CN208288556U - A kind of construction project information system management device - Google Patents
A kind of construction project information system management device Download PDFInfo
- Publication number
- CN208288556U CN208288556U CN201820525170.5U CN201820525170U CN208288556U CN 208288556 U CN208288556 U CN 208288556U CN 201820525170 U CN201820525170 U CN 201820525170U CN 208288556 U CN208288556 U CN 208288556U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- clean cover
- motor
- camera
- cover
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Studio Devices (AREA)
Abstract
The utility model discloses a kind of construction project information system management devices, it is characterized by comprising monitor cameras, the right side insertion of the monitor camera is equipped with camera eyeglass, the right side of the monitor camera is fixedly connected with Clean cover, the right side of the Clean cover offers through-hole, by installing outlet pipe additional to monitor camera, water pump, screw rod, nut, bristle bar and motor, the effect of dust can be sprayed water to camera eyeglass and wipe out by realizing nozzle, camera eyeglass easy to clean is reached, supervisor is set to supervise the purpose of construction with more cleaning.
Description
Technical field
The utility model relates to Construction Project Management technical field, specially a kind of construction project information system management device.
Background technique
Supervisor is needed to supervise to scene in the process of construction of one architectural engineering in China, so as in time
Processing work progress in every affairs, guarantee going on smoothly for engineering.In some large-scale construction engineerings, not only put more
Wide, environment is complicated and changeable, technical standard is more, quality safety requires high, supervisor that need to ceaselessly run in each setting
Between, and contacted using liaison mode mostly to the supervision and management of each setting, for the prison convenient for supervisor to scene
The mode remotely monitored can be used in work, and existing long-range monitoring is generally basede on video monitoring, and video monitoring mostly uses open type
Monitoring camera, due to certain projects construction environment exist very big fugitive dust, can usually make monitoring camera surface modes
It pastes unclear, needs periodic cleaning, the foundation to construction personnel in this way brings big inconvenience.
Utility model content
The purpose of this utility model is to provide a kind of construction project information system management devices, to solve above-mentioned background technique
The problem of middle proposition.
To achieve the above object, the utility model provides the following technical solutions: a kind of construction project information system management device,
It is characterized by comprising monitor camera, the right side insertion of the monitor camera is equipped with camera eyeglass, the monitoring
The right side of video camera is fixedly connected with Clean cover, and the right side of the Clean cover offers through-hole;
The inner cavity top surface of the Clean cover is fixedly connected with water tank, and the lower surface of the water tank is fixedly connected with water outlet
One end of pipe, is fixedly connected with water pump on rear side of the inner cavity right side of the Clean cover, and the input terminal of water pump by outlet pipe with
Water tank connection, the leading flank top of the Clean cover is fixedly connected with battery, and battery is electrically connected with water pump, the Clean cover
Inner cavity be vertically fixedly connected with sparge pipe, and the input terminal of sparge pipe is connected to the output end of water pump, under the sparge pipe
Surface is fixedly connected with nozzle, is fixedly connected with bearing, the inner ring surface of the bearing in the middle part of the inner cavity trailing flank of the Clean cover
It is fixed to be plugged with screw rod, and the front end of screw rod extends to outside through the inner cavity leading flank of Clean cover, before the surface of the screw rod
End is bolted with nut, and the lower surface of the nut is fixedly connected with bristle bar, the left side of the bristle bar and camera eyeglass
Right side fit closely, the lower surface of the bristle bar is fixedly connected with fixed ring, and the inner cavity of the Clean cover is vertically fixed
Be connected with slide bar, and the inner ring surface of fixed ring is slidably socketed in the surface of slide bar, the front surface of the screw rod be fixedly connected with from
Moving gear, the leading flank of the Clean cover is fixedly connected with motor, and motor is electrically connected with battery, and the output end of the motor is solid
Surely it is connected with driving gear, and driving gear is engaged with driven gear.
Preferably, the inner chamber bottom surface of the Clean cover is fixedly connected with wastewater trough.
Preferably, the upper surface right side opening of the Clean cover is equipped with filler, and filler is connected to water tank.
Preferably, motor cover is fixedly connected on the leading flank of the Clean cover, and motor and battery are respectively positioned on motor cover
Inside.
Compared with prior art, the utility model has the beneficial effects that by installing outlet pipe, water additional to monitor camera
Pump, screw rod, nut, bristle bar and motor, the effect of dust can be sprayed water to camera eyeglass and wipe out by realizing nozzle, be reached
Camera eyeglass easy to clean makes supervisor supervise the purpose of construction with more cleaning.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is Clean cover structural schematic diagram.
In figure: 1 monitor camera, 2 camera eyeglasses, 3 Clean covers, 301 water tanks, 302 outlet pipes, 303 water pumps, 304
Battery, 305 sparge pipes, 306 nozzles, 307 bearings, 308 screw rods, 309 nuts, 310 bristle bars, 311 fixed rings, 312 slide bars,
313 driven gears, 314 motors, 315 driving gears, 316 wastewater troughs, 317 filler, 318 motor covers, 4 through-holes.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
The utility model provides a kind of technical solution referring to FIG. 1-2: a kind of construction project information system management device,
Be characterized in that: including monitor camera 1, the right side insertion of monitor camera 1 is equipped with camera eyeglass 2, monitor camera 1
Right side be fixedly connected with Clean cover 3, the right side of Clean cover 3 offers through-hole 4;
As shown in Fig. 2, the inner cavity top surface of Clean cover 3 is fixedly connected with water tank 301, the lower surface of water tank 301 is fixed
It is connected with one end of outlet pipe 302, is fixedly connected with water pump 303 on rear side of the inner cavity right side of Clean cover 3, and water pump 303 is defeated
Enter end to be connected to by outlet pipe 302 with water tank 301, the leading flank top of Clean cover 3 is fixedly connected with battery 304, and battery
304 are electrically connected with water pump 303, and the inner cavity of Clean cover 3 is vertically fixedly connected with sparge pipe 305, and the input terminal of sparge pipe 305 with
The output end of water pump 303 is connected to, and the lower surface of sparge pipe 305 is fixedly connected with nozzle 306, in the inner cavity trailing flank of Clean cover 3
Portion is fixedly connected with bearing 307, and the inner ring surface of bearing 307 is fixed to be plugged with screw rod 308, and the front end of screw rod 308 is through cleaning
The inner cavity leading flank of cover 3 extends to outside, and the front end surface of screw rod 308 is bolted with nut 309, and the lower surface of nut 309 is fixed
It is connected with bristle bar 310, the left side of bristle bar 310 and the right side of camera eyeglass 2 fit closely, under bristle bar 310
Surface is fixedly connected with fixed ring 311, and the inner cavity of Clean cover 3 is vertically fixedly connected with slide bar 312, and the inner ring of fixed ring 311
Face is slidably socketed in the surface of slide bar 312, and the front surface of screw rod 308 is fixedly connected with driven gear 313, the front side of Clean cover 3
Face is fixedly connected with motor 314, and motor 314 is electrically connected with battery 304, and the output end of motor 314 is fixedly connected with driving tooth
Wheel 315, and driving gear 315 engage with driven gear 313, by give the installation of monitor camera 1 outlet pipe 302, water pump 303,
Screw rod 308, nut 309, bristle bar 310 and motor 314, realizing nozzle 306 can spray water to camera eyeglass 2 and wipe out ash
The effect of dirt has achieved the purpose that camera eyeglass 2 easy to clean, supervisor is made to supervise construction with more cleaning.
Camera eyeglass 2 can be entered in monitor camera 1 with blocks dust, even if fugitive dust occurs in construction site, dust is only
It can be attached to by through-hole 4 on the right side of camera eyeglass 2.
The lower end of nozzle 306 is the setting that is tilted to the left, and when the lower end of nozzle 306 being made to spray water, water can be sprayed on camera
On the left side of eyeglass 2.
Specifically, will not leak out outside Clean cover 3, keep away after flowing through camera eyeglass 2 for the water that nozzle 306 sprays
Exempt to make dirty Clean cover 3, the inner chamber bottom surface of Clean cover 3 is fixedly connected with wastewater trough 316.
Specifically, facilitating to make the water in water tank 301 after being finished and adding water, Clean cover 3 into water tank 301
Upper surface right side opening be equipped with filler 317, and filler 317 is connected to water tank 301.
Specifically, the fugitive dust of construction site is fallen on motor 314 and battery 304 in order to prevent, make motor 314 and battery
It into ash and is damaged inside 304, motor cover 318, and motor 314 and the equal position of battery 304 is fixedly connected on the leading flank of Clean cover 3
In the inside of motor cover 318.
Working principle: the utility model is a kind of construction project information system management device, when the fugitive dust of construction site passes through
When through-hole 4 is covered with camera eyeglass 2,304 feed pump 303 of battery and motor 314 provide electric energy, and the work of water pump 303 passes through water outlet
Water in water tank 301 is extracted out and is conveyed into sparge pipe 305 by pipe 302, and the nozzle 306 of 305 lower surface of sparge pipe sprays to water
The right side of camera eyeglass 2, while the work of motor 314 drives driving gear 315 to rotate, driving gear 315 passes through driven tooth
Wheel 313 drives screw rod 308 to rotate, and screw rod 308 rotates and drives bristle bar 310 to move right by nut 309, while bristle bar
310 drive fixed rings 311 move right on slide bar 312, so that bristle bar 310 is constantly in upright state, bristle bar 310 will be taken the photograph
As the dust of the mixing dampening of 2 right side of head mirror piece wipes out, the water for mixing dust flows into wastewater trough 316.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (4)
1. a kind of construction project information system management device, it is characterised in that: including monitor camera (1), the monitor camera
(1) right side insertion is equipped with camera eyeglass (2), and the right side of the monitor camera (1) is fixedly connected with Clean cover
(3), the right side of the Clean cover (3) offers through-hole (4);
The inner cavity top surface of the Clean cover (3) is fixedly connected with water tank (301), and the lower surface of the water tank (301) is fixed
It is connected with one end of outlet pipe (302), is fixedly connected with water pump (303) on rear side of the inner cavity right side of the Clean cover (3), and water
The input terminal of pump (303) is connected to by outlet pipe (302) with water tank (301), and the leading flank top of the Clean cover (3) is fixed
It is connected with battery (304), and battery (304) is electrically connected with water pump (303), the inner cavity of the Clean cover (3) is vertically fixedly connected
Have sparge pipe (305), and the input terminal of sparge pipe (305) is connected to the output end of water pump (303), the sparge pipe (305)
Lower surface is fixedly connected with nozzle (306), is fixedly connected with bearing (307), institute in the middle part of the inner cavity trailing flank of the Clean cover (3)
The inner ring surface fixation for stating bearing (307) is plugged with screw rod (308), and the front end of screw rod (308) is before the inner cavity of Clean cover (3)
Side extends to outside, and the front end surface of the screw rod (308) is bolted with nut (309), and the lower surface of the nut (309) is solid
Surely it is connected with bristle bar (310), the left side of the bristle bar (310) and the right side of camera eyeglass (2) fit closely, institute
The lower surface for stating bristle bar (310) is fixedly connected with fixed ring (311), and the inner cavity of the Clean cover (3) is vertically fixedly connected with
Slide bar (312), and the inner ring surface of fixed ring (311) is slidably socketed in the surface of slide bar (312), the preceding table of the screw rod (308)
Face is fixedly connected with driven gear (313), and the leading flank of the Clean cover (3) is fixedly connected with motor (314), and motor
(314) it is electrically connected with battery (304), the output end of the motor (314) is fixedly connected with driving gear (315), and driving tooth
Wheel (315) is engaged with driven gear (313).
2. a kind of construction project information system management device according to claim 1, it is characterised in that: the Clean cover (3)
Inner chamber bottom surface be fixedly connected with wastewater trough (316).
3. a kind of construction project information system management device according to claim 2, it is characterised in that: the Clean cover (3)
Upper surface right side opening be equipped with filler (317), and filler (317) are connected to water tank (301).
4. a kind of construction project information system management device according to claim 3, it is characterised in that: the Clean cover (3)
Leading flank on be fixedly connected with motor cover (318), and motor (314) and battery (304) are respectively positioned on the interior of motor cover (318)
Side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820525170.5U CN208288556U (en) | 2018-04-13 | 2018-04-13 | A kind of construction project information system management device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820525170.5U CN208288556U (en) | 2018-04-13 | 2018-04-13 | A kind of construction project information system management device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208288556U true CN208288556U (en) | 2018-12-28 |
Family
ID=64725130
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820525170.5U Expired - Fee Related CN208288556U (en) | 2018-04-13 | 2018-04-13 | A kind of construction project information system management device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208288556U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111193913A (en) * | 2020-03-02 | 2020-05-22 | 大连理工大学 | City street video acquisition device that walks |
-
2018
- 2018-04-13 CN CN201820525170.5U patent/CN208288556U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111193913A (en) * | 2020-03-02 | 2020-05-22 | 大连理工大学 | City street video acquisition device that walks |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208288556U (en) | A kind of construction project information system management device | |
CN219560645U (en) | Mould cleaning equipment for casting | |
CN115664344A (en) | Device and method for automatic fault alarm of photovoltaic power station | |
CN115532659A (en) | Automatic transmission system of surface treatment cleaning roller | |
CN211247681U (en) | Cleaning device for electrolytic cell | |
CN113560233A (en) | Waste oil stain cleaning and collecting device for mechanical equipment maintenance | |
CN221071073U (en) | Medium-pressure filter for sewage treatment | |
CN219689372U (en) | 3-isochromanone wastewater filtering device | |
CN219378174U (en) | Intelligent building site management device based on municipal works | |
CN219298127U (en) | Silt cleaning device that long distance water transfer engineering used | |
CN217464470U (en) | Simple slag remover | |
CN220013870U (en) | Distributed municipal water supply and storage facility | |
CN213924075U (en) | Lifting type stirring structure used in sewage treatment tank | |
CN220433203U (en) | Impurity filtering device for silk production | |
CN220493071U (en) | Roller compacted concrete digital dam construction real-time monitoring equipment for steep valley topography | |
CN216136738U (en) | A drainage device for modified epoxy production | |
CN214556011U (en) | Industrial wastewater pool anti-deposition treatment device | |
CN220781535U (en) | Automatic cleaning device for highway monitoring probe | |
CN220679351U (en) | Casting machinery cooling device with self-cleaning function | |
CN220678726U (en) | Cleaning mechanism for laser equipment | |
CN220160815U (en) | Cleaning mechanism of oil storage tank | |
CN217904344U (en) | Photovoltaic board self-cleaning device | |
CN220238885U (en) | Electric tar precipitator capable of automatically cleaning inner cavity | |
CN212976039U (en) | Cleaning device for machining mechanical parts | |
CN218424644U (en) | Residue cleaning device of water treatment reaction tank |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181228 Termination date: 20200413 |