CN206753204U - A kind of civil engineering guard rail - Google Patents
A kind of civil engineering guard rail Download PDFInfo
- Publication number
- CN206753204U CN206753204U CN201720470949.7U CN201720470949U CN206753204U CN 206753204 U CN206753204 U CN 206753204U CN 201720470949 U CN201720470949 U CN 201720470949U CN 206753204 U CN206753204 U CN 206753204U
- Authority
- CN
- China
- Prior art keywords
- montants
- guard rail
- cross bar
- civil engineering
- motion bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
It the utility model is related to guard rail technical field, especially a kind of civil engineering guard rail, including two montants being vertically arranged, the bottom of two montants is provided with base, and the top of two montants is connected by horizontally disposed first cross bar, the bottom of two montants is connected by horizontally disposed second cross bar, screwed hole is offered vertically on two bases, and it is inserted with screw rod in each screwed hole, it is vertical and be arranged at intervals with multiple inserted links between two montants, the top offered on first cross bar for multiple inserted links is corresponded to through the perpendicular perforation plugged.The utility model has the advantages of simple in construction, easy to use, and effectively the position of guard rail can be fixed, and can also make the overall state when in use of guard rail more stable, the situation for avoiding guard rail from toppling in use.
Description
Technical field
It the utility model is related to guard rail technical field, more particularly to a kind of civil engineering guard rail.
Background technology
In the work progress of civil engineering construction, the various unlimited edges in construction operation place are required for progress safety anti-
Shield, is isolated and is protected to the place of hot work in progress usually through guard rail in the prior art, to avoid unnecessary loss.Mesh
Guardrail structure is all relatively simple used in preceding, lighter in weight, cause guard rail when in use Chang Yinwei a variety of causes and incline
, the using effect of guard rail has been had a strong impact on, has been not easy to actually use.
Utility model content
The purpose of this utility model is easily toppled in use to solve guard rail present in prior art
The shortcomings that, and a kind of civil engineering guard rail proposed.
To achieve these goals, the utility model employs following technical scheme:
Design a kind of civil engineering guard rail, including two montants being vertically arranged, the bottom of two montants are equal
Base is provided with, and the top of two montants is connected by horizontally disposed first cross bar, the bottom of two montants passes through
Horizontally disposed second cross bar connects, and offers screwed hole on two bases vertically, and plugged in each screwed hole
There is a screw rod, it is vertical between two montants and be arranged at intervals with multiple inserted links, offer on first cross bar and inserted for multiple
The top of bar is corresponding through the perpendicular perforation plugged, and supporting for the bottom corresponding inserted for supplying multiple inserted links is offered on the second cross bar
Groove;
Inside at the top of multiple inserted links offers placed cavity, and the middle part of each inserted link is offered for motion bar
For level through the second horizontal perforation plugged, the middle part of two montants offers runs through plug first for motion bar is horizontal
Horizontal perforation, the bottom of the placed cavity are further opened with placing with being mutually communicated at the top of the first horizontal perforation in two montants
Groove, the side for placing bottom portion of groove offers through hole, and the top of placement groove and the bottom of the first horizontal perforation are mutual
Insertion, the bottom for placing inside grooves are vertically arranged with spring, supports block are provided with the top of the spring, the supports block
Side is connected with slide block, and the side of motion bar offers arc groove along its axial direction.
Preferably, the bottom of each screw rod is provided with spine.
Preferably, the diameter of the motion bar is more than the diameter of placed cavity.
The utility model proposes a kind of civil engineering guard rail, beneficial effect is:The utility model has structure
Simply, the advantages of easy to use, be able to can have by being pierced the screw rod on base both sides in ground and sand being poured into inserted link
Imitate and the position of guard rail is fixed, and can also make the overall state when in use of guard rail more stable, avoid guard rail
Situation about toppling in use.
Brief description of the drawings
Fig. 1 be the utility model proposes a kind of civil engineering guard rail structural representation;
Fig. 2 is the A portions cutaway view Amplified image in Fig. 1;
Fig. 3 be the utility model proposes a kind of civil engineering guard rail inserted link inner side elevational view.
In figure:Montant 1, motion bar 2, screw rod 3, base 4, the first cross bar 5, inserted link 6, placed cavity 7, arc groove 8, second
Cross bar 9, supports block 10, place groove 11, spring 12, the first horizontal perforation 13, perpendicular perforation 14, screwed hole 15, the second horizontal perforation 16, dial
Motion block 17, through hole 18.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.
Reference picture 1-3, a kind of civil engineering guard rail, including two montants 1 being vertically arranged, the bottom of two montants 1
Portion is provided with base 4, and the top of two montants 1 is connected by horizontally disposed first cross bar 5, the bottom of two montants 1
Connected by horizontally disposed second cross bar 9, offer screwed hole 15 on two bases 4 vertically, and in each screwed hole 15
Screw rod 3 is inserted with, the bottom of each screw rod 3 is provided with spine, by the way that earthward interior rotation can be to two montants by screw rod 3
1 position is fixed, and the situation that guard rail is toppled in use can effectively be avoided by so setting, in screw rod 3
Bottom sets tip screw rod 3 of being more convenient for pierce in ground.
It is vertical and be arranged at intervals with multiple inserted links 6 between two montants 1, offered on the first cross bar 5 for multiple inserted links 6
Top is corresponding through the perpendicular perforation 14 plugged, and supporting for the bottom corresponding inserted for supplying multiple inserted links 6 is offered on the second cross bar 9
Groove, in the present embodiment, the quantity of inserted link 6 is preferably five.
The inside at multiple tops of inserted link 6 offers placed cavity 7, and the middle part of each inserted link 6 is offered for motion bar 2
For level through the second horizontal perforation 16 plugged, the middle part of two montants 1 offers runs through plug first for motion bar 2 is horizontal
Horizontal perforation 13, the bottom of placed cavity 7 and the top of the first horizontal perforation 13 are mutually communicated.The diameter of motion bar 2 is more than placed cavity 7
Diameter, so set and can ensure that motion bar 2 does not open up the side of arc groove 8 and can block the bottom of placed cavity 7 completely.
It is further opened with placing groove 11 in two montants 1, the side for placing the bottom of groove 11 offers through hole 18, and places
The top of groove 11 and the bottom of the first horizontal perforation 13 are mutually communicated, and are placed the bottom inside groove 11 and are vertically arranged with spring
12, the top of spring 12 is provided with supports block 10, and the side of supports block 10 is connected with slide block 17, and the side of motion bar 2 is along its axle
To offering arc groove 8.
Operation principle:, can be to two in guard rail in use, by the way that by the screw rod 3 on both sides base 4, earthward inner part drilling moves
The position of side montant 1 is fixed, and can pour into the sand in construction site in placed cavity 7, and it is whole to increase guardrail with this
The weight of body, make guard rail overall more steady when in use, can effectively avoid the situation that guard rail is toppled over;Without the use of when
Rotatable motion bar 2, make arc groove 8 on motion bar 2 against the bottom of placed cavity 7, now motion bar 2 and placed cavity 7
Space is left between bottom, the sand in placed cavity 7 can be flowed out by the space, be easy to guard rail storing arrangement.
It is described above, the only preferable embodiment of the utility model, but the scope of protection of the utility model is not
This is confined to, any one skilled in the art is in the technical scope that the utility model discloses, according to this practicality
New technical scheme and its utility model design are subject to equivalent substitution or change, should all cover in protection model of the present utility model
Within enclosing.
Claims (3)
1. a kind of civil engineering guard rail, including two montants (1) being vertically arranged, the bottom of two montants (1) are equal
Base (4) is provided with, and the top of two montants (1) is connected by horizontally disposed first cross bar (5), two montants
(1) bottom is connected by horizontally disposed second cross bar (9), it is characterised in that is opened up vertically on two bases (4)
There is screwed hole (15), and screw rod (3) is inserted with each screwed hole (15), vertical between two montants (1) and interval
Multiple inserted links (6) are provided with, the top offered on first cross bar (5) for multiple inserted links (6) corresponds to perpendicular through what is plugged
Perforate (14), and the arrival slot of the bottom corresponding inserted for multiple inserted links (6) is offered on the second cross bar (9);
Inside at the top of multiple inserted links (6) offers placed cavity (7), and the middle part of each inserted link (6) offers confession
Motion bar (2) is horizontal through the second horizontal perforation (16) plugged, and the middle part of two montants (1) is offered for motion bar
(2) it is horizontal mutual through the first horizontal perforation (13) plugged, the bottom and the top of the first horizontal perforation (13) of the placed cavity (7)
Insertion, two montants (1) are interior to be further opened with placing groove (11), and the side for placing groove (11) bottom offers logical
Hole (18), and the top of placement groove (11) and the bottom of the first horizontal perforation (13) are mutually communicated, in the placement groove (11)
The bottom in portion is vertically arranged with spring (12), and supports block (10), the side of the supports block (10) are provided with the top of the spring (12)
While slide block (17) is connected with, and the side of motion bar (2) offers arc groove (8) along its axial direction.
A kind of 2. civil engineering guard rail according to claim 1, it is characterised in that the bottom of each screw rod (3)
Portion is provided with spine.
A kind of 3. civil engineering guard rail according to claim 1, it is characterised in that the diameter of the motion bar (2)
More than the diameter of placed cavity (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720470949.7U CN206753204U (en) | 2017-04-28 | 2017-04-28 | A kind of civil engineering guard rail |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720470949.7U CN206753204U (en) | 2017-04-28 | 2017-04-28 | A kind of civil engineering guard rail |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206753204U true CN206753204U (en) | 2017-12-15 |
Family
ID=60616286
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720470949.7U Expired - Fee Related CN206753204U (en) | 2017-04-28 | 2017-04-28 | A kind of civil engineering guard rail |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206753204U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108316723A (en) * | 2018-04-27 | 2018-07-24 | 佛山市甄睿智能科技有限公司 | A kind of protective device of shifting carrying platform parking robot suitable for stereo garage |
CN108824956A (en) * | 2018-06-17 | 2018-11-16 | 安徽绿泉生态农业股份有限公司 | A kind of flower planting protection guardrail |
-
2017
- 2017-04-28 CN CN201720470949.7U patent/CN206753204U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108316723A (en) * | 2018-04-27 | 2018-07-24 | 佛山市甄睿智能科技有限公司 | A kind of protective device of shifting carrying platform parking robot suitable for stereo garage |
CN108824956A (en) * | 2018-06-17 | 2018-11-16 | 安徽绿泉生态农业股份有限公司 | A kind of flower planting protection guardrail |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206753204U (en) | A kind of civil engineering guard rail | |
CN202249152U (en) | Fence | |
CN210852604U (en) | Transportation small handcart for construction | |
CN207173468U (en) | Height-adjustable chain footstep | |
CN207003327U (en) | A kind of highway isolated column being moved easily | |
CN206476033U (en) | The steering structure of scooter | |
CN205759238U (en) | Rotary fire extinguishing mop | |
CN212233826U (en) | Folding bed | |
CN205033781U (en) | Portable teaching board | |
CN107157324A (en) | A kind of cup for heating up water | |
CN202302601U (en) | Detachable umbrella base of sun umbrella | |
CN207941503U (en) | A kind of molten material reaction kettle of rare earth | |
CN206885290U (en) | The leisure booth waterborne of the convenient moving belt camel of energy | |
CN206499856U (en) | A kind of jigsaw puzzle plate | |
CN207484448U (en) | A kind of Phase of Electric Power Projects tamping unit | |
CN206923910U (en) | Put bookshelf in a kind of library | |
CN209201702U (en) | A kind of afforestation tree fixing device | |
CN213965166U (en) | Airfoil part loose joint connection structure of metal assembly type model | |
CN209997130U (en) | adjustable badminton columns | |
CN211355888U (en) | Adjustable support frame for anesthesia department | |
CN204829189U (en) | Simply inhale wall formula router support | |
CN209040762U (en) | A kind of boring boring tower device of railway protective wall water mill brill | |
CN204098792U (en) | Reinforce mast mechanism | |
CN207934421U (en) | A kind of Multifunctional decoration platform | |
CN216305808U (en) | Dormitory is with multiplicable lifting surface's formula cat ladder of accomodating |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171215 Termination date: 20180428 |