CN208297142U - For the turbine power plant static test system of retrofiting that navigates - Google Patents

For the turbine power plant static test system of retrofiting that navigates Download PDF

Info

Publication number
CN208297142U
CN208297142U CN201820774067.4U CN201820774067U CN208297142U CN 208297142 U CN208297142 U CN 208297142U CN 201820774067 U CN201820774067 U CN 201820774067U CN 208297142 U CN208297142 U CN 208297142U
Authority
CN
China
Prior art keywords
navigates
power plant
remodeling
turbine power
test system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820774067.4U
Other languages
Chinese (zh)
Inventor
高彦生
刘文建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huadian General Light Gas Engine Equipment Co Ltd
Original Assignee
Huadian General Light Gas Engine Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huadian General Light Gas Engine Equipment Co Ltd filed Critical Huadian General Light Gas Engine Equipment Co Ltd
Priority to CN201820774067.4U priority Critical patent/CN208297142U/en
Application granted granted Critical
Publication of CN208297142U publication Critical patent/CN208297142U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing And Monitoring For Control Systems (AREA)

Abstract

The utility model provides a kind of for the remodeling turbine power plant static test system that navigates, comprising: shell is equipped with signal generating assembly, output precision and control assembly on the housing;Operating circuit, the operating circuit are arranged in the shell, and the operating circuit is communicated with the signal generating assembly, the output precision and the control assembly;Wherein the operating circuit includes: logic controller, the control assembly and the logic controller communication;Signal generator, the signal generating assembly pass through the signal generator and the logic controller communication;Display module, the output precision pass through the display module and the logic controller communication.Compared with prior art, the utility model has the advantage that on the basis of keeping original test request for the remodeling turbine power plant static test system that navigates, a set of test platform is designed, by test plan prepared in advance, diagnosed, tested and is recorded on platform.

Description

For the turbine power plant static test system of retrofiting that navigates
Technical field
The utility model relates to one kind for the remodeling turbine power plant static test system that navigates.
Background technique
Boat retrofits Gas Turbine Generating Units after finalization of the manufacture at present, gas turbine, generator, activation system, lubrication System, cleaning system, control system, vibroseis, fire-fighting system, distribution system, synchronization system, direct current system, AC system Carry out connection electrically and mechanically, between system or independent prizing body itself to carry out functional test, electrical installation test etc. quiet State test, and these tests are all that independent test, record are carried out by various instruments, instrument, cannot concentrate and be tested, be taken It is thing, laborious, it is not easy to carry out centralized recording, system decision problem reason.
Utility model content
For the defects in the prior art, the utility model aim is to provide a kind of being used for for solution above-mentioned technical problem Boat remodeling turbine power plant static test system.
In order to solve the above technical problems, the utility model provides a kind of remodeling turbine power plant static test system that is used to navigate System, comprising: shell is equipped with signal generating assembly, output precision and control assembly on the housing;Operating circuit, the work Make circuit to be arranged in the shell, the operating circuit and the signal generating assembly, the output precision and the control Assembly communication;Wherein the operating circuit includes: logic controller, the control assembly and the logic controller communication;Letter Number generator, the signal generating assembly pass through the signal generator and the logic controller communication;Display module, it is described Output precision passes through the display module and the logic controller communication.
Preferably, the signal generator includes: that layer occurs for signal, and layer occurs for the signal and the logic controller is logical Letter;Power station subsystem element and station control unit, the signal generating assembly pass through the power station subsystem element and described Station control unit occurs layer with the signal and communicates.
Preferably, the signal generating assembly includes simulation instrument signal generator, RTD/TC signal generator, switch letter Number generator and voltage/current source generator.
Preferably, the control assembly includes test subsystems selection key, test human-computer interaction interface and emergent stopping Button.
Preferably, the output precision includes feedback states display and Pressure/Temperature display.
Preferably, the operating circuit further includes alarm output module, the alarm output module and the logic control Device communication.
Preferably, it is equipped with alarm assemblies on the housing, the alarm assemblies are communicated with the alarm output module;Its Described in alarm assemblies include alarm/shutdown status indicator and buzzer.
Preferably, the logic controller is PLC.
Compared with prior art, the utility model has following excellent for the remodeling turbine power plant static test system that navigates Point: on the basis of keeping original test request, a set of test platform is designed, by test plan prepared in advance, in platform On diagnosed, tested and recorded.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other spies of the utility model Sign objects and advantages will become more apparent upon.
Fig. 1 is the utility model for the remodeling turbine power plant static test system structural schematic diagram that navigates;
Fig. 2 is the utility model for the remodeling turbine power plant static test system operating circuit schematic diagram that navigates.
In figure:
1- simulates instrument signal generator 2-RTD/TC signal generator 3- switch signal generator
4- voltage/current source generator 5- alarm/shutdown status indicator 6- feedback states display
7- buzzer 8- Pressure/Temperature display 9- test subsystems selection key
10- emergency stop button 11- tests human-computer interaction interface 12- shell
Specific embodiment
The utility model is described in detail combined with specific embodiments below.Following embodiment will be helpful to this field Technical staff further understands the utility model, but does not limit the utility model in any form.It should be pointed out that ability For the those of ordinary skill in domain, without departing from the concept of the premise utility, several changes and improvements can also be made.
The utility model for navigate remodeling turbine power plant static test system by various voltmeters, signal generator, Alarm, analog signal, the functions such as switching signal, display instruction, which are integrated on moveable test platform, to be designed for uniformity, And is classified and arranged according to certain rule or test request and signals security.
As shown in Figure 1 and Figure 2, a kind of remodeling turbine power plant static test system that is used to navigate provided by the utility model, Include: shell 12, be equipped with signal generating assembly, output precision, control assembly and alarm assemblies on housing 12, operating circuit is set It sets in shell 12, operating circuit is communicated with signal generating assembly, output precision control assembly and alarm assemblies.
Operating circuit specifically includes that logic controller (the present embodiment uses PLC), signal generator, display module and report Alert output module.
Signal generator includes: that layer occurs for signal, and layer occurs for signal and logic controller (the present embodiment uses PLC) is logical Letter;Power station subsystem element and station control unit, signal generating assembly pass through power station subsystem element and station control unit Layer occurs with signal to communicate.
Signal generating assembly includes simulation instrument signal generator 1, RTD/TC signal generator 2, switch signal generator 3 And voltage/current source generator 4.
Control assembly includes test subsystems selection key 9, test human-computer interaction interface 11 and emergency stop button 10.
Output precision includes feedback states display 6 and Pressure/Temperature display 8.
It is equipped with alarm assemblies on housing 12, alarm assemblies are communicated with alarm output module;Wherein alarm assemblies include report Police/shutdown status indicator 5 and buzzer 7.
1) power station static test is broadly divided into power station subsystem element and station control unit two parts, according to test request System under test (SUT) may be selected in control assembly.
2) when power station subsystem element is measured body, the electric signal of generation is sent to signal, layer, signal hair occurs The signal of acquisition is input to logic controller (the present embodiment uses PLC) and passes through display module display module by generating layer, is read Real time data.PLC is according to logic judgment simultaneously, if reaches alarm or shutdown value sends signal alarm output module.
3) when station control unit be measured body when, by signal occur layer output voltage, electric current, pressure, flow, RTD, TC, on-off model test its internal board, electric linkage function.
4) concentrations such as indicator light, alarm lamp, buzzer are connected to alarm output module, accurately and reliably judge testing number According to.
5) it will start switch, signaling switch, emergent stopping, logic control etc. are arranged in control assembly, logic controller (this Embodiment uses PLC), improve the safety of whole system.
By this comprehensive test platform device, each subsystem stationary singnal in power station is simulated, power station control system is carried out Functional test, while data record and report output are carried out by built-in record PAD.
By this comprehensive test platform device, individual control signal and correlation signal are sent to a subsystem, checks each son Working state of system, and form relative recording and report.
Specific embodiment of the utility model is described above.It is to be appreciated that the utility model not office It is limited to above-mentioned particular implementation, those skilled in the art can make a variety of changes or modify within the scope of the claims, This has no effect on the substantive content of the utility model.In the absence of conflict, the spy in embodiments herein and embodiment Sign can be arbitrarily combined with each other.

Claims (8)

1. one kind is for the remodeling turbine power plant static test system that navigates characterized by comprising
Shell is equipped with signal generating assembly, output precision and control assembly on the housing;
Operating circuit, the operating circuit are arranged in the shell, the operating circuit and the signal generating assembly, described Output precision and control assembly communication;Wherein
The operating circuit includes:
Logic controller, the control assembly and the logic controller communication;
Signal generator, the signal generating assembly pass through the signal generator and the logic controller communication;
Display module, the output precision pass through the display module and the logic controller communication.
2. according to claim 1 for the remodeling turbine power plant static test system that navigates, which is characterized in that the letter Number generator includes:
Layer occurs for signal, and layer and the logic controller communication occur for the signal;
Power station subsystem element and station control unit, the signal generating assembly pass through the power station subsystem element and described Station control unit occurs layer with the signal and communicates.
3. according to claim 2 for the remodeling turbine power plant static test system that navigates, which is characterized in that the letter Number generating assembly includes simulation instrument signal generator, RTD/TC signal generator, switch signal generator and voltage/current source Generator.
4. according to claim 2 for the remodeling turbine power plant static test system that navigates, which is characterized in that the control Component processed includes test subsystems selection key, test human-computer interaction interface and emergency stop button.
5. according to claim 1 for the remodeling turbine power plant static test system that navigates, which is characterized in that described defeated Component includes feedback states display and Pressure/Temperature display out.
6. according to claim 5 for the remodeling turbine power plant static test system that navigates, which is characterized in that the work It further include alarm output module as circuit, the alarm output module and the logic controller communication.
7. according to claim 6 for the remodeling turbine power plant static test system that navigates, which is characterized in that described Shell is equipped with alarm assemblies, and the alarm assemblies are communicated with the alarm output module;Wherein
The alarm assemblies include alarm/shutdown status indicator and buzzer.
8. according to claim 1 for the remodeling turbine power plant static test system that navigates, which is characterized in that described to patrol Collecting controller is PLC.
CN201820774067.4U 2018-05-23 2018-05-23 For the turbine power plant static test system of retrofiting that navigates Active CN208297142U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820774067.4U CN208297142U (en) 2018-05-23 2018-05-23 For the turbine power plant static test system of retrofiting that navigates

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820774067.4U CN208297142U (en) 2018-05-23 2018-05-23 For the turbine power plant static test system of retrofiting that navigates

Publications (1)

Publication Number Publication Date
CN208297142U true CN208297142U (en) 2018-12-28

Family

ID=64726915

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820774067.4U Active CN208297142U (en) 2018-05-23 2018-05-23 For the turbine power plant static test system of retrofiting that navigates

Country Status (1)

Country Link
CN (1) CN208297142U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114115167A (en) * 2020-08-27 2022-03-01 郑州深澜动力科技有限公司 Battery pack fire extinguishing test system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114115167A (en) * 2020-08-27 2022-03-01 郑州深澜动力科技有限公司 Battery pack fire extinguishing test system
CN114115167B (en) * 2020-08-27 2024-03-26 郑州深澜动力科技有限公司 Battery pack fire extinguishing test system

Similar Documents

Publication Publication Date Title
CN201336157Y (en) Novel test device for reactor protection systematic procedure instrument testing
CN208297142U (en) For the turbine power plant static test system of retrofiting that navigates
CN102798759A (en) Insulation resistance test system
CN104020376A (en) Three-remote automatic testing method for power distribution terminal
CN205620509U (en) Difunctional circuit maintenance tester
CN209215493U (en) A kind of railway signal measuring device
CN106019123A (en) RF circuit off-location detecting system of communication and navigation system
CN112485577B (en) Low-voltage testing device for power electronic equipment
GB1355142A (en) Computer-based installation for the functional checking of a vehicle electrical system
CN104391255A (en) Switching power supply fault simulator
CN103995207A (en) Three-remote automatic test device for power distribution terminal
CN209044027U (en) NEW ADAPTIVE tripping outlet logic tester
CN104407254A (en) Circuit board tester
CN203981790U (en) A kind of combined type backup auto-activating device tester
CN103207342B (en) A kind of checking experiment grounding intelligent prior-warning device
CN206021071U (en) A kind of diesel engine side monitoring box test system
CN203522711U (en) Signal converter electrical aging detection apparatus
CN205193187U (en) Extra -high voltage TDC direct current protection verifying attachment
CN209731272U (en) A kind of test platform of High Speed Train Operation Control system
CN209471144U (en) A kind of hydroelectric power plant's generating unit speed node calibration equipment
CN105606988A (en) Circuit tester
CN203101536U (en) Switch cabinet test table
CN111308235A (en) Relay protection contact action tester based on wireless transmission
CN221378137U (en) Test bench of BOX equipment
CN108226730A (en) A kind of multichannel insulation pressure resistance automatic testing equipment and method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant