CN208269640U - A kind of infrared ray continuous tunnel furnace - Google Patents

A kind of infrared ray continuous tunnel furnace Download PDF

Info

Publication number
CN208269640U
CN208269640U CN201721680892.XU CN201721680892U CN208269640U CN 208269640 U CN208269640 U CN 208269640U CN 201721680892 U CN201721680892 U CN 201721680892U CN 208269640 U CN208269640 U CN 208269640U
Authority
CN
China
Prior art keywords
drying tunnel
transmission net
net band
case
heating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721680892.XU
Other languages
Chinese (zh)
Inventor
张益翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Renda Energy-Saving Equipment Technology Co Ltd
Original Assignee
Dongguan Renda Energy-Saving Equipment Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Renda Energy-Saving Equipment Technology Co Ltd filed Critical Dongguan Renda Energy-Saving Equipment Technology Co Ltd
Priority to CN201721680892.XU priority Critical patent/CN208269640U/en
Application granted granted Critical
Publication of CN208269640U publication Critical patent/CN208269640U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of infrared ray continuous tunnel furnaces, including drying tunnel case, transmission net band is connected in the driving device, the drying tunnel case interior side is provided with preheating chamber, the side of the preheating chamber is provided with heating room, the transmission net band is located at preheating chamber and the partial interior of heating room is provided with heating element, the side of the heating room is provided with cooling chamber, the side of the drying tunnel case is additionally provided with power cord box, the transmission net band extends workpiece exit end and is equipped with tensioning apparatus, and the bottom of the transmission net band is equipped with variable frequency reducer motor.This infrared ray continuous tunnel furnace, it can be with automatic time switch machine, it completes automatically to control the switching on and shutting down of continuous tunnel furnace, working efficiency is higher, there is good ground line, power on, test product can be put into drying tunnel case after everything in readiness, open power supply, begun to warm up in the bright expression case of red indicating light, when temperature reaches institute's controlling temperature, red light puts out green light and starts constant temperature.

Description

A kind of infrared ray continuous tunnel furnace
Technical field
It is specially a kind of infrared the utility model relates to the baking technology field to a kind of hardware, glassware etc. Line continuous tunnel furnace.
Background technique
Continuous tunnel furnace specifications and models are more, but basic structure is similar, are made of cabinet, heat-generating system and temperature-controlling system.City at present Traditional continuous tunnel furnace heating method is electric heating on field, is heated using the heating bar of the thick resistance wire production of 5mm.For traditional tunnel The disadvantages of high energy consumption, the furnace temperature of road furnace are difficult to control, heating is uneven.
Utility model content
The purpose of this utility model is to provide a kind of infrared ray continuous tunnel furnaces, and with low energy consumption, furnace temperature is easy to control, heating is equal The advantages that even, solves the problems of the prior art.
To achieve the above object, the utility model provides the following technical solutions: a kind of infrared ray continuous tunnel furnace, including drying tunnel Case, the bottom of the drying tunnel case are equipped with support frame, and the side of the drying tunnel case is provided with workpiece import, the workpiece import Side is equipped with driving device, and transmission net band is connected in the driving device, and the transmission net band enters baking from workpiece import Road case, the drying tunnel case interior side are provided with preheating chamber, and the first exhaust gas row is provided on the drying tunnel case at the top of the preheating chamber Mouth is put, the side of the preheating chamber is provided with heating room, is provided with the first thermal cycle wind on the drying tunnel case in the heating ceiling portion Machine, the side of first thermal circulation fan are provided with the second Waste gas outlet, the side setting of second Waste gas outlet There is the second thermal circulation fan, the transmission net band is located at preheating chamber and the part of heating chamber is provided with heating element, described The side of heating room is provided with cooling chamber, and cooling blower, the cooling blower are provided on the drying tunnel case at the top of the cooling chamber The drying tunnel case side of installation place is provided with cooling exhaust gas interface, and the side of the drying tunnel case is additionally provided with power cord box, the biography It send mesh belt through drying tunnel case, extends the workpiece outlet of the drying tunnel case other end, the transmission net band extends workpiece exit end Tensioning apparatus is installed, the bottom of the transmission net band is equipped with variable frequency reducer motor.
Preferably, the heating element is made of 18 380v infrared ray heating tubes, and the heating wire inside heating tube is one The component of kind nickel chromium triangle aluminium heating wire.
Preferably, the thickness of the heating wire of the heating element is 0.8mm.
Preferably, the infrared ray heating tube inside the heating element is equipped with alumina silicate thermal insulation board and 5mm outer cover of steel plate.
Preferably, it is placed with thermal element to be added on the transmission net band, drying tunnel is entered from workpiece import by transmission net band Case.
Preferably, the transmission net band is a kind of component of stainless steel material.
Compared with prior art, the beneficial effects of the utility model are as follows:
This infrared ray continuous tunnel furnace, transmission net band run through drying tunnel case, export and stretch out from the workpiece of the drying tunnel case other end, transmission net It takes and is placed with thermal element to be added, drying tunnel case is entered from workpiece import by transmission net band, export output drying tunnel case, phase from workpiece Between pass sequentially through preheating chamber, heating room and cooling chamber, while using the Japanese Omron temperature control system of intelligence, more accurate control temperature Degree, leakage protection system guarantee operator's personal safety, reduce production safety risk, can be with automatic time switch machine, can Switch machine time is set, completes automatically to control the switching on and shutting down of continuous tunnel furnace, booting heating is waited without special messenger and delays work Make the time, working efficiency is higher, while the power supply plug-in strip of enough capacity is installed according to continuous tunnel furnace power, and enough power supplys is selected to lead Line, and should have good ground line, power supply line is connected with Electric control case, drying tunnel, infrared heating equipment, is powered on, Test product can be put into drying tunnel case after everything in readiness, open power supply, begun to warm up in the bright expression case of red indicating light, when When temperature reaches institute's controlling temperature, red light puts out green light and starts constant temperature.
Detailed description of the invention
Fig. 1 is the front view of the utility model;
Fig. 2 is the top cross-sectional view of the utility model;
Fig. 3 is the side view of the utility model.
In figure: 1 drying tunnel case, 2 preheating chambers, 3 heating elements, 4 heating rooms, 5 cooling chambers, 6 tensioning apparatus, the outlet of 7 workpiece, 8 Cooling blower, 9 second thermal circulation fans, 10 second Waste gas outlets, 11 first thermal circulation fans, 12 first Waste gas outlets, 13 workpiece imports, 14 transmission net bands, 15 driving devices, 16 support frames, 17 variable frequency reducer motors, 18 power cord box, 19 coolings are useless Gas interface.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
It please refers to Fig. 1-3, a kind of infrared ray continuous tunnel furnace, including drying tunnel case 1, the bottom of drying tunnel case 1 and support frame 16 is installed, The side of drying tunnel case 1 is provided with workpiece import 13, and the side of workpiece import 13 is equipped with driving device 15, connects in driving device 15 It is connected to transmission net band 14, transmission net band 14 runs through drying tunnel case 1, stretches out from the workpiece of 1 other end of drying tunnel case outlet 7, transmission net band It is placed with thermal element to be added on 14, drying tunnel case 1 is entered from workpiece import 13 by transmission net band 14,7 output is dried from workpiece outlet Road case 1, transmission net band 14 are a kind of component of stainless steel material, and transmission net band 14 enters drying tunnel case 1 from workpiece import 13, to be added Heated work pieces are placed on transmission net band 14, enter drying tunnel case 1 with transmission net band 14,1 interior side of drying tunnel case is provided with preheating chamber 2, the first Waste gas outlet 12 is provided on the drying tunnel case 1 at the top of preheating chamber 2, and the side of preheating chamber 2 is provided with heating room 4, adds It is provided with the first thermal circulation fan 11 on the drying tunnel case 1 at 4 top of hot cell, it is useless that the side of the first thermal circulation fan 11 is provided with second Gas discharge outlet 10, the side of the second Waste gas outlet 10 are provided with the second thermal circulation fan 9, and transmission net band 14 is located at preheating chamber 2 Part inside heating room 4 is provided with heating element 3, heating element 3 is made of 18 380v infrared ray heating tubes, heating unit Infrared ray heating tube inside part 3 is equipped with alumina silicate thermal insulation board and 5mm outer cover of steel plate, and the heating wire inside heating tube is a kind of nickel The thickness of the component of chromium aluminium heating wire, the heating wire of heating element 3 is 0.8mm, and heated work pieces to be added enter preheating chamber 2 and pass through heating Element 3 is preheated, and the exhaust gas of generation is discharged from the first Waste gas outlet 12, and heated work pieces to be added are run to transmission net band 14 to be added Hot cell 4 is heated by heating element 3, adds thermogenetic exhaust gas to be discharged from the second Waste gas outlet 10, while the first heat is followed Ring blower 11 and the work of the second thermal circulation fan 9, so that heating is more uniform, the side of heating room 4 is provided with cooling chamber 5, Cooling blower 8 is provided on the top drying tunnel case 1 of cooling chamber 5,1 side of drying tunnel case of 8 installation place of cooling blower is provided with cooling Exhaust gas interface 19, heated work pieces to be added run to cooling chamber 5 with transmission net band 14, and cooling blower 8 works, and treat heating workpiece and carry out Cooling, the exhaust gas of generation is discharged from cooling exhaust gas interface 19, and the side of drying tunnel case 1 is additionally provided with power cord box 18, transmission net band 14 are equipped with tensioning apparatus 6 from one end that workpiece outlet 7 is stretched out, and the bottom of transmission net band 14 is equipped with variable frequency reducer motor 17, This infrared ray continuous tunnel furnace, transmission net band 14 run through drying tunnel case 1, stretch out from the workpiece of 1 other end of drying tunnel case outlet 7, transmission net band It is placed with thermal element to be added on 14, drying tunnel case 1 is entered from workpiece import 13 by transmission net band 14,7 output is dried from workpiece outlet Road case 1, during which passes sequentially through preheating chamber 2, heating room 4 and cooling chamber 5, and transmission net band 14 is located at preheating chamber 2 and heats the portion of room 4 Divide and be internally provided with heating element 3, heating element 3 is made of 18 380v infrared ray heating tubes, infrared inside heating element 3 Line heating tube is equipped with alumina silicate thermal insulation board and 5mm outer cover of steel plate, and the heating wire inside heating tube is a kind of nickel chromium triangle aluminium heating wire Component, the thickness of the heating wire of heating element 3 are 0.8mm, heated work pieces to be added enter preheating chamber 2 carried out by heating element 3 it is pre- The exhaust gas of heat, generation is discharged from the first Waste gas outlet 12, and heated work pieces to be added run to heating room 4 by adding with transmission net band 14 Thermal element 3 is heated, and thermogenetic exhaust gas is added to be discharged from the second Waste gas outlet 10, while the first thermal circulation fan 11 and The work of two thermal circulation fans 9, so that heating is more uniform, heated work pieces to be added run to cooling chamber 5 with transmission net band 14, cooling Blower 8 works, and treats heating workpiece and is cooled down, and the exhaust gas of generation is discharged from cooling exhaust gas interface 19, while using intelligent day This Omron temperature control system, more precise control of temperature, leakage protection system guarantee operator's personal safety, reduce production peace Full blast danger, automatic time switch machine can set switch machine time, complete automatically to control the switching on and shutting down of continuous tunnel furnace, not have to Special messenger waits booting heating and the time that dallies over one's work, working efficiency are higher, and the power supply of enough capacity is installed according to continuous tunnel furnace power Plug-in strip selects enough power leads, and should have good ground line, and power supply line and Electric control case, drying tunnel, infrared ray are added Hot equipment connection, powers on, can be put into test product in drying tunnel case after everything in readiness, open power supply, red indicating light is bright It indicates to have begun to warm up in case, when temperature reaches institute's controlling temperature, red light puts out green light and starts constant temperature.
In summary: this infrared ray continuous tunnel furnace, transmission net band 14 run through drying tunnel case 1, go out from the workpiece of 1 other end of drying tunnel case Mouth 7 stretches out, and is placed with thermal element to be added on transmission net band 14, enters drying tunnel case 1 from workpiece import 13 by transmission net band 14, from During which 7 output drying tunnel case 1 of workpiece outlet passes sequentially through preheating chamber 2, heating room 4 and cooling chamber 5, while using the Japanese Europe of intelligence Nurse dragon temperature control system, more precise control of temperature, leakage protection system guarantee operator's personal safety, reduce production safety wind Danger can set switch machine time with automatic time switch machine, complete automatically to control the switching on and shutting down of continuous tunnel furnace, no It is waited being switched on special messenger and be heated and the time that dallies over one's work, working efficiency are higher, while enough capacity is installed according to continuous tunnel furnace power Power supply plug-in strip, enough power leads are selected, and should have good ground line, by power supply line and Electric control case, drying tunnel, red The connection of outside line heating equipment, powers on, can be put into test product in drying tunnel case after everything in readiness, opens power supply, and red refers to Show in the bright expression case of lamp and begun to warm up, when temperature reaches institute's controlling temperature, red light puts out green light and starts constant temperature.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of infrared ray continuous tunnel furnace, including drying tunnel case (1), it is characterised in that: the bottom of the drying tunnel case (1) is equipped with support The side of frame (16), the drying tunnel case (1) is provided with workpiece import (13), and the side of the workpiece import (13) is equipped with driving Device (15) is connected with transmission net band (14) on the driving device (15), and the transmission net band (14) is from workpiece import (13) Into drying tunnel case (1), drying tunnel case (1) interior side is provided with preheating chamber (2), the drying tunnel case at the top of the preheating chamber (2) (1) it is provided on the first Waste gas outlet (12), the side of the preheating chamber (2) is provided with heating room (4), the heating room (4) it is provided with the first thermal circulation fan (11) on the drying tunnel case (1) at the top of, the side setting of first thermal circulation fan (11) Have the second Waste gas outlet (10), the side of second Waste gas outlet (10) is provided with the second thermal circulation fan (9), described Transmission net band (14), which is located at preheating chamber (2) and heats room (4) internal part, to be provided with heating element (3), the heating room (4) Side be provided with cooling chamber (5), be provided with cooling blower (8) on the drying tunnel case (1) at the top of the cooling chamber (5), it is described cold But drying tunnel case (1) side of blower (8) installation place is provided with cooling exhaust gas interface (19), and the side of the drying tunnel case (1) is also set It is equipped with power cord box (18), the transmission net band (14) runs through drying tunnel case (1), and the workpiece for extending drying tunnel case (1) other end goes out Mouth (7), the transmission net band (14) are extended workpiece outlet (7) one end and are equipped with tensioning apparatus (6), the transmission net band (14) Bottom variable frequency reducer motor (17) are installed.
2. a kind of infrared ray continuous tunnel furnace according to claim 1, it is characterised in that: the heating element (3) is by 18 380v infrared ray heating tube forms, and the heating wire inside heating tube is a kind of component of nickel chromium triangle aluminium heating wire.
3. a kind of infrared ray continuous tunnel furnace according to claim 1, it is characterised in that: the heating wire of the heating element (3) Thickness be 0.8mm.
4. a kind of infrared ray continuous tunnel furnace according to claim 1, it is characterised in that: red inside the heating element (3) Outside line heating tube is equipped with alumina silicate thermal insulation board and 5mm outer cover of steel plate.
5. a kind of infrared ray continuous tunnel furnace according to claim 1, it is characterised in that: be placed on the transmission net band (14) Thermal element to be added enters drying tunnel case (1) from workpiece import (13) by transmission net band (14).
6. a kind of infrared ray continuous tunnel furnace according to claim 1, it is characterised in that: the transmission net band (14) be it is a kind of not The component for steel material of becoming rusty.
CN201721680892.XU 2017-12-06 2017-12-06 A kind of infrared ray continuous tunnel furnace Expired - Fee Related CN208269640U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721680892.XU CN208269640U (en) 2017-12-06 2017-12-06 A kind of infrared ray continuous tunnel furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721680892.XU CN208269640U (en) 2017-12-06 2017-12-06 A kind of infrared ray continuous tunnel furnace

Publications (1)

Publication Number Publication Date
CN208269640U true CN208269640U (en) 2018-12-21

Family

ID=64673489

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721680892.XU Expired - Fee Related CN208269640U (en) 2017-12-06 2017-12-06 A kind of infrared ray continuous tunnel furnace

Country Status (1)

Country Link
CN (1) CN208269640U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112050633A (en) * 2020-09-14 2020-12-08 港加贺电子(深圳)有限公司 Curing oven

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112050633A (en) * 2020-09-14 2020-12-08 港加贺电子(深圳)有限公司 Curing oven

Similar Documents

Publication Publication Date Title
CN102092926B (en) Toughened grass homogenizing furnace
CN206207943U (en) A kind of wood industry sheet material drying unit
CN109385648A (en) A kind of copper foil warpage annealing device and method
CN202885457U (en) Silver strip drying oven
CN208269640U (en) A kind of infrared ray continuous tunnel furnace
CN206377994U (en) A kind of Intelligent box type resistance furnace
CN102020033A (en) High temperature shrink furnace
CN102305522A (en) Electric dry oven for Chinese herbal medicine
CN202945153U (en) Energy-saving heating air circulation and convection heating glass heating furnace
CN201933010U (en) Toughened glass homogenizing furnace
CN209082015U (en) A kind of copper foil warpage annealing device
CN208995631U (en) A kind of net belt type bright annealing furnace
CN208366050U (en) A kind of pressure tank furnace
CN204285586U (en) Portable low-voltage warmer
CN103647004A (en) An LED lamp tube baking apparatus
CN202158743U (en) Super-hard material compound accessory drying oven
CN208187071U (en) Drying cotton machine
CN206531379U (en) Intelligence multistage drying-plate machine
CN2433019Y (en) Thermal dry oven thin high-efficient abnormal section bar
CN205156563U (en) Continuous drying furnace of honeycomb type catalyst
CN210449755U (en) Heated air circulation formula heating chamber
CN203818592U (en) Continuous type tempering furnace of tail decoration lamp
CN206247808U (en) A kind of single channel double push pedal continuous tunnel furnaces drying control device
CN103740909B (en) A kind of policer operation three Room vacuum oven
CN104259358A (en) Heating mechanism of aluminum alloy blank

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181221

Termination date: 20191206

CF01 Termination of patent right due to non-payment of annual fee