CN208328939U - Shore protection jackstone operation platform - Google Patents

Shore protection jackstone operation platform Download PDF

Info

Publication number
CN208328939U
CN208328939U CN201820471211.7U CN201820471211U CN208328939U CN 208328939 U CN208328939 U CN 208328939U CN 201820471211 U CN201820471211 U CN 201820471211U CN 208328939 U CN208328939 U CN 208328939U
Authority
CN
China
Prior art keywords
jackstone
ship
stone
block stone
cargo ship
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820471211.7U
Other languages
Chinese (zh)
Inventor
张海波
李玉霞
刘娟
钱明
张长庆
吕德永
江小寒
曹慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Changjiang Waterway Engineering Bureau
Original Assignee
Nanjing Changjiang Waterway Engineering Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Changjiang Waterway Engineering Bureau filed Critical Nanjing Changjiang Waterway Engineering Bureau
Priority to CN201820471211.7U priority Critical patent/CN208328939U/en
Application granted granted Critical
Publication of CN208328939U publication Critical patent/CN208328939U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model provides a kind of shore protection jackstone operation platform, is related to the technical field of hydraulic engineering.Shore protection jackstone operation platform provided by the utility model includes: jackstone ship, block stone cargo ship, net bagged stones jackstone system, jackstone excavator and jackstone section detection device;Jackstone ship and the setting of block stone cargo ship interval, are provided with detector gap between jackstone ship and block stone cargo ship;Jackstone excavator is set on jackstone ship, the block stone on block stone cargo ship can be thrown to riprap protection area far from the side of jackstone ship from block stone cargo ship;Net bagged stones jackstone system can a side from jackstone ship far from block stone cargo ship to riprap protection area launch net bagged stones;Jackstone section detection device is set on jackstone ship, and water-bed jackstone profile data can be detected by detector gap.By shore protection jackstone operation platform provided by the utility model, it is longer to alleviate the existing construction period of the construction of underwater dumped rockfill in the prior art, the lower technical problem of construction efficiency.

Description

Shore protection jackstone operation platform
Technical field
The utility model relates to the technical fields of hydraulic engineering, more particularly, to a kind of shore protection jackstone operation platform.
Background technique
River is important shipping resource, has the characteristics that low energy consumption and freight volume is big, payes attention to by various countries.Natural conditions Under, non-constant water flow and sediment movement cause the unstable of river bottom structure.It is real for the stability for improving navigation channel structure Applying river bottom protection engineering and carrying out river bottom protection erosion control to river is the pith in waterway regulation works.Underwater dumped rockfill is as a kind of common Underwater river bottom protection construction technology, be widely used in waterway regulation works construction in.Underwater dumped rockfill be directed to the riverbed washed away or Person's bank slope is jettisoninged block stone, is covered guard plot by block stone, is washed away with reducing water flow to river bottom structure and embankment, reach anti- Punching and the effect for improving the integrally-built stability in river.This shore protection technique of underwater dumped rockfill has easy for construction, building stones source The features such as abundant low with engineering cost, and the hydrologic condition court in river can also effectively be guided to be conducive to navigation channel development and stabilization Direction evolution;Currently, mostly using underwater dumped rockfill during the Changjiang river and Basin of Huaihe River dredging waterway to carry out shore protection.
Underwater dumped rockfill construction in the prior art generally comprises two step process of rough polishing and fine polishing.First according to guard plot original knot The measurement data and requirement of shelter of structure, the block stone amount jettisoninged required for budget guard plot;Rough polishing is the block stone amount according to budget 85%-95% is jettisoninged block stone using rough polishing mechanized equipment to guard plot.After rough polishing, rough polishing mechanized equipment is sailed out of into guard plot, is made The block stone jettisoninged is measured in the structure that guard plot is formed with surveying vessel, and is carried out with intrinsic riprap protection structure Comparison, analysis obtain the block stone amount supplemented required for specific location.Then, surveying vessel is sailed out of into guard plot, according to analysis data, It is jettisoninged according to quantity block stone using fine polishing mechanized equipment to the position for requiring supplementation with block stone.Underwater dumped rockfill in the prior art construction can be compared with Good control is jettisoninged quality, and the riprap protection structure to be formed is made to play preferable protection effect to river;But there is construction week Phase is longer, the lower technical problem of construction efficiency.
The information disclosed in the background technology section is intended only to deepen the reason to the general background technology of the utility model Solution, and it is known to those skilled in the art existing to be not construed as recognizing or imply that the information is constituted in any form Technology.
Utility model content
The purpose of this utility model is to provide a kind of shore protection jackstone operation platforms, to alleviate underwater dumped rockfill in the prior art The existing construction period of construction is longer, the lower technical problem of construction efficiency.
Shore protection jackstone operation platform provided by the utility model includes: jackstone ship, block stone cargo ship, net bagged stones jackstone system System, jackstone excavator and jackstone section detection device;Jackstone ship and the setting of block stone cargo ship interval, jackstone ship and block stone fortune Detector gap is provided between defeated ship;The top surface of block stone cargo ship can store block stone;Jackstone excavator is set on jackstone ship, Block stone on block stone cargo ship can be thrown to riprap protection area far from the side of jackstone ship from block stone cargo ship;Net bagged stones are thrown Stone system is set on jackstone ship, can a side from jackstone ship far from block stone cargo ship to riprap protection area launch the string bag Stone;Jackstone section detection device is set on jackstone ship, and water-bed jackstone profile data can be detected by detector gap.
Further, jackstone section detection device includes sounding instrument, the first position indicator, detection mounting rod and detection sliding rail; Detection sliding rail is installed on jackstone ship close to the edge of detector gap, and extends along the longitudinal direction of jackstone ship;Detect mounting rod edge Vertical direction extends, and is slidably connected on detection sliding rail;First position indicator is set to the top of detection mounting rod, sounding instrument It is set to the bottom end of detection mounting rod.
Further, net bagged stones jackstone system includes jackstone loop wheel machine, and jackstone loop wheel machine can be by net bagged stones far from jackstone ship The side of block stone cargo ship puts into riprap protection area.
Further, jackstone loop wheel machine includes string bag hook, jackstone hoist cable and unhook hoist cable, and the string bag is linked up with and jackstone hoist cable Connection, for lifting by crane net bagged stones;Unhook hoist cable is connect with the back that the string bag is linked up with, and string bag hook can be pulled to break off relations with net bagged stones.
Further, net bagged stones jackstone system further includes the second position indicator, and jackstone loop wheel machine includes jackstone boom;Jackstone hoist cable Around the top of jackstone boom, the second position indicator is set to the top of jackstone boom.
Further, jackstone excavator includes excavator base and shovel arm, and excavator base is set to the top of jackstone ship Face, shovel arm one end are connect with excavator base, and the other end extends to side of the block stone cargo ship far from jackstone ship.
Further, the top surface of jackstone ship is provided with walking guide groove, and walking guide groove prolongs along the longitudinal direction of jackstone ship It stretches;Jackstone excavator is slidably connected in walking guide groove, can be moved relative to jackstone ship along walking guide groove.
Further, block stone cargo ship is provided with block stone deflector, block stone deflector upper end far from the side of jackstone ship It is connected to the edge of block stone cargo ship, lower end extends to the direction far from block stone cargo ship.
Further, jackstone ship is provided with isolation pillar close to the side of block stone cargo ship, and isolation pillar is transported to block stone Defeated ship extends, and can abut with the side of block stone cargo ship.
Further, the end that pillar is isolated is provided with rubber pad.
Shore protection jackstone operation platform provided by the utility model, is related to the technical field of hydraulic engineering.The utility model mentions The shore protection jackstone operation platform of confession includes: jackstone ship, block stone cargo ship, net bagged stones jackstone system, jackstone excavator and jackstone Section detection device;Jackstone ship and the setting of block stone cargo ship interval, are provided with detection between jackstone ship and block stone cargo ship Gap;The top surface of block stone cargo ship can store block stone;Jackstone excavator is set on jackstone ship, can will be on block stone cargo ship Block stone is thrown to riprap protection area far from the side of jackstone ship from block stone cargo ship;Net bagged stones jackstone system is set to stone dumper On oceangoing ship, can a side from jackstone ship far from block stone cargo ship to riprap protection area launch net bagged stones;Jackstone section detection device It is set on jackstone ship, water-bed jackstone profile data can be detected by detector gap.Drive jackstone ship and the transport of block stone Ship is to riprap protection area, and storage has block stone on block stone cargo ship;By jackstone excavator, by the block stone on block stone cargo ship from block Stone cargo ship is thrown to riprap protection area far from the side of jackstone ship;Then jackstone ship and block stone cargo ship edge are driven from throwing Stone ship is directed toward the direction synchronizing moving of block stone cargo ship, is moved to the detector gap between jackstone ship and block stone cargo ship The top for the riprap protection structure that the block stone jettisoninged is formed;Jackstone excavator can continue block stone of jettisoninging, while jackstone section is examined Survey the device jackstone profile data water-bed by detector gap detection.
According to the detection data of jackstone section detection device, analysis is obtained to need to mend the specific location for throwing block stone and mend and be thrown Amount.Continue to drive jackstone ship and block stone cargo ship along the direction synchronizing moving for being directed toward block stone cargo ship from jackstone ship, makes The riprap protection structure for completing detection is located at side of the stone dumper oceangoing ship far from block stone cargo ship;It is carried out by net bagged stones jackstone system Site-directed quantitative is jettisoninged net bagged stones, is made to be formed in river guard plot and is met the riprap protection structure of requirement of shelter.
Carrying out jackstone operation using jackstone excavator has the advantages that efficiency;Net bagged stones, which have, to be easy to accurately control position of jettisoninging It sets and the advantages of the amount of jettisoninging.Using shore protection jackstone operation platform provided by the utility model, can first quickly jettisoning greatly to guard plot Then gauge block stone carries out accurate mend and throws;In this way it is easier to control quality of jettisoninging, while reducing the movement of mechanical equipment, Construction speed is accelerated, so that it is longer to alleviate the existing construction period of the construction of underwater dumped rockfill in the prior art, construction efficiency Lower technical problem.
To enable the above objects, features, and advantages of the utility model to be clearer and more comprehensible, be cited below particularly the utility model compared with Good embodiment, and cooperate appended attached drawing, it is described below in detail.
Detailed description of the invention
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution in the prior art Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below In attached drawing be that some embodiments of the utility model are not paying creativeness for those of ordinary skill in the art Under the premise of labour, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the axonometric drawing of shore protection jackstone operation platform provided by the embodiment of the utility model;
Fig. 2 is the top view of shore protection jackstone operation platform provided by the embodiment of the utility model;
Fig. 3 is the side view of shore protection jackstone operation platform provided by the embodiment of the utility model;
Fig. 4 is the structural schematic diagram of string bag hook in shore protection jackstone operation platform provided by the embodiment of the utility model.
Icon: 01- jackstone ship;Pillar is isolated in 011-;02- block stone cargo ship;021- block stone deflector;031- depth measurement Instrument;The first position indicator of 032-;033- detects mounting rod;034- detects sliding rail;041- loop wheel machine pedestal;042- jackstone boom;043- Jackstone hoist cable;044- string bag hook;045- unhook hoist cable;The second position indicator of 046-;051- excavator base;052- shovels arm; The walking guide groove of 0531- first;The walking guide groove of 0532- second;06- detector gap.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described Embodiment is the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, originally Field those of ordinary skill every other embodiment obtained without making creative work belongs to practical Novel protected range.
It is in the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", " perpendicular Directly ", the orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition, term " the One ", " second ", " third " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition The concrete meaning of language in the present invention.
Shore protection jackstone operation platform provided by the embodiment of the utility model includes: jackstone ship 01, block stone cargo ship 02, net Pocket stone jackstone system, jackstone excavator and jackstone section detection device;Jackstone ship 01 and the setting of the interval of block stone cargo ship 02, throw Detector gap 06 is provided between stone ship 01 and block stone cargo ship 02;The top surface of block stone cargo ship 02 can store block stone;Jackstone Excavator is set on jackstone ship 01, can by the block stone on block stone cargo ship 02 from block stone cargo ship 02 far from jackstone ship 01 Side be thrown to riprap protection area;Net bagged stones jackstone system is set on jackstone ship 01, can be from jackstone ship 01 far from block Net bagged stones are launched to riprap protection area in one side of stone cargo ship 02;Jackstone section detection device is set on jackstone ship 01, can Water-bed jackstone profile data is detected by detector gap 06.
Specifically, jackstone ship 01 and block stone cargo ship 02 are driven to riprap protection area, storing on block stone cargo ship 02 has Block stone;By jackstone excavator, by the block stone on block stone cargo ship 02 from 02 side far from jackstone ship 01 of block stone cargo ship It is thrown to riprap protection area;Then jackstone ship 01 and block stone cargo ship 02 are driven and is directed toward block stone cargo ship along from jackstone ship 01 02 direction synchronizing moving makes the detector gap 06 between jackstone ship 01 and block stone cargo ship 02 be moved to the block stone jettisoninged The top of the riprap protection structure of formation;Jackstone excavator can continue block stone of jettisoninging, while jackstone section detection device passes through inspection It surveys gap 06 and detects water-bed jackstone profile data.
According to the detection data of jackstone section detection device, analysis is obtained to need to mend the specific location for throwing block stone and mend and be thrown Amount.Continuing driving jackstone ship 01, along being directed toward from jackstone ship 01, the direction of block stone cargo ship 02 is synchronous to be moved with block stone cargo ship 02 It is dynamic, so that the riprap protection structure that detection is completed is located at side of the stone dumper oceangoing ship 01 far from block stone cargo ship 02;Pass through net bagged stones Jackstone system carries out site-directed quantitative and jettisonings net bagged stones, makes to be formed in river guard plot and meets the riprap protection structure of requirement of shelter.
Had the advantages that using the progress jackstone operation of jackstone excavator high-efficient;Net bagged stones, which have to be easy to accurately control, jettisonings The advantages of position and the amount of jettisoninging.It, can be first quickly to protection using shore protection jackstone operation platform provided by the embodiment of the utility model Area jettisonings big gauge block stone, then carries out accurate mend and throws, and multiple jettisonings operation and detection operation can carry out simultaneously;In this way, easily It is controlled in quality of jettisoninging, while reducing the movement of mechanical equipment, accelerate construction speed.
In some embodiments, be separately installed on jackstone ship 01 and block stone cargo ship 02 GPS (global positioning system, Full name in English: Global Positioning System) position indicator, to obtain the tool of jackstone ship 01 and block stone cargo ship 02 The accuracy for position of jettisoninging is improved consequently facilitating controlling the position of jackstone ship 01 and block stone cargo ship 02 in body position.
In some embodiments, jackstone ship 01 uses flat top barge, is provided with larger area at the top of flat top barge Plane, in order to install net bagged stones jackstone system, jackstone excavator and jackstone section detection device.
Further, please refer to Fig. 1 and Fig. 3, jackstone section detection device include sounding instrument 031, the first position indicator 032, Detect mounting rod 033 and detection sliding rail 034;Detection sliding rail 034 is installed on jackstone ship 01 close to the edge of detector gap 06, and Longitudinal direction along jackstone ship 01 extends;Detection mounting rod 033 extends along the vertical direction, and is slidably connected to detection sliding rail 034 On;First position indicator 032 is set to the top of detection mounting rod 033, and sounding instrument 031 is set to the bottom end of detection mounting rod 033.
Specifically, sounding instrument 031 uses single beam echosounding instrument, and the probe of sounding instrument 031 is installed on detection mounting rod 033 Bottom end.First position indicator 032 uses GPS positioning instrument, and the GPS satellite antenna of the first position indicator 032 is installed on detection mounting rod 033 Top.Detection mounting rod 033 is protruded into river water by detector gap 06.Under the guiding role of detection sliding rail 034, detection Mounting rod 033 drives the longitudinal movement along jackstone ship 01 synchronous with the first position indicator 032 of sounding instrument 031, to established throwing Stone safeguard structure is detected, and the measuring height of section data of each specific location can be obtained, to analyze the specific position for obtaining and needing to mend throwing Set and specifically mend throwing amount.
When detecting to riprap protection structure, it can control jackstone ship 01 and block stone cargo ship 02 along from jackstone ship The direction of 01 direction block stone cargo ship 02 is slowly moved, to obtain the more complete data of riprap protection structure.
In some embodiments, jackstone section detection device further includes detection driving device, detection driving device and detection Mounting rod 033 is sequentially connected, and detection mounting rod 033 can be driven to translate along detection sliding rail 034.
In some embodiments, sounding instrument 031 uses multibeam echosounder.
Further, net bagged stones jackstone system includes jackstone loop wheel machine, and jackstone loop wheel machine can be remote from jackstone ship 01 by net bagged stones Side from block stone cargo ship 02 puts into riprap protection area.
Specifically, jackstone loop wheel machine includes loop wheel machine pedestal 041, jackstone boom 042 and jackstone hoist cable 043, and loop wheel machine pedestal 041 connects It is connected on jackstone ship 01;One end of jackstone boom 042 is connected to loop wheel machine pedestal 041, and the other end tilts upward extension, and throws Stone boom 042 can be rotated relative to loop wheel machine pedestal 041, to adjust the projected position of the vertical direction on the top of jackstone boom 042;It throws 043 one end of stone hoist cable is connected to loop wheel machine pedestal 041, and the other end extends downwardly around the top of jackstone boom 042.Net bagged stones suspension In jackstone hoist cable 043, can be rotated by control jackstone boom 042 relative to loop wheel machine pedestal 041 to adjust the position of net bagged stones, thus Net bagged stones are jettisoninged to setting position.
Further, jackstone loop wheel machine further includes string bag hook 044 and unhook hoist cable 045, and the string bag links up with 044 and jackstone hoist cable 043 connection, for lifting by crane net bagged stones;Unhook hoist cable 045 is connect with the back of string bag hook 044, and the string bag can be pulled to link up with 044 It breaks off relations with net bagged stones.
Specifically, it is hung on string bag hook 044 with Fig. 4, net bagged stones referring to figure 3., control net bagged stones are moved to setting It jettisonings behind position;Unhook hoist cable 045 is pulled, 044 overturning of string bag hook can be driven, to keep string bag hook 044 and net bagged stones de- Hook.In this way, unhook operation is simplified, convenient for breaking off relations to net bagged stones, to improve construction efficiency.
Further, net bagged stones jackstone system further includes the second position indicator 046;Jackstone hoist cable 043 bypasses jackstone boom 042 Top, the second position indicator 046 is set to the top of jackstone boom 042.
Specifically, the second position indicator 046 uses GPS positioning instrument, and the GPS satellite antenna of the second position indicator 046 is installed on throwing The top of stone boom 042;Jackstone hoist cable 043 extends downwardly around the top of jackstone boom 042, and net bagged stones hang on jackstone hoist cable On 043.In this way, the projection of the GPS satellite antenna of the second position indicator 046 along the vertical direction is overlapped with net bagged stones, it is fixed by second Position instrument 046 can accurately detect the position of jettisoninging in real time of net bagged stones, to improve the accuracy for position of jettisoninging.
Further, jackstone excavator includes excavator base 051 and shovel arm 052, and excavator base 051 is set to jackstone The top surface of ship 01, shovel 052 one end of arm are connect with excavator base 051, and the other end extends to block stone cargo ship 02 far from jackstone The side of ship 01.
Specifically, jackstone excavator uses high-front shovel.It is moved by control shovel arm 052, can make to deposit in block stone fortune Block stone on defeated ship 02 slides from the side far from jackstone ship 01 to riprap protection area.
Further, the top surface of jackstone ship 01 is provided with walking guide groove, and walking guide groove is along the vertical of jackstone ship 01 To extension;Jackstone excavator is slidably connected in walking guide groove, can be moved relative to jackstone ship 01 along walking guide groove.
Specifically, referring to Fig.1 and 2, the top surface of jackstone ship 01 is provided with first baffle, second baffle, third gear Plate and fourth gear plate, first baffle, second baffle, third baffle and fourth gear plate are vertically arranged, and along jackstone ship 01 Longitudinal extend.Form the first walking guide groove 0531 between first baffle and second baffle, third baffle and fourth gear plate it Between formed second walking guide groove 0532;The crawler belt of jackstone excavator two sides is respectively arranged at the first walking guide groove 0531 and Two walking guide grooves 0532.First walking guide groove 0531 and the second walking guide groove 0532 can play the movement of jackstone excavator It to guiding role, and prevents jackstone excavator from turning on one's side, keeps the movement of jackstone excavator more steady, and make jackstone ship 01 overall structure is more firm.
Further, block stone cargo ship 02 is provided with block stone deflector 021, block stone water conservancy diversion far from the side of jackstone ship 01 021 upper end of plate is connected to the edge of block stone cargo ship 02, and lower end extends to the direction far from block stone cargo ship 02.
Specifically, block stone deflector 021 is made of steel plate, and upper end is welded in the edge of block stone cargo ship 02.Block stone is led Flowing plate 021 bootable block of stone movement, avoid block stone in dropping process the outer wall of impact block stone cargo ship 02 and block stone is transported Ship 02 causes to damage, on the one hand can protection block stone cargo ship 02, be on the other hand conducive to block stone and accurately fall to setting position.
Further, jackstone ship 01 is provided with isolation pillar 011 close to the side of block stone cargo ship 02, and pillar is isolated 011 extends to block stone cargo ship 02, and can abut with the side of block stone cargo ship 02.
Specifically, isolation pillar 011 abutted with the side of block stone cargo ship 02, can stoping block stone cargo ship 02 continue it is close Jackstone ship 01, to guarantee the width of detector gap 06.
In some embodiments, two isolation pillars are arranged close to the side of block stone cargo ship 02 in the bow of jackstone ship 01 011, two isolation pillars 011 are distributed along the vertical direction;The stern of jackstone ship 01 is arranged close to the side of block stone cargo ship 02 Two isolation pillars 011, two isolation pillars 011 are distributed along the vertical direction.Make jackstone ship 01 close to block stone cargo ship in this way When 02, the distribution of force of the two is more balanced.
Further, the end for pillar 011 being isolated is provided with rubber pad.
Specifically, rubber pad can play buffer function, reduce stone dumper when isolation pillar 011 strikes block stone cargo ship 02 The impact force that oceangoing ship 01 and block stone cargo ship 02 are subject to reduces the influence to the stability of jackstone ship 01 and block stone cargo ship 02.
Further, shore protection jackstone operation platform provided by the utility model includes first connecting rod and the second connecting rod, The both ends of first connecting rod are rotationally connected with jackstone ship 01 and block stone cargo ship 02 respectively, and first connecting rod can distinguish phase Jackstone ship 01 and block stone cargo ship 02 are rotated around vertical axis;The both ends of second connecting rod are rotationally connected with stone dumper respectively Oceangoing ship 01 and block stone cargo ship 02, and the second connecting rod can be respectively with respect to jackstone ship 01 and block stone cargo ship 02 around vertical axis Rotation;First connecting rod and the second connecting rod are parallel to each other.
Specifically, the junction of first connecting rod and jackstone ship 01 and block stone cargo ship 02 is provided with retaining mechanism, locks One end of first connecting rod can be lock onto jackstone ship 01 by tight mechanism, and the other end lock onto block stone cargo ship 02.
In some embodiments, first connecting rod and the second connecting rod can be disassembled from block stone cargo ship 02 respectively.
Jackstone ship 01 and block stone cargo ship 02 are connected as an entirety by first connecting rod and the second connecting rod, it can Overall stability is improved, reduces and shakes.In addition, first connecting rod and the second connecting rod are transported with jackstone ship 01 and block stone respectively Ship 02 is rotatablely connected, and first connecting rod and the second connecting rod are parallel to each other, so that jackstone ship 01 and block stone cargo ship 02 It can relatively move, to maintain the flexibility of the two movement.
Finally, it should be noted that all the embodiments in this specification are described in a progressive manner, each embodiment What is stressed is all differences from other embodiments, and same and similar part cross-reference is between each embodiment It can;The above various embodiments is only to illustrate the technical solution of the utility model, rather than its limitations;Although referring to aforementioned each implementation The utility model is described in detail in example, those skilled in the art should understand that: it still can be to aforementioned Technical solution documented by each embodiment is modified, or equivalent substitution of some or all of the technical features; And these are modified or replaceed, the model for various embodiments of the utility model technical solution that it does not separate the essence of the corresponding technical solution It encloses.

Claims (10)

1. a kind of shore protection jackstone operation platform characterized by comprising jackstone ship, block stone cargo ship, net bagged stones jackstone system System, jackstone excavator and jackstone section detection device;
The jackstone ship and described piece of stone cargo ship interval setting, are arranged between the jackstone ship and described piece of stone cargo ship There is detector gap;
The top surface of described piece of stone cargo ship can store block stone;The jackstone excavator is set on the jackstone ship, can be by institute The block stone stated on block stone cargo ship is thrown to riprap protection area far from the side of the jackstone ship from described piece of stone cargo ship;
The net bagged stones jackstone system is set on the jackstone ship, can be from the jackstone ship far from described piece of stone cargo ship A side to the riprap protection area launch net bagged stones;
The jackstone section detection device is set on the jackstone ship, and water-bed jackstone can be detected by the detector gap Profile data.
2. shore protection jackstone operation platform according to claim 1, which is characterized in that the jackstone section detection device includes Sounding instrument, the first position indicator, detection mounting rod and detection sliding rail;The detection sliding rail is installed on the jackstone ship close to described The edge of detector gap, and extend along the longitudinal direction of the jackstone ship;The detection mounting rod extends along the vertical direction, and sliding It is dynamic to be connected on the detection sliding rail;
First position indicator is set to the top of the detection mounting rod, and the sounding instrument is set to the detection mounting rod Bottom end.
3. shore protection jackstone operation platform according to claim 1, which is characterized in that the net bagged stones jackstone system includes throwing Net bagged stones can be put into the throwing far from the side of described piece of stone cargo ship from the jackstone ship by stone loop wheel machine, the jackstone loop wheel machine Stone guard plot.
4. shore protection jackstone operation platform according to claim 3, which is characterized in that the jackstone loop wheel machine includes that the string bag is hung Hook, jackstone hoist cable and unhook hoist cable, the connection of the string bag hook and the jackstone hoist cable, for lifting by crane net bagged stones;It is described de- Hook block rope is connect with the back that the string bag is linked up with, and the string bag hook can be pulled to break off relations with the net bagged stones.
5. shore protection jackstone operation platform according to claim 4, which is characterized in that the net bagged stones jackstone system further includes Second position indicator, the jackstone loop wheel machine include jackstone boom;The jackstone hoist cable bypasses the top of the jackstone boom, and described the Two position indicators are set to the top of the jackstone boom.
6. shore protection jackstone operation platform according to claim 2, which is characterized in that the jackstone excavator includes excavator Base and shovel arm, the excavator base are set to the top surface of the jackstone ship, described shovel arm one end and the excavator machine Seat connection, the other end extend to side of the described piece of stone cargo ship far from the jackstone ship.
7. shore protection jackstone operation platform according to claim 6, which is characterized in that the top surface of the jackstone ship is provided with Walking guide groove, the walking guide groove extend along the longitudinal direction of the jackstone ship;The jackstone excavator is slidably connected to institute It states in walking guide groove, can be moved relative to the jackstone ship along the walking guide groove.
8. shore protection jackstone operation platform according to claim 6, which is characterized in that described piece of stone cargo ship is far from the throwing The side of stone ship is provided with block stone deflector, and described piece of stone deflector upper end is connected to the edge of described piece of stone cargo ship, Lower end extends to the direction far from described piece of stone cargo ship.
9. shore protection jackstone operation platform according to claim 1, which is characterized in that the jackstone ship is close to described block of stone The side of cargo ship is provided with isolation pillar, and the isolation pillar extends to described piece of stone cargo ship, and can transport with described block of stone The side of defeated ship abuts.
10. shore protection jackstone operation platform according to claim 9, which is characterized in that the end setting of the isolation pillar There is rubber pad.
CN201820471211.7U 2018-04-02 2018-04-02 Shore protection jackstone operation platform Active CN208328939U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820471211.7U CN208328939U (en) 2018-04-02 2018-04-02 Shore protection jackstone operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820471211.7U CN208328939U (en) 2018-04-02 2018-04-02 Shore protection jackstone operation platform

Publications (1)

Publication Number Publication Date
CN208328939U true CN208328939U (en) 2019-01-04

Family

ID=64780537

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820471211.7U Active CN208328939U (en) 2018-04-02 2018-04-02 Shore protection jackstone operation platform

Country Status (1)

Country Link
CN (1) CN208328939U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112030978A (en) * 2020-09-08 2020-12-04 浙江世润建创科技发展有限公司 Underwater accurate stone throwing system for complex terrain and stone throwing construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112030978A (en) * 2020-09-08 2020-12-04 浙江世润建创科技发展有限公司 Underwater accurate stone throwing system for complex terrain and stone throwing construction method

Similar Documents

Publication Publication Date Title
CN103924597B (en) Platform-type jackstone leveling ship and construction method thereof
CN203846501U (en) Platform-type riprap leveling ship
CN107063196B (en) Seabed sand waves migration observation device and method based on pressure gauge
CN201137057Y (en) Bridge subaqueous base floating type borehole platform
CN102979039B (en) Elevated trestle bridge construction method on covering-free steep bare rock in deepwater and rapid stream
CN208328939U (en) Shore protection jackstone operation platform
JP4960402B2 (en) Dredging method by grab dredger
CN106985973B (en) A kind of sea area probing sand anchor cast anchor and the method that weighs anchor
CN110667787A (en) A throw stone ship for pile foundation is thrown and is filled
CN114197439B (en) Construction method and construction equipment for high-current deepwater underwater gravel pile
US7252159B2 (en) Underwater rock boring apparatus having differential global positioning system receiver and boring method thereof
CN208325562U (en) Stone dumper waterborne and jackstone system waterborne
JP4883494B2 (en) Underwater dangerous goods recovery device and recovery method
CN207260079U (en) One kind hangs peace prefabricated sandbag system
CN1472399A (en) Method for positioning floatation transported heavy anchor of steel caisson of deep underwater foundation of bridge
JP2018520281A (en) Deep grooving plows on stern with instruments for assessing the protection ability of submarine trenches
CN201397153Y (en) Root and stone detector
CN203876952U (en) Pontoon system for immersed pipes to pass through rivers
CN102561454A (en) Water intake method utilizing pipe jacking vertically
CN211228512U (en) Stone throwing ship for bridge bottom construction
CN204875664U (en) A retaining wall structure for interim pier in bay
KR102079809B1 (en) Rock crushing ship for submarine cable installation and method using it
CN104594291B (en) A kind of soft raft mattress sinking construction method that can improve mattress sinking smooth degree
CN108411969B (en) Shallow sweeping device and shallow sweeping method for dredger
CN110411411A (en) Topographic section measuring device under the complexity water flow urban river water of mountain area

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant