CN208276866U - A kind of insulation bucket tool container - Google Patents
A kind of insulation bucket tool container Download PDFInfo
- Publication number
- CN208276866U CN208276866U CN201820049999.2U CN201820049999U CN208276866U CN 208276866 U CN208276866 U CN 208276866U CN 201820049999 U CN201820049999 U CN 201820049999U CN 208276866 U CN208276866 U CN 208276866U
- Authority
- CN
- China
- Prior art keywords
- module
- panel
- fixed
- tool
- electric wrench
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009413 insulation Methods 0.000 title claims abstract description 29
- 238000012795 verification Methods 0.000 claims description 7
- 238000010276 construction Methods 0.000 abstract description 27
- 230000004308 accommodation Effects 0.000 abstract description 4
- 230000001934 delay Effects 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 5
- 230000005611 electricity Effects 0.000 description 3
- 239000007787 solid Substances 0.000 description 2
- 241000282693 Cercopithecidae Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 230000035807 sensation Effects 0.000 description 1
Landscapes
- Electric Cable Installation (AREA)
Abstract
The utility model belongs to electric construction tool field, in particular relates to a kind of insulation bucket tool container, which includes the panel being fixed on insulation bucket headwall, and the panel is equipped with tool and sets up component;The panel be it is rectangular-shaped, be arranged along the direction for being parallel to insulation bucket headwall, the one side far from insulation bucket headwall is the front of panel, and the one side close to insulation bucket headwall is the back side of panel, and the tool sets up component and is arranged on the front of panel.The tool container of the utility model provides the accommodation space for concentrating and setting up, conveniently taking for various power tools, operating personnel is avoided because finding or selecting the factor of construction delays and insecurity caused by tool, construction efficiency is improved, ensure that construction safety.
Description
Technical field
The utility model belongs to electric construction tool field, in particular relates to a kind of insulation bucket tool container.
Background technique
Due to the needs of power construction, hot-line repair rectification is common work, when power construction, power construction operation people
Livewire work protection tool and insulating glove itself are dressed in the insulation bucket of aerial lift device with insulated arm in member station, and insulate in bucket
Narrow space, but complete a common job of starting to exchange fire and just need replacing multiple types of tools, therefore operating personnel is often because seek
It looks for or selects tool and be delayed construction, construction efficiency is caused to be had a greatly reduced quality;In addition find tool when body move and attention
Dispersion also bring uncertain factor to the safety of construction operation.
Therefore, the tool containing device sought a kind of compatible multiple types of tools, construction worker is facilitated to take is at present urgently
Technical problem to be solved.
Utility model content
According to problems of the prior art, it is each that the utility model, which provides a kind of insulation bucket tool container,
Kind power tool provides the accommodation space for concentrating and setting up, conveniently taking, and improves construction efficiency, ensure that construction safety.
The utility model uses following technical scheme:
A kind of insulation bucket tool container, includes the panel being fixed on insulation bucket headwall, and the panel is equipped with work
Tool sets up component.
Preferably, the panel is rectangular-shaped, is arranged along the direction for being parallel to insulation bucket headwall, far from insulation bucket bucket
The one side of wall is the front of panel, and the one side close to insulation bucket headwall is the back side of panel, and the tool sets up component setting and exists
On the front of panel.
It is further preferred that it includes that parallel groove clamp placement module, screw knife module, spanner are fixed that the tool, which sets up component,
Module, bolt module, pliers fixed module, electric wrench fixed module, big Hooking module, small Hooking module, nut module, set
Cylinder module I, sleeve module II, empty slot module, intercom module, knife saw socket module, electrical verification pen module;The parallel groove clamp is put
Set module, screw knife module, spanner fixed module, bolt module, pliers fixed module, electric wrench fixed module, big hook
Module, small Hooking module, nut module, sleeve module I, sleeve module II, empty slot module, intercom module, knife saw slot mould
It is fixed on the front of panel some or all of in block, electrical verification pen module.
Still more preferably, the screw knife module, spanner fixed module, bolt module, pliers fixed module, big extension
Hook modules, small Hooking module, nut module, sleeve module I, the size of empty slot module are identical and both sides are equipped with card, face
The front of plate is equipped with multiple groups card slot corresponding with the position of card, and the card can be connected in card slot;The screw cutting die
Block, spanner fixed module, bolt module, pliers fixed module, big Hooking module, small Hooking module, nut module, sleeve module
I, empty slot module can be detachably mounted on the front of panel by the cooperation of card and card slot.
Still more preferably, the electric wrench fixed module includes electric wrench fixation hole, electric wrench fixing groove,
Electric wrench fixing groove is located at the top of a positive side for panel, and electric wrench fixed hole position is oblique in electric wrench fixing groove
Lower section.
It is further preferred that the upper rear portion of the panel is set, there are two S-shaped panels to link up with, what two panels were linked up with
Connecting line is parallel to the top margin of panel;The side that two panels link up with the back side far from panel is fixed with same root connection
Bar, the both ends of the connecting rod are separately fixed on two panel hooks.
The utility model has the beneficial effects that:
1) panel of the tool container of the utility model is arranged along the direction for being parallel to insulation bucket headwall, and tool rack
If component is arranged on the front of panel;Panel and tool set up the above-mentioned setting of component, are not interfering normal construction operation
Meanwhile provided for various power tools concentrate set up, the convenient accommodation space taken, avoid operating personnel because find or
The factor of construction delays and insecurity caused by tool is selected, construction efficiency is improved, ensure that construction safety.
2) in the tool container of the utility model, the size of each module of tool erection component is identical and two sides are equipped with
The front of card, panel is equipped with multiple groups card slot corresponding with the position of card, and the card can be connected in card slot;Card and
The setting of card slot, according to the needs of construction operation, can only select needs so that each module is detachably mounted on panel
Module is fixed on the front of panel, while guaranteeing construction operation mobility, because tool is excessive when avoiding construction operation
It is caused to select difficulty.
3) electric wrench fixation hole, electricity in the tool container of the utility model, in the electric wrench fixed module
Wrench fixing groove and knife saw socket module are fixed on panel;It is common when due to electric wrench and knife saw being construction operation
Tool, on the one hand the fixation of electric wrench fixed module and knife saw socket module avoids when construction operation prepares and electronic pulls
On the other hand the omission of hand and knife saw reduces uncertainty when construction operation.
4) in the tool container of the utility model, the upper rear portion of the panel set there are two S-shaped panel link up with, two
The connecting line of the panel hook is parallel to the top margin of panel;The side that two panels link up with the back side far from panel is fixed
There is same root connecting rod, the both ends of the connecting rod are separately fixed on two panel hooks;The setting of connecting rod, a side
It is played in face of panel hook and reinforces stable effect, another aspect connecting rod can be used for placing the insulated target of livewire work.
Detailed description of the invention
Fig. 1 is the structural perspective of the utility model tool container.
Appended drawing reference: 1- panel, 2- tool set up component, 11- card slot, 12- panel hook, 13- connecting rod, 21- and ditch
Wire clamp placement module, 22- screw knife module, 23- spanner fixed module, 24- bolt module, 25- pliers fixed module, 26- electricity
Wrench fixed module, the big Hooking module of 27-, the small Hooking module of 28-, 29- nut module, 30- sleeve module I, 31- sleeve die
Block II, 32- empty slot module, 33- intercom module, 34- knife saw socket module, 35- electrical verification pen module, 36- card, 261- are electronic
Spanner fixation hole, 262- electric wrench fixing groove.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
The tool container as shown in Figure 1, a kind of insulation struggles against includes the panel 1 being fixed on insulation bucket headwall, the face
Plate 1 is equipped with tool and sets up component 2;The panel 1 be it is rectangular-shaped, along be parallel to insulation bucket headwall direction be arranged, far
One side from insulation bucket headwall is the front of panel 1, and the one side close to insulation bucket headwall is the back side of panel 1, the tool rack
If component 2 is arranged on the front of panel 1.
The tool sets up component 2:
Parallel groove clamp placement module 21, if can be used for placing three according to operation needs there are three the closed hole slot in bottom
All kinds of parallel groove clamps;
Screw knife module 22, if there are four bottom not blind bore, wherein intermediate two round holes are for placing inhomogeneity
The screwdriver of type, the biggish slot in the left and right sides and round hole place monkey wrench respectively;
Spanner fixed module 23, if being pulled there are three different size of rectangle through hole for placing the spanner of different size
Hand is from top to bottom inserted into, greatly head-up;
Bolt module 24, if matching in operation process with nut module 29 there are five bottom blind bore for placing screw rod
It closes and uses;
Pliers fixed module 25, if there are four bottom not blind bore, it is manual for placing all kinds of vices, nipper plier etc.
Tool;
Electric wrench fixed module 26, including electric wrench fixation hole 261, electric wrench fixing groove 262, electric wrench is solid
Determining hole 261 is circular dead ring, for fixing the pipette tips front end of electric wrench;Electric wrench fixing groove 262 is equipped with by centre
Two pieces of insulating panels of crack are formed, for fixing the handle of electric wrench;
Big Hooking module 27 is equipped with a closing hook and an opening hook, close link up with can be used for hanging lanyard rope,
The objects such as pulley, opening hook is for placing the objects such as four-head peeler;
Small Hooking module 28, if there are four monocycle opening hooks, for hanging all kinds of auxiliary items, such as gloves, insulating cement
Volume etc.;
Nut module 29 is equipped with six roots of sensation insulating bar, is used for placing nut, makes in operation process with the cooperation of bolt module 24
With;
Sleeve module I 30, if there are three the closed round hole in bottom, the electricity for placing three kinds of different sizes and being of little use
The sleeve of wrench, convenient working is replaced in the process, while making up the deficiency of II 31 middle sleeve of sleeve module;
Sleeve module II 31, if there are four insulated columns, for placing the sleeve of common four kinds of specifications;
Empty slot module 32 is similar to the groove of drawer equipped with one, for placing the small object used in all kinds of operation process
Part;
Intercom module 33 is equipped with groove body, for placing intercom;
Knife saw socket module 34, equipped with hollow long groove body, for placing electrician's chopper and saw;
Electrical verification pen module 35 is equipped with the not closed rectangular opening in a bottom and a closed round hole in bottom, uses respectively
In the long spanner of placement and the telescopic electroscope of 10kV.
The parallel groove clamp placement module 21, screw knife module 22, spanner fixed module 23, bolt module 24, pliers are solid
Cover half block 25, electric wrench fixed module 26, big Hooking module 27, small Hooking module 28, nut module 29, sleeve module I 30,
Sleeve module II 31, empty slot module 32, intercom module 33, knife saw socket module 34, the part in electrical verification pen module 35 or complete
Portion is fixed on the front of panel 1.
The screw knife module 22, spanner fixed module 23, bolt module 24, pliers fixed module 25, big Hooking module
27, small Hooking module 28, nut module 29, sleeve module I 30, the size of empty slot module 32 is identical and both sides are equipped with card
36, the front of panel 1 is equipped with multiple groups card slot 11 corresponding with the position of card 36, and the card 36 can be connected to card slot 11
It is interior;It is the screw knife module 22, spanner fixed module 23, bolt module 24, pliers fixed module 25, big Hooking module 27, small
Hooking module 28, nut module 29, sleeve module I 30, empty slot module 32 can be removable by card 36 and the cooperation of card slot 11
That unloads is fixed on the front of panel 1.
The electric wrench fixed module 26 includes electric wrench fixation hole 261, electric wrench fixing groove 262, electronic to pull
Hand fixing groove 262 is located at the top of a positive side for panel 1, and electric wrench fixation hole 261 is located at electric wrench fixing groove 262
Obliquely downward.
The upper rear portion of the panel 1 is set there are two S-shaped panel hook 12, and the connecting line of two panel hooks 12 is flat
Row is in the top margin of panel 1;The side that two panels link up with 12 back sides far from panel 1 is fixed with same root support rod 13,
The both ends of the support rod 13 are separately fixed on two panel hooks 12.
In conclusion the utility model provides a kind of insulation bucket tool container, provided for various power tools
The accommodation space for setting up, conveniently taking is concentrated, avoids operating personnel because finding or selecting construction delays caused by tool
And the factor of insecurity, construction efficiency is improved, ensure that construction safety.
Claims (3)
- The tool container 1. a kind of insulation struggles against, it is characterised in that: it include the panel (1) being fixed on insulation bucket headwall, it is described Panel (1) is equipped with tool and sets up component (2);The panel (1) be it is rectangular-shaped, along be parallel to insulation bucket headwall direction be arranged, far from insulation bucket headwall one side For the front of panel (1), the one side close to insulation bucket headwall is the back side of panel (1), and the tool sets up component (2) setting and exists On the front of panel (1);It includes parallel groove clamp placement module (21), screw knife module (22), spanner fixed module that the tool, which sets up component (2), (23), bolt module (24), pliers fixed module (25), electric wrench fixed module (26), big Hooking module (27), small hook Module (28), nut module (29), sleeve module I (30), sleeve module II (31), empty slot module (32), intercom module (33), knife saw socket module (34), electrical verification pen module (35);The parallel groove clamp placement module (21), screw knife module (22), Spanner fixed module (23), pliers fixed module (25), electric wrench fixed module (26), links up with greatly mould at bolt module (24) Block (27), small Hooking module (28), nut module (29), sleeve module I (30), sleeve module II (31), empty slot module (32), Intercom module (33), knife saw socket module (34) are being fixed on panel (1) just some or all of in electrical verification pen module (35) On face;The screw knife module (22), spanner fixed module (23), bolt module (24), pliers fixed module (25), big hook Module (27), small Hooking module (28), nut module (29), sleeve module I (30), the size of empty slot module (32) are identical and two Side is equipped with card (36), and the front of panel (1) is equipped with multiple groups card slot (11) corresponding with the position of card (36), described Card (36) can be connected in card slot (11);The screw knife module (22), spanner fixed module (23), bolt module (24), Pliers fixed module (25), big Hooking module (27), small Hooking module (28), nut module (29), sleeve module I (30), sky Channel mould block (32) can be detachably mounted on the front of panel (1) by the cooperation of card (36) and card slot (11).
- The tool container 2. a kind of insulation according to claim 1 struggles against, it is characterised in that: the electric wrench fixed module It (26) include electric wrench fixation hole (261), electric wrench fixing groove (262), electric wrench fixing groove (262) is located at panel (1) at the top of a positive side, electric wrench fixation hole (261) is located at the obliquely downward of electric wrench fixing groove (262).
- The tool container 3. a kind of insulation according to claim 2 struggles against, it is characterised in that: on the back side of the panel (1) Portion is set there are two S-shaped panel hook (12), and the connecting line of two panel hooks (12) is parallel to the top margin of panel (1);Two The side at a back side of the panel hook (12) far from panel (1) is fixed with same root connecting rod (13), the connecting rod (13) both ends are separately fixed on two panel hooks (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820049999.2U CN208276866U (en) | 2018-01-12 | 2018-01-12 | A kind of insulation bucket tool container |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820049999.2U CN208276866U (en) | 2018-01-12 | 2018-01-12 | A kind of insulation bucket tool container |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208276866U true CN208276866U (en) | 2018-12-25 |
Family
ID=64748513
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820049999.2U Expired - Fee Related CN208276866U (en) | 2018-01-12 | 2018-01-12 | A kind of insulation bucket tool container |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208276866U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110340856A (en) * | 2019-06-26 | 2019-10-18 | 嘉兴运达智能设备有限公司 | A kind of flexible set technique template generated for rail Bank of Communications industry |
CN110576421A (en) * | 2019-10-11 | 2019-12-17 | 国网山东省电力公司潍坊供电公司 | A insulating tool holder for insulating bucket arm car |
CN111604872A (en) * | 2020-06-08 | 2020-09-01 | 国网天津市电力公司 | Insulating tool box of fighting |
-
2018
- 2018-01-12 CN CN201820049999.2U patent/CN208276866U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110340856A (en) * | 2019-06-26 | 2019-10-18 | 嘉兴运达智能设备有限公司 | A kind of flexible set technique template generated for rail Bank of Communications industry |
CN110340856B (en) * | 2019-06-26 | 2022-07-22 | 嘉兴运达智能设备有限公司 | Flexible generation complete process template for rail transit industry |
CN110576421A (en) * | 2019-10-11 | 2019-12-17 | 国网山东省电力公司潍坊供电公司 | A insulating tool holder for insulating bucket arm car |
CN111604872A (en) * | 2020-06-08 | 2020-09-01 | 国网天津市电力公司 | Insulating tool box of fighting |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208276866U (en) | A kind of insulation bucket tool container | |
CN110797810B (en) | Electric wire and cable peeling device | |
CN203887825U (en) | Multifunctional hydraulic tongs | |
CN112398041B (en) | Cable clamp | |
CN202586183U (en) | Stripping pliers | |
CN203787858U (en) | Transmission line split conductor sag adjustment tool | |
CN211556692U (en) | High efficiency is wire stripping device for electrical engineering | |
CN211163583U (en) | Multifunctional tool pliers | |
EP2402123A3 (en) | Manually operated machine tool with an energy storage device | |
CN103915782A (en) | Power transmission line bundled connector sag adjustment tool | |
CN210188988U (en) | Screw locking machine for electrode holder wiring groove | |
CN203839851U (en) | Stripping device for main insulation cladding in high-voltage cable | |
CN204858236U (en) | Portable electric crimping pinchers | |
CN203357294U (en) | Multifunctional nipper pliers | |
CN211890484U (en) | Special pliers for meter installation and power connection | |
CN207900089U (en) | A kind of bending line tweezer | |
CN207824812U (en) | A kind of insulating hammer for live working of distribution network | |
CN205614607U (en) | Multifunctional electrician's scissors | |
CN214023824U (en) | Battery negative pole connects electric pole and decides equipment | |
CN211426774U (en) | Special clamp for volt-ampere characteristic test of current transformer | |
CN104037674A (en) | Multipurpose cable stripper | |
CN204131009U (en) | Wire stripping pliers | |
CN211377255U (en) | High-voltage board with tool holder | |
CN218678245U (en) | Standardized wire stripping pliers of measurement assembly | |
CN211045776U (en) | Multifunctional crocodile clip clamp |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181225 |