforced by pre-pouring grout, can be more preferable The construction of control freezing method after stratum settlement, reduce influence to construction environment, and easy to operate.
The formula whirl spraying of shield tunnel shearing resistance described in the present embodiment is freezed to block the construction procedure of iterative structure are as follows:
S1: laying whirl spraying stake holes 31 in intact section of jurisdiction side 29, and the whirl spraying stake holes 31 passes through 27 vault of section of jurisdiction and arch bottom, Jet groutinl constructs to form whirl spraying wall 33 in whirl spraying stake holes 31;
S2: freezing hole 30 is laid outside 33 inside of whirl spraying wall and 33 horizontal width range of whirl spraying wall, wherein being located at rotation The drilling center of circle of freezing hole 30 in spray wall 33 is overlapped with the drilling center of circle of whirl spraying stake holes 31, to reduce difficulty of construction, is improved Then construction efficiency squeezes into freezing pipe 32 in the freezing hole 30;
S3: by Grouting Pipe 4 to freezing pipe 32 carry out pre-pouring grout, to Grouting Pipe 4 carry out slip casting during, gradually The Grouting Pipe 4 is extracted out from the freezing pipe 32;
S4: leading to cold liquid in the cryovial 2 in freezing pipe 32, carries out frozen construction formation and freezes wall 34, makes the jelly Knot wall 34 and the overlapping of whirl spraying wall 33 form whirl spraying and freeze wall 35.
It is not only in the description and the implementation although the embodiments of the present invention have been disclosed as above Listed utilization, it can be applied to various fields suitable for the present invention completely, for those skilled in the art, Other modifications may be easily implemented, therefore without departing from the general concept defined in the claims and the equivalent scope, this reality It is not limited to specific details and legend shown and described herein with novel.

Claims (4)

1. shield tunnel shearing resistance formula whirl spraying is freezed to block iterative structure characterized by comprising
Whirl spraying wall, is set to intact section of jurisdiction side, and the height of the whirl spraying wall is not less than section of jurisdiction internal diameter;
Freeze wall, is set to intact section of jurisdiction side, and the wall that freezes is overlapped with the whirl spraying wall and formed in section of jurisdiction Wall is freezed in whirl spraying, and the height for freezing wall is greater than the height of the whirl spraying wall, and the wall that freezes is indulged along tunnel To thickness be less than the whirl spraying wall along tunnel longitudinal direction thickness, it is described freeze wall along tunnel circumferential direction width greater than described in Width of the whirl spraying wall along tunnel circumferential direction.
2. shield tunnel shearing resistance formula whirl spraying as described in claim 1 is freezed to block iterative structure, which is characterized in that described to freeze Wall exceeds section of jurisdiction vault in its short transverse respectively and encircles bottom outer profile at least 2m, described to freeze wall at it along tunnel circumferential direction Horizontal width direction be respectively more than section of jurisdiction two sides at least 1m.
3. shield tunnel shearing resistance formula whirl spraying as claimed in claim 2 is freezed to block iterative structure, which is characterized in that further include freezing Knot pipe, the freezing pipe are located at the inside for freezing wall, and spacing of the freezing pipe along tunnel longitudinal direction is not more than 1.2m, edge The array pitch of tunnel circumferential direction is not more than 1.4m.
4. shield tunnel shearing resistance formula whirl spraying as claimed in claim 3 is freezed to block iterative structure, which is characterized in that described to freeze Pipe includes cryovial, grout outlet and drill bit, and the grout outlet spacer sleeve is set to outside the cryovial and the two axis is overlapped, described One end of grout outlet is located at ipsilateral opening with cryovial and is connected by sealing bottom surface, the drill bit be pyramidal structure, and with institute It states bottom surface to connect and form cone-shaped cavity between bottom surface, and will be freezed on the bottom surface circumferentially arranged with several logical slurry holes Cavity between pipe outer wall and pulp inside pipe wall is connected to the cone-shaped cavity, and several slurry outlets are additionally provided on the grout outlet, Several slots are additionally provided on the drill bit.
CN201820973947.4U 2018-06-22 2018-06-22 Shield tunnel shearing resistance formula whirl spraying is freezed to block iterative structure Active CN208330417U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820973947.4U CN208330417U (en) 2018-06-22 2018-06-22 Shield tunnel shearing resistance formula whirl spraying is freezed to block iterative structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820973947.4U CN208330417U (en) 2018-06-22 2018-06-22 Shield tunnel shearing resistance formula whirl spraying is freezed to block iterative structure

Publications (1)

Publication Number Publication Date
CN208330417U true CN208330417U (en) 2019-01-04

Family

ID=64768536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820973947.4U Active CN208330417U (en) 2018-06-22 2018-06-22 Shield tunnel shearing resistance formula whirl spraying is freezed to block iterative structure

Country Status (1)

Country Link
CN (1) CN208330417U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108729933A (en) * 2018-06-22 2018-11-02 中交第二航务工程局有限公司 Shield tunnel shearing resistance formula churning is freezed to block iterative structure and its construction method
CN110821504A (en) * 2019-12-04 2020-02-21 中铁十二局集团有限公司 Water-rich stratum shield starting end rotary spraying and freezing combined reinforcing structure and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108729933A (en) * 2018-06-22 2018-11-02 中交第二航务工程局有限公司 Shield tunnel shearing resistance formula churning is freezed to block iterative structure and its construction method
CN110821504A (en) * 2019-12-04 2020-02-21 中铁十二局集团有限公司 Water-rich stratum shield starting end rotary spraying and freezing combined reinforcing structure and construction method

Similar Documents

Publication Publication Date Title
CN103835284B (en) A kind of Pile In Drill In Karst Terrain structure and construction method
CN105240024B (en) A kind of method of parallel shield method enlarging construction subway station
CN109208637A (en) Increase the construction method of open-cut station newly on the basis of existing tunnel
CN102606168B (en) Construction method for preventing settlement and deformation of shallow-buried-excavation tunnel in excavation
CN102606167A (en) Settlement control construction method for transverse grouting guide pipe of shallow underground excavation tunnel
CN106869969A (en) A kind of excavation supporting construction method of soft rock large section tunnel
CN203741820U (en) Cast-in-situ bored pile structure for karst area
CN104963696B (en) The construction method of tunnel bottom arching
CN208330417U (en) Shield tunnel shearing resistance formula whirl spraying is freezed to block iterative structure
CN109372520A (en) One kind passing through Debris Flow Deposition area tunnel support structure and its construction method
CN108386198A (en) A kind of novel tunnel inverted arch basement weak country rock processing method
CN110528523A (en) A kind of highly permeable stratum building foundation pit horizontal grouting back cover construction method
CN112963156A (en) Composite reinforcing method and composite reinforcing structure for shallow tunnel in soil-rock composite stratum
CN211500658U (en) Shallow tunnel supporting construction that nearly connects that buries suitable for sand ground
CN108756955A (en) Shield tunnel gravity type sealing plugging structure and method
CN206888992U (en) A kind of water-bed mine shield tunnel combination docking structure form
CN208280969U (en) Shield tunnel gravity type sealing plugging structure
CN105649655A (en) Device used for grouting reinforcement from interior of shield tunneling machine to peripheral stratum
CN104099946A (en) Novel jacking pipe intersegment overhaul well
CN101793027B (en) Core-grouted static pressure anchor rod pile
CN207033463U (en) Mine shield handing-over tunnel folded type joint design in the middle part of marine site
CN206359987U (en) A kind of Retaining Structure with Double-row Piles
CN208917850U (en) A kind of miniature steel pipe pile adds grid to spray anchor deep foundation ditch combination supporting scheme system
CN108915705B (en) A kind of baffle grouting construction method blocked for shield export & import leak
CN203583501U (en) Deep-layer shear resistant device capable of preventing rock sliding

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant