CN208292090U - A kind of construction device for transporting objects - Google Patents

A kind of construction device for transporting objects Download PDF

Info

Publication number
CN208292090U
CN208292090U CN201721761955.4U CN201721761955U CN208292090U CN 208292090 U CN208292090 U CN 208292090U CN 201721761955 U CN201721761955 U CN 201721761955U CN 208292090 U CN208292090 U CN 208292090U
Authority
CN
China
Prior art keywords
conveyer belt
mobile base
storage bin
construction device
transporting objects
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721761955.4U
Other languages
Chinese (zh)
Inventor
付宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ji Xingli
Shen Xixi
Wang Guike
Wang Shaohua
Original Assignee
付宇
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 付宇 filed Critical 付宇
Priority to CN201721761955.4U priority Critical patent/CN208292090U/en
Application granted granted Critical
Publication of CN208292090U publication Critical patent/CN208292090U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of construction device for transporting objects, including mobile base and storage bin, conveyer belt is horizontally installed in the installation position of the mounting rack body upper part setting, the connection frame rotation connection that mounting rack ontology side outer rim is welded and fixed adjusts conveying band body one end, driving motor is installed in the installation position of mobile base upper surface other side setting, retarder is installed in the installation position that the driving motor is arranged far from battery pack side mobile base upper surface, the mobile base upper surface is equipped with storage bin far from the support frame upper level that mounting rack side is welded and fixed, air outlet connects air inlet by gas-guide tube in the middle part of the dust suction cover body, dust bag is installed outside the fan outlet.The construction device for transporting objects, hydraulic top jacking adjust the angle of conveyer belt, adjust the delivery head of material and increase the conveying distance of material.

Description

A kind of construction device for transporting objects
Technical field
The utility model belongs to conveying device technical field, and in particular to a kind of construction device for transporting objects.
Background technique
Currently, construction refers to the production activity of engineering construction implementation phase, it is the building course of all kinds of buildings, It can be described as the various lines on design drawing, in specified place, become process in kind.It is needed in building construction process Using a large amount of material, these materials require to transport specified place carry out using.Building site is chaotic, can not make With oversize vehicle come transported material, manual handling then needs to take a substantial amount of time and physical strength.
Existing device for transporting objects can only store material, need manually to carry out material unloading after reaching landing place, when need By material be transported to eminence or it is more remote when need manually to unload material and transport again by flat car or manually Defeated, large labor intensity, working efficiency is low, is unable to satisfy the requirement of job location nervous duration.Due to the particularity of building material, Surface of material attachment or this as powder material, Discharging Process is easy to produce a large amount of fugitive dusts, influence ambient conditions with And the physical condition of staff.
Utility model content
The purpose of this utility model is to provide a kind of construction device for transporting objects, to solve above-mentioned background technique The problem of middle proposition.
To achieve the above object, the utility model provides the following technical solutions: a kind of construction device for transporting objects, Including mobile base and storage bin, the mounting base that mobile base upper surface side is welded and fixed is pacified by the way that fastening bolt is fixed The bottom end shelved is horizontally installed with conveyer belt, the mounting rack ontology one in the installation position of mounting rack body upper part setting The connection frame rotation connection that side outer rim is welded and fixed adjusts conveying band body one end, and mobile base body upper surface side is set Battery pack is installed in the installation position set, driving electricity is installed in the installation position of mobile base upper surface other side setting Machine, the driving motor is equipped with retarder in the installation position far from the mobile base upper surface setting of battery pack side, described Mobile base upper surface is equipped with storage bin, the storage bin sheet far from the support frame upper level that mounting rack side is welded and fixed Body is equipped with dust hood close to one upper lateral part outer rim of conveyer belt, and air outlet connects wind by gas-guide tube in the middle part of the dust suction cover body Machine air inlet is equipped with dust bag outside the fan outlet.
Preferably, the belt cylinder of the driving motor output end installation connects retarder input terminal, institute by driving belt The reel for stating the installation of retarder output end is separately connected conveyer belt by driving belt and adjusts the driving roller bearing of conveyer belt.
Preferably, the lower frame for adjusting conveying band body is welded with bracket, and the bracket lower weld is solid Fixed engaging lug connects hydraulic top interior bar top by pin, and the hydraulic top is mounted on mobile base side outer rim and is welded and fixed Erecting bed in the middle part of.
Preferably, the storage bin is welded with slide plate close to the discharge door lower tilt that conveyer belt side is arranged.
Preferably, the storage room inboard, upright being arranged inside the storage bin is equipped with push plate, and the push plate is far from storage One middle side part of room opening connects piston rod one end, and the piston bar body other end is mounted on cylinder interior.
Preferably, the cylinder is horizontally arranged at protective cover inner horizontal axial location, and the protective cover passes through fastening spiral shell Bolt is fixed on storage bin ontology side.
The technical effect and advantage of the utility model: the construction device for transporting objects passes through hydraulic top jacking tune The angle for saving conveyer belt, realizes the adjusting to material delivery head, while can increase the conveying distance of material, adapts to different The demand of material conveying, different material use demand possibly transport material to eminence or distant place, adjust conveying The tilt angle of band adjusts delivery head, will adjust conveyer belt and is laid flat increase conveying distance, meets different use demands;Pass through The dust that material conveying in dust hood lower part generates is sucked in dust bag and is stored by blower work, and the collection realized to dust is clear Reason guarantees that ambient enviroment is good, reduces the generation of fugitive dust, protect the health of staff;Pass through air cylinder driven piston rod Push plate is pushed, the effect being smoothly pushed into material on conveyer belt is realized, the taking and placing without manually carrying out material work, and mitigate The labor intensity of staff improves the efficiency of material conveying.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the storage bin diagrammatic cross-section of the utility model.
In figure: 1 mobile base, 2 mounting racks, 3 conveyer belts, 4 hydraulic tops, 5 battery packs, 6 driving motors, 7 retarders, 8 are adjusted Save conveyer belt, 9 storage bins, 10 dust hoods, 11 blowers, 12 dust bags, 13 slide plates, 14 cylinders, 15 piston rods, 16 push plates.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Referring to Fig. 1, structural schematic diagram of the Fig. 1 for the utility model, a kind of construction device for transporting objects, In, including mobile base 1 and storage bin 9, the mounting base that the 1 upper surface side of mobile base is welded and fixed is by fastening spiral shell Bolt is fixed on the bottom end of mounting rack 2, and 2 top of mounting rack installs conveyer belt 3, conveyer belt 3 is lifted to suitable height;Institute It states and is horizontally installed with conveyer belt 3 in the installation position of 2 body upper part of mounting rack setting, the conveyer belt 3 conveys material;The installation The connection frame rotation connection that 2 ontology side outer rim of frame is welded and fixed adjusts 8 ontology one end of conveyer belt, and the adjusting conveyer belt 8 can To adjust inclined angle, the height of adjustment material conveying;The lower frame for adjusting 8 ontology of conveyer belt is welded with branch Frame, the bracket connect hydraulic top 4;The fixed engaging lug of the bracket lower weld connects 4 interior bar top of hydraulic top by pin End, the work of hydraulic top 4 jacking adjust conveyer belt 8, and adjustment adjusts the angle of conveyer belt 8, so as to adjust the height of material conveying Degree;The hydraulic top 4 is mounted in the middle part of the erecting bed that 1 side outer rim of mobile base is welded and fixed, and the mobile base 1 is mobile Whole device is moved to suitable operating position;It is installed in the installation position of 1 body upper surface side of the mobile base setting There is battery pack 5, the battery pack 5 provides electric power for the electrical component of whole device;The 1 upper surface other side of mobile base is set Driving motor 6 is installed, the driving motor 6 is alternating current generator, the work output power of driving motor 6 in the installation position set;Institute It states in the installation position that driving motor 6 is arranged far from 1 upper surface of mobile base of 5 side of battery pack and retarder 7 is installed, it is described to subtract Fast device 7 increases the torque that driving motor 7 exports, and improves carrying capacity;The belt cylinder of 6 output end of the driving motor installation passes through Driving belt connects 7 input terminal of retarder, and the reel of 7 output end of the retarder installation is separately connected conveying by driving belt Driving roller bearing with 3 and adjusting conveyer belt 8, the support frame that 1 upper surface of mobile base is welded and fixed far from 2 side of mounting rack Upper level is equipped with storage bin 9, the 9 internal reservoir material of storage bin;The storage bin 9 is arranged close to 3 side of conveyer belt Discharge door lower tilt be welded with slide plate 13, the slide plate 13 is oriented to material, reaches material more smoothly To 3 top of conveyer belt;9 ontology of storage bin is equipped with dust hood 10, the dust hood close to 3 one upper lateral part outer rim of conveyer belt 10 dust suctions;Air outlet connects 11 air inlet of blower by gas-guide tube in the middle part of 10 ontology of dust hood, and the work of blower 11 produces Raw subnormal ambient sucks outside air internal;Dust bag 12, the dust bag 12 are installed outside 11 air outlet of blower Collect dust.
Referring to Fig. 2, Fig. 2 is the storage bin diagrammatic cross-section of the utility model.The storage being arranged inside the storage bin 9 Indoor is vertically-mounted push plate 16, and material is released in the push plate 16;In the side that the push plate 16 is open far from storage room Portion connects 15 one end of piston rod, and the piston rod 15 pushes push plate 16;The 15 ontology other end of piston rod is mounted on cylinder 14 Inside, the cylinder 14, which provides power, keeps piston rod 15 mobile;The cylinder 14 is horizontally arranged at protective cover inner horizontal axis Position, the internal component installed of protective cover protection;The protective cover is fixed on 9 ontology one of storage bin by fastening bolt Side.
Working principle: different material is stored in by storage bin 9 according to actual demand using whole device and is stored accordingly Chamber interior operates hydraulic top 4 later and adjusts later by pulling mobile base 1 that whole part is moved to suitable job site The whole distance for adjusting height or transport that the inclined angle of conveyer belt 8 is transported so as to adjust material, opening battery pack 5 later is Electrical component power supply in whole device, the work output power of driving motor 6, delivers power to retarder by driving belt In 7, increases driving roller bearing of the torque later by power transmission to conveyer belt 3 and adjusting conveyer belt 8 by retarder 7, make to convey Band 3 and adjusting conveyer belt 8 start turning, and transport material, while the work of blower 11 generates suction for 10 body lower part of dust hood Dust enters in pipeline, regathers and stores in dust bag 12, selects material then to select specific cylinder according to actual demand 14 are operated, and 14 task driven piston rod 15 of cylinder is made to push push plate 16, and the promotion of push plate 16 is made to be stored in 9 storage room of storage bin Internal material is shifted 3 top of conveyer belt onto and is transported.
Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention, it is not limited to this Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic It is equivalently replaced, within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on, It should be included within the scope of protection of this utility model.

Claims (6)

1. a kind of construction device for transporting objects, including mobile base (1) and storage bin (9), it is characterised in that: the shifting The mounting base that dynamic pedestal (1) upper surface side is welded and fixed is fixed on the bottom end of mounting rack (2), the installation by fastening bolt It is horizontally installed with conveyer belt (3) in the installation position of frame (2) body upper part setting, mounting rack (2) the ontology side outer rim welding Fixed connection frame rotation connection adjusts conveyer belt (8) ontology one end, mobile base (1) the body upper surface side setting It is equipped in installation position battery pack (5), driving electricity is installed in the installation position of mobile base (1) the upper surface other side setting Machine (6), the driving motor (6) are equipped in the installation position far from mobile base (1) the upper surface setting of battery pack (5) side Retarder (7), the support frame upper level installation that mobile base (1) upper surface is welded and fixed far from mounting rack (2) side Have storage bin (9), storage bin (9) ontology is equipped with dust hood (10), the suction close to (3) one upper lateral part outer rim of conveyer belt Air outlet connects blower (11) air inlet, installation outside blower (11) air outlet by gas-guide tube in the middle part of dust hood (10) ontology There are dust bag (12).
2. a kind of construction device for transporting objects according to claim 1, it is characterised in that: the driving motor (6) the belt cylinder of output end installation connects retarder (7) input terminal, retarder (7) the output end installation by driving belt Reel by driving belt be separately connected conveyer belt (3) and adjust conveyer belt (8) driving roller bearing.
3. a kind of construction device for transporting objects according to claim 1, it is characterised in that: the adjusting conveyer belt (8) lower frame of ontology is welded with bracket, and the fixed engaging lug of the bracket lower weld is connected hydraulic by pin (4) interior bar top is pushed up, the hydraulic top (4) is mounted in the middle part of the erecting bed that mobile base (1) side outer rim is welded and fixed.
4. a kind of construction device for transporting objects according to claim 1, it is characterised in that: the storage bin (9) Discharge door lower tilt close to the setting of conveyer belt (3) side is welded with slide plate (13).
5. a kind of construction device for transporting objects according to claim 1, it is characterised in that: the storage bin (9) The storage room inboard, upright of inside setting is equipped with push plate (16), and the push plate (16) connects far from a middle side part of storage room opening It takes over a job stopper rod (15) one end, it is internal that piston rod (15) the ontology other end is mounted on cylinder (14).
6. a kind of construction device for transporting objects according to claim 5, it is characterised in that: cylinder (14) water Safety is mounted in protective cover inner horizontal axial location, and the protective cover is fixed on storage bin (9) ontology side by fastening bolt.
CN201721761955.4U 2017-12-15 2017-12-15 A kind of construction device for transporting objects Expired - Fee Related CN208292090U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721761955.4U CN208292090U (en) 2017-12-15 2017-12-15 A kind of construction device for transporting objects

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721761955.4U CN208292090U (en) 2017-12-15 2017-12-15 A kind of construction device for transporting objects

Publications (1)

Publication Number Publication Date
CN208292090U true CN208292090U (en) 2018-12-28

Family

ID=64696823

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721761955.4U Expired - Fee Related CN208292090U (en) 2017-12-15 2017-12-15 A kind of construction device for transporting objects

Country Status (1)

Country Link
CN (1) CN208292090U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117284815A (en) * 2023-09-26 2023-12-26 深圳市建筑装饰(集团)有限公司 Energy-saving dust removal equipment for green building engineering construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117284815A (en) * 2023-09-26 2023-12-26 深圳市建筑装饰(集团)有限公司 Energy-saving dust removal equipment for green building engineering construction
CN117284815B (en) * 2023-09-26 2024-05-10 深圳市建筑装饰(集团)有限公司 Energy-saving dust removal equipment for green building engineering construction

Similar Documents

Publication Publication Date Title
CN208292090U (en) A kind of construction device for transporting objects
CN205114260U (en) Slide is carried to tobacco bale
CN211109516U (en) Spiral feeding grain elevator
CN105129454A (en) Automatic scattered grain collecting car
CN106672468B (en) A kind of stirring-type solid powder hopper jamming device
CN208265096U (en) A kind of Intelligent logistics warehouse landing platform
CN207174676U (en) The automatic grains unloading system in the broken workshop of five-grain powder based on bucket elevator
CN206126168U (en) Stainless steel spiral unloader
CN206605648U (en) A kind of concrete materials automatic charging device
CN206068986U (en) A kind of bagged cement loading system
CN206068987U (en) A kind of bagged cement loading system
CN209193109U (en) A kind of automatic charging device
CN209337725U (en) Full-automatic bulk granule materials charging crane
CN206665476U (en) The self-propelled conveying device that a kind of PLC is automatically controlled
CN102992034B (en) Movable container powder and particle material vanning and devanning canning equipment and method utilizing same
CN202765873U (en) Stationary type automobile bulk machine
CN217349844U (en) Chute type powder lifting mechanism and container unpacking device
CN109368291A (en) A kind of automatic charging device
CN217102225U (en) Length-adjustable and angle-adjustable continuous unloader
CN206068989U (en) A kind of bagged cement loading system
CN206108448U (en) Novel bagged water mud carloader
CN206068996U (en) A kind of bagged cement loading system
CN206032257U (en) Vibration blanking formula pumpkin seeds transportation storehouse
CN205554011U (en) Bulk material collection vehicle
CN220693812U (en) Pneumatic conveying device for shallow round bin

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20181224

Address after: 100000 Beijing Chaoyang District Zhou Jing courtyard 1 traffic department highway a Bureau

Co-patentee after: Ji Xingli

Patentee after: Ji Bo

Co-patentee after: Jiang Kai

Co-patentee after: Liu Chenglin

Co-patentee after: Liu Guojun

Co-patentee after: Shen Xixi

Co-patentee after: Tian Jianliang

Co-patentee after: Wang Guike

Co-patentee after: Wang Shaohua

Co-patentee after: Zhang Shibo

Address before: 050000 Unit 503, 18 Block 2, 33 Jianhuanan Street, Chang'an District, Shijiazhuang City, Hebei Province

Patentee before: Fu Yu

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181228

Termination date: 20191215

CF01 Termination of patent right due to non-payment of annual fee