CN208328931U - A kind of leading truck for injection taper pile waterborne - Google Patents
A kind of leading truck for injection taper pile waterborne Download PDFInfo
- Publication number
- CN208328931U CN208328931U CN201820691416.6U CN201820691416U CN208328931U CN 208328931 U CN208328931 U CN 208328931U CN 201820691416 U CN201820691416 U CN 201820691416U CN 208328931 U CN208328931 U CN 208328931U
- Authority
- CN
- China
- Prior art keywords
- hanger
- movable stand
- steel
- horizontal
- support frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model relates to pile foundation construction technical field of structures, in particular to a kind of leading truck for injection taper pile waterborne.Including support frame;The support frame is that the hanger along horizontal cross arrangement is equipped with along horizontal longitudinally arranged sub-truss, support frame;The upper and lower ends of the hanger are provided with two groups of movable stands, two groups of movable stands vertically arranged for interval;The movable stand is that can be movably attached to hold together mouth for clamp steel pipe stake body in being equipped on the guide frame on hanger, movable stand in the horizontal direction.The guide body structure of the utility model is simple, easy to operate, cheap, applied widely, can be applied to the steel-pipe pile inserting piling guiding construction of various different sizes, has great promotional value.
Description
Technical field
The utility model relates to pile foundation construction technical field of structures, in particular to a kind of guiding for injection taper pile waterborne
Frame.
Background technique
Taper pile, the i.e. vertical line of itself and horizontal plane keep certain inclination angle, and in some cases, the advantage of taper pile is although non-
Chang Mingxian, but its application in practical projects reaches far away due ratio, main cause be the difficulty of construction of taper pile very
Greatly.Under normal circumstances, injection taper pile waterborne needs to set up large area operation at sea fixed platform, uses large-scale special equipment.Such as
The Chinese invention patent of entitled " a kind of composite steel tube taper pile construction method " of Patent No. " CN106120806A " describes one
Kind taper pile construction method, the arrangement and method for construction are needed using the dedicated rig bracket with inclined end face, by putting steel-pipe pile
It sets on the inclined end face of rig bracket, steel-pipe pile is allowed to keep heeling condition, then carry out heavy construction of shaking.Though this arrangement and method for construction
The difficulty of construction of taper pile can so be greatly lowered, but need using dedicated rig bracket, cost is more high, and drilling machine
The inclined end face of bracket is fixed structure, can not be adjusted, and the taper pile construction of fixed inclination in curves, the scope of application are only applicable to
It is narrow.
In order to solve the problems, such as that the scope of application is narrow, having Patent No. " CN106759345A " entitled, " a kind of taper pile is applied
The Chinese utility model patent of construction equipment and taper pile base pit stand construction ", a kind of taper pile construction equipment of the patent protection
And its construction method, the construction equipment are set between sleeve fixture and mechanical pedestal by the installation sleeve fixture in mechanical pedestal
It is equipped with the regulating device for adjusting sleeve fixture tilt angle.When construction, sleeve fixture clamps steel-pipe pile, and regulating device adjusts steel pipe
The tilt angle of stake.The steel-pipe pile tilt adjustable of the construction equipment can be suitable for the construction of various taper piles.But the device
All regulating measures are realized by regulating device, and the weight of steel-pipe pile is supported by regulating device, completely to be realized tiltedly
Stake Slope angle adjustment, needs to install large-scale power-equipment, and the cost of whole device is just greatly improved in this, and needs
Professional is wanted to operate, effect is relatively low, and effect on environment is big.
Utility model content
The taper pile construction equipment that the purpose of this utility model seeks to solve the prior art that above-mentioned background technique is mentioned is deposited
The either scope of application is small or the high problem complicated for operation of cost, a kind of leading truck for injection taper pile waterborne is provided.
The technical solution of the utility model are as follows: a kind of leading truck for injection taper pile waterborne, it is characterised in that: including branch
Support;The support frame is that the extension along horizontal cross arrangement is equipped with along horizontal longitudinally arranged sub-truss, support frame
Frame;The upper and lower ends of the hanger are provided with two groups of movable stands, two groups of movable stands vertically arranged for interval;The movable stand
For that can be movably attached in the horizontal direction in being equipped on the guide frame on hanger, movable stand for clamping steel pipe stake body
Hold together mouth.At least one group can be movably attached in the horizontal direction on hanger in two groups of movable stands.
The further movable stand includes the horizontal support that can along horizontal transverse movement be connected on hanger;It is described
Hanger on transverse shifting oil cylinder is installed;The transverse shifting oil cylinder arranges that shell is fixed on hanger along horizontal cross
On, pushing end is fixedly connected with horizontal support.
The further movable stand along horizontally vertically moving can be connected on horizontal support;The horizontal support
On longitudinal movement oil cylinder is installed;The longitudinal movement oil cylinder is longitudinally arranged along level, and shell is fixed on movable stand, top
End is pushed away to be fixed on horizontal support.
It further include further pipe bending cylinder;It is provided on the support frame along horizontal longitudinally arranged sliding rail;It is described
Hanger be slidably connected on sliding rail;The pipe bending cylinder is longitudinally arranged along level, and shell is fixed on the support frame, pushing tow
End is fixed on hanger.
The further mouth that holds together includes two folded arms and two groups of clamping oil cylinders for being set to movable stand longitudinal end;Institute
The folded arm one end stated can rotationally be articulated and connected around vertical axis in movable stand end;The clamping oil cylinder shell is fixed on shifting
In moving frame, pushing end is fixed in folded arm for driving folded arm rotation to realize the clamping to steel-pipe pile.
A kind of construction method of injection taper pile waterborne, it is characterised in that: movable supporting frame to steel pipe pile sinking construction point is adjusted
The lengthwise position of section support frame upper hanger is aligned movable stand in a vertical direction with construction point, on handling steel-pipe pile to movable stand
Steel-pipe pile is gripped, the horizontal position for adjusting two groups of movable stands up and down changes the gradient of steel-pipe pile, reaches design
After gradient, by shaking, heavy equipment carries out inserting piling construction to steel-pipe pile.
The lengthwise position of the further adjusting support frame upper hanger makes movable stand and construction point in a vertical direction
The method of alignment are as follows: moved by longitudinal slide rail of the pipe bending cylinder pushing tow hanger on support frame on support frame, change hanger
Lengthwise position on the support frame is aligned the movable stand on hanger in a vertical direction with construction point.
The method that steel-pipe pile is gripped on the further handling steel-pipe pile to movable stand are as follows: adjust and hang
The position of the horizontal direction of two groups of movable stands on frame is overlapped the mouth that holds together of upper and lower two groups of movable stand ends in a vertical direction, hangs
Fortune steel-pipe pile passes through two in the vertical direction and holds together mouth, and steel-pipe pile is clamped by the clamping oil cylinder that driving is held together on mouth.
The method that the horizontal position of the further described two groups of movable stands of adjusting changes the gradient of steel-pipe pile are as follows: pass through
The horizontal support that transverse shifting oil cylinder driving on hanger is slidably connected on hanger changes two groups of movements along horizontal transverse movement
Two on frame are held together mouth in the relative position of transverse direction, adjust the lateral inclination angle of steel-pipe pile;By on horizontal support
The movable stand that longitudinal movement oil cylinder driving is slidably connected on horizontal support changes on two groups of movable stands along horizontal transverse movement
Two are held together mouth in the relative position of longitudinal direction, adjust the longitudinal inclination of steel-pipe pile.
It is further the following steps are included: 1), movable supporting frame to steel pipe pile sinking construction point, pipe bending cylinder drives hanger
It is moved along sliding rail, the lengthwise position for adjusting hanger is aligned movable stand in a vertical direction with construction point;
2) the transverse shifting oil cylinder and longitudinal movement oil cylinder on hanger, are driven, the horizontal position of two groups of movable stands up and down is adjusted
It sets, is overlapped the mouth that holds together on two groups of movable stands in a vertical direction;
3), handling steel-pipe pile passes through two in the vertical direction and holds together mouth, holds together the clamping oil cylinder driving folded arm rotation in mouth, by steel
Tubular pole is clamped to two and holds together in mouth;
4) it, drives the transverse shifting oil cylinder on hanger to make two groups of movable stands along horizontal cross difference moved further, adjusts steel pipe
The sideways pitch of stake drives the longitudinal movement oil cylinder on hanger to make two groups of movable stands along horizontal longitudinal different moved furthers, adjusts
The fore-and-aft tilt degree of steel-pipe pile;
5) after, reaching designed inclination angle degree, by shaking, heavy equipment carries out inserting piling construction to steel-pipe pile.
The advantages of the utility model has: 1, the utility model passes through two groups of movements that can be moved in the horizontal direction alone of setting
Frame can easily change the tilt angle of clamping steel-pipe pile, and the steel-pipe pile for adapting to various different gradients is oriented to construction;
2, the utility model improves the stability of total by two groups of independent movable stands come supporting steel tubular pole,
The adjusting of steel-pipe pile tilt angle can be completed without introducing large-scale adjustment equipment, regulative mode is simple, and it is easy to operate, and make
Valence is low;
3, the utility model is by being changed into two sides in horizontal longitudinal direction and horizontal cross for two groups of moving horizontally for movable stand
To steel-pipe pile capable of being made to adapt to the angular adjustment of all directions, regulative mode is easy, efficiently, and high degree improves guiding and applies
The efficiency of work;
4, for the utility model by installing pipe bending cylinder between hanger and support frame, the level that can adjust hanger is longitudinal
Position makes hanger adapt to the steel-pipe pile construction point of different location, reduces the adjusting number of support frame, improves the effect of guiding construction
Rate;
5, the utility model holds together mouth by what folded arm and clamping oil cylinder formed by being arranged, and can clamp the steel pipe of different tube diameters
Stake, makes entire leading truck can adapt to the steel-pipe pile of various different sizes, improves the application range of leading truck.
The guide body structure of the utility model is simple, easy to operate, cheap, applied widely, can be applied to each
The steel-pipe pile inserting piling of kind different size is oriented to construction, has great promotional value.
Detailed description of the invention
Fig. 1: the main view of the utility model;
Fig. 2: the side view of the utility model;
Fig. 3: the movable stand top view of the utility model;
Wherein: 1-support frame;2-hangers;3-movable stands;4-horizontal supports;5-transverse shifting oil cylinders;6-is longitudinal
Shift cylinder;7-pipe bending cylinders;8-sliding rails;9-folded arms;10-clamping oil cylinders.
Specific embodiment
The utility model is described in further detail in the following with reference to the drawings and specific embodiments.
Such as Fig. 1~3, a kind of leading truck for injection taper pile waterborne, including support frame 1, the support frame 1 of the present embodiment are
Be fixed on operation platform or workboat be provided with along horizontal longitudinally arranged sub-truss, support frame 1 it is vertical along level
To the sliding rail 8 of arrangement.
It as shown in Figures 1 to 3, further include hanger 2, the hanger 2 of the present embodiment is the truss knot being slidably connected on sliding rail 8
Structure, 2 side of hanger are provided with the inverted U card slot being fastened on sliding rail 8, are slidably connected by card slot and sliding rail 8, hanger 2 and cunning
Pipe bending cylinder 7 is provided between rail 8.As shown in Figure 1, pipe bending cylinder 7 is longitudinally arranged along level, shell is fixed on support frame 1
On, pushing end is fixed on hanger 2.Pipe bending cylinder 7 makes hanger for driving hanger 2 along sliding rail 8 along horizontally vertically moving with this
2 is corresponding in a vertical direction with the steel pipe pile sinking construction of lower section point.
It is provided with two groups of movable stands 3 on the hanger 2 of the present embodiment, two groups of movable stands 3 arranged for interval up and down in the vertical direction.
As shown in Figures 1 to 3, movable stand 3 is the truss structure that relative displacement can be generated with hanger 2, and movable stand 3 is longitudinally arranged along level,
Its end, which is equipped with, holds together mouth for clamp steel-pipe pile.
As shown in figure 3, holding together mouth includes two folded arms 9 and two groups of clamping oil cylinders 10 for being set to 3 longitudinal end of movable stand, embrace
9 one end of arm can be rotationally articulated and connected in 3 end of movable stand around vertical axis, clamped 10 shell of oil cylinder and be fixed on movable stand 3,
Pushing end is fixed in folded arm 9 for driving the rotation of folded arm 9 to realize the clamping to steel-pipe pile.Clamp the group of oil cylinder 10 and folded arm 9
Closing structure can adapt to the steel-pipe pile of different tube diameters.
Two of two groups of movable stands 3 of the present embodiment hold together mouth and change relative position under the adjusting of movable stand 3, to adjust
The gradient of steel-pipe pile.As shown in Figures 1 to 3, the movable stand 3 of the present embodiment can be realized horizontal cross and horizontal longitudinal tune
Section.Movable stand 3 includes the horizontal support 4 that can along horizontal transverse movement be connected on hanger 2, is equipped with lateral shifting on hanger 2
Dynamic oil cylinder 5, transverse shifting oil cylinder 5 arrange that shell is fixed on hanger 2 along horizontal cross, and pushing end and horizontal support 4 are fixed
Connection.Change the lateral position of movable stand 3 by transverse shifting oil cylinder 5, so that changing two holds together the phase of mouth in a lateral direction
To position, change steel-pipe pile lateral inclination angle.
Movable stand 3 along horizontally vertically moving can be connected on horizontal support 4, and longitudinal movement is equipped on horizontal support 4
Oil cylinder 6, longitudinal movement oil cylinder 6 are longitudinally arranged along level, and shell is fixed on movable stand 3, and pushing end is fixed on horizontal support 4
On.The lengthwise position for changing movable stand 3 by longitudinal movement oil cylinder 6 holds together the length that mouth stretches out hanger 2, change two and hold together mouth
Relative position in a longitudinal direction adjusts steel-pipe pile longitudinal inclination.
In actual use, the guide rail arranged along horizontal cross can be set on hanger 2, convenient for the movement of horizontal support 4,
It is provided on horizontal support 4 along horizontal longitudinally arranged guide rail, frame 3 easy to remove is moved along horizontal longitudinal.
When practical guiding construction, 1, mobile operation platform or workboat to piling construction point, make support frame 1 be moved to by
The construction point of pile sinking being carried out hanger 2 is adjusted after movement in place, pipe bending cylinder 7 drives hanger 2 to move along sliding rail 8,
The lengthwise position for adjusting hanger 2 is aligned movable stand 3 in a vertical direction with construction point, and the support frame 1 of the present embodiment is mobile real
Primary Location on border, the movement of hanger 2 are to be accurately positioned;
2, the transverse shifting oil cylinder 5 and longitudinal movement oil cylinder 6 on hanger 2 are driven, moves two groups of movable stands 3 in the horizontal direction
It is dynamic, the horizontal position of two groups of movable stands 3 up and down is adjusted, is overlapped the mouth that holds together on two groups of movable stands 3 in a vertical direction, two are held together
Mouth is overlapped in a vertical direction, is easy to lift equipment and steel-pipe pile is transferred on movable stand 3;
3, handling steel-pipe pile passes through two in the vertical direction and holds together mouth, and the clamping oil cylinder 10 held together in mouth drives folded arm 9 to rotate, and makes
Two folded arms 9 tightening on movable stand 3 clamps steel-pipe pile, and the present embodiment is equipped with the idler wheel of guiding on the inside of folded arm 9, just
Steel-pipe pile being moved along axial when the construction of later period inserting piling, and steel-pipe pile, which is hoisted to two and holds together in mouth, holds together mouth by two along the vertical direction
It is clamped;
4, drive the horizontal support 4 being slidably connected on hanger 2 along horizontal horizontal by the transverse shifting oil cylinder 5 on hanger 2
To movement, two changed on two groups of movable stands 3 hold together mouth in the relative position of transverse direction, adjust the superelevation angle of steel-pipe pile
Degree, the movable stand 3 being slidably connected on horizontal support 4 by longitudinal movement oil cylinder 6 driving on horizontal support 4 is along horizontal cross
Mobile, two changed on two groups of movable stands 3 hold together mouth in the relative position of longitudinal direction, adjust the fore-and-aft tilt angle of steel-pipe pile
Degree, the different moved furthers of two groups of movable stands 3 make two to hold together mouth and mutually stagger in a vertical direction, effectively have adjusted steel-pipe pile
Vertical tilt angle;
5, after reaching designed inclination angle degree, by shaking, heavy equipment carries out inserting piling construction to steel-pipe pile.
After steel-pipe pile completes inserting piling construction, successively carried out according to above-mentioned steps until all steel-pipe pile completion inserting pilings are applied
Work.The present embodiment is reduced to the movement of two groups of movable stand horizontal directions by the adjusting by vertical tilt angle, reduces steel pipe
Stake gradient adjusts difficulty, keeps whole operation method easy, efficient, the efficiency and safety of guiding construction is greatly improved,
Reduce the cost of guiding device.
The vertical direction of the present embodiment refers to that the up and down direction in Fig. 2, the transverse direction of the present embodiment refer to the right and left in Fig. 2
To the longitudinal direction of the present embodiment refers to the direction of the vertical paper in Fig. 2.
Basic principles, main features, and advantages of the present invention has been shown and described above.Current row
The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments
Only illustrate the principles of the present invention, the utility model can also on the premise of not departing from the spirit and scope of the utility model
There are various changes and modifications, these various changes and improvements fall within the scope of the claimed invention.The utility model is wanted
Protection scope is asked to be defined by appended claims and its equivalent.
Claims (5)
1. a kind of leading truck for injection taper pile waterborne, it is characterised in that: including support frame (1);The support frame (1) is
Along horizontal longitudinally arranged sub-truss, the hanger (2) along horizontal cross arrangement is installed on support frame (1);The hanger
(2) upper and lower ends are provided with two groups of movable stands (3), two groups of movable stands (3) vertically arranged for interval;The movable stand (3)
For that can be movably attached in the horizontal direction in the guide frame on hanger (2), movable stand is equipped on (3) for clamping steel-pipe pile
Pile body holds together mouth.
2. a kind of leading truck for injection taper pile waterborne as described in claim 1, it is characterised in that: the movable stand
It (3) include the horizontal support (4) that can along horizontal transverse movement be connected on hanger (2);Cross is installed on the hanger (2)
To Shift cylinder (5);The transverse shifting oil cylinder (5) arranges that shell is fixed on hanger (2), pushing tow along horizontal cross
End is fixedly connected with horizontal support (4).
3. a kind of leading truck for injection taper pile waterborne as claimed in claim 2, it is characterised in that: the movable stand
(3) it can along horizontally vertically moving be connected on horizontal support (4);Longitudinal movement oil is installed on the horizontal support (4)
Cylinder (6);The longitudinal movement oil cylinder (6) is longitudinally arranged along level, and shell is fixed on movable stand (3), and pushing end is fixed
On horizontal support (4).
4. a kind of leading truck for injection taper pile waterborne as described in claim 1, it is characterised in that: further include pipe bending cylinder
(7);It is provided on the support frame (1) along horizontal longitudinally arranged sliding rail (8);The hanger (2) is slidably connected to cunning
On rail (8);The pipe bending cylinder (7) is longitudinally arranged along level, and shell is fixed on support frame (1), and pushing end is fixed on
On hanger (2).
5. a kind of leading truck for injection taper pile waterborne as described in claim 1, it is characterised in that: the mouth that holds together includes
It is set to two folded arms (9) and two groups of clamping oil cylinders (10) of movable stand (3) longitudinal end;Described folded arm (9) one end can be around
Vertical axis is rotationally articulated and connected in movable stand (3) end;Described clamping oil cylinder (10) shell is fixed on movable stand (3)
On, pushing end is fixed on folded arm (9) for driving folded arm (9) rotation to realize the clamping to steel-pipe pile.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820691416.6U CN208328931U (en) | 2018-05-10 | 2018-05-10 | A kind of leading truck for injection taper pile waterborne |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820691416.6U CN208328931U (en) | 2018-05-10 | 2018-05-10 | A kind of leading truck for injection taper pile waterborne |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208328931U true CN208328931U (en) | 2019-01-04 |
Family
ID=64777409
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820691416.6U Active CN208328931U (en) | 2018-05-10 | 2018-05-10 | A kind of leading truck for injection taper pile waterborne |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208328931U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532605A (en) * | 2018-05-10 | 2018-09-14 | 中交武汉港湾工程设计研究院有限公司 | A kind of leading truck for injection taper pile waterborne |
-
2018
- 2018-05-10 CN CN201820691416.6U patent/CN208328931U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532605A (en) * | 2018-05-10 | 2018-09-14 | 中交武汉港湾工程设计研究院有限公司 | A kind of leading truck for injection taper pile waterborne |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106761487B (en) | The method that marine drilling platform has processing system with pipe and connects movement thribble | |
CN108532605A (en) | A kind of leading truck for injection taper pile waterborne | |
CN109577214A (en) | A kind of bridge detection repair device | |
CN106404521A (en) | Hydraulic pressure test tube machine and tube body clamping centering device | |
CN102828697A (en) | Telescopic overall hoisting derrick device and hoisting method thereof | |
CN203097737U (en) | Telescopic integral hoisting type headframe device | |
CN208328931U (en) | A kind of leading truck for injection taper pile waterborne | |
CN201636435U (en) | Tensioner used for ocean pipe laying ship | |
CN210524337U (en) | Oil gas pipeline construction support | |
CN209603898U (en) | Bore completion tubular column upper and lower rig floor system automatically | |
CN106645233B (en) | A kind of x-ray flaw detector lifting support | |
CN108945298B (en) | Marine underwater detection support structure and operation method thereof | |
CN110485411A (en) | End supports amplitude variation type stirring piling all-in-one machine and its construction method | |
CN212802720U (en) | Temporary support capable of being adjusted in multiple directions | |
CN101949169B (en) | Large pipeline sludge dredging machine | |
CN108412441A (en) | A kind of guide device | |
CN108005047A (en) | The piling machine of anti-tidal bore | |
US4315702A (en) | Method for aligning two pipeline ends and apparatus for carrying out the method | |
CN201889605U (en) | Vertical pipe aligning device of corrugated expansion pipe | |
CN203867273U (en) | Inclined telegraph pole centering guide | |
CN203175435U (en) | Large-inclination drill rod conveyor device matched with coal mine drill rig for use | |
CN208747175U (en) | A kind of excavation stand hoisting mechanism | |
CN210598869U (en) | Flexible guiding device for workover treatment and workover treatment device | |
CN210117166U (en) | Bridge crane with ladder-shaped frame capable of being laid down | |
CN208747503U (en) | A kind of excavation stand hangs vehicle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |