CN208280037U - Division control type box culvert synchronizes jacking system - Google Patents

Division control type box culvert synchronizes jacking system Download PDF

Info

Publication number
CN208280037U
CN208280037U CN201721354775.4U CN201721354775U CN208280037U CN 208280037 U CN208280037 U CN 208280037U CN 201721354775 U CN201721354775 U CN 201721354775U CN 208280037 U CN208280037 U CN 208280037U
Authority
CN
China
Prior art keywords
jacking
box culvert
control unit
type box
hydraulic pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721354775.4U
Other languages
Chinese (zh)
Inventor
王国仲
路亮
蔡忠泽
刘宴会
董会川
张社学
汪学军
梁宏星
张海莉
席永兴
李建华
徐子星
邵士毫
魏海丽
张华�
李勇强
路其星
吴雷
王文东
赵子刚
田家
卢黎明
李文华
何斌
谷明
杜旭光
郭少华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEBEI GAODA TECHNOLOGIES Co Ltd
China Railway Sixth Group Co Ltd
Shijiazhuang Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Original Assignee
HEBEI GAODA TECHNOLOGIES Co Ltd
China Railway Sixth Group Co Ltd
Shijiazhuang Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI GAODA TECHNOLOGIES Co Ltd, China Railway Sixth Group Co Ltd, Shijiazhuang Railway Construction Co Ltd of China Railway Sixth Group Co Ltd filed Critical HEBEI GAODA TECHNOLOGIES Co Ltd
Priority to CN201721354775.4U priority Critical patent/CN208280037U/en
Application granted granted Critical
Publication of CN208280037U publication Critical patent/CN208280037U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model is suitable for technical field of road construction, more particularly to a kind of synchronous jacking system of division control type box culvert.It include: jacking branch, hydraulic pump and the measurement module of multiple parallel connections, each jacking branch includes the solenoid valve being sequentially connected in series and top pick;Top pick in each jacking branch connect with one end of the hydraulic pump, and the solenoid valve in each jacking branch is connect with the other end of the hydraulic pump;The measurement module includes the separate-blas estimation unit of the control unit for controlling solenoid valve opening and closing and the jacking deviation for detecting box culvert, and the solenoid valve in each jacking branch is all connected with described control unit, and the separate-blas estimation unit connects described control unit.After adopting the above scheme, measurement accuracy can be improved, quickening holds out against speed.

Description

Division control type box culvert synchronizes jacking system
Technical field
The utility model relates to technical field of road construction, more particularly to a kind of synchronous jacking system of division control type box culvert.
Background technique
Box culvert be it is a kind of with armored concrete make box culvert, box culvert construct generally use it is cast-in-place, what is excavated Bottom is set in groove, pours a layer concrete bed course, then the reinforcing bar scene processed is bound, branch internal model and external mold pour Side wall top half and top plate.The box culvert made passes through under the pick jacking to the roadbed of railway or road of top.
In the prior art, the jacking system of box culvert is mainly by one or two pumps station, more jack and more piece parallels It forms, after box culvert advancing a distance, manual measurement jacking deviation, by way of closing part top pick by hand, reduction side Thrust, correct jacking deviation, that there are measurement accuracy is poor, move speed is slow, delays construction speed.
Utility model content
In view of this, the utility model embodiment provides a kind of division control type box culvert synchronization jacking system, it is existing to solve Manual measurement low precision in technology holds out against slow-footed problem.
In order to solve the above technical problems, technical solution adopted in the utility model is: a kind of division control type box culvert is synchronous to be pushed up Into system, comprising: jacking branch, hydraulic pump and the measurement module of multiple parallel connections, each jacking branch includes being sequentially connected in series Solenoid valve and top pick;
Top pick in each jacking branch connect with one end of the hydraulic pump, the solenoid valve in each jacking branch with The other end of the hydraulic pump connects;
The measurement module includes the control unit for controlling solenoid valve opening and closing and the jacking deviation for detecting box culvert Separate-blas estimation unit, the solenoid valve in each jacking branch is all connected with described control unit, the separate-blas estimation unit connection Described control unit.
As further technical solution, the separate-blas estimation unit includes first laser range finder, second laser ranging Device and subtraction circuit, the first laser range finder and second laser range finder are inputted with the operation of the subtraction circuit respectively End connection, the operation output end of the subtraction circuit are connect with described control unit signal.
It further include for measuring hydraulic pump output terminal hydraulic pressure sensor and report as further technical solution Alarm device, the pressure sensor are located at the hydraulic output end side of the hydraulic pump, the pressure sensor and the control Cell signal connection, described control unit are connect with the warning device.
As further technical solution, the warning device includes buzzer siren, visual alarm, voice broadcast Any one or more in alarm and short message prompting alarm.
As further technical solution, described control unit is PLC controller.
It further include flowline, oil return pipe and oil distributing pipe, the jacking branch of several parallel connections as further technical solution It is arranged between the oil distributing pipe, the output end side of the hydraulic pump connects the oil distributing pipe by the flowline, described The input terminal side of hydraulic pump connects the oil distributing pipe by the oil return pipe.
As further technical solution, the oil distributing pipe has two.
The utility model embodiment provides a kind of division control type box culvert synchronization jacking system, automatic by separate-blas estimation unit The jacking deviation for detecting box culvert automatically adjusts jacking degree further according to the jacking deviation detected, can correct jacking deviation automatically, It improves measurement accuracy, improve move speed and quality simultaneously, ensure being normally carried out for construction.
Detailed description of the invention
It, below will be to embodiment or existing skill in order to illustrate more clearly of the technical scheme in the embodiment of the utility model Attached drawing needed in art description is briefly described, it should be apparent that, the accompanying drawings in the following description is only that this is practical Novel some embodiments, for those of ordinary skill in the art, without any creative labor, also Other drawings may be obtained according to these drawings without any creative labor.
Fig. 1 is the structural schematic diagram of the synchronous jacking system of division control type box culvert provided by the embodiment of the utility model;
Fig. 2 is the control principle schematic diagram of the synchronous jacking system of division control type box culvert provided by the embodiment of the utility model.
Specific embodiment
In being described below, for illustration and not for limitation, such as particular system structure, technology etc are proposed Detail, to understand thoroughly the utility model embodiment.However, it will be clear to one skilled in the art that there is no this The utility model also may be implemented in the other embodiments of a little details.In other situations, it omits to well-known system The detailed description of system, apparatus, circuit and method, in case unnecessary details interferes the description of the utility model.
In order to illustrate technical solution described in the utility model, the following is a description of specific embodiments.
It is a kind of synchronous jacking system of division control type box culvert provided by the embodiment of the utility model, packet shown in Fig. 1 and Fig. 2 Include: jacking branch 8, hydraulic pump 3 and the measurement module of multiple parallel connections, each jacking branch 8 include the solenoid valve being sequentially connected in series 2 and top pick 1;
Top pick 1 in each jacking branch 8 connect with one end of the hydraulic pump 3, the electromagnetism in each jacking branch 8 Valve 2 is connect with the other end of the hydraulic pump 3;
Measurement module includes the control unit 91 for controlling the opening and closing of solenoid valve 2 and the jacking deviation for detecting box culvert Separate-blas estimation unit 92, the solenoid valve 2 in each jacking branch 8 is all connected with described control unit 91, the separate-blas estimation list Member 92 connects described control unit 91.
Specifically, separate-blas estimation unit 92 is for detecting jacking deviation of the box culvert in jack-in process, when two sides, jacking is inclined When difference is excessive, jacking deviation will be sent, excessive information to control unit 91 will after control unit 91 receives the information The jacking deviation carried according to the information sends the opening and closing that control instruction controls solenoid valve 2 to corresponding solenoid valve 2, adjusts Thrust force, and then adjust jacking deviation can correct jacking deviation until until jacking is synchronous automatically, raising measurement accuracy, Move speed and quality are improved simultaneously, ensures being normally carried out for construction.
The separate-blas estimation unit 92 includes first laser range finder, second laser range finder and subtraction circuit, and described the One airborne laser range finder and second laser range finder are connect with the operation input terminal of the subtraction circuit respectively, the subtraction circuit Operation output end connect with 91 signal of described control unit, first laser range finder and second laser range finder are located at The two sides of box culvert tail portion vertical plane measure the jacking distance of two sides respectively.
In addition, in a specific example, as shown in Fig. 2, further including for measuring the hydraulic pressure of hydraulic pump output terminal Sensor 4 and warning device 10, the pressure sensor 4 are located at the hydraulic output end side of the hydraulic pump 3, the pressure Sensor 4 is connect with 91 signal of described control unit, and described control unit 91 is connect with the warning device 10, pressure sensing Device 4 is used to measure the output pressure of hydraulic pump, when output pressure is excessive, just sends reminder message to control unit 91, control When unit 91 receives the reminder message, it is excessive to 10 warning reminding staff's output pressure of warning device to send alarm command.
Warning device 10 includes in buzzer siren, visual alarm, voice broadcast alarm and short message prompting alarm Any one or more, various ways are combined together, and safeguard work personnel can receive warning message.
As shown in Fig. 2, control unit 91 be PLC controller, aim at industrial environment apply and design.It uses one Class programmable memory is used for its internally stored program, executes logical operation, sequential control, and timing is counted and grasped with arithmetic The user oriented instructions such as work, and various types of mechanical or production processes are controlled by number or analog pattern input/output.
Preferably, as shown in Figure 1, the quantity of jacking branch 8 is 8, control is simple, and the precision of jacking deviation measurement Accurately, construction quality can be improved.
It further include flowline 5, oil return pipe 6 and oil distributing pipe 7, the jacking branch 8 of several parallel connections is arranged in the oil distributing pipe 7 Between, the output end side of the hydraulic pump 3 connects the oil distributing pipe 7, the input of the hydraulic pump 3 by the flowline 5 End side connects the oil distributing pipe 7 by the oil return pipe 6, it is preferred that oil distributing pipe 7 has two, and oil distributing pipe 7 is used for each Top pick 1 in jacking branch 8 divides oil.
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each function Can unit, module division progress for example, in practical application, can according to need and by above-mentioned function distribution by difference Functional unit, module complete, i.e., the internal structure of described device is divided into different functional unit or module, with complete All or part of function described above.Each functional unit in embodiment, module can integrate in a processing unit In, it is also possible to each unit and physically exists alone, can also be integrated in one unit with two or more units, on It states integrated unit both and can take the form of hardware realization, can also realize in the form of software functional units.In addition, Each functional unit, module specific name be also only for convenience of distinguishing each other, the protection model being not intended to limit this application It encloses.The specific work process of unit in above system, module, can refer to corresponding processes in the foregoing method embodiment, This is repeated no more.
Those of ordinary skill in the art may be aware that described in conjunction with the examples disclosed in the embodiments of the present disclosure Unit and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions It is implemented in hardware or software actually, the specific application and design constraint depending on technical solution.Professional technique Personnel can use different methods to achieve the described function each specific application, but this realization should not be recognized For beyond the scope of the utility model.
In embodiment provided by the utility model, it should be understood that disclosed device and method can pass through Other modes are realized.For example, system embodiment described above is only schematical, for example, the module or unit Division, only a kind of logical function partition, there may be another division manner in actual implementation, for example, multiple units or Component can be combined or can be integrated into another system, or some features can be ignored or not executed.Another point is shown The mutual coupling or direct-coupling or communication connection shown or discussed can be through some interfaces, device or unit INDIRECT COUPLING or communication connection can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, as unit The component of display may or may not be physical unit, it can and it is in one place, or may be distributed over more In a network unit.Some or all of unit therein can be selected to realize this embodiment scheme according to the actual needs Purpose.
In addition, each functional unit in each embodiment of the utility model can integrate in one processing unit, It can be each unit to physically exist alone, can also be integrated in one unit with two or more units.It is above-mentioned integrated Unit both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product When, it can store in a computer readable storage medium.Based on this understanding, the skill of the utility model embodiment Substantially all or part of the part that contributes to existing technology or the technical solution can be with soft in other words for art scheme The form of part product embodies, which is stored in a storage medium, including some instructions are to make Obtain a computer equipment (can be personal computer, server or the network equipment etc.) or processor (processor) Execute all or part of the steps of each embodiment the method for the utility model embodiment.And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), the various media that can store program code such as magnetic or disk.
Embodiment described above is only to illustrate the technical solution of the utility model, rather than its limitations;Although referring to before Embodiment is stated the utility model is described in detail, those skilled in the art should understand that: it still can be with It modifies the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features;And These are modified or replaceed, the essence for various embodiments of the utility model technical solution that it does not separate the essence of the corresponding technical solution Mind and range, should be included within the scope of protection of this utility model.

Claims (7)

1. a kind of synchronous jacking system of division control type box culvert characterized by comprising the jacking branches of multiple parallel connections, hydraulic pump and Measurement module, each jacking branch include the solenoid valve being sequentially connected in series and top pick;
Top pick in each jacking branch connect with one end of the hydraulic pump, the solenoid valve in each jacking branch and the liquid The other end of press pump connects;
The measurement module includes the inclined of the control unit for controlling solenoid valve opening and closing and jacking deviation for detecting box culvert Poor detection unit, the solenoid valve in each jacking branch are all connected with described control unit, described in the separate-blas estimation unit connection Control unit.
2. the synchronous jacking system of division control type box culvert according to claim 1, which is characterized in that the separate-blas estimation unit packet Include first laser range finder, second laser range finder and subtraction circuit, the first laser range finder and second laser range finder It is connect respectively with the operation input terminal of the subtraction circuit, the operation output end and described control unit signal of the subtraction circuit Connection.
3. the synchronous jacking system of division control type box culvert according to claim 1, which is characterized in that further include hydraulic for measuring Pump output terminal hydraulic pressure sensor and warning device, the pressure sensor are located at the hydraulic output end one of the hydraulic pump Side, the pressure sensor are connect with described control unit signal, and described control unit is connect with the warning device.
4. the synchronous jacking system of division control type box culvert according to claim 3, which is characterized in that the warning device includes bee It rings alarm, visual alarm, any one or more in voice broadcast alarm and short message prompting alarm.
5. the synchronous jacking system of division control type box culvert according to claim 1, which is characterized in that described control unit PLC Controller.
6. the synchronous jacking system of division control type box culvert according to claim 1, which is characterized in that further include flowline, oil return The jacking branch of pipe and oil distributing pipe, several parallel connections is arranged between the oil distributing pipe, and the output end side of the hydraulic pump passes through The flowline connects the oil distributing pipe, and the input terminal side of the hydraulic pump connects the oil distributing pipe by the oil return pipe.
7. the synchronous jacking system of division control type box culvert according to claim 6, which is characterized in that the oil distributing pipe has two.
CN201721354775.4U 2017-10-19 2017-10-19 Division control type box culvert synchronizes jacking system Active CN208280037U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721354775.4U CN208280037U (en) 2017-10-19 2017-10-19 Division control type box culvert synchronizes jacking system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721354775.4U CN208280037U (en) 2017-10-19 2017-10-19 Division control type box culvert synchronizes jacking system

Publications (1)

Publication Number Publication Date
CN208280037U true CN208280037U (en) 2018-12-25

Family

ID=64747272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721354775.4U Active CN208280037U (en) 2017-10-19 2017-10-19 Division control type box culvert synchronizes jacking system

Country Status (1)

Country Link
CN (1) CN208280037U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107574765A (en) * 2017-10-19 2018-01-12 中铁六局集团石家庄铁路建设有限公司 Division control type box culvert synchronization jacking system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107574765A (en) * 2017-10-19 2018-01-12 中铁六局集团石家庄铁路建设有限公司 Division control type box culvert synchronization jacking system

Similar Documents

Publication Publication Date Title
BR112012006055A2 (en) methods for use in predicting sand production from a geomechanical reservoir system, for producing sand from a geomechanical reservoir system, and for operating a geomechanical reservoir system to control sand production from the geomechanical reservoir system
CN106991214A (en) The informatization management method of high speed railway prefabricating Liang Chang based on BIM
WO2007146069A3 (en) A sketch-based design system, apparatus, and method for the construction and modification of three-dimensional geometry
HK1142707A1 (en) System and method for facilitating responsible behaviour
WO2014116299A3 (en) Systems and methods for mirroring virtual functions in a chassis configured to receive a plurality of modular information handling systems and a plurality of modular information handling resources
MX2017014748A (en) Method and system for determining a status of one or more tanks in a particular location.
WO2012082928A3 (en) System and method for simulating fluid flow in a fractured reservoir
WO2009137398A3 (en) System, program product and methods for performing automated real-time oil reservoir pressure estimation
PH12018500013A1 (en) Method for monitoring a medical device
WO2007130997A3 (en) Method and device for filtering, segmenting, compressing and classifying oscillatory signals
WO2014145531A3 (en) Ambulatory sensing system and associated methods
WO2012148890A3 (en) Methods of employing and using a hybrid transponder system for long-range sensing and 3d localization
CN208280037U (en) Division control type box culvert synchronizes jacking system
EP3832664A4 (en) Disease evaluation index calculation method, device, system, and program, and model creation method for calculating disease evaluation index
CN206858089U (en) A kind of hydraulic lifting dynamical system of the road administration construction based on PLC
CN104141510A (en) Karst tunnel water burst sensing early warning system and karst tunnel water burst sensing early warning method based on Internet of Things
US20220403724A1 (en) Systems and methods for controlling fracturing operations using monitor well pressure
WO2014064536A3 (en) System, method and apparatus that enables a new economic architecture for the exchange of value
WO2016022188A3 (en) Video-assisted landing guidance system and method
ATE368886T1 (en) MANAGING A RELATIONSHIP BETWEEN A TARGET VOLUME AND A SOURCE VOLUME
CN204301728U (en) A kind of monitoring device of subgrade settlement
CN107025516A (en) The KXG of high speed railway prefabricating Liang Chang based on BIM
CN110096602A (en) Information displaying method, the apparatus and system of highway engineering based on BIM component
CN107764509B (en) Gas-water interface control simulation experiment system in cavity-making process of salt cavern gas storage
WO2019099539A3 (en) Method and system for electronic vaping operations

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant