CN208282291U - A kind of central air-conditioning integrated form refrigeration station - Google Patents

A kind of central air-conditioning integrated form refrigeration station Download PDF

Info

Publication number
CN208282291U
CN208282291U CN201820195056.0U CN201820195056U CN208282291U CN 208282291 U CN208282291 U CN 208282291U CN 201820195056 U CN201820195056 U CN 201820195056U CN 208282291 U CN208282291 U CN 208282291U
Authority
CN
China
Prior art keywords
platform
base
circulating pump
welding platform
base steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820195056.0U
Other languages
Chinese (zh)
Inventor
侯亚雄
崔韶云
吴增亮
马兆辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingyun Construction Co Ltd
Original Assignee
Qingyun Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingyun Construction Co Ltd filed Critical Qingyun Construction Co Ltd
Priority to CN201820195056.0U priority Critical patent/CN208282291U/en
Application granted granted Critical
Publication of CN208282291U publication Critical patent/CN208282291U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices That Are Associated With Refrigeration Equipment (AREA)

Abstract

The utility model discloses a kind of central air-conditioning integrated form refrigeration stations, formed it is characterized by: being provided with base platform and control room by region division inside integrated form refrigeration station, base platform structure be welded by 200*200*8*12H shaped steel combination and will thereon by region division be 1# base steel plinth welding platform, 2# base steel plinth welding platform, three groups of welding platform of 3# base steel plinth constitute;Required equipment is corresponded to easy to install, easily differentiation according to division region by the utility model, easy to maintain;After the optimization of the utility model Integrated design, space 20% is saved.The space saved is by sufficiently planning and re-uses, and can be used as lobby or other purposes use.The area saved, which is converted into economic benefit, can reach 70~900,000 yuan.

Description

A kind of central air-conditioning integrated form refrigeration station
Technical field
The utility model relates to central air-conditioning to assemble field, specifically a kind of central air-conditioning integrated form refrigeration station.
Background technique
It is more and more precious for town site with the continuous progress of the continuous development of urban construction and society, so And effectively using imperative with planning construction land used.Existing central air-conditioning integrated form refrigeration station, compared with traditional refrigerator Room equipment distributing arrangement, can effectively improve computer room space utilization rate, reduce non-commercial occupied area, increase computer room aesthetics. Modularization decomposition is carried out to " integrated form refrigeration station " using BIM technology simultaneously, it will a large amount of field pipes welding point originally Solution carries out prefabricated processing using " Full-automatic welding equipment " to factory floor, substantially increases pipeline welding quality, and can be effective Improve computer room site operation environment.Due to " integrated form refrigeration station " early period largely prefabricated work be completed in workshop, so The application of " integrated form refrigeration station " is smaller by construction site environmental constraints, to shorten construction period to greatest extent.
Functional module is more, and assembling process is often limited because of place or building area is excessive and limited, and each group Can only be using live separately installed traditional approach between part, therefore not can guarantee installation quality and shorten installation period.
Structure design: region division is clear, it is easy to install, easily distinguish it is easy to maintain.
Assemble method: standardisation process is easy to assembly quick, reduces the construction time.
Utility model content
A kind of central air-conditioning integrated form refrigeration station, it is characterised in that: be arranged inside integrated form refrigeration station by region division It is made of base platform (1) and control room (10), base platform (1) structure is welded simultaneously by 200*200*8*12H shaped steel combination It will be thereon 1# base steel plinth welding platform (11), 2# base steel plinth welding platform (12), 3# base steel plinth welding platform by region division (13) three groups of compositions;
Preferably, being set as refrigeration unit (2), chilled water circulating pump on the 1# base steel plinth welding platform (11) Unit (3), cooling water circulating pump unit (4) composition;Wherein refrigeration unit (2) is set as two, chilled water circulating pump unit (3) Three are set as, cooling water circulating pump unit (4) is set as three.
Preferably, being set as heat exchanger (5) and hot water circulating pump (6) on the 2# base steel plinth welding platform (12); Wherein heat exchanger (5) is two, hot water circulating pump (6) is two.
Preferably, being set as softening water tank (7), softening hydrophone (8), moisturizing on the 3# base solder platform (13) It pumps (9).
Preferably, the H profile steel basis of the base platform and ground contact surface are equipped with three glue resilient cushions;
On the 1# base steel plinth welding platform (11), refrigeration unit (2), chilled water circulating pump unit (3), cooling water are followed Ring pump assembly (4) bottom is provided with three glue resilient cushions;On 2# base steel plinth welding platform (12), heat exchanger (5) and hot water circuit Pump (6) bottom is provided with Rubber shock-absorbing pad;Softening water tank (7), softening hydrophone (8), benefit on 3# base steel plinth welding platform (13) Water pump (9) bottom is provided with resilient cushion.
Assembly method described in the utility model by the utility model region division and is set on the basic platform that will be welded Standby installation drawing position is installed, and manpower is saved.
The utility model has the advantages that
Required equipment is corresponded to easy to install, easily differentiation according to division region by the utility model, easy to maintain;It is practical new using this After the optimization of type Integrated design, space 20% is saved.The space saved is by sufficiently planning and re-uses, and can be used as lobby Or other purposes use.The area saved, which is converted into economic benefit, can reach 70~900,000 yuan.
Detailed description of the invention
Fig. 1 is this utility structure schematic diagram;
Specific embodiment
With reference to the accompanying drawing, the utility model is described in detail.
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only to explain this Utility model is not used to limit the utility model.
Its structure of body guard plate described in the utility model is as shown, the integrated form refrigeration station is placed in base platform (1) on, base platform (1) structure is to be welded by 200*200*8*12H shaped steel combination and will be thereon 1# steel by region division (13) three groups of base solder platform (11), 2# base steel plinth welding platform (12), 3# base steel plinth welding platform compositions.With control on duty Room (14)
Preferably, being set as refrigeration unit (2), chilled water circulating pump on the 1# base steel plinth welding platform (11) Unit (3), cooling water circulating pump unit (4) composition;Wherein refrigeration unit (2) is set as two, chilled water circulating pump unit (3) Three are set as, cooling water circulating pump unit (4) is set as three.
Preferably, being set as heat exchanger (5) and hot water circulating pump (6) on the 2# base steel plinth welding platform (12); Wherein heat exchanger (5) is two, hot water circulating pump (6) is two.
Preferably, being set as softening water tank (7), softening hydrophone (8), moisturizing on the 3# base solder platform (13) It pumps (9).
Preferably, the H profile steel basis of the base platform and ground contact surface are equipped with three glue resilient cushions;
On the 1# base steel plinth welding platform (11), refrigeration unit (2), chilled water circulating pump unit (3), cooling water are followed Ring pump assembly (4) bottom is provided with three glue resilient cushions;On 2# base steel plinth welding platform (12), heat exchanger (5) and hot water circuit Pump (6) bottom is provided with Rubber shock-absorbing pad;Softening water tank (7), softening hydrophone (8), benefit on 3# base steel plinth welding platform (13) Water pump (9) bottom is provided with resilient cushion.
Required equipment is corresponded to easy to install, easily differentiation according to division region by the utility model, easy to maintain;It is practical new using this After the optimization of type Integrated design, space 20% is saved.The space saved is by sufficiently planning and re-uses, and can be used as control on duty Room processed uses.The area saved, which is converted into economic benefit, can reach 70~900,000 yuan.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Made any modifications, equivalent replacements, and improvements etc., should be included in the utility model within the spirit and principle of utility model Protection scope within.

Claims (2)

1. a kind of central air-conditioning integrated form refrigeration station, it is characterised in that: be provided with inside integrated form refrigeration station by region division Base platform (1) and control room (10) composition, base platform (1) structure be welded by 200*200*8*12H shaped steel combination and incite somebody to action It is thereon 1# base steel plinth welding platform (11), 2# base steel plinth welding platform (12), 3# base steel plinth welding platform by region division (13) three groups of compositions;
Refrigeration unit (2), chilled water circulating pump unit (3), cooling water are set as on the 1# base steel plinth welding platform (11) Recycle pump assembly (4) composition;Wherein refrigeration unit (2) is set as two, and chilled water circulating pump unit (3) is set as three, cold But water-circulating pump unit (4) is set as three;
Heat exchanger (5) and hot water circulating pump (6) are set as on the 2# base steel plinth welding platform (12);Wherein heat exchanger (5) It is two for two, hot water circulating pump (6);
Softening water tank (7), softening hydrophone (8), small pump (9) are set as on the 3# base solder platform (13).
2. a kind of central air-conditioning integrated form refrigeration station according to claim 1, it is characterised in that: the base platform H profile steel basis and ground contact surface are equipped with three glue resilient cushions;On the 1# base steel plinth welding platform (11), refrigeration unit (2), chilled water circulating pump unit (3), cooling water circulating pump unit (4) bottom are provided with three glue resilient cushions;2# steel base solder On platform (12), heat exchanger (5) and hot water circulating pump (6) bottom are provided with Rubber shock-absorbing pad;3# base steel plinth welding platform (13) softening water tank (7), softening hydrophone (8), small pump (9) bottom are provided with resilient cushion on.
CN201820195056.0U 2018-02-05 2018-02-05 A kind of central air-conditioning integrated form refrigeration station Expired - Fee Related CN208282291U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820195056.0U CN208282291U (en) 2018-02-05 2018-02-05 A kind of central air-conditioning integrated form refrigeration station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820195056.0U CN208282291U (en) 2018-02-05 2018-02-05 A kind of central air-conditioning integrated form refrigeration station

Publications (1)

Publication Number Publication Date
CN208282291U true CN208282291U (en) 2018-12-25

Family

ID=64748636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820195056.0U Expired - Fee Related CN208282291U (en) 2018-02-05 2018-02-05 A kind of central air-conditioning integrated form refrigeration station

Country Status (1)

Country Link
CN (1) CN208282291U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110118429A (en) * 2018-02-05 2019-08-13 清云建设有限公司 A kind of central air-conditioning integrated form refrigeration station assembly method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110118429A (en) * 2018-02-05 2019-08-13 清云建设有限公司 A kind of central air-conditioning integrated form refrigeration station assembly method

Similar Documents

Publication Publication Date Title
CN208282291U (en) A kind of central air-conditioning integrated form refrigeration station
CN110118429A (en) A kind of central air-conditioning integrated form refrigeration station assembly method
CN104157402A (en) Transformer radiating system with underground environment as cooling source
CN201366631Y (en) Assembled protective structure of vertical machining center
CN102661190A (en) Diesel power generator with trinity heat radiators
CN208939439U (en) A kind of open air preassembled transformer station
CN203166350U (en) Cooling system of distribution box set
CN102345353A (en) Internal home appliance device of integrated ceiling
CN202419874U (en) Condensate-water recycling system
CN201526565U (en) Cooling device of tunneling machine hydraulic system
CN2548046Y (en) Air source heat pump floor board heating apparatus
CN205662549U (en) Novel slewing bearing raceway does not have soft height and imitate quench machining tool
CN205119294U (en) Air conditioner and heat exchange system
CN204753986U (en) Construct interim board house roofing cooling water cooling system
CN202066231U (en) Water supply system of solar water heater detection device
CN205156664U (en) Portable cooling tower device
CN102466359B (en) Device for heating cleaning pool by using waste heat of air compressor
CN104251571A (en) Method for treating industrial waste heat by utilizing ground source heat pump and solar energy
CN1332168C (en) Spray pond cooling tower
CN103245022A (en) Underground water source heat pump air conditioning system
CN203323269U (en) Underground water source heat pump air conditioner system
CN201043307Y (en) Bearing structure of clean room equipment
CN220170015U (en) Receive water machinery cooling tower
CN203655425U (en) Diesel generating set adopting separated running
CN204385247U (en) The water spray shower quenching device of casting train wheel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181225

Termination date: 20210205

CF01 Termination of patent right due to non-payment of annual fee