CN208309591U - 一种不落地电梯基坑 - Google Patents

一种不落地电梯基坑 Download PDF

Info

Publication number
CN208309591U
CN208309591U CN201820924205.2U CN201820924205U CN208309591U CN 208309591 U CN208309591 U CN 208309591U CN 201820924205 U CN201820924205 U CN 201820924205U CN 208309591 U CN208309591 U CN 208309591U
Authority
CN
China
Prior art keywords
foundation pit
wall
vertical muscle
base plate
horizontal bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820924205.2U
Other languages
English (en)
Inventor
薛利辉
左光辉
陈威
牛慧
马友利
张焕科
李付香
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Chaoyang Architectural Design Co Ltd
Original Assignee
Henan Chaoyang Architectural Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Chaoyang Architectural Design Co Ltd filed Critical Henan Chaoyang Architectural Design Co Ltd
Priority to CN201820924205.2U priority Critical patent/CN208309591U/zh
Application granted granted Critical
Publication of CN208309591U publication Critical patent/CN208309591U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

一种不落地电梯基坑,包括楼层梁、基坑侧壁和基坑底板,基坑侧壁位于竖直方向上,基坑侧壁连接在楼层梁下方,基坑侧壁上设置有竖向筋,竖向筋的上端伸入到楼层梁中,靠近基坑内侧的竖向筋向外侧弯折,基坑底板中设置有横向筋,在竖向筋上设置有与其垂直的分布筋。本实用新型通过在楼层梁下方设置竖向筋来构建基坑侧壁,在相对面的竖向筋之间锚固横向筋来构建基坑底板,通过楼层梁、基坑侧壁和基坑底板围成电梯基坑,本实用新型在坑底四周梁局部加高与坑底平齐,不会影响地下室或基坑下层其余空间的使用,除基坑对应区域外也不会影响地下室或下层其余空间的净高,使施工及设计有例可循,便于施工标准化操作。

Description

一种不落地电梯基坑
技术领域
本实用新型涉及建筑领域,特别涉及一种不落地电梯基坑。
背景技术
目前,大型商业或综合体,因为使用功能需要,会设置多部电梯,某些电梯不需要下到地下室,电梯基坑不在基础标高,就需要在顶板处设置电梯基坑,电梯基坑较深的话,坑底板无法锚固,一般采用的解决方案有:1、坑底四周增加柱子将坑底板托起,但是这样会影响地下室或基坑下层空间的使用,尤其是基坑在车道上方则不能使用这种方案;2、四周梁加高,与坑底平齐,四周梁加高会影响地下室的净高,尤其是要走设备管道时,高度会受限制。
实用新型内容
针对上述技术问题,本实用新型的目的是提供一种不落地电梯基坑。
本实用新型的技术方案具体为:
一种不落地电梯基坑,包括楼层梁、基坑侧壁和基坑底板,基坑侧壁位于竖直方向上,基坑侧壁连接在楼层梁下方,基坑侧壁上设置有竖向筋,竖向筋的上端伸入到楼层梁中,靠近基坑内侧的竖向筋向外侧弯折,基坑底板中设置有横向筋,在竖向筋上设置有与其垂直的分布筋。
所述竖向筋包括外侧竖向筋和内侧竖向筋,所述横向筋包括上层横向筋和下层横向筋,上层横向筋双向设置,基坑侧壁上的外侧竖向筋和基坑底板上的下层横向筋一体连接为U型钢筋且双向设置,两组相对的基坑侧壁的内侧竖向筋与上层横向筋之间互相锚固。
所述靠近基坑内侧的内侧竖向筋向外侧弯折,弯入楼层梁的纵筋内侧,弯折角度为0-30°。
所述基坑侧壁的厚度不小于250mm,基坑底板的厚度不小于250mm。
相对于现有技术,本实用新型的技术效果为,通过在楼层梁下方设置竖向筋来构建基坑侧壁,在相对面的竖向筋之间锚固横向筋来构建基坑底板,通过楼层梁、基坑侧壁和基坑底板围成电梯基坑,本实用新型在坑底四周梁局部加高与坑底平齐,不会影响地下室或基坑下层其余空间的使用,除基坑对应区域外也不会影响地下室或下层其余空间的净高,使施工及设计有例可循,便于施工标准化操作。
附图说明
图1为本实用新型的结构示意图。
具体实施方式
如图1中所示,一种不落地电梯基坑,包括楼层梁1、基坑侧壁2和基坑底板3,基坑侧壁2位于竖直方向上,基坑侧壁2连接在楼层梁1下方,楼层梁1、基坑侧壁2和基坑底板3围成电梯的基坑,基坑侧壁2上设置有竖向筋,竖向筋的上端伸入到楼层梁1中,竖向筋包括外侧竖向筋4和内侧竖向筋7,靠近基坑内侧的内侧竖向筋7向外侧弯折,弯入楼层梁1的纵筋内侧并锚固,弯折角度为0-30°,在基坑侧壁2的竖向筋的垂直方向上绑扎有分布筋6。
基坑底板3中设置有横向筋,横向筋包括上层横向筋5和下层横向筋8,上层横向筋5双向设置,基坑侧壁2上的外侧竖向筋4和基坑底板3上的下层横向筋8一体连接为U型钢筋且双向设置,上层横向筋5和U型钢筋双向设置,在基坑底板3上形成钢筋网格,两组相对的基坑侧壁2的内侧竖向筋7与基坑底板3的上层横向筋5之间互相锚固连接。
基坑侧壁2的厚度不小于250mm,基坑底板3的厚度不小于250mm。
将一根长钢筋按照图1中所示结构弯折成U型钢筋,然后布置上层横向筋5、内侧竖向筋7与分布筋6,浇注混凝土,构建出基坑侧壁2和基坑底板3,形成电梯基坑,为保证电梯基坑的防水效果,基坑侧壁2的厚度不小于250mm,基坑底板3的厚度不小于250mm,成型后,从地下室或下层空间看,基坑相对于地下室顶板或下层空间顶板局部凸出,不会影响下层其余空间的使用,除基坑对应区域外也不会影响其余下层空间的净高。
以上所述的仅是本实用新型的优选实施方式,应当指出,对于本领域的技术人员来说,在不脱离本实用新型整体构思前提下,还可以作出若干改变和改进,这些也应该视为本实用新型的保护范围。

Claims (4)

1.一种不落地电梯基坑,其特征在于:包括楼层梁(1)、基坑侧壁(2)和基坑底板(3),基坑侧壁(2)位于竖直方向上,基坑侧壁(2)连接在楼层梁(1)下方,基坑侧壁(2)上设置有竖向筋,竖向筋的上端伸入到楼层梁(1)中,靠近基坑内侧的竖向筋向外侧弯折,基坑底板(3)中设置有横向筋,在竖向筋上设置有与其垂直的分布筋(6)。
2.如权利要求1所述的一种不落地电梯基坑,其特征在于:所述竖向筋包括外侧竖向筋(4)和内侧竖向筋(7),所述横向筋包括上层横向筋(5)和下层横向筋(8),上层横向筋(5)双向设置,基坑侧壁(2)上的外侧竖向筋(4)和基坑底板(3)上的下层横向筋(8)一体连接为U型钢筋且双向设置,两组相对的基坑侧壁(2)的内侧竖向筋(7)与上层横向筋(5)之间互相锚固。
3.如权利要求2所述的不落地电梯基坑,其特征在于:所述靠近基坑内侧的内侧竖向筋(7)向外侧弯折,弯入楼层梁(1)的纵筋内侧,弯折角度为0-30°。
4.如权利要求1所述的不落地电梯基坑,其特征在于:所述基坑侧壁(2)的厚度不小于250mm,基坑底板(3)的厚度不小于250mm。
CN201820924205.2U 2018-06-14 2018-06-14 一种不落地电梯基坑 Expired - Fee Related CN208309591U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820924205.2U CN208309591U (zh) 2018-06-14 2018-06-14 一种不落地电梯基坑

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820924205.2U CN208309591U (zh) 2018-06-14 2018-06-14 一种不落地电梯基坑

Publications (1)

Publication Number Publication Date
CN208309591U true CN208309591U (zh) 2019-01-01

Family

ID=64706965

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820924205.2U Expired - Fee Related CN208309591U (zh) 2018-06-14 2018-06-14 一种不落地电梯基坑

Country Status (1)

Country Link
CN (1) CN208309591U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847229A (zh) * 2019-11-08 2020-02-28 中国二十冶集团有限公司 一种用地沟结构内壁钢筋替代马镫筋的施工方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847229A (zh) * 2019-11-08 2020-02-28 中国二十冶集团有限公司 一种用地沟结构内壁钢筋替代马镫筋的施工方法

Similar Documents

Publication Publication Date Title
CN204662499U (zh) 地下室混凝土外墙、防水、肥槽一体化施工构造
CN110485553A (zh) 一种预制装配式基础的装配式建筑及其装配方法
CN207551711U (zh) 一种预制墙体吊装施工系统
CN208309591U (zh) 一种不落地电梯基坑
CN207348229U (zh) 一种沉箱与隔墙的连接结构
CN103938755B (zh) 一种井道下挂式转换梁的隔震结构及其施工方法
CN206360431U (zh) 一种地下室汽车坡道
CN104912100B (zh) 综合管廊综合安装口
CN209308222U (zh) 一种带企口预制剪力墙的连接结构
CN208870236U (zh) 一种构造柱顶部与主体结构连接装置
CN208650098U (zh) 多标高复杂地下室的外墙结构
CN209368859U (zh) 一种低层建筑的基础结构体系
CN202359570U (zh) 基坑斜坡改进的桩筏基础
CN208088318U (zh) 桩顶扶壁式挡墙支护结构
CN201232188Y (zh) 扶壁式土钉墙
CN208518076U (zh) 支撑柱柱脚抗震结构
CN202830935U (zh) 深基坑内坑中坑水平支撑结构
CN205804694U (zh) 超高层公寓中避难层墙肢结构
CN106088599B (zh) 建筑群之间地下室地面层结构先开口后封闭施工方法
CN205742263U (zh) 一种地铁出入口出地面平台加强结构
CN206337576U (zh) 一种挡土墙及边坡支护系统
CN108824483A (zh) 多层地下室的外墙结构及其施工方法
DE602007008518D1 (de) Verfahren zur Fundamentverstärkung, das eine in den Boden eingelassene Fundamentplatte umfasst, insbesondere für Fundamente von Masten, und so erhaltene Konstruktion
CN106088643B (zh) 一种旧建筑抗震建筑群的规划设计方法
CN205475300U (zh) 利用基坑围护结构的塔吊基础承台

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: Room 2205, 22 / F, unit 1, building 1, No. 100, Shangdu Road, Zhengzhou District, Henan Free Trade Zone, Zhengzhou City, Henan Province

Patentee after: Henan Chaoyang Architectural Design Co., Ltd.

Address before: 450000 Unit 1, Unit 22, 22005, North Shangdu Road, Zhengdong New District, Zhengzhou City, Henan Province

Patentee before: Henan Chaoyang Architectural Design Co., Ltd.

CP02 Change in the address of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190101

Termination date: 20200614

CF01 Termination of patent right due to non-payment of annual fee