CN206753204U - A kind of civil engineering guard rail - Google Patents

A kind of civil engineering guard rail Download PDF

Info

Publication number
CN206753204U
CN206753204U CN201720470949.7U CN201720470949U CN206753204U CN 206753204 U CN206753204 U CN 206753204U CN 201720470949 U CN201720470949 U CN 201720470949U CN 206753204 U CN206753204 U CN 206753204U
Authority
CN
China
Prior art keywords
montants
guard rail
cross bar
civil engineering
motion bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720470949.7U
Other languages
Chinese (zh)
Inventor
魏伟
张慎豪
周国帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720470949.7U priority Critical patent/CN206753204U/en
Application granted granted Critical
Publication of CN206753204U publication Critical patent/CN206753204U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

It the utility model is related to guard rail technical field, especially a kind of civil engineering guard rail, including two montants being vertically arranged, the bottom of two montants is provided with base, and the top of two montants is connected by horizontally disposed first cross bar, the bottom of two montants is connected by horizontally disposed second cross bar, screwed hole is offered vertically on two bases, and it is inserted with screw rod in each screwed hole, it is vertical and be arranged at intervals with multiple inserted links between two montants, the top offered on first cross bar for multiple inserted links is corresponded to through the perpendicular perforation plugged.The utility model has the advantages of simple in construction, easy to use, and effectively the position of guard rail can be fixed, and can also make the overall state when in use of guard rail more stable, the situation for avoiding guard rail from toppling in use.

Description

A kind of civil engineering guard rail
Technical field
It the utility model is related to guard rail technical field, more particularly to a kind of civil engineering guard rail.
Background technology
In the work progress of civil engineering construction, the various unlimited edges in construction operation place are required for progress safety anti- Shield, is isolated and is protected to the place of hot work in progress usually through guard rail in the prior art, to avoid unnecessary loss.Mesh Guardrail structure is all relatively simple used in preceding, lighter in weight, cause guard rail when in use Chang Yinwei a variety of causes and incline , the using effect of guard rail has been had a strong impact on, has been not easy to actually use.
Utility model content
The purpose of this utility model is easily toppled in use to solve guard rail present in prior art The shortcomings that, and a kind of civil engineering guard rail proposed.
To achieve these goals, the utility model employs following technical scheme:
Design a kind of civil engineering guard rail, including two montants being vertically arranged, the bottom of two montants are equal Base is provided with, and the top of two montants is connected by horizontally disposed first cross bar, the bottom of two montants passes through Horizontally disposed second cross bar connects, and offers screwed hole on two bases vertically, and plugged in each screwed hole There is a screw rod, it is vertical between two montants and be arranged at intervals with multiple inserted links, offer on first cross bar and inserted for multiple The top of bar is corresponding through the perpendicular perforation plugged, and supporting for the bottom corresponding inserted for supplying multiple inserted links is offered on the second cross bar Groove;
Inside at the top of multiple inserted links offers placed cavity, and the middle part of each inserted link is offered for motion bar For level through the second horizontal perforation plugged, the middle part of two montants offers runs through plug first for motion bar is horizontal Horizontal perforation, the bottom of the placed cavity are further opened with placing with being mutually communicated at the top of the first horizontal perforation in two montants Groove, the side for placing bottom portion of groove offers through hole, and the top of placement groove and the bottom of the first horizontal perforation are mutual Insertion, the bottom for placing inside grooves are vertically arranged with spring, supports block are provided with the top of the spring, the supports block Side is connected with slide block, and the side of motion bar offers arc groove along its axial direction.
Preferably, the bottom of each screw rod is provided with spine.
Preferably, the diameter of the motion bar is more than the diameter of placed cavity.
The utility model proposes a kind of civil engineering guard rail, beneficial effect is:The utility model has structure Simply, the advantages of easy to use, be able to can have by being pierced the screw rod on base both sides in ground and sand being poured into inserted link Imitate and the position of guard rail is fixed, and can also make the overall state when in use of guard rail more stable, avoid guard rail Situation about toppling in use.
Brief description of the drawings
Fig. 1 be the utility model proposes a kind of civil engineering guard rail structural representation;
Fig. 2 is the A portions cutaway view Amplified image in Fig. 1;
Fig. 3 be the utility model proposes a kind of civil engineering guard rail inserted link inner side elevational view.
In figure:Montant 1, motion bar 2, screw rod 3, base 4, the first cross bar 5, inserted link 6, placed cavity 7, arc groove 8, second Cross bar 9, supports block 10, place groove 11, spring 12, the first horizontal perforation 13, perpendicular perforation 14, screwed hole 15, the second horizontal perforation 16, dial Motion block 17, through hole 18.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.
Reference picture 1-3, a kind of civil engineering guard rail, including two montants 1 being vertically arranged, the bottom of two montants 1 Portion is provided with base 4, and the top of two montants 1 is connected by horizontally disposed first cross bar 5, the bottom of two montants 1 Connected by horizontally disposed second cross bar 9, offer screwed hole 15 on two bases 4 vertically, and in each screwed hole 15 Screw rod 3 is inserted with, the bottom of each screw rod 3 is provided with spine, by the way that earthward interior rotation can be to two montants by screw rod 3 1 position is fixed, and the situation that guard rail is toppled in use can effectively be avoided by so setting, in screw rod 3 Bottom sets tip screw rod 3 of being more convenient for pierce in ground.
It is vertical and be arranged at intervals with multiple inserted links 6 between two montants 1, offered on the first cross bar 5 for multiple inserted links 6 Top is corresponding through the perpendicular perforation 14 plugged, and supporting for the bottom corresponding inserted for supplying multiple inserted links 6 is offered on the second cross bar 9 Groove, in the present embodiment, the quantity of inserted link 6 is preferably five.
The inside at multiple tops of inserted link 6 offers placed cavity 7, and the middle part of each inserted link 6 is offered for motion bar 2 For level through the second horizontal perforation 16 plugged, the middle part of two montants 1 offers runs through plug first for motion bar 2 is horizontal Horizontal perforation 13, the bottom of placed cavity 7 and the top of the first horizontal perforation 13 are mutually communicated.The diameter of motion bar 2 is more than placed cavity 7 Diameter, so set and can ensure that motion bar 2 does not open up the side of arc groove 8 and can block the bottom of placed cavity 7 completely.
It is further opened with placing groove 11 in two montants 1, the side for placing the bottom of groove 11 offers through hole 18, and places The top of groove 11 and the bottom of the first horizontal perforation 13 are mutually communicated, and are placed the bottom inside groove 11 and are vertically arranged with spring 12, the top of spring 12 is provided with supports block 10, and the side of supports block 10 is connected with slide block 17, and the side of motion bar 2 is along its axle To offering arc groove 8.
Operation principle:, can be to two in guard rail in use, by the way that by the screw rod 3 on both sides base 4, earthward inner part drilling moves The position of side montant 1 is fixed, and can pour into the sand in construction site in placed cavity 7, and it is whole to increase guardrail with this The weight of body, make guard rail overall more steady when in use, can effectively avoid the situation that guard rail is toppled over;Without the use of when Rotatable motion bar 2, make arc groove 8 on motion bar 2 against the bottom of placed cavity 7, now motion bar 2 and placed cavity 7 Space is left between bottom, the sand in placed cavity 7 can be flowed out by the space, be easy to guard rail storing arrangement.
It is described above, the only preferable embodiment of the utility model, but the scope of protection of the utility model is not This is confined to, any one skilled in the art is in the technical scope that the utility model discloses, according to this practicality New technical scheme and its utility model design are subject to equivalent substitution or change, should all cover in protection model of the present utility model Within enclosing.

Claims (3)

1. a kind of civil engineering guard rail, including two montants (1) being vertically arranged, the bottom of two montants (1) are equal Base (4) is provided with, and the top of two montants (1) is connected by horizontally disposed first cross bar (5), two montants (1) bottom is connected by horizontally disposed second cross bar (9), it is characterised in that is opened up vertically on two bases (4) There is screwed hole (15), and screw rod (3) is inserted with each screwed hole (15), vertical between two montants (1) and interval Multiple inserted links (6) are provided with, the top offered on first cross bar (5) for multiple inserted links (6) corresponds to perpendicular through what is plugged Perforate (14), and the arrival slot of the bottom corresponding inserted for multiple inserted links (6) is offered on the second cross bar (9);
Inside at the top of multiple inserted links (6) offers placed cavity (7), and the middle part of each inserted link (6) offers confession Motion bar (2) is horizontal through the second horizontal perforation (16) plugged, and the middle part of two montants (1) is offered for motion bar (2) it is horizontal mutual through the first horizontal perforation (13) plugged, the bottom and the top of the first horizontal perforation (13) of the placed cavity (7) Insertion, two montants (1) are interior to be further opened with placing groove (11), and the side for placing groove (11) bottom offers logical Hole (18), and the top of placement groove (11) and the bottom of the first horizontal perforation (13) are mutually communicated, in the placement groove (11) The bottom in portion is vertically arranged with spring (12), and supports block (10), the side of the supports block (10) are provided with the top of the spring (12) While slide block (17) is connected with, and the side of motion bar (2) offers arc groove (8) along its axial direction.
A kind of 2. civil engineering guard rail according to claim 1, it is characterised in that the bottom of each screw rod (3) Portion is provided with spine.
A kind of 3. civil engineering guard rail according to claim 1, it is characterised in that the diameter of the motion bar (2) More than the diameter of placed cavity (7).
CN201720470949.7U 2017-04-28 2017-04-28 A kind of civil engineering guard rail Expired - Fee Related CN206753204U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720470949.7U CN206753204U (en) 2017-04-28 2017-04-28 A kind of civil engineering guard rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720470949.7U CN206753204U (en) 2017-04-28 2017-04-28 A kind of civil engineering guard rail

Publications (1)

Publication Number Publication Date
CN206753204U true CN206753204U (en) 2017-12-15

Family

ID=60616286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720470949.7U Expired - Fee Related CN206753204U (en) 2017-04-28 2017-04-28 A kind of civil engineering guard rail

Country Status (1)

Country Link
CN (1) CN206753204U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108316723A (en) * 2018-04-27 2018-07-24 佛山市甄睿智能科技有限公司 A kind of protective device of shifting carrying platform parking robot suitable for stereo garage
CN108824956A (en) * 2018-06-17 2018-11-16 安徽绿泉生态农业股份有限公司 A kind of flower planting protection guardrail

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108316723A (en) * 2018-04-27 2018-07-24 佛山市甄睿智能科技有限公司 A kind of protective device of shifting carrying platform parking robot suitable for stereo garage
CN108824956A (en) * 2018-06-17 2018-11-16 安徽绿泉生态农业股份有限公司 A kind of flower planting protection guardrail

Similar Documents

Publication Publication Date Title
CN206753204U (en) A kind of civil engineering guard rail
CN202249152U (en) Fence
CN210852604U (en) Transportation small handcart for construction
CN207173468U (en) Height-adjustable chain footstep
CN207003327U (en) A kind of highway isolated column being moved easily
CN206476033U (en) The steering structure of scooter
CN205759238U (en) Rotary fire extinguishing mop
CN212233826U (en) Folding bed
CN205033781U (en) Portable teaching board
CN107157324A (en) A kind of cup for heating up water
CN202302601U (en) Detachable umbrella base of sun umbrella
CN207941503U (en) A kind of molten material reaction kettle of rare earth
CN206885290U (en) The leisure booth waterborne of the convenient moving belt camel of energy
CN206499856U (en) A kind of jigsaw puzzle plate
CN207484448U (en) A kind of Phase of Electric Power Projects tamping unit
CN206923910U (en) Put bookshelf in a kind of library
CN209201702U (en) A kind of afforestation tree fixing device
CN213965166U (en) Airfoil part loose joint connection structure of metal assembly type model
CN209997130U (en) adjustable badminton columns
CN211355888U (en) Adjustable support frame for anesthesia department
CN204829189U (en) Simply inhale wall formula router support
CN209040762U (en) A kind of boring boring tower device of railway protective wall water mill brill
CN204098792U (en) Reinforce mast mechanism
CN207934421U (en) A kind of Multifunctional decoration platform
CN216305808U (en) Dormitory is with multiplicable lifting surface's formula cat ladder of accomodating

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171215

Termination date: 20180428