CN208308555U - A kind of energy-saving and emission-reducing town sewage treatment system - Google Patents

A kind of energy-saving and emission-reducing town sewage treatment system Download PDF

Info

Publication number
CN208308555U
CN208308555U CN201820559816.1U CN201820559816U CN208308555U CN 208308555 U CN208308555 U CN 208308555U CN 201820559816 U CN201820559816 U CN 201820559816U CN 208308555 U CN208308555 U CN 208308555U
Authority
CN
China
Prior art keywords
mesotube
upside
pond body
saving
emission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820559816.1U
Other languages
Chinese (zh)
Inventor
林思定
胡立杆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Lutong Construction Co Ltd
Original Assignee
Wenzhou Lutong Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Lutong Construction Co Ltd filed Critical Wenzhou Lutong Construction Co Ltd
Priority to CN201820559816.1U priority Critical patent/CN208308555U/en
Application granted granted Critical
Publication of CN208308555U publication Critical patent/CN208308555U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Biological Treatment Of Waste Water (AREA)

Abstract

The utility model discloses a kind of energy-saving and emission-reducing town sewage treatment systems, its drip irrigation device includes vertical sedimentation basin, the vertical sedimentation basin includes pond body, top cover is provided on the upside of the pond body, the mesotube for being pierced by top cover is vertically arranged in the middle part of the pond body, the pond body side is equipped with water inlet pipe, the other side is connected with outlet pipe, the water inlet pipe protrudes into mesotube and is fixedly connected with opening up elbow, the water outlet pipe part is provided with block valve, the pool bottom is connected with sludge pipe, mud valve is provided at the sludge pipe, the ring box being socketed on the outside of mesotube is provided on the upside of the top cover.After sewage enters mesotube, the lesser pollutant of density floats, and when the pollutant floated is more, closes block valve, so that the water level in mesotube rises, so that the pollutant floated can overflow in ring box on the upside of mesotube.Entire sedimentation basin can play preferable elimination effect.

Description

A kind of energy-saving and emission-reducing town sewage treatment system
Technical field
The utility model relates to sewage treatment field, in particular to a kind of energy-saving and emission-reducing town sewage treatment system.
Background technique
Sewage treatment refers to the process of to make sewage reach draining or the water quality requirement that reuses and purifies to it, It is the important means for protecting town environment, energy-saving and emission-reduction.Currently, town domestic sewage, which is handled, is generally divided into three-level, coagulation, Refer to undissolved pollutant and parasitic ovum in Applied Physics facture removal sewage;Two stage treatment refers to using at biology The oxidation operation of complexity various in sewage is degraded to simple substance by logos;Tertiary treatment, refer to the applied chemistry precipitation method, Biochemical process, physical-chemical process etc. remove phosphorus, nitrogen, organic matter difficult to degrade, inorganic salts etc. in sewage.
Notification number discloses a kind of town sewage treatment system for the Chinese patent of CN105060632A, including in sequence The first anaerobic pond, aerobic tank, the first sedimentation basin, the second anaerobic pond and the second sedimentation basin of connection, the interior biology that is equipped with of aerobic tank turn Disk and aerator, the second anaerobic pond is interior to be equipped with stereo-elastic material, temperature controller and heating tape, and it is molten that the second anaerobic pond is equipped with NaHCO3 Liquid holding vessel, is equipped with Al2 (SO4) 3 solution storage tanks between the second anaerobic pond and the second sedimentation basin, the present invention is additionally provided with the first dirt Mud reflux branch, the second sludge reflux branch and sewage separation branch, the first sludge reflux branch and the second sludge reflux branch On be respectively equipped with sludge outlet.
Sedimentation basin in above-mentioned sewage disposal system can separate the undissolved substance such as sludge with water body.But sewage The substance that middle partial density is smaller and can not settle can swim in the water surface, not can be removed or even be discharged together.
Utility model content
In view of the above technical defects, the purpose of the utility model is to provide a kind of energy-saving and emission-reducing urban wastewater treatment systems System, including the vertical sedimentation basin for filtering insoluble matter, elimination effect is good.
To achieve the above object, the utility model provides following technical solution:
A kind of energy-saving and emission-reducing town sewage treatment system, including vertical sedimentation basin, the vertical sedimentation basin include Pond body, the pond body upside are provided with top cover, are vertically arranged with the mesotube for being pierced by top cover, the pond body one in the middle part of the pond body Side is equipped with water inlet pipe, the other side is connected with outlet pipe, and the water inlet pipe is protruded into mesotube and is fixedly connected with opening up Elbow, the water outlet pipe part is provided with block valve, and the pool bottom is connected with sludge pipe, the row of being provided at the sludge pipe Slurry valve, the top cover upside are provided with the ring box being socketed on the outside of mesotube.
By using above-mentioned technical proposal, after sewage enters mesotube, the biggish pollutant of density with downelling until It is deposited in pool bottom, when pool bottom sludge is more, mud valve is opened, discharges it;And the lesser pollution of density Object floats, and water flow can not be followed to be discharged from water outlet pipe part, when the pollutant floated is more, block valve is closed, so that in pond body The pressure in portion increases, so that the water level in mesotube rises, so that the pollutant floated can be on the upside of mesotube It overflows in ring box.Entire sedimentation basin can play preferable elimination effect.
The utility model is further arranged to: being provided with relief hole on the upside of the top cover, is provided at the relief hole close Seal apparatus.
By using above-mentioned technical proposal, after opening sealing device, the intracorporal air in pond just can be discharged from relief hole, just Enter in pond body in sewage.
The utility model is further arranged to: the sealing device includes the sealed passage being fixedly connected at relief hole, It is hinged with sealing cover above the sealed passage, is provided with the seal groove of annular on the upside of the sealed passage, in the seal groove It is provided with the sealing ring being close to sealing cover, the sealing cover and sealed passage are fixedly connected to company far from the side of hinged place Fishplate bar is connected by fixing bolt with fixture nut between two connecting plates.
By using above-mentioned technical proposal, after backing out fixing bolt and fixture nut, sealing cover just can be opened, and be opened quick It is convenient, and sealing effect is good.
The utility model is further arranged to: the ring box includes the inner ring plate being close to mesotube, positioned at outside It is flushed on the upside of outer ring plate and the bottom plate being close to top cover, the inner ring plate and mesotube, inner ring is higher than on the upside of the outer ring plate On the upside of plate.
By using above-mentioned technical proposal, water level in mesotube rises until floating material is just when being higher by mesotube most high side It can be flowed into ring box with sewage, and staff forgets that floating material also will receive the limit of outer ring plate when opening block valve for the moment Position out of ring box without flowing out.
The utility model is further arranged to: be provided with return port on the downside of the inner ring plate, the mesotube be provided with Return port corresponding through-hole is provided with filter screen at the return port, is fixedly connected with rotational handle on the outside of the outer ring plate.
By using above-mentioned technical proposal, ring box is rotated when return port face through-hole, sewage just can flow back to center In pipe, and blocking of the floating material by filter screen, and then the progress removed convenient for floating material next time.
The utility model is further arranged to: the mesotube lower end is fixedly connected with shunting bucket, the shunting hopper opening Place is provided with the spoiler of cone cell, the spoiler and shunts and has the gap passed through for sewage between bucket, the spoiler with It shunts and is fixedly connected between bucket by fixing piece.
By using above-mentioned technical proposal, spoiler can play blocking effect to the sewage flowed out out of mesotube, drop Low flow velocity avoids the trouble of the sludge of water impact pool bottom.
The utility model is further arranged to: the fixing piece includes two and is fixedly connected respectively with spoiler and shunting bucket Fixed ring, be fixedly connected with several connection straps between two fixed rings.
By using above-mentioned technical proposal, spoiler and the bonding strength shunted between bucket are high, spoiler be able to bear compared with Big impact force.
In conclusion the utility model has the following beneficial effects:
1. passing through the setting of ring box and block valve, the floating pollutants in sewage can remove and elimination effect is good;
2. the sludge of pool bottom not will receive the impact of water flow by the setting of spoiler, avoid sludge by water flow band Play and influence the trouble of effect of settling.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of embodiment;
Fig. 2 is the structural schematic diagram after embodiment removal top cover, sealing device and ring box;
Fig. 3 is the perspective view of the explosion of fixing piece in embodiment, mesotube, spoiler and water inlet pipe;
Fig. 4 is another visual angle schematic diagram of embodiment;
Fig. 5 is the enlarged diagram of a-quadrant in Fig. 4;
Fig. 6 is the enlarged diagram of B area in Fig. 4.
Description of symbols: 1, vertical sedimentation basin;2, pond body;3, top cover;31, relief hole;4, mesotube;41, through-hole; 42, bucket is shunted;5, water inlet pipe;51, elbow;6, ring box;61, inner ring plate;611, return port;62, outer ring plate;63, bottom plate; 64, filter screen;65, rotational handle;7, sealing device;71, sealed passage;711, seal groove;72, sealing cover;73, sealing ring; 74, connecting plate;75, fixing bolt;76, fixture nut;8, spoiler;9, fixing piece;91, fixed ring;92, connection strap;10, go out Water pipe;11, block valve;12, sludge pipe;13, mud valve.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
A kind of energy-saving and emission-reducing town sewage treatment system, as shown in Figure 1, including for removing the pollution for being not dissolved in water The vertical sedimentation basin 1 of object, vertical sedimentation basin 1 include pond body 2.2 downside of pond body is tapered, is provided with and is used on the upside of pond body 2 By the top cover 3 of 2 upside closure of openings of pond body.
As shown in Figure 1 and Figure 2, be vertically arranged with the mesotube 4 for being pierced by top cover 3 in the middle part of pond body 2,2 side of pond body be equipped with into Water pipe 5, the other side are connected with outlet pipe 10, and water inlet pipe 5 protrudes into mesotube 4 and is fixedly connected with opening up elbow 51. After sewage enters mesotube 4 from water inlet pipe 5, the biggish pollutant of density is with downelling until being deposited in 2 bottom of pond body.Pond 2 bottom of body is connected with sludge pipe 12, and sludge pipe 12 is connected with mud valve 13.When 2 base sludge of pond body is more, mud valve is opened 13, the sludge of 2 bottom of pond body is pressurized and the natural discharge from sludge pipe 12.The lesser pollutant of density floats in mesotube 4, Water flow can not be followed to be discharged from outlet pipe 10, and then guarantee pollutant elimination effect.
As shown in Figure 2 and Figure 3,4 lower end of mesotube is fixedly connected with shunting bucket 42, shunts the opening that bucket 42 deviates from mesotube 4 Greater than the opening towards mesotube 4, so that sewage latus rectum increases, so that effluent flow rate declines.42 openings of bucket are shunted to set It is equipped with the spoiler 8 of cone cell, 8 tip of spoiler is towards shunting bucket 42 and axial line is overlapped with 42 axial lines of bucket are shunted, spoiler 8 With shunting there is the gap passed through for sewage between bucket 42.Blocking by spoiler 8 after sewage is flowed out out of mesotube 4, into And flow velocity is reduced again, avoid the trouble of the sludge of 2 bottom of water impact pond body.
As shown in figure 3, being fixedly connected between spoiler 8 and shunting bucket 42 by fixing piece 9, fixing piece 9 includes two points It is not fixedly connected on 8 upside of spoiler and shunts the fixed ring 91 of 42 inside of bucket, is fixedly connected between two fixed rings 91 Four connection straps 92 being placed equidistant with around shunting 42 axial lines of bucket.Spoiler 8 and the bonding strength shunted between bucket 42 are high, choked flow Plate 8 is able to bear biggish impact force.
As shown in Figure 1 and Figure 2, outlet pipe 10 is connected with block valve 11, is provided on the upside of top cover 3 and is socketed on 4 outside of mesotube Ring box 6.When the pollutant floated in mesotube 4 is more, block valve 11 is closed, so that the pressure inside pond body 2 increases, So that the water level in mesotube 4 rises, so that the pollutant floated can overflow to ring box on the upside of mesotube 4 In 6.Open block valve 11 after floating material largely flows into ring box 6 so that the water level decreasing in mesotube 4, floating material from And it can be removed.
As shown in figure 4, ring box 6 includes the inner ring plate 61 being close to mesotube 4, the outer ring plate 62 positioned at outside, inner ring Plate 61 and outer ring plate are fixedly connected with the bottom plate 63 being close to top cover 3 between 62 downside.Inner ring plate 61 and 4 upside of mesotube are neat It is flat, 61 upside of inner ring plate is higher than on the upside of outer ring plate 62.Water level in mesotube 4 rises until drift when being higher by the most high side of mesotube 4 Floating object just can flow into ring box 6 with sewage, and staff forgets that floating material also will receive when opening block valve 11 for the moment The limit of outer ring plate 62 out of ring box 6 without flowing out.
As shown in Figure 4, Figure 5, return port 611 is provided on the downside of inner ring plate 61, mesotube 4 is provided with right with return port 611 The through-hole 41(answered is as shown in Figure 2), filter screen 64 is provided at return port 611, and rotation hand is fixedly connected on the outside of outer ring plate 62 Handle 65.Ring box 6 is rotated until sewage just can flow back in mesotube 4 when 611 face through-hole 41 of return port, and floating material by The blocking of filter screen 64, and then the progress removed convenient for floating material next time.Therefore staff is not necessarily to frequently in ring box 6 Floating material be purged, it is time saving and energy saving.
As shown in figs. 4 and 6, it is provided with relief hole 31 on the upside of top cover 3, sealing device 7 is provided at relief hole 31.Sealing Device 7 includes the sealed passage 71 being fixedly connected at relief hole 31, is hinged with sealing cover 72 at the upper side of sealed passage 71, close It is provided with the seal groove 711 of annular on the upside of envelope channel 71, is provided with the sealing ring 73 being close to sealing cover 72 in seal groove 711, Sealing cover 72 and sealed passage 71 far from both the side of hinged place be fixedly connected to connecting plate 74, between two connecting plates 74 It is connected by fixing bolt 75 and fixture nut 76.After backing out fixing bolt 75 and fixture nut 76, sealing cover 72 just can be opened, Rapid and convenient is opened, and sealing effect is good.After opening sealing device 7, the air in pond body 2 can be arranged from relief hole 31 Out, and then convenient for sewage enter pond body 2.
The course of work:
After sewage enters mesotube 4, the biggish pollutant of density with downelling until be deposited in 2 bottom of pond body, and it is close It spends lesser pollutant to float, water flow can not be followed to be discharged from outlet pipe 10.When 2 base sludge of pond body is more, the row of opening Slurry valve 13, discharges it.When the pollutant floated is more, block valve 11 is closed, so that on the water level in mesotube 4 It rises, so that the pollutant floated overflows in ring box 6, opens block valve after floating material largely flows into ring box 6 11, ring box 6 is finally rotated up to 611 face through-hole 41 of return port, so that the sewage in ring box 6 flows back in mesotube 4.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.

Claims (7)

1. a kind of energy-saving and emission-reducing town sewage treatment system, including vertical sedimentation basin (1), it is characterised in that: the perpendicular stream Formula sedimentation basin (1) includes pond body (2), is provided with top cover (3) on the upside of the pond body (2), is vertically arranged in the middle part of the pond body (2) It is pierced by the mesotube (4) of top cover (3), pond body (2) side is equipped with water inlet pipe (5), the other side is connected with outlet pipe (10), The water inlet pipe (5) is protruded into mesotube (4) and is fixedly connected with opening up elbow (51), sets at the outlet pipe (10) It is equipped with block valve (11), pond body (2) bottom is connected with sludge pipe (12), is provided with mud valve at the sludge pipe (12) (13), the ring box (6) being socketed on the outside of mesotube (4) is provided on the upside of the top cover (3).
2. a kind of energy-saving and emission-reducing town sewage treatment system according to claim 1, it is characterised in that: the top cover (3) upside is provided with relief hole (31), is provided with sealing device (7) at the relief hole (31).
3. a kind of energy-saving and emission-reducing town sewage treatment system according to claim 2, it is characterised in that: the sealing dress Setting (7) includes the sealed passage (71) being fixedly connected at relief hole (31), is hinged with sealing above the sealed passage (71) Cover (72), the seal groove (711) of annular be provided on the upside of the sealed passage (71), be provided in the seal groove (711) with The side of the sealing ring (73) that sealing cover (72) is close to, the sealing cover (72) and sealed passage (71) far from hinged place is fixed It is connected with connecting plate (74), is connected between two connecting plates (74) by fixing bolt (75) and fixture nut (76).
4. a kind of energy-saving and emission-reducing town sewage treatment system according to claim 1, it is characterised in that: the ring box It (6) include the inner ring plate (61) being close to mesotube (4), the outer ring plate (62) positioned at outside and the bottom be close to top cover (3) It flushes on the upside of plate (63), the inner ring plate (61) and mesotube (4), is higher than on inner ring plate (61) on the upside of the outer ring plate (62) Side.
5. a kind of energy-saving and emission-reducing town sewage treatment system according to claim 4, it is characterised in that: the inner ring plate (61) downside is provided with return port (611), and the mesotube (4) is provided with through-hole (41) corresponding with return port (611), described It is provided at return port (611) filter screen (64), is fixedly connected with rotational handle (65) on the outside of the outer ring plate (62).
6. a kind of energy-saving and emission-reducing town sewage treatment system according to claim 1, it is characterised in that: the mesotube (4) lower end is fixedly connected with shunting bucket (42), the spoiler (8) for shunting bucket (42) opening and being provided with cone cell, the resistance There is the gap passed through for sewage between flowing plate (8) and shunting bucket (42), pass through between the spoiler (8) and shunting bucket (42) Fixing piece (9) is fixedly connected.
7. a kind of energy-saving and emission-reducing town sewage treatment system according to claim 6, it is characterised in that: the fixing piece It (9) include two fixed rings (91) being fixedly connected respectively with spoiler (8) and shunting bucket (42), two fixed rings (91) Between be fixedly connected with several connection straps (92).
CN201820559816.1U 2018-04-18 2018-04-18 A kind of energy-saving and emission-reducing town sewage treatment system Active CN208308555U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820559816.1U CN208308555U (en) 2018-04-18 2018-04-18 A kind of energy-saving and emission-reducing town sewage treatment system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820559816.1U CN208308555U (en) 2018-04-18 2018-04-18 A kind of energy-saving and emission-reducing town sewage treatment system

Publications (1)

Publication Number Publication Date
CN208308555U true CN208308555U (en) 2019-01-01

Family

ID=64719970

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820559816.1U Active CN208308555U (en) 2018-04-18 2018-04-18 A kind of energy-saving and emission-reducing town sewage treatment system

Country Status (1)

Country Link
CN (1) CN208308555U (en)

Similar Documents

Publication Publication Date Title
CN104445835B (en) A kind of method and system being applicable to the process of refuse of small town percolate
CN208308555U (en) A kind of energy-saving and emission-reducing town sewage treatment system
CN202643409U (en) Novel aeration structure of membrane biological reactor (MBR)
CN113797606A (en) Rectangular peripheral inlet and outlet sedimentation tank with optimized water inlet and outlet and sludge discharge modes
CN208389549U (en) A kind of waste water high-efficiency processing unit
CN108483794B (en) Sewage treatment system
CN206985883U (en) Deck runoff pollution processing integrated apparatus
CN205948442U (en) Dirty water sedimentation bucket of modified
CN208916968U (en) Desulfurization wastewater multi-level handling system
CN109331506A (en) Vertical sedimentation tank
CN207429844U (en) A kind of settler convenient for separation of solid and liquid
CN213049532U (en) Rectangular peripheral inlet and outlet sedimentation tank with optimized water inlet and outlet and sludge discharge modes
CN206198858U (en) A kind of earth solution separator
CN209679570U (en) A kind of vertical sedimentation tank
CN208757025U (en) A kind of novel biological engineering sewage-treatment plant
CN208516997U (en) A kind of micro- flotation air floatation machine
CN206688305U (en) A kind of electroplating wastewater recycle device
EP1138363B1 (en) Device for withdrawing purified water from a container in the biological purification of waste water
CN206927727U (en) A kind of sewage-treatment plant
CN207483423U (en) A kind of intermittent static processing sedimentation basin of hardly possible settled sludge
CN207091223U (en) A kind of raw water filtration device
CN208933021U (en) A kind of flotation tank
CN113117392B (en) Organic wastewater treatment process and device
CN221071120U (en) Waste water precipitation adsorption purification device
KR20160048500A (en) Perforated drain pipe for back-washing wastewater, and dissolved air flotation type water treatment apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: An energy-saving and emission reducing urban sewage treatment system

Effective date of registration: 20230912

Granted publication date: 20190101

Pledgee: Zhejiang Tailong Commercial Bank Co.,Ltd. Wenzhou Lucheng Wuma Small and Micro Specialized Sub branch

Pledgor: WENZHOU LUTONG CONSTRUCTION Co.,Ltd.

Registration number: Y2023980056264

PE01 Entry into force of the registration of the contract for pledge of patent right