CN208280575U - A kind of building scaffold connection structure with safety insurance structure - Google Patents

A kind of building scaffold connection structure with safety insurance structure Download PDF

Info

Publication number
CN208280575U
CN208280575U CN201820439799.8U CN201820439799U CN208280575U CN 208280575 U CN208280575 U CN 208280575U CN 201820439799 U CN201820439799 U CN 201820439799U CN 208280575 U CN208280575 U CN 208280575U
Authority
CN
China
Prior art keywords
column
fixed
plate
scaffold
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820439799.8U
Other languages
Chinese (zh)
Inventor
周淑华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DALI CONSTRUCTION GROUP CO., LTD.
Original Assignee
周淑华
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 周淑华 filed Critical 周淑华
Priority to CN201820439799.8U priority Critical patent/CN208280575U/en
Application granted granted Critical
Publication of CN208280575U publication Critical patent/CN208280575U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The building scaffold connection structure with safety insurance structure that the utility model discloses a kind of, is related to scaffold field.This kind of scaffold, including scaffold main body and safety device, loading plate is connected with above the scaffold main body, the left side central portion rotation of the safety device is connected with screw column, the front of the scaffold main body is welded with fixed column, is inlaid with support column on the left of the fixed column.It is provided with screw column and extends transversely through fixed plate and fixed column, and fixed safety device, when staff needs using scaffold main body, need staff that safety device is fixed on to the top of fixed column by screw column, so that the loading plate placed above fixed column is fixed in fixed column, to make loading plate be firmly fixed in scaffold main body, suitable for the production and use of the building scaffold connection structure with safety insurance structure, there is good development prospect.

Description

A kind of building scaffold connection structure with safety insurance structure
Technical field
The utility model relates to Construction Formwork & Scaffold Technology field, specially a kind of building scaffold with safety insurance structure connects Binding structure.
Background technique
Scaffold is to guarantee each work progress is gone on smoothly and is set up workbench.It is divided by the position set up outer Scaffold, internal scaffolding;Timber scaffolding, bamboo scaffolding, steel pipe scaffold can be divided by material difference;It is divided by structural form vertical Rod-type scaffold, door-type scaffold, swinging scaffold, suspended scaffold, chooses formula scaffold, climbs formula foot hand bridge scaffold Frame
Existing scaffold is easy to happen shaking when staff constructs, and threatens the safety of staff, and After existing scaffold is knocked, and connection structure is easily deformed fracture, so that scaffold collapses or acutely rocks, so that existing Scaffold be unable to get on the market and be widely applied and approve.
Utility model content
The building scaffold connection structure with safety insurance structure that the purpose of this utility model is to provide a kind of, with solution It proposes in certainly above-mentioned background technique to be easy to shake when construction and connection structure is easily deformed fracture and collapses or acutely rock Problem.
To achieve the above object, the utility model provides the following technical solutions: a kind of building with safety insurance structure Scaffold connecting structure, including scaffold main body and safety device are connected with loading plate above the scaffold main body, The left side central portion rotation of the safety device is connected with screw column, and the front of the scaffold main body is welded with fixed column, described Support column is inlaid on the left of fixed column, the back side of the fixed column is welded with crossbeam, and the top activity of the safety device connects It is connected to connecting column, the upper center rotation of the connecting column is connected with connecting screw, is welded with handle above the connecting screw Hand, the left end of the screw column are welded with fixed handle, and the underside of the connecting column is connected with fixed plate, the fixed plate Right side insertion it is fluted, the lower right-hand side of the fixed plate is welded with connecting plate, and the right end of the connecting plate is connected with It is fixedly connected with column, the column that is fixedly connected is rotated by connecting plate, and the top of the fixed plate, which is run through, connecting hole.
Preferably, the screw column extends transversely through fixed plate and fixed column, and fixed safety device.
Preferably, the fixed plate is provided with two pieces, and fixed plate is arranged to " inverted triangle " shape, and passes through connecting plate phase To connection.
Preferably, the groove and connecting plate are respectively provided in " semi arch " shape, and the inside of groove and connecting plate with The connection of fixed column Vertical movements.
Preferably, the connecting column is connected to the top of fixed plate by connecting screw Vertical movements, and connecting column and solid Loading plate is embedded between fixed board.
Preferably, there are four the safety device settings, and safety device is connected to the top of fixed column in rectangular active.
Compared with prior art, the utility model has the beneficial effects that this kind has the building foot hand of safety insurance structure Frame connecting structure is provided with screw column and extends transversely through fixed plate and fixed column, and fixed safety device, when staff needs to make When with scaffold main body, need staff that safety device is fixed on to the top of fixed column by screw column, so that fixed column The loading plate that top is placed is fixed in fixed column, so that loading plate be made to be firmly fixed in scaffold main body, is provided with Two fixed plates, and fixed plate is arranged to " inverted triangle " shape, and connects by the way that connecting plate is opposite, when operator station is carrying When being constructed on plate, and the connecting plate of " inverted triangle " shape can share staff's bring weight, and connecting plate The angle that fixed column is formed with loading plate can be filled, so that operator station is on loading plate when constructing, and foot Hand cradle main body will not shake, and fluted and connecting plate be arranged, and groove and connecting plate are respectively provided in " semi arch " shape, and groove It connect with fixed column Vertical movements with the inside of connecting plate, when safety device is fixed on the top of fixed column, and connects The outside that plate and groove can be fitted in fixed column completely is not in when so that safety device being fixed on the top of fixed column Gap causes safety device to lose the effect of stable scaffold main body, is provided with connecting column, and connecting column is hung down by connecting screw Directly be movably connected in the top of fixed plate, and be embedded in loading plate between fixed plate, when staff using scaffold main body into When row construction, and connecting column reinforces loading plate by connecting screw, so that loading plate is in staff's construction, it will not Position occurs to deviate, so that loading plate is fixed on the top of scaffold main body, setting is there are four safety device, and safety device The top of fixed column is connected in rectangular active, when scaffold main body because supporting pillar be broken or scaffold main body by hit occur When shaking, and four safety devices can fix scaffold main body, so that the work people to be constructed using scaffold main body Member will not shake because of scaffold main body, and staff is caused to fall from scaffold main body injury.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is one of the safety device partial structural diagram of the utility model;
Fig. 3 is the two of the safety device partial structural diagram of the utility model.
In figure: 1, scaffold main body, 2, fixed column, 3, support column, 4, crossbeam, 5, safety device, 6, loading plate, 7, fixation Plate, 8, connecting column, 9, connecting screw, 10, handle, 11, fixed handle, 12, groove, 13, connecting plate, 14, be fixedly connected with column, 15, screw column, 16, connecting hole.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1 to 3 is please referred to, the utility model provides a kind of technical solution: a kind of building foot with safety insurance structure Hand cradle connection structure, including scaffold main body 1, fixed column 2, support column 3, crossbeam 4, safety device 5, loading plate 6, fixed plate 7, Connecting column 8, handle 10, fixed handle 11, groove 12, connecting plate 13, is fixedly connected with column 14, screw column 15 and connects connecting screw 9 Hole 16 is connect, the top of scaffold main body 1 is connected with loading plate 6, and the left side central portion rotation of safety device 5 is connected with screw column 15, and screw column 15 extends transversely through fixed plate 7 and fixed column 2, and fixed safety device 5, when staff needs using foot hand When frame body 1, need staff that safety device 5 is fixed on to the top of fixed column 2 by screw column 15, so that fixed column 2 The loading plate 6 that top is placed is fixed in fixed column 2, so that it is firmly fixed to loading plate 6 in scaffold main body 1, and There are four the settings of safety device 5, and safety device 5 is connected to the top of fixed column 2 in rectangular active, when scaffold main body 1 because When the fracture of supporting pillar 3 or scaffold main body 1 are shaken by shock, and four safety devices 5 can be fixed by scaffold main body 1 Firmly, so that the staff to be constructed using scaffold main body 1 will not be shaken because of scaffold main body 1, lead to work people Member falls injury from scaffold main body 1, and the front of scaffold main body 1 is welded with fixed column 2, and the left side of fixed column 2 is inlaid with Support column 3, the back side of fixed column 2 are welded with crossbeam 4, and the top of safety device 5 is connected with connecting column 8, and connecting column 8 is logical The top that 9 Vertical movements of connecting screw are connected to fixed plate 7 is crossed, and is embedded in loading plate 6 between fixed plate 7, works as staff When being constructed using scaffold main body 1, and connecting column 8 is reinforced loading plate 6 by connecting screw 9, so that loading plate 6 In staff's construction, position deviation will not occur, so that loading plate 6 is fixed on the top of scaffold main body 1, connecting column 8 upper center rotation is connected with connecting screw 9, and the top of connecting screw 9 is welded with handle 10, the left end welding of screw column 15 There is fixed handle 11, the underside of connecting column 8 is connected with fixed plate 7, and fixed plate 7 is provided with two pieces, and fixed plate 7 is arranged It is connected at " inverted triangle " shape, and by the way that connecting plate 13 is opposite, when operator station constructs on loading plate 6, and " The connecting plate 13 of triangle " shape can share staff's bring weight, and connecting plate 13 can be by fixed column 2 and carrying The angle that plate 6 is formed is filled, so that operator station is on loading plate 6 when constructing, and scaffold main body 1 will not shake It is dynamic, the right side insertion fluted 12 of fixed plate 7, and groove 12 and connecting plate 13 are respectively provided in " semi arch " shape, and groove 12 It is connect with 2 Vertical movements of fixed column with the inside of connecting plate 13, when safety device 5 is fixed on the top of fixed column 2, and Connecting plate 13 and groove 12 can be fitted in the outside of fixed column 2 completely, so that safety device 5 is fixed on the top of fixed column 2 When, be not in gap, safety device 5 is caused to lose the effect of stable scaffold main body 1, the lower right-hand side welding of fixed plate 7 There is connecting plate 13, the right end of connecting plate 13, which is connected with, is fixedly connected with column 14, is fixedly connected with column 14 and carries out by connecting plate 13 Rotation, the top of fixed plate 7, which is run through, connecting hole 16.
Working principle: the building scaffold connection structure firstly the need of this kind of staff with safety insurance structure carries out It is simple to understand, then need staff by safety device 5 by being mounted on the top of scaffold main body 1, when and the people that works Movement when member is because of construction will lead to scaffold main body 1 and shake, and safety device 5 is carried out scaffold main body 1 by fixed plate 7 It reinforces, so that staff is in construction, scaffold main body 1 will not be shaken, when scaffold main body 1 is knocked, so that support When column 3 loses the effect of support scaffolding main body 1, and safety device 5 can play the effect of fixed scaffold main body 1, and foot hand Frame body 1 is after being knocked, and loading plate 6 is fixed on 1 top of scaffold main body by connecting column 8 by safety device 5, so that because holding Support plate 6 tilts after scaffold main body 1 is knocked, and when staff needs to dismantle safety device, staff is needed to hold Firmly handle 10 is rotated clockwise, so that connecting column 8 and fixed plate 7 are detached from, staff is then needed to hold fixed handle 11, and needle rotation of taking advantage of a situation is carried out, and screw column 15 can be synchronized and be rotated, so that safety device 5 and fixed column 2 are detached from, this is just It is the working principle of building scaffold connection structure of this kind with safety insurance structure.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of building scaffold connection structure with safety insurance structure, including scaffold main body (1) and safety device (5), it is characterised in that: be connected with loading plate (6) above the scaffold main body (1), a left side for the safety device (5) Middle side part rotation is connected with screw column (15), and the front of the scaffold main body (1) is welded with fixed column (2), the fixed column (2) be inlaid on the left of support column (3), the back side of the fixed column (2) is welded with crossbeam (4), the safety device (5) it is upper Side is connected with connecting column (8), and the upper center rotation of the connecting column (8) is connected with connecting screw (9), the connection spiral shell It is welded with handle (10) above silk (9), the left end of the screw column (15) is welded with fixed handle (11), the connecting column (8) underside is connected with fixed plate (7), and the right side of the fixed plate (7) is embedded in fluted (12), the fixed plate (7) Lower right-hand side be welded with connecting plate (13), the right end of the connecting plate (13), which is connected with, to be fixedly connected column (14), described It is fixedly connected with column (14) to be rotated by connecting plate (13), the top of the fixed plate (7), which is run through, connecting hole (16).
2. a kind of building scaffold connection structure with safety insurance structure according to claim 1, it is characterised in that: The screw column (15) extends transversely through fixed plate (7) and fixed column (2), and fixed safety device (5).
3. a kind of building scaffold connection structure with safety insurance structure according to claim 1, it is characterised in that: The fixed plate (7) is provided with two pieces, and fixed plate (7) is arranged to " inverted triangle " shape, and connects by the way that connecting plate (13) are opposite It connects.
4. a kind of building scaffold connection structure with safety insurance structure according to claim 1, it is characterised in that: The groove (12) and connecting plate (13) are respectively provided in " semi arch " shape, and the inside of groove (12) and connecting plate (13) with The connection of fixed column (2) Vertical movements.
5. a kind of building scaffold connection structure with safety insurance structure according to claim 1, it is characterised in that: The connecting column (8) is connected to the top of fixed plate (7), and connecting column (8) and fixed plate by connecting screw (9) Vertical movements (7) loading plate (6) are embedded between.
6. a kind of building scaffold connection structure with safety insurance structure according to claim 1, it is characterised in that: There are four safety device (5) settings, and safety device (5) is connected to the top of fixed column (2) in rectangular active.
CN201820439799.8U 2018-03-29 2018-03-29 A kind of building scaffold connection structure with safety insurance structure Expired - Fee Related CN208280575U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820439799.8U CN208280575U (en) 2018-03-29 2018-03-29 A kind of building scaffold connection structure with safety insurance structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820439799.8U CN208280575U (en) 2018-03-29 2018-03-29 A kind of building scaffold connection structure with safety insurance structure

Publications (1)

Publication Number Publication Date
CN208280575U true CN208280575U (en) 2018-12-25

Family

ID=64750148

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820439799.8U Expired - Fee Related CN208280575U (en) 2018-03-29 2018-03-29 A kind of building scaffold connection structure with safety insurance structure

Country Status (1)

Country Link
CN (1) CN208280575U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111287092A (en) * 2020-03-10 2020-06-16 中铁北京工程局集团北京有限公司 Intelligent flange plate supporting system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111287092A (en) * 2020-03-10 2020-06-16 中铁北京工程局集团北京有限公司 Intelligent flange plate supporting system

Similar Documents

Publication Publication Date Title
CN208280575U (en) A kind of building scaffold connection structure with safety insurance structure
CN201152024Y (en) Oblique wall ledger beam strutting piece
CN209536959U (en) Paint kettle auxiliary topples over fixed frame
CN207462497U (en) Extinguisher fixing device in a kind of construction site room
CN205935690U (en) Concrete spreader grudging post structure
CN101392628B (en) Side-tilting prevention trestle ladder
CN206753204U (en) A kind of civil engineering guard rail
CN205936453U (en) Balanced pillow of fall way pole with adjustable
CN214006557U (en) Novel concrete pump pipe support
CN210992879U (en) Accomodate badminton rack fast
CN207546284U (en) A kind of construction of hydro project agitating device
CN108571066B (en) A kind of tetrahedron solid frameworks structure
CN208996448U (en) A kind of building template support construction
CN204238585U (en) New builing structure bracing or strutting arrangement
CN206700986U (en) Flue gas cleaner support
CN207405975U (en) A kind of Cantilever Beams fixing device for building
CN207582933U (en) Super High large span outrigger drawknot structure
CN204872055U (en) Storage rack is used in prefabricated component production
CN209082515U (en) A kind of building foundation pit supporting device
CN211899518U (en) Safe scaffold is used in construction of building capital construction
CN210600949U (en) Electronic class tablet machine uses rack
CN207970414U (en) A kind of aerobic training leg pressing holder
CN208516906U (en) Device is removed in the simple promotion of mold
CN208151976U (en) Formwork support arrangement structure suitable for large volume gravity dam
CN207420092U (en) A kind of construction steel structure type column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190419

Address after: 311200 Room 601, Yongtaifeng Square, 297 Shixinbei Road, Xiaoshan Economic and Technological Development Zone, Hangzhou City, Zhejiang Province

Patentee after: DALI CONSTRUCTION GROUP CO., LTD.

Address before: 643000 Wenfengshan District, Daan District, Zigong City, Sichuan Province

Patentee before: Zhou Shuhua

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181225

Termination date: 20210329