CN208329859U - A kind of guardrail of municipal administration greenbelt - Google Patents

A kind of guardrail of municipal administration greenbelt Download PDF

Info

Publication number
CN208329859U
CN208329859U CN201820963062.6U CN201820963062U CN208329859U CN 208329859 U CN208329859 U CN 208329859U CN 201820963062 U CN201820963062 U CN 201820963062U CN 208329859 U CN208329859 U CN 208329859U
Authority
CN
China
Prior art keywords
pipe
water
guardrail
sparge
several
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820963062.6U
Other languages
Chinese (zh)
Inventor
王佳文
何江
阮善圣
叶静依
丁波波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yangtian Construction Co ltd
Original Assignee
Taizhou Yangtian Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taizhou Yangtian Construction Co Ltd filed Critical Taizhou Yangtian Construction Co Ltd
Priority to CN201820963062.6U priority Critical patent/CN208329859U/en
Application granted granted Critical
Publication of CN208329859U publication Critical patent/CN208329859U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model provides a kind of guardrail of municipal greenbelt, belongs to municipal equipment technical field.The guardrail that it solves existing municipal greenbelt such as has a single function at the technical problems.The guardrail of this municipal administration greenbelt includes several groups balustrade assemblies, every group of balustrade assemblies include several vertical bars and the cross bar fixed with vertical bar, every group of balustrade assemblies further include a water pipe and several sparge pipes, sparge pipe is vertically arranged, several sparge pipes are set side by side with several vertical bars, water pipe is horizontally disposed, water pipe in two adjacent groups balustrade assemblies is interconnected, fixation is bonded by fastener between water pipe and sparge pipe and water pipe and vertical bar, several and one-to-one intercommunicating pore of sparge pipe is provided on the circumferential surface to recline on water pipe with sparge pipe, there is the water inlet pipe of protrusion on sparge pipe, water inlet pipe is plugged in intercommunicating pore and seals with intercommunicating pore, several hole for water sprayings are provided on sparge pipe.The utility model has the advantages that pour greenbelt by guardrail.

Description

A kind of guardrail of municipal administration greenbelt
Technical field
The utility model belongs to municipal equipment technical field, is related to a kind of guardrail of municipal greenbelt.
Background technique
Greenbelt refers to the bar shaped area for greening.Visual fatigue, environment purification, beautifying city, reduction can be eliminated The effects of traffic accident, in city in occupation of the critical role that do not replace.In order to avoid people trample greenbelt, while being also The people are avoided to cross greenbelt to go across the road, guardrail can be arranged in greenbelt two sides in people.The main function of existing guardrail It is that protection stops, sprinkling truck is needed to carry out to the pouring maintenance of greenbelt, therefore the effect of guardrail is relatively simple.
Summary of the invention
The purpose of this utility model is the presence of the above problem in view of the prior art, proposes a kind of shield of municipal greenbelt The technical issues of column, the utility model solves is to be poured by guardrail to greenbelt.
The purpose of this utility model can be realized by the following technical scheme:
A kind of guardrail of municipal administration greenbelt, including several groups balustrade assemblies, every group of balustrade assemblies include several vertical bars With the cross bar fixed with vertical bar, which is characterized in that every group of balustrade assemblies further include a water pipe and several sparge pipes, the spray Water pipe is vertically arranged, and the sparge pipe is hollow pipe closed at both ends, and several sparge pipes are set side by side with several vertical bars It sets, the water pipe is horizontally disposed, and the water pipe in two adjacent groups balustrade assemblies is interconnected, the water pipe and sparge pipe and water pipe Fixation is bonded by fastener between vertical bar, several and sparge pipe is provided on the circumferential surface to recline on the water pipe with sparge pipe one by one Corresponding intercommunicating pore has the water inlet pipe of protrusion on the sparge pipe, and the water inlet pipe is plugged in intercommunicating pore and and intercommunicating pore It seals, is provided with several hole for water sprayings on the sparge pipe.
Water pipe is connected to total water route, and sparge pipe and vertical bar are fixed vertically, can play the role of guardrail, pedestrian is avoided to trample cross Greenbelt is worn, cross bar and water pipe, which play, is connected sparge pipe and vertical bar, guarantees the intensity of guardrail;It is right when needing to pour Water pipe carries out water flowing, and water enters in sparge pipe by water inlet pipe, and sparge pipe has the side of hole for water spraying when installing towards greenbelt, Final water is sprayed on greenbelt by hole for water spraying, realizes the pouring to greenbelt;Above-mentioned guardrail is guaranteeing to realize that protection stops Also pouring is able to achieve while function, so that the maintenance of greenbelt is more convenient.
In the guardrail of above-mentioned municipal greenbelt, sealing ring is embedded on the water inlet pipe, the sealing ring can be with company The hole wall of through-hole seals against.The sealing being able to achieve by sealing ring between water inlet pipe and intercommunicating pore.
In the guardrail of above-mentioned municipal greenbelt, between the water pipe and sparge pipe be located at water inlet pipe periphery be covered with by The outer seal ring that glass cement is formed.The sealing between water pipe and sparge pipe is further realized by glass cement.
In the guardrail of above-mentioned municipal greenbelt, several hole for water sprayings are in be arranged above and below, the spray being located above The diameter in water hole is less than the diameter of underlying hole for water spraying.Hole for water spraying is relatively large in diameter, and the water flow of ejection is more anxious, that is, away from From remoter, therefore, the pouring to each position of greenbelt is able to achieve by the hole for water spraying of above-mentioned arrangement.
In the guardrail of above-mentioned municipal greenbelt, the fastener includes two clamping parts being C-shaped one and is in U-typed Clamping part two, the back of two clamping parts one connect with the both ends of clamping part two respectively, and the clamping part two can be buckled in On sparge pipe or vertical bar, the clamping part one can be buckled on water pipe.Clamping part two is fixed with corresponding sparge pipe or vertical bar, Clamping part one is capable of fixing water pipe, therefore is able to achieve water pipe and fixes with sparge pipe or being bonded for vertical bar, passes through two clamping parts One stronger can fix water pipe.
In the guardrail of above-mentioned municipal greenbelt, it is all secured on the sparge pipe and vertical bar and lacks two pieces of blocks, two pieces The block up and down be distributed, the upper and lower end faces of the clamping part two respectively with two pieces of blocks against.It can be further by block Clamping part two is limited in the position of sparge pipe or vertical bar, enables the positioning water pipe that fastener is more stable.
In the guardrail of above-mentioned municipal greenbelt, the sparge pipe and the setting of vertical bar interval.The structure can guarantee to green Change the pouring of band more evenly.
Compared with prior art, the guardrail of this municipal administration greenbelt is both able to achieve protection and stops, while being also able to achieve pouring, has Have greenbelt maintenance more easily advantage.
Detailed description of the invention
Fig. 1 is the side structure schematic view of balustrade assemblies.
Fig. 2 is the schematic cross-sectional view that water pipe is connect with sparge pipe.
Fig. 3 is the enlarged structure schematic diagram in the portion A in Fig. 2.
Fig. 4 is the structural schematic diagram of fastener.
In figure, 1, vertical bar;2, cross bar;3, water pipe;31, intercommunicating pore;4, sparge pipe;41, water inlet pipe;42, sealing ring;43, Hole for water spraying;5, fastener;51, clamping part one;52, clamping part two;6, outer seal ring;7, block.
Specific embodiment
It is specific embodiment of the utility model and in conjunction with attached drawing below, the technical solution of the utility model is made further Description, but the utility model is not limited to these examples.
As shown in Figure 1 to Figure 3, the guardrail of municipal greenbelt includes several groups balustrade assemblies, and every group of balustrade assemblies include Several vertical bars 1 and the cross bar 2 fixed with vertical bar 1, every group of balustrade assemblies further include a water pipe 3 and several sparge pipes 4, spray Water pipe 4 is vertically arranged, and sparge pipe 4 is hollow pipe closed at both ends, and interval is set several sparge pipes 4 side by side with several vertical bars 1 Set, water pipe 3 is horizontally disposed, and the water pipe 3 in two adjacent groups balustrade assemblies is interconnected, water pipe 3 and sparge pipe 4 and water pipe 3 with It is fixed between vertical bar 1 by the fitting of fastener 5, several and sparge pipe 4 is provided on the circumferential surface to recline on water pipe 3 with sparge pipe 4 one by one Corresponding intercommunicating pore 31 has the water inlet pipe 41 of protrusion on sparge pipe 4, is embedded with sealing ring 42, sealing ring 42 on water inlet pipe 41 It can be sealed against with the hole wall of intercommunicating pore 31,41 periphery of water inlet pipe is located between water pipe 3 and sparge pipe 4 and is covered with by glass cement shape At outer seal ring 6, be provided with several hole for water sprayings 43 on sparge pipe 4, several hole for water sprayings 43 are in being arranged above and below, the water spray being located above The diameter in hole 43 is less than the diameter of underlying hole for water spraying 43.
As shown in figure 4, fastener 5 include two clamping parts 1 being C-shaped and the clamping part 2 52 in U-typed, two The back of clamping part one is connect with the both ends of clamping part two respectively, and clamping part two can be buckled on sparge pipe 4 or vertical bar 1, buckle Portion one can be buckled on water pipe 3.Few two pieces of blocks 7 are all secured on sparge pipe 4 and vertical bar 1, two pieces of about 7 blocks are distributed, buckle The upper and lower end faces in portion two respectively with two pieces of blocks 7 against.Clamping part 2 52 and corresponding sparge pipe 4 or vertical bar 1 are fixed, card Buckle 1 is capable of fixing water pipe 3, therefore is able to achieve water pipe 3 and fixes with sparge pipe 4 or being bonded for vertical bar 1, is blocked by two Buckle 1 can be stronger fixed by water pipe 3.
Water pipe 3 is connected to total water route, and sparge pipe 4 and vertical bar 1 are fixed vertically, can play the role of guardrail, pedestrian is avoided to step on It steps on and crosses greenbelt, cross bar 2 and water pipe 3 play and sparge pipe 4 and vertical bar 1 are connected, and guarantee the intensity of guardrail;It is needing to pour When filling, water flowing is carried out to water pipe 3, water is entered in sparge pipe 4 by water inlet pipe 41, and there is sparge pipe 4 side of hole for water spraying 43 to pacify Towards greenbelt when dress, final water is sprayed on greenbelt by hole for water spraying 43, realizes the pouring to greenbelt;Above-mentioned guardrail Guaranteeing also to be able to achieve pouring while realizing protection barrier functionality, so that the maintenance of greenbelt is more convenient.
The specific embodiments described herein are merely examples of the spirit of the present invention.The utility model institute Belonging to those skilled in the art can make various modifications or additions to the described embodiments or using similar Mode substitute, but without departing from the spirit of the present application or beyond the scope of the appended claims.

Claims (7)

1. a kind of guardrail of municipal administration greenbelt, including several groups balustrade assemblies, every group of balustrade assemblies include several vertical bars and The fixed cross bar with vertical bar, which is characterized in that every group of balustrade assemblies further include a water pipe and several sparge pipes, the water spray Pipe is vertically arranged, and the sparge pipe is hollow pipe closed at both ends, and several sparge pipes are set side by side with several vertical bars, The water pipe is horizontally disposed, and the water pipe in two adjacent groups balustrade assemblies is interconnected, the water pipe and sparge pipe and water pipe with It is bonded and is fixed by fastener between vertical bar, is provided on the circumferential surface to recline on the water pipe with sparge pipe several a pair of with sparge pipe one The intercommunicating pore answered, has the water inlet pipe of protrusion on the sparge pipe, and the water inlet pipe is plugged in intercommunicating pore and close with intercommunicating pore It seals, is provided with several hole for water sprayings on the sparge pipe.
2. the guardrail of municipal administration greenbelt according to claim 1, which is characterized in that be embedded with sealing on the water inlet pipe Circle, the sealing ring can be sealed against with the hole wall of intercommunicating pore.
3. the guardrail of municipal administration greenbelt according to claim 2, which is characterized in that be located between the water pipe and sparge pipe Water inlet pipe periphery is covered with the outer seal ring formed by glass cement.
4. the guardrail of municipal administration greenbelt according to claim 1, which is characterized in that several hole for water sprayings are in row up and down Column, the diameter for the hole for water spraying being located above are less than the diameter of underlying hole for water spraying.
5. the guardrail of municipal administration greenbelt according to claim 1, which is characterized in that the fastener includes two and is C-shaped Clamping part one and clamping part two in U-typed, the back of two clamping parts one connect respectively with the both ends of clamping part two, The clamping part two can be buckled on sparge pipe or vertical bar, and the clamping part one can be buckled on water pipe.
6. the guardrail of municipal administration greenbelt according to claim 5, which is characterized in that fixed on the sparge pipe and vertical bar At least two pieces of blocks, two pieces of blocks are distributed up and down, the upper and lower end faces of the clamping part two respectively with two pieces of blocks against.
7. the guardrail of municipal administration greenbelt according to claim 1, which is characterized in that the sparge pipe and vertical bar interval are set It sets.
CN201820963062.6U 2018-06-21 2018-06-21 A kind of guardrail of municipal administration greenbelt Expired - Fee Related CN208329859U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820963062.6U CN208329859U (en) 2018-06-21 2018-06-21 A kind of guardrail of municipal administration greenbelt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820963062.6U CN208329859U (en) 2018-06-21 2018-06-21 A kind of guardrail of municipal administration greenbelt

Publications (1)

Publication Number Publication Date
CN208329859U true CN208329859U (en) 2019-01-04

Family

ID=64769177

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820963062.6U Expired - Fee Related CN208329859U (en) 2018-06-21 2018-06-21 A kind of guardrail of municipal administration greenbelt

Country Status (1)

Country Link
CN (1) CN208329859U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622590A (en) * 2020-06-05 2020-09-04 安徽国云智能科技有限公司 Wisdom city is with water-collecting type greenbelt guardrail

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622590A (en) * 2020-06-05 2020-09-04 安徽国云智能科技有限公司 Wisdom city is with water-collecting type greenbelt guardrail
CN111622590B (en) * 2020-06-05 2021-11-12 深圳老玩童网络有限公司 Wisdom city is with water-collecting type greenbelt guardrail

Similar Documents

Publication Publication Date Title
CN208329859U (en) A kind of guardrail of municipal administration greenbelt
CN201695334U (en) Bridge deck siphon drainage system
CN208197133U (en) The automatic water mists canopy cover curing system of concrete prefabricated element
CN207920121U (en) Slope protection engineering spray maintenance device
CN207159890U (en) A kind of urban construction greenbelt isolation guardrail
CN208097666U (en) A kind of purification system avoiding civil construction dust from construction sites
CN210782218U (en) Vertical greening curtain wall
CN109371835B (en) Orthotropic bridge deck structure with drainage function
CN214061409U (en) Municipal works urban road guardrail that can spray water smoke
CN205088615U (en) Road sprays guardrail system
CN205546790U (en) Water -saving irrigation system based on rainwater is collected
CN208850252U (en) A kind of overhead type flower case of urban viaduct bridge floor anti-collision wall
CN204728251U (en) A kind of highway center isolated area hair-dryer
CN204023474U (en) A kind of isolation guardrail attaching road spray equipment
CN205884145U (en) Formula of sinking greenbelt
CN208577980U (en) A kind of hard shoulder prefabricated component being embedded with water-spraying type water part
CN207525693U (en) Hedgerow cleaning system
CN205019890U (en) Device of factory building dust fall
CN207405561U (en) A kind of construction site assembled fence spraying device
CN206000257U (en) A kind of sunk type greenbelt isolated column
CN213292242U (en) Cleaning, dedusting and spraying device for construction site
CN208097665U (en) It is a kind of for preventing and treating the formula spray equipment of sitting on the fence of civil construction dust from construction sites
CN206545190U (en) Environmental sanitation sprinkling truck detachable guardrail flusher
CN105148651A (en) Workshop dust removal device
CN209010979U (en) A kind of novel curing system for Bridge High-pier column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 318000 No.2, building 4, Yantou Dongyuan, Yantou village, Haimen street, Jiaojiang District, Taizhou City, Zhejiang Province

Patentee after: Zhejiang Yangtian Construction Co.,Ltd.

Address before: 318099 No.2, building 4, Yantou Dongyuan, Yantou village, Haimen street, Jiaojiang District, Taizhou City, Zhejiang Province

Patentee before: TAIZHOU YANGTIAN CONSTRUCTION Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190104