CN208308343U - A kind of very heavy top support tool of combined type - Google Patents

A kind of very heavy top support tool of combined type Download PDF

Info

Publication number
CN208308343U
CN208308343U CN201820713124.8U CN201820713124U CN208308343U CN 208308343 U CN208308343 U CN 208308343U CN 201820713124 U CN201820713124 U CN 201820713124U CN 208308343 U CN208308343 U CN 208308343U
Authority
CN
China
Prior art keywords
main body
ladder
component
support tool
combined type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820713124.8U
Other languages
Chinese (zh)
Inventor
王慷
蒋玉林
毛智鹏
李崇威
刘功亮
罗杰
赵亚康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Peak and Frequency Regulation Power Generation Co of China Southern Power Grid Co Ltd
Original Assignee
Peak and Frequency Regulation Power Generation Co of China Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Peak and Frequency Regulation Power Generation Co of China Southern Power Grid Co Ltd filed Critical Peak and Frequency Regulation Power Generation Co of China Southern Power Grid Co Ltd
Priority to CN201820713124.8U priority Critical patent/CN208308343U/en
Application granted granted Critical
Publication of CN208308343U publication Critical patent/CN208308343U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a kind of very heavy top support tools of combined type, including the first main body and the second main body being combined with the first main body;First main body and the second main body are provided with the first ladder from top to bottom, and second ladder contrary with the first ladder is provided on each step of the first ladder;Wherein the quantity of step is identical in the first ladder of the first main body and the first ladder of the second main body;The reversing of second main body is placed on above the first main body, each step in each second ladder of each step and the first main body in each second ladder of the second main body from top to bottom from top to bottom successively cooperates inlay after be combined into a cuboid or cube structure.In the utility model, due to the ladder that the first ladder in the first main body and the second main body and the second ladder are opposite direction, therefore the first main body and the second main body can be combined to a firm cuboid or cube structure, substantially increase the safety of the very heavy top support tool of the utility model.

Description

A kind of very heavy top support tool of combined type
Technical field
The utility model relates to a kind of stake tool, in particular to a kind of very heavy top support tool of combined type.
Background technique
During unit big light maintenance, jack is the high key equipment of utilization rate.Jack due to by height and The limitation of stroke needs different degrees of cushioning in narrow space use.When lacking the cushion block of proper height in practical maintenance, It will often be used after the overlapping of the supporters such as iron plate, flitch, nut, steel pipe, to meet the height requirement that jack uses, above-mentioned work It is had the following disadvantages for the branch stake tool of jack:
1, security risk is larger: hydraulic jack generally requires to bear several tons of even more than ten tons of pressure, and jack stress is not There are supporter pop-up and weight falling risk when uniform or supporter surface irregularity, causes injury to personnel and equipment damage;
2, reduce working efficiency: under different use environments, there is variation in bearing height, can not find conjunction in a short time Suitable supporter, causes working hour to waste;
3, reduce man-machine efficacy: in order to avoid supporter inclination when using a variety of supporters, the non-stress of jack and by Power initial stage needs manually help supporter, and since supporter is more heavier, staff's physical strength expends larger;
4, supporter intensity hardness is improper: the most frequently used supporter is flitch and steel plate, and flitch is easy to squeeze in use process Crushing is split, and steel plate can injury device surface due to excessive high hardness.
The main reason for causing disadvantages mentioned above has: (1) supporter out-of-flatness, and multiple supporters use simultaneously, and supporter is whole Body rigidity;(2) proper height supporter generally requires specially to make, wasting manpower and material resources;(3) it is necessary when Multi-layer supporting object uses Artificial help guarantees that supporter does not fall inclination;(4) supporter intensity and hardness are improper.In addition scene is interim in the prior art Cushion block is easily occurred to loosen swag phenomenon in use, influences safety due to being cooperated using plane.
Utility model content
The shortcomings that the purpose of the utility model is to overcome the prior arts and deficiency provide a kind of highly-safe combined type Very heavy top support tool.
The purpose of this utility model is achieved through the following technical solutions: a kind of very heavy top support tool of combined type, including the One main body and the second main body being combined with the first main body;First main body and the second main body are provided with from top to bottom One ladder is provided with second ladder contrary with the first ladder on each step of the first ladder;Wherein first main body The quantity of step is identical in first ladder and the first ladder of the second main body;
The reversing of second main body is placed on above the first main body, each in each second ladder of the second main body from top to bottom Each step in rank and each second ladder of the first main body from top to bottom successively cooperate inlay after be combined into a cuboid or stand Cube structure.
It preferably, further include the third main body being set under the first main body and the be set under the second main body the 4th Main body, wherein third main body and the 4th main body include a main body, and third main body and the 4th body side face are set from bottom to up It is equipped with first ladder, is provided with second ladder contrary with the first ladder on each step of the first ladder;As third master When body is set under the first main body, the lower surface of the upper surface of third main body and the first main body is completely attached to, i.e. third main body Upper surface it is identical with area with the underside shape of the first main body;When the 4th main body is set under the second main body, The upper surface of 4th main body and the lower surface of the second main body completely attach to, i.e. the following table of the upper surface of the 4th main body and the second main body Face shape is identical with area;
Third main body forms the first component after being set under the first main body, after the 4th main body is set under the second main body Second component is formed, second component reversing is placed on above the first component, each second ladder of second component from top to bottom Each step of each step and each second ladder of the first component from top to bottom successively cooperates inlay after be combined into a cuboid or Cube structure.
It preferably, further include the third main body being set under the first main body and the be set under the second main body the 4th Main body, wherein third main body and the 4th main body include multiple main bodys;
In third main body and the 4th main body, each body upper surface is long-pending and following table area is sequentially increased;By third main body With when each main body successively stacks from top to bottom in the 4th main body, the upper surface of each main body connects completely with the lower surface of its upper main body Touching, i.e., the upper surface of each main body is identical with the underside shape of its upper main body and area, upper surface in third main body The upper surface of a smallest main body is identical with the underside shape of the first main body and area, upper surface in the 4th main body The upper surface of a smallest main body is identical with the underside shape of the second main body and area;
In third main body and the 4th main body, each body side face is provided with the first ladder from top to bottom, the first ladder Second ladder contrary with the first ladder is provided on each step;
Top surface area and the smallest several main bodys of following table area are selected from third main body and are successively stacked from top to bottom Afterwards, the first component is formed after third main body being set under the first main body;Top surface area and following table are selected from the 4th main body The smallest several main bodys of area and after successively stacking from top to bottom form the after the 4th main body is set under the second main body One component;Second component reversing is placed on above the first component, each step of each second ladder of second component from top to bottom Successively cooperate with each step of each second ladder of the first component from top to bottom and is combined into a cuboid or cube after inlaying Structure.
Preferably, the number of second stair-step is 2.
Preferably, the number of first stair-step is 2 to 9.
It preferably, further include muti-piece supplement plate.
Preferably, each step height of first ladder is 10mm, the height 3mm of each step of the second ladder.
It further, further include for placing the portable of the first main body, the second main body, third main body and the 4th main body Case.
Further, first main body, the second main body, third main body and the 4th main body are all made of the conjunction of 7075 aviation aluminium Gold production.
Further, it is respectively set on first main body, the second main body, third main body and the 4th main body corresponding position There is the through-hole passed through for pin.
The utility model compared with the existing technology have following advantages and effects
(1) the very heavy top support kit of the utility model combined type includes the first main body and is combined with the first main body Second main body;Wherein the first main body and the second main body are provided with the first ladder from top to bottom, are arranged on each step of the first ladder There is second ladder contrary with the first ladder;Wherein the first main body is identical with the quantity of the first ladder in the second main body.? In the utility model, the reversing of the second main body is placed on above the first main body, in each second ladder of the second main body from top to bottom Each step and the first main body each second ladder from top to bottom in each step successively cooperate inlay after be combined into one it is rectangular Body or cube structure.Due to the ladder that the first ladder in the first main body and the second main body and the second ladder are opposite direction, because This is when the reversing of the second main body to be placed on above the first main body, step in each second ladder in the first main body and the second main body Successively cooperation, which is inlayed, can be combined to a firm cuboid or cube structure, substantially increase the utility model jack The safety of branch stake tool the phenomenon that capable of effectively avoiding the occurrence of loosening and rock, and will not be slipped in stress inclination, be fitted For cooperating close component using meeting continually changing height and space requirement, such as guide vane arm in jack disconnecting process Extraction, large scale equipment gentle support etc. after card plug.In addition in the utility model, as long as the first main body and the second main body are carried out group Branch stake tool can be obtained in conjunction, therefore very easy to use.
It (2) further include respectively corresponding for being arranged in the first main body in the very heavy top support tool of the utility model combined type It include one or more main bodys in third main body and the 4th main body with the third main body and the 4th main body below the second main body, During actual use is each, the main body that can according to need corresponding number in selection third main body and the 4th main body is combined, To obtain the branch stake tool of different height, therefore the utility model can choose at random the support of corresponding height according to actual needs Tool, is used with flexible modulation and height cooperation jack in various height occasions, is temporarily only had with cushion block instead of scene single The structure of one height.
(3) in the very heavy top support tool of the utility model combined type, the first main body and the second main body use 7075 aviation aluminium Alloy production has the advantages that intensity is high, the use of light-weight and Overhaul site.
It (4) further include thering is muti-piece to supplement plate in the very heavy top support tool of the utility model combined type, it can be with by supplement plate One small-scale adjustment is carried out to the height of very heavy top support tool.
(5) in the very heavy top support tool of the utility model combined type, the first main body, the second main body, third main body and the 4th It is respectively arranged with the multiple through-holes passed through for pin on main body corresponding position, is combined when them and forms cuboid or cube structure Afterwards, each pin passes through through-hole, so that they stronger are combined.
Detailed description of the invention
Fig. 1 is the Longitudinal cross section schematic of the first main body and the second main body in embodiment 1.
Fig. 2 is the longitudinal section signal for the very heavy top support tool that first main body and the second body combination obtain in embodiment 1 Figure.
Fig. 3 is the schematic diagram of third main body and the 4th main body in embodiment 3.
Fig. 4 is the very heavy topmast that the first main body in embodiment 3, the second main body, third main body and the 4th body combination obtain Stake tool structural schematic diagram.
Specific embodiment
The present invention will be further described in detail with reference to the embodiments and the accompanying drawings, but the implementation of the utility model Mode is without being limited thereto.
Embodiment 1
Present embodiment discloses a kind of very heavy top support tool of combined type, including the first main body and carried out with the first main body Second main body of combination;First main body and the second main body are provided with the first ladder from top to bottom, on each step of the first ladder It is provided with second ladder contrary with the first ladder;Wherein the first ladder of the first ladder of the first main body and the second main body The quantity of middle step is identical, and the quantity of step is also identical in the second ladder of the first main body and the second ladder of the second main body;Such as Shown in Fig. 1, in the present embodiment, the first main body and the second main body are provided with the first ladder from top to bottom, wherein on the first ladder Including 3 steps, naturally it is also possible to be the step of other quantity.In the present embodiment as shown in Figure 1, the first ladder from top to bottom Each step is extending direction to the left, makes the second ladder in the left side of each step of the first ladder, wherein the second ladder from it is lower to Upper each step is extending direction to the right, i.e. the first ladder and the second ladder it is contrary.Wherein dotted line is the first rank in figure Each step scratches the position of the second ladder of production in ladder.
As shown in Fig. 2, the reversing of the second main body is placed on above the first main body, each second-order of the second main body from top to bottom Each step in each second ladder of each step and the first main body from top to bottom in ladder successively cooperates inlay after be combined into one Cuboid or cube structure, the structure constitute the very heavy top support tool of the present embodiment.
In the present embodiment, as illustrated in fig. 1 and 2, the second ladder includes 2 steps, naturally it is also possible to according to the actual situation It is set as other quantity.
In the present embodiment, further include muti-piece supplement plate, by supplement plate can height to very heavy top support tool into One small-scale adjustment of row.
In the present embodiment, each step height of the first ladder is 10mm, the height 3mm of each step of the second ladder.
In the present embodiment, further include suitcase for placing the first main body and the second main body, facilitate storage maintenance, no It is easy to be lost.
In the present embodiment, the first main body and the second main body are all made of the production of 7075 aerolites, with intensity height, again The advantages of amount is light and Overhaul site uses.
Embodiment 2
Present embodiment discloses a kind of very heavy top support tool of combined type, the present embodiment and the difference of embodiment 1 are only that, The present embodiment further includes the third main body being set under the first main body and the 4th main body being set under the second main body, Middle third main body and the 4th main body include a main body, and third main body and the 4th body side face are provided with the from bottom to up One ladder is provided with second ladder contrary with the first ladder on each step of the first ladder;When third main body is set to When under the first main body, the lower surface of the upper surface of third main body and the first main body is completely attached to, i.e. the upper surface of third main body It is identical with area with the underside shape of the first main body;When the 4th main body is set under the second main body, the 4th main body Upper surface and the second main body lower surface completely attach to, i.e., the underside shape of the upper surface of the 4th main body and the second main body and Area is identical.
In the present embodiment, each main body is all made of the production of 7075 aerolites in third main body and the 4th main body, does not make Used time is also stored in suitcase.
Third main body forms the first component after being set under the first main body, after the 4th main body is set under the second main body Second component is formed, second component reversing is placed on above the first component, each second ladder of second component from top to bottom Each step of each step and each second ladder of the first component from top to bottom successively cooperates inlay after be combined into a cuboid or Cube structure.
In the present embodiment, the first component and the second main body and the 4th main body composition that the first main body and third main body are constituted Second component combination after will obtain the very heavy top support tool an of height.Therefore this implementation can be used according to actual needs The very heavy top support tool got in example.
Embodiment 3
Present embodiment discloses a kind of very heavy top support tool of combined type, the present embodiment and the difference of embodiment 1 are only that, The present embodiment further includes the third main body being set under the first main body and the 4th main body being set under the second main body, Middle third main body and the 4th main body include multiple main bodys;
In third main body and the 4th main body, each body upper surface is long-pending and following table area is sequentially increased;By third main body With when each main body successively stacks from top to bottom in the 4th main body, the upper surface of each main body connects completely with the lower surface of its upper main body Touching, i.e., the upper surface of each main body is identical with the underside shape of its upper main body and area, upper surface in third main body The upper surface of a smallest main body is identical with the underside shape of the first main body and area, upper surface in the 4th main body The upper surface of a smallest main body is identical with the underside shape of the second main body and area;
In third main body and the 4th main body, each body side face is provided with the first ladder from top to bottom, the first ladder Second ladder contrary with the first ladder is provided on each step, in the present embodiment third main body and the 4th main body In, each the first ladder of main body includes 2 steps, and the second ladder being arranged on each step of the first ladder includes 2 steps.This implementation In example, each main body is all made of the production of 7075 aerolites in third main body and the 4th main body, is also stored in when unused In suitcase.
Top surface area and the smallest several main bodys of following table area are selected from third main body and are successively stacked from top to bottom Afterwards, the first component is formed after third main body being set under the first main body;Be illustrated in figure 3 selected from third main body it is upper Under surface area and the smallest 3 main bodys of following table area to it is upper successively stack after schematic diagram.Wherein 3 main bodys from bottom to up, on Surface area and following table area are sequentially reduced.
Top surface area and the smallest several main bodys of following table area are selected from the 4th main body and are successively stacked from top to bottom Afterwards, the first component is formed after the 4th main body being set under the second main body;As shown in figure 4, second component reversing is placed on Above the first component, each step and each second-order of the first component from top to bottom of each second ladder of second component from top to bottom Ladder each step successively cooperate inlay after be combined into a cuboid or cube structure.
In the present embodiment, the master that corresponding number is selected in the 4th main body can be neutralized from third main body according to height requirement Body respectively corresponds the very heavy top support tool for being combined with the first main body and the second main body and forming corresponding height, to obtain difference The branch stake tool of height, therefore the present embodiment can choose at random the branch stake tool of corresponding height according to actual needs, with flexible It adjusts and height cooperation jack is used in various height occasions, temporarily there was only the knot of single height with cushion block instead of scene Structure.
Above-described embodiment is the preferable embodiment of the utility model, but the embodiments of the present invention is not by above-mentioned The limitation of embodiment, it is made under other any spiritual essence and principles without departing from the utility model to change, modify, replacing In generation, simplifies combination, should be equivalent substitute mode, is included within the protection scope of the utility model.

Claims (10)

1. a kind of very heavy top support tool of combined type, which is characterized in that be combined including the first main body and with the first main body The second main body;First main body and the second main body are provided with the first ladder from top to bottom, on each step of the first ladder It is provided with second ladder contrary with the first ladder;Wherein the first ladder of the first ladder of the first main body and the second main body The quantity of middle step is identical;
The reversing of second main body is placed on above the first main body, each step in each second ladder of the second main body from top to bottom with Each step in each second ladder of first main body from top to bottom successively cooperates inlay after be combined into a cuboid or cube Structure.
2. the very heavy top support tool of combined type according to claim 1, which is characterized in that further include being set to the first main body Beneath third main body and the 4th main body being set under the second main body, wherein third main body and the 4th main body include one A main body, third main body and the 4th body side face are provided with first ladder from bottom to up, set on each step of the first ladder It is equipped with second ladder contrary with the first ladder;When third main body is set under the first main body, third main body it is upper Surface and the lower surface of the first main body completely attach to, i.e. the underside shape and area of the upper surface of third main body and the first main body It is identical;When the 4th main body is set under the second main body, the upper surface of the 4th main body and the lower surface of the second main body are complete Full connected, the i.e. upper surface of the 4th main body are identical with area with the underside shape of the second main body;
Third main body forms the first component, formation after the 4th main body is set under the second main body after being set under the first main body Second component reversing is placed on above the first component, each of each second ladder of second component from top to bottom by second component Each step of rank and each second ladder of the first component from top to bottom successively cooperates inlay after be combined into a cuboid or cube Body structure.
3. the very heavy top support tool of combined type according to claim 1, which is characterized in that further include being set to the first main body Beneath third main body and the 4th main body being set under the second main body, wherein third main body and the 4th main body include more A main body;
In third main body and the 4th main body, each body upper surface is long-pending and following table area is sequentially increased;By third main body and When each main body successively stacks from top to bottom in four main bodys, the upper surface of each main body and the lower surface of its upper main body are completely attached to, The upper surface of i.e. each main body is identical with the underside shape of its upper main body and area, and upper surface is minimum in third main body A main body upper surface it is identical with the underside shape of the first main body and area, upper surface is minimum in the 4th main body A main body upper surface it is identical with the underside shape of the second main body and area;
In third main body and the 4th main body, each body side face is provided with each of the first ladder, the first ladder from top to bottom Second ladder contrary with the first ladder is provided on step;
It, will after selecting top surface area and the smallest several main bodys of following table area in third main body and successively stacking from top to bottom Third main body forms the first component after being set under the first main body;Top surface area and following table area are selected most from the 4th main body Small several main bodys and after successively stacking from top to bottom, form first after the 4th main body is set under the second main body Part;Second component reversing is placed on above the first component, each step of each second ladder of second component from top to bottom and the Each step of each second ladder of one component from top to bottom successively cooperates inlay after be combined into a cuboid or cube structure.
4. the very heavy top support tool of combined type according to any one of claim 1 to 3, which is characterized in that described second The number of stair-step is 2.
5. the very heavy top support tool of combined type according to any one of claim 1 to 3, which is characterized in that described first The number of stair-step is 2 to 9.
6. the very heavy top support tool of combined type according to any one of claim 1 to 3, which is characterized in that further include more Block supplements plate.
7. the very heavy top support tool of combined type according to any one of claim 1 to 3, which is characterized in that described first Each step height of ladder is 10mm, the height 3mm of each step of the second ladder.
8. the very heavy top support tool of combined type according to claim 2 or 3, which is characterized in that further include for placing the The suitcase of one main body, the second main body, third main body and the 4th main body.
9. the very heavy top support tool of combined type according to claim 2 or 3, which is characterized in that first main body, second Main body, third main body and the 4th main body are all made of the production of 7075 aerolites.
10. the very heavy top support tool of combined type according to claim 2 or 3, which is characterized in that first main body, The through-hole passed through for pin is respectively arranged on two main bodys, third main body and the 4th main body corresponding position.
CN201820713124.8U 2018-05-14 2018-05-14 A kind of very heavy top support tool of combined type Active CN208308343U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820713124.8U CN208308343U (en) 2018-05-14 2018-05-14 A kind of very heavy top support tool of combined type

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820713124.8U CN208308343U (en) 2018-05-14 2018-05-14 A kind of very heavy top support tool of combined type

Publications (1)

Publication Number Publication Date
CN208308343U true CN208308343U (en) 2019-01-01

Family

ID=64710970

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820713124.8U Active CN208308343U (en) 2018-05-14 2018-05-14 A kind of very heavy top support tool of combined type

Country Status (1)

Country Link
CN (1) CN208308343U (en)

Similar Documents

Publication Publication Date Title
CN206317053U (en) Precast T-Beam reinforcing bar storage rack
CN204323865U (en) A kind of dismountable wood case
CN208308343U (en) A kind of very heavy top support tool of combined type
CN108656295A (en) A kind of wood composite pallet nailing moulds of industrial equipment
CN105036000B (en) Slabstone tipper
CN204473899U (en) A kind of fluid pressure type stacks bricks mechanical device
CN205034791U (en) Full -automatic hacking machine of pi shaped steel
CN202580521U (en) Supporting frame
CN208217255U (en) A kind of telescopic wood composite pallet
CN203419690U (en) Manual earthquake rescuing machine
CN206545164U (en) A kind of Anti-seismic bridge pier
CN204954055U (en) Anticreep water cutting machine
CN204473300U (en) A kind of pressure case apparatus
CN206084848U (en) It compresses tightly depression bar frock to add to arrange
CN203544592U (en) Tray making ATM convenient to carry
CN206108330U (en) Automatic material discharging equipment
CN203210476U (en) Plate pressing device for laminating type plywood
CN205273541U (en) Firm type medicine carrier in make full use of space
CN205076342U (en) Fence is collected to packing box support frame
CN206766080U (en) A kind of material conveying trolley for civil engineering
CN215554532U (en) Cathode copper plate finishing machine
CN206299952U (en) A kind of carbon black is returned matches somebody with somebody safe block-resistant type blanking bearing
CN209701205U (en) A kind of wind-power tower production steel plate stacking adapter
CN204210588U (en) A kind of container
CN207534428U (en) 30 ° of groove board special fixtures of milling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant