CN208329859U - A kind of guardrail of municipal administration greenbelt - Google Patents
A kind of guardrail of municipal administration greenbelt Download PDFInfo
- Publication number
- CN208329859U CN208329859U CN201820963062.6U CN201820963062U CN208329859U CN 208329859 U CN208329859 U CN 208329859U CN 201820963062 U CN201820963062 U CN 201820963062U CN 208329859 U CN208329859 U CN 208329859U
- Authority
- CN
- China
- Prior art keywords
- pipe
- water
- guardrail
- sparge
- several
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 95
- 238000005507 spraying Methods 0.000 claims abstract description 18
- 230000000712 assembly Effects 0.000 claims abstract description 17
- 238000000429 assembly Methods 0.000 claims abstract description 17
- 239000011148 porous material Substances 0.000 claims abstract description 14
- 238000007789 sealing Methods 0.000 claims description 10
- 239000007921 spray Substances 0.000 claims description 5
- 239000004568 cement Substances 0.000 claims description 4
- 239000011521 glass Substances 0.000 claims description 4
- 230000008901 benefit Effects 0.000 abstract description 2
- 238000012423 maintenance Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 206010039203 Road traffic accident Diseases 0.000 description 1
- 238000007792 addition Methods 0.000 description 1
- 208000003464 asthenopia Diseases 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000000746 purification Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model provides a kind of guardrail of municipal greenbelt, belongs to municipal equipment technical field.The guardrail that it solves existing municipal greenbelt such as has a single function at the technical problems.The guardrail of this municipal administration greenbelt includes several groups balustrade assemblies, every group of balustrade assemblies include several vertical bars and the cross bar fixed with vertical bar, every group of balustrade assemblies further include a water pipe and several sparge pipes, sparge pipe is vertically arranged, several sparge pipes are set side by side with several vertical bars, water pipe is horizontally disposed, water pipe in two adjacent groups balustrade assemblies is interconnected, fixation is bonded by fastener between water pipe and sparge pipe and water pipe and vertical bar, several and one-to-one intercommunicating pore of sparge pipe is provided on the circumferential surface to recline on water pipe with sparge pipe, there is the water inlet pipe of protrusion on sparge pipe, water inlet pipe is plugged in intercommunicating pore and seals with intercommunicating pore, several hole for water sprayings are provided on sparge pipe.The utility model has the advantages that pour greenbelt by guardrail.
Description
Technical field
The utility model belongs to municipal equipment technical field, is related to a kind of guardrail of municipal greenbelt.
Background technique
Greenbelt refers to the bar shaped area for greening.Visual fatigue, environment purification, beautifying city, reduction can be eliminated
The effects of traffic accident, in city in occupation of the critical role that do not replace.In order to avoid people trample greenbelt, while being also
The people are avoided to cross greenbelt to go across the road, guardrail can be arranged in greenbelt two sides in people.The main function of existing guardrail
It is that protection stops, sprinkling truck is needed to carry out to the pouring maintenance of greenbelt, therefore the effect of guardrail is relatively simple.
Summary of the invention
The purpose of this utility model is the presence of the above problem in view of the prior art, proposes a kind of shield of municipal greenbelt
The technical issues of column, the utility model solves is to be poured by guardrail to greenbelt.
The purpose of this utility model can be realized by the following technical scheme:
A kind of guardrail of municipal administration greenbelt, including several groups balustrade assemblies, every group of balustrade assemblies include several vertical bars
With the cross bar fixed with vertical bar, which is characterized in that every group of balustrade assemblies further include a water pipe and several sparge pipes, the spray
Water pipe is vertically arranged, and the sparge pipe is hollow pipe closed at both ends, and several sparge pipes are set side by side with several vertical bars
It sets, the water pipe is horizontally disposed, and the water pipe in two adjacent groups balustrade assemblies is interconnected, the water pipe and sparge pipe and water pipe
Fixation is bonded by fastener between vertical bar, several and sparge pipe is provided on the circumferential surface to recline on the water pipe with sparge pipe one by one
Corresponding intercommunicating pore has the water inlet pipe of protrusion on the sparge pipe, and the water inlet pipe is plugged in intercommunicating pore and and intercommunicating pore
It seals, is provided with several hole for water sprayings on the sparge pipe.
Water pipe is connected to total water route, and sparge pipe and vertical bar are fixed vertically, can play the role of guardrail, pedestrian is avoided to trample cross
Greenbelt is worn, cross bar and water pipe, which play, is connected sparge pipe and vertical bar, guarantees the intensity of guardrail;It is right when needing to pour
Water pipe carries out water flowing, and water enters in sparge pipe by water inlet pipe, and sparge pipe has the side of hole for water spraying when installing towards greenbelt,
Final water is sprayed on greenbelt by hole for water spraying, realizes the pouring to greenbelt;Above-mentioned guardrail is guaranteeing to realize that protection stops
Also pouring is able to achieve while function, so that the maintenance of greenbelt is more convenient.
In the guardrail of above-mentioned municipal greenbelt, sealing ring is embedded on the water inlet pipe, the sealing ring can be with company
The hole wall of through-hole seals against.The sealing being able to achieve by sealing ring between water inlet pipe and intercommunicating pore.
In the guardrail of above-mentioned municipal greenbelt, between the water pipe and sparge pipe be located at water inlet pipe periphery be covered with by
The outer seal ring that glass cement is formed.The sealing between water pipe and sparge pipe is further realized by glass cement.
In the guardrail of above-mentioned municipal greenbelt, several hole for water sprayings are in be arranged above and below, the spray being located above
The diameter in water hole is less than the diameter of underlying hole for water spraying.Hole for water spraying is relatively large in diameter, and the water flow of ejection is more anxious, that is, away from
From remoter, therefore, the pouring to each position of greenbelt is able to achieve by the hole for water spraying of above-mentioned arrangement.
In the guardrail of above-mentioned municipal greenbelt, the fastener includes two clamping parts being C-shaped one and is in U-typed
Clamping part two, the back of two clamping parts one connect with the both ends of clamping part two respectively, and the clamping part two can be buckled in
On sparge pipe or vertical bar, the clamping part one can be buckled on water pipe.Clamping part two is fixed with corresponding sparge pipe or vertical bar,
Clamping part one is capable of fixing water pipe, therefore is able to achieve water pipe and fixes with sparge pipe or being bonded for vertical bar, passes through two clamping parts
One stronger can fix water pipe.
In the guardrail of above-mentioned municipal greenbelt, it is all secured on the sparge pipe and vertical bar and lacks two pieces of blocks, two pieces
The block up and down be distributed, the upper and lower end faces of the clamping part two respectively with two pieces of blocks against.It can be further by block
Clamping part two is limited in the position of sparge pipe or vertical bar, enables the positioning water pipe that fastener is more stable.
In the guardrail of above-mentioned municipal greenbelt, the sparge pipe and the setting of vertical bar interval.The structure can guarantee to green
Change the pouring of band more evenly.
Compared with prior art, the guardrail of this municipal administration greenbelt is both able to achieve protection and stops, while being also able to achieve pouring, has
Have greenbelt maintenance more easily advantage.
Detailed description of the invention
Fig. 1 is the side structure schematic view of balustrade assemblies.
Fig. 2 is the schematic cross-sectional view that water pipe is connect with sparge pipe.
Fig. 3 is the enlarged structure schematic diagram in the portion A in Fig. 2.
Fig. 4 is the structural schematic diagram of fastener.
In figure, 1, vertical bar;2, cross bar;3, water pipe;31, intercommunicating pore;4, sparge pipe;41, water inlet pipe;42, sealing ring;43,
Hole for water spraying;5, fastener;51, clamping part one;52, clamping part two;6, outer seal ring;7, block.
Specific embodiment
It is specific embodiment of the utility model and in conjunction with attached drawing below, the technical solution of the utility model is made further
Description, but the utility model is not limited to these examples.
As shown in Figure 1 to Figure 3, the guardrail of municipal greenbelt includes several groups balustrade assemblies, and every group of balustrade assemblies include
Several vertical bars 1 and the cross bar 2 fixed with vertical bar 1, every group of balustrade assemblies further include a water pipe 3 and several sparge pipes 4, spray
Water pipe 4 is vertically arranged, and sparge pipe 4 is hollow pipe closed at both ends, and interval is set several sparge pipes 4 side by side with several vertical bars 1
Set, water pipe 3 is horizontally disposed, and the water pipe 3 in two adjacent groups balustrade assemblies is interconnected, water pipe 3 and sparge pipe 4 and water pipe 3 with
It is fixed between vertical bar 1 by the fitting of fastener 5, several and sparge pipe 4 is provided on the circumferential surface to recline on water pipe 3 with sparge pipe 4 one by one
Corresponding intercommunicating pore 31 has the water inlet pipe 41 of protrusion on sparge pipe 4, is embedded with sealing ring 42, sealing ring 42 on water inlet pipe 41
It can be sealed against with the hole wall of intercommunicating pore 31,41 periphery of water inlet pipe is located between water pipe 3 and sparge pipe 4 and is covered with by glass cement shape
At outer seal ring 6, be provided with several hole for water sprayings 43 on sparge pipe 4, several hole for water sprayings 43 are in being arranged above and below, the water spray being located above
The diameter in hole 43 is less than the diameter of underlying hole for water spraying 43.
As shown in figure 4, fastener 5 include two clamping parts 1 being C-shaped and the clamping part 2 52 in U-typed, two
The back of clamping part one is connect with the both ends of clamping part two respectively, and clamping part two can be buckled on sparge pipe 4 or vertical bar 1, buckle
Portion one can be buckled on water pipe 3.Few two pieces of blocks 7 are all secured on sparge pipe 4 and vertical bar 1, two pieces of about 7 blocks are distributed, buckle
The upper and lower end faces in portion two respectively with two pieces of blocks 7 against.Clamping part 2 52 and corresponding sparge pipe 4 or vertical bar 1 are fixed, card
Buckle 1 is capable of fixing water pipe 3, therefore is able to achieve water pipe 3 and fixes with sparge pipe 4 or being bonded for vertical bar 1, is blocked by two
Buckle 1 can be stronger fixed by water pipe 3.
Water pipe 3 is connected to total water route, and sparge pipe 4 and vertical bar 1 are fixed vertically, can play the role of guardrail, pedestrian is avoided to step on
It steps on and crosses greenbelt, cross bar 2 and water pipe 3 play and sparge pipe 4 and vertical bar 1 are connected, and guarantee the intensity of guardrail;It is needing to pour
When filling, water flowing is carried out to water pipe 3, water is entered in sparge pipe 4 by water inlet pipe 41, and there is sparge pipe 4 side of hole for water spraying 43 to pacify
Towards greenbelt when dress, final water is sprayed on greenbelt by hole for water spraying 43, realizes the pouring to greenbelt;Above-mentioned guardrail
Guaranteeing also to be able to achieve pouring while realizing protection barrier functionality, so that the maintenance of greenbelt is more convenient.
The specific embodiments described herein are merely examples of the spirit of the present invention.The utility model institute
Belonging to those skilled in the art can make various modifications or additions to the described embodiments or using similar
Mode substitute, but without departing from the spirit of the present application or beyond the scope of the appended claims.
Claims (7)
1. a kind of guardrail of municipal administration greenbelt, including several groups balustrade assemblies, every group of balustrade assemblies include several vertical bars and
The fixed cross bar with vertical bar, which is characterized in that every group of balustrade assemblies further include a water pipe and several sparge pipes, the water spray
Pipe is vertically arranged, and the sparge pipe is hollow pipe closed at both ends, and several sparge pipes are set side by side with several vertical bars,
The water pipe is horizontally disposed, and the water pipe in two adjacent groups balustrade assemblies is interconnected, the water pipe and sparge pipe and water pipe with
It is bonded and is fixed by fastener between vertical bar, is provided on the circumferential surface to recline on the water pipe with sparge pipe several a pair of with sparge pipe one
The intercommunicating pore answered, has the water inlet pipe of protrusion on the sparge pipe, and the water inlet pipe is plugged in intercommunicating pore and close with intercommunicating pore
It seals, is provided with several hole for water sprayings on the sparge pipe.
2. the guardrail of municipal administration greenbelt according to claim 1, which is characterized in that be embedded with sealing on the water inlet pipe
Circle, the sealing ring can be sealed against with the hole wall of intercommunicating pore.
3. the guardrail of municipal administration greenbelt according to claim 2, which is characterized in that be located between the water pipe and sparge pipe
Water inlet pipe periphery is covered with the outer seal ring formed by glass cement.
4. the guardrail of municipal administration greenbelt according to claim 1, which is characterized in that several hole for water sprayings are in row up and down
Column, the diameter for the hole for water spraying being located above are less than the diameter of underlying hole for water spraying.
5. the guardrail of municipal administration greenbelt according to claim 1, which is characterized in that the fastener includes two and is C-shaped
Clamping part one and clamping part two in U-typed, the back of two clamping parts one connect respectively with the both ends of clamping part two,
The clamping part two can be buckled on sparge pipe or vertical bar, and the clamping part one can be buckled on water pipe.
6. the guardrail of municipal administration greenbelt according to claim 5, which is characterized in that fixed on the sparge pipe and vertical bar
At least two pieces of blocks, two pieces of blocks are distributed up and down, the upper and lower end faces of the clamping part two respectively with two pieces of blocks against.
7. the guardrail of municipal administration greenbelt according to claim 1, which is characterized in that the sparge pipe and vertical bar interval are set
It sets.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820963062.6U CN208329859U (en) | 2018-06-21 | 2018-06-21 | A kind of guardrail of municipal administration greenbelt |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820963062.6U CN208329859U (en) | 2018-06-21 | 2018-06-21 | A kind of guardrail of municipal administration greenbelt |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208329859U true CN208329859U (en) | 2019-01-04 |
Family
ID=64769177
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820963062.6U Expired - Fee Related CN208329859U (en) | 2018-06-21 | 2018-06-21 | A kind of guardrail of municipal administration greenbelt |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208329859U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111622590A (en) * | 2020-06-05 | 2020-09-04 | 安徽国云智能科技有限公司 | Wisdom city is with water-collecting type greenbelt guardrail |
-
2018
- 2018-06-21 CN CN201820963062.6U patent/CN208329859U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111622590A (en) * | 2020-06-05 | 2020-09-04 | 安徽国云智能科技有限公司 | Wisdom city is with water-collecting type greenbelt guardrail |
CN111622590B (en) * | 2020-06-05 | 2021-11-12 | 深圳老玩童网络有限公司 | Wisdom city is with water-collecting type greenbelt guardrail |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208329859U (en) | A kind of guardrail of municipal administration greenbelt | |
CN201695334U (en) | Bridge deck siphon drainage system | |
CN208197133U (en) | The automatic water mists canopy cover curing system of concrete prefabricated element | |
CN207920121U (en) | Slope protection engineering spray maintenance device | |
CN207159890U (en) | A kind of urban construction greenbelt isolation guardrail | |
CN208097666U (en) | A kind of purification system avoiding civil construction dust from construction sites | |
CN210782218U (en) | Vertical greening curtain wall | |
CN109371835B (en) | Orthotropic bridge deck structure with drainage function | |
CN214061409U (en) | Municipal works urban road guardrail that can spray water smoke | |
CN205088615U (en) | Road sprays guardrail system | |
CN205546790U (en) | Water -saving irrigation system based on rainwater is collected | |
CN208850252U (en) | A kind of overhead type flower case of urban viaduct bridge floor anti-collision wall | |
CN204728251U (en) | A kind of highway center isolated area hair-dryer | |
CN204023474U (en) | A kind of isolation guardrail attaching road spray equipment | |
CN205884145U (en) | Formula of sinking greenbelt | |
CN208577980U (en) | A kind of hard shoulder prefabricated component being embedded with water-spraying type water part | |
CN207525693U (en) | Hedgerow cleaning system | |
CN205019890U (en) | Device of factory building dust fall | |
CN207405561U (en) | A kind of construction site assembled fence spraying device | |
CN206000257U (en) | A kind of sunk type greenbelt isolated column | |
CN213292242U (en) | Cleaning, dedusting and spraying device for construction site | |
CN208097665U (en) | It is a kind of for preventing and treating the formula spray equipment of sitting on the fence of civil construction dust from construction sites | |
CN206545190U (en) | Environmental sanitation sprinkling truck detachable guardrail flusher | |
CN105148651A (en) | Workshop dust removal device | |
CN209010979U (en) | A kind of novel curing system for Bridge High-pier column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 318000 No.2, building 4, Yantou Dongyuan, Yantou village, Haimen street, Jiaojiang District, Taizhou City, Zhejiang Province Patentee after: Zhejiang Yangtian Construction Co.,Ltd. Address before: 318099 No.2, building 4, Yantou Dongyuan, Yantou village, Haimen street, Jiaojiang District, Taizhou City, Zhejiang Province Patentee before: TAIZHOU YANGTIAN CONSTRUCTION Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190104 |