CN208293559U
CN208293559U CN201820964652.0U CN201820964652U CN208293559U CN 208293559 U CN208293559 U CN 208293559U CN 201820964652 U CN201820964652 U CN 201820964652U CN 208293559 U CN208293559 U CN 208293559U
Authority
CN
China
Prior art keywords
pipe
preloading
sealing film
fixing system
connect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820964652.0U
Other languages
Chinese (zh)
Inventor
黄承斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Huadian Engineering Group Co Ltd
Original Assignee
China Huadian Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Huadian Engineering Group Co Ltd filed Critical China Huadian Engineering Group Co Ltd
Priority to CN201820964652.0U priority Critical patent/CN208293559U/en
Application granted granted Critical
Publication of CN208293559U publication Critical patent/CN208293559U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model relates to the realm of building construction, especially a kind of soft foundation discharge fixing system.Plastic draining board is vertically arranged in ground in the utility model, horizontal drain pipe is horizontally disposed and connect with the upper end of plastic draining board, horizontal drain pipe is also controlled to a vacuum pump, vacuum pump is also connect through pipeline with rhone, and horizontal drain pipe buries through sand bedding course, and sealing film is also equipped on sand bedding course, preloading is provided with above sealing film, filter pipe is set between sealing film and preloading, and siphon pipe one end is connect with filter pipe, and the other end is connect with rhone.Soft foundation discharge fixing system improves foundation drainage and hydraulic fill sand drainage effect, so that the effect of discharging consolidation construction is more preferable, more efficient.

Description

A kind of soft foundation discharge fixing system
Technical field
The utility model relates to the realm of building construction, especially a kind of soft foundation discharge fixing system.
Background technique
In construction, the requirement for ground soil property is stringenter, and soil property is excessively soft, water content is high, void ratio Poor such as soft in some geology such as strand, the lakes and marhshes and valley floor area of big or high compressibility geotechnic engineering, such as Fruit is constructed without the discharging consolidation of ground, and building occurs depression or even collapses very risky.It is right in order to eliminate this hidden danger When this soft soil property carries out construction, often need to carry out discharging consolidation construction, and in the work progress of discharging consolidation Base draining and preloading draining are all extremely important.But after carrying out preloading by hydraulic fill sand at present, large quantity of moisture is deposited on sealing film Top, it is difficult to effectively exclude, and be easy to cause secondary seepage, increase the workload of foundation drainage, to the effect of discharging consolidation construction Fruit has a significant impact, it is therefore desirable to design a kind of foundation drainage and all good drain consolidation system of hydraulic fill sand drainage effect.
Utility model content
The purpose of the utility model is to provide a kind of soft foundation discharge fixing systems, improve foundation drainage and blow Back-up sand drainage effect, so that the effect of discharging consolidation construction is more preferable, more efficient, the wherein mode energy conservation of hydraulic fill sand draining It is convenient, save a large amount of manpower and material resources.
In order to solve the above technical problems, the utility model adopts the following technical solutions:
A kind of soft foundation discharge fixing system, including plastic draining board, horizontal drain pipe, sand bedding course, sealing film, vacuum Pump, preloading, filter pipe, siphon pipe and rhone, the plastic draining board are vertically arranged in ground, the horizontal drain pipe water Flat to be arranged and connect with the upper end of plastic draining board, the horizontal drain pipe is also controlled to a vacuum pump, and the vacuum pump is also through pipe Road is connect with rhone, and the horizontal drain pipe buries through sand bedding course, and sealing film, the sealing are also equipped on the sand bedding course Preloading is provided with above film, the filter pipe is set between sealing film and preloading, and described siphon pipe one end is connect with filter pipe, The other end is connect with rhone.
Soft foundation discharge fixing system above-mentioned, one end that the siphon pipe is connect with rhone is lower than to be connected with filter pipe The height for meeting place is lower than the height of siphon pipe and filter pipe junction.
Soft foundation discharge fixing system above-mentioned, the sealing film are at least equipped with two layers, the sealing film and sand pad It is additionally provided with non-woven geotextile between layer, is also equipped with non-woven geotextile between sealing film and the preloading.
Soft foundation discharge fixing system above-mentioned, further includes check-valves and pipe valve, and the check-valves and pipe valve are set to On the pipeline that vacuum pump is connect with horizontal drain pipe.
Soft foundation discharge fixing system above-mentioned, the preloading use hydraulic fill sand mode, and are multistage preloading.
Soft foundation discharge fixing system above-mentioned, ground surrounding are additionally provided with envelope wall, and the envelope wall is using double Stake, the sealed wall sealing in the edge of the sealing film.
Soft foundation discharge fixing system above-mentioned, ground surrounding are additionally provided with sand-proof wall, the sand-proof wall.
Compared with prior art, the utility model has the beneficial effect that
1) the utility model improves foundation drainage and hydraulic fill sand row by providing a kind of soft foundation discharge fixing system Water effect, so that the effect of discharging consolidation construction is more preferable, more efficient, the mode energy-saving convenient that wherein hydraulic fill sand drains, Save a large amount of manpower and material resources;
2) by the way that filter pipe is arranged between sealing film and preloading, and filter pipe and draining are separately connected by siphon pipe Slot, since the water level of leakage is in preloading lower part, the pressure being subject to is larger, therefore the water leaked can be discharged to rhone through siphon pipe In;Wherein in order to keep the water discharge effect of leakage more preferably more stable, the one end for connecting siphon pipe with rhone is lower than and drainage The water leaked in preloading is endlessly discharged in rhone by one end of pipe connection to form siphonic effect, to save A large amount of manpower and material resources have been saved, hydraulic fill sand preloading mode is cooperated, the time spent needed for preloading is greatly saved;
3) it is laid with multi-layer sealed film, reducing sealing film breakage causes vacuum degree to be difficult to maintain or reach the possibility of standard Property;And seal the non-woven geotextile under film and avoid sealing film and directly contacted with subsoil stone, to reduce damaged possibility Property;
4) by the way that check-valves and pipe valve are arranged on the pipeline that vacuum pump is connect with horizontal drain pipe, so that stopping in vacuum pump After pump, the vacuum degree sealed under film still is able to effectively be kept, and reaches predetermined true when reducing replacement vacuum pump again The time of reciprocal of duty cycle;
5) edge for sealing film is sealed by using envelope wall, so that the sealing effect of sealing film is more preferable, so that The effect that vacuum pump vacuumizes is more preferably more stable, wherein using the envelope wall of double-row pile but also envelope wall is more stable, favorably In pressure of the receiving from vacuum and preloading;
6) sand-proof wall is arranged by the surrounding in preloading, so that the silt for reducing preloading, which is flown upward, to be made when blowing The case where at polluting, so that engineering is more environmentally-friendly.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
The meaning of appended drawing reference: 1- plastic draining board, 2- horizontal drain pipe, 3- sand bedding course, 4- sealing film, 5- vacuum pump, 6- preloading, 7- filter pipe, 8- siphon pipe, 9- rhone, 10- non-woven geotextile, 11- check-valves, 12- pipe valve, 13- envelope wall, 14- sand-proof wall.
The utility model is further described with reference to the accompanying drawings and detailed description.
Specific embodiment
The embodiments of the present invention 1: a kind of soft foundation discharge fixing system is constituted as shown in Figure 1, including plastic row Water plate 1, horizontal drain pipe 2, sand bedding course 3, sealing film 4, vacuum pump 5, preloading 6, filter pipe 7, siphon pipe 8 and rhone 9, it is described Several plastic draining boards 1 are vertically arranged in ground, and several horizontal drain pipes 2 are horizontally disposed with and and plastic draining board 1 upper end connection, the horizontal drain pipe 2 are also connect with several vacuum pumps 5, and the vacuum pump 5 is also through pipeline and rhone 9 Connection, the horizontal drain pipe 2 bury through sand bedding course 3, are also equipped on the sand bedding course 3 and seal film 4, on the sealing film 4 Side is provided with preloading 6, and the preloading 6 uses hydraulic fill sand mode, and is multistage preloading;The filter pipe 7 is set to sealing film 4 Between preloading 6, described 8 one end of siphon pipe is connect with filter pipe 7, and the other end is connect with rhone 9, the siphon pipe 8 and row The height of 9 junction of sink is lower than the height of siphon pipe 8 and 7 junction of filter pipe.
The sealing film 4 is at least equipped with two layers, is additionally provided with non-woven geotextile between the sealing film 4 and sand bedding course 3 10, non-woven geotextile 10 is also equipped between the sealing film 4 and preloading 6.
Ground surrounding is additionally provided with envelope wall 13, and the envelope wall 13 uses double-row pile, and the edge of the sealing film 4 is through close Protection wall 13 seals.
Ground surrounding is additionally provided with sand-proof wall 14, and 14 height of sand-proof wall is greater than 6 height of preloading.
Embodiment 2: a kind of soft foundation discharge fixing system is constituted as shown in Figure 1, including plastic draining board 1, horizontal row Water pipe 2, sand bedding course 3, sealing film 4, vacuum pump 5, preloading 6, filter pipe 7, siphon pipe 8 and rhone 9, several plastic rows Water plate 1 is vertically arranged in ground, and several horizontal drain pipes 2 are horizontally disposed and connect with the upper end of plastic draining board 1, The horizontal drain pipe 2 is also connect with several vacuum pumps 5, and the vacuum pump 5 is also connect through pipeline with rhone 9, the water Flat raft water pipe 2 buries through sand bedding course 3, and sealing film 4 is also equipped on the sand bedding course 3, is provided with preloading above the sealing film 4 6, the preloading 6 uses hydraulic fill sand mode, and is multistage preloading;The filter pipe 7 is set between sealing film 4 and preloading 6, Described 8 one end of siphon pipe is connect with filter pipe 7, and the other end is connect with rhone 9, the siphon pipe 8 and 9 junction of rhone Height is lower than the height of siphon pipe 8 and 7 junction of filter pipe.
The sealing film 4 is at least equipped with two layers, is additionally provided with non-woven geotextile between the sealing film 4 and sand bedding course 3 10, non-woven geotextile 10 is also equipped between the sealing film 4 and preloading 6.
The soft foundation discharge fixing system, further includes check-valves 11 and pipe valve 12, the check-valves 11 and pipe valve 12 It is set on the pipeline that vacuum pump 5 is connect with horizontal drain pipe 2.
Soft foundation discharge fixing system above-mentioned, ground surrounding are additionally provided with envelope wall 13, and the envelope wall 13 uses The sealed wall 13 in edge of double-row pile, the sealing film 4 seals.
Soft foundation discharge fixing system above-mentioned, ground surrounding are additionally provided with sand-proof wall 14, the sand-proof wall 14 Height is greater than 6 height of preloading.
Working principle of the utility model is: the utility model is by by plastic draining board 1, horizontal drain pipe 2, sand bedding course 3, sealing film 4, vacuum pump 5, preloading 6, filter pipe 7, siphon pipe 8 and rhone 9, organic to be assembled into a kind of draining of soft soil foundation solid Clone system, the soft foundation discharge fixing system improve foundation drainage effect, so that the effect of discharging consolidation construction is more Good, more efficient, wherein the mode energy-saving convenient of hydraulic fill sand draining, saves a large amount of manpower and material resources;Wherein by Soft Soil Layer Upper progress hydraulic fill sand construction, place elevation is increased, then passes through the plastic draining board 1 of setting vertical direction and the water of horizontal direction Flat raft water pipe 2, and processing is sealed to place by sealing film 4, then carry out vacuumizing the multistage preloading of cooperation by vacuum pump 5 It presses to ground, so that the water of Soft Soil Layer and hydraulic reclamation layer of sand extrudes upwards through plastic draining board 1, and the filter through horizontal direction Pipe in vacuum pump 5 by being discharged, so that the moisture in soil property is discharged, strengthens the degree of consolidation of ground, to reach the later period The demand of construction;Wherein by the way that filter pipe 7 is arranged between sealing film 4 and preloading 6, and it is separately connected by siphon pipe 8 Filter pipe 7 and rhone 9, since the water level of leakage is in 6 lower part of preloading, the pressure being subject to is larger, therefore the water leaked can be through rainbow Suction pipe 8 is discharged in rhone 9;Wherein in order to keep the water discharge effect of leakage more preferably more stable, make siphon pipe 8 and rhone 9 One end of connection is lower than one end for connecting with filter pipe 7, to form siphonic effect, will endlessly leak in preloading 6 Water is discharged in rhone 9, to save a large amount of manpower and material resources, cooperates 6 mode of hydraulic fill sand preloading, preloading 6 is greatly saved The time of required cost;It is laid with multi-layer sealed film 4, reducing sealing 4 breakage of film causes vacuum degree to be difficult to maintain or reach standard A possibility that;And seal the non-woven geotextile 10 under film 4 avoid sealing film 4 directly contacted with subsoil stone, to reduce A possibility that damaged;By the way that check-valves 11 and pipe valve 12 are arranged on the pipeline that vacuum pump 5 is connect with horizontal drain pipe 2, so that After 5 termination of pumping of vacuum pump, the vacuum degree sealed under film 4 still is able to effectively be kept, weight when reducing replacement vacuum pump 5 Newly reach the time of predetermined vacuum level;The edge for sealing film 4 is sealed by using envelope wall 13, so that sealing film 4 Sealing effect is more preferable so that the effect that vacuum pump 5 vacuumizes is more preferably more stable, wherein using double-row pile envelope wall 13 but also Envelope wall 13 is more stable, is conducive to bear the pressure from vacuum and preloading 6;By the surrounding in preloading 6, sand-proof is set Wall 14, so that the silt for reducing preloading 6 flies upward the case where polluting when blowing, so that engineering is more Environmental protection.

Claims (7)

1. a kind of soft foundation discharge fixing system, which is characterized in that including plastic draining board (1), horizontal drain pipe (2), sand Bed course (3), sealing film (4), vacuum pump (5), preloading (6), filter pipe (7), siphon pipe (8) and rhone (9), the plastic row Water plate (1) is vertically arranged in ground, and the horizontal drain pipe (2) is horizontally disposed and connect with the upper end of plastic draining board (1), The horizontal drain pipe (2) also connect with vacuum pump (5), and the vacuum pump (5) also connect through pipeline with rhone (9), described Horizontal drain pipe (2) buries through sand bedding course (3), is also equipped on the sand bedding course (3) and seals film (4), on the sealing film (4) Side be provided with preloading (6), the filter pipe (7) be set to sealing film (4) and preloading (6) between, described siphon pipe (8) one end and Filter pipe (7) connection, the other end are connect with rhone (9).
2. soft foundation discharge fixing system according to claim 1, which is characterized in that the siphon pipe (8) and draining The height of slot (9) junction is lower than the height of siphon pipe (8) and filter pipe (7) junction.
3. soft foundation discharge fixing system according to claim 1, which is characterized in that the sealing film (4) at least spreads It equipped with two layers, is additionally provided with non-woven geotextile (10) between the sealing film (4) and sand bedding course (3), the sealing film (4) and heap It carries and is also equipped with non-woven geotextile (10) between (6).
4. soft foundation discharge fixing system according to claim 1, which is characterized in that further include check-valves (11) and cut Door (12), the check-valves (11) and pipe valve (12) are set on the pipeline that vacuum pump (5) is connect with horizontal drain pipe (2).
5. soft foundation discharge fixing system according to claim 1, which is characterized in that the preloading (6) uses hydraulic reclamation Sand mode, and be multistage preloading.
6. soft foundation discharge fixing system according to claim 1, which is characterized in that ground surrounding is additionally provided with sealing Wall (13), the envelope wall (13) use double-row pile, the sealed wall in edge (13) sealing of sealing film (4).
7. soft foundation discharge fixing system according to claim 1, which is characterized in that ground surrounding is additionally provided with radix saposhnikoviae Husky wall (14), the sand-proof wall (14) are highly greater than preloading (6) height.
CN201820964652.0U 2018-06-21 2018-06-21 A kind of soft foundation discharge fixing system Active CN208293559U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820964652.0U CN208293559U (en) 2018-06-21 2018-06-21 A kind of soft foundation discharge fixing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820964652.0U CN208293559U (en) 2018-06-21 2018-06-21 A kind of soft foundation discharge fixing system

Publications (1)

Publication Number Publication Date
CN208293559U true CN208293559U (en) 2018-12-28

Family

ID=64702243

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820964652.0U Active CN208293559U (en) 2018-06-21 2018-06-21 A kind of soft foundation discharge fixing system

Country Status (1)

Country Link
CN (1) CN208293559U (en)

Similar Documents

Publication Publication Date Title
CN102220757B (en) Immediate processing method for drainage solidifying of super soft soil shallow surface space
CN201165659Y (en) Direct discharging type vacuum preloading reinforced soft soil function structure
CN110195430A (en) A kind of anti-stacking pressure construction of soft soil treatment method of multidimensional sealing space vacuum water diversion
CN102330424A (en) Vacuum preloading consolidation method for duplex vacuum tube well of blowing filling soft soil
CN101597898B (en) Rigid drainage pile and construction method thereof
CN102322054B (en) Method for processing ultra-soft soil through combining shallow-surface-layer intermittent strong water-pumping/draining with short-term air-curing
CN114108597A (en) Vacuum drainage grouting method
CN201214787Y (en) Rigid water drain pile
CN106677158B (en) A kind of blowing-filling sludge superficial layer Quick uniform processing method and structure recently
CN201785743U (en) Vacuum preloading consolidated soft soil foundation for combining sand wells and water discharging plates
CN208293559U (en) A kind of soft foundation discharge fixing system
CN113653063A (en) Weathered rock fracture water pumping drainage and recharge device and construction method thereof
CN106638554B (en) The processing method of Soft Clay Foundation
CN110485405B (en) Reinforcing system and reinforcing method for soft soil foundation
CN205501983U (en) Decompression drainage tubular pile
CN205314084U (en) Soft soil foundation rapidly transacting system
CN111501727A (en) Device for vacuum preloading treatment of waste slurry of drainage plate and construction process thereof
CN108691310A (en) A kind of soft foundation discharge fixing system and method
CN208266612U (en) A kind of town road structure
CN208803456U (en) A kind of structure for reinforcing peat soil using sand pile and drain bar
CN206512698U (en) A kind of layer of blowing-filling sludge superficial recently Quick uniform processing structure
CN207553077U (en) Soft Ground Improved By Vacuum Preloading structure
CN216339715U (en) Anti processing structure that floats of underground works
CN113585311B (en) Vacuum dewatering method with dewatering well penetrating through deep foundation pit
CN208933947U (en) A kind of novel evacuated precompressed subgrade combined stack-load system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant