CN208266792U CN201820664702.3U CN201820664702U CN208266792U CN 208266792 U CN208266792 U CN 208266792U CN 201820664702 U CN201820664702 U CN 201820664702U CN 208266792 U CN208266792 U CN 208266792U
Authority
CN
China
Prior art keywords
control
deal pile
control beam
screw rod
locking nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820664702.3U
Other languages
Chinese (zh)
Inventor
贾卫亮
刘士杰
吴向东
张建伟
张跃进
王现中
张树鹏
李臣奇
曾明雄
谢经祥
高朋
霍祥宏
侯宝磊
陈海江
孙明秋
郑磊
郝明慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 15th Bureau Group Co Ltd
City Construction Co Ltd of China Railway 15th Bureau Group Co Ltd
Original Assignee
China Railway 15th Bureau Group Co Ltd
City Construction Co Ltd of China Railway 15th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 15th Bureau Group Co Ltd, City Construction Co Ltd of China Railway 15th Bureau Group Co Ltd filed Critical China Railway 15th Bureau Group Co Ltd
Priority to CN201820664702.3U priority Critical patent/CN208266792U/en
Application granted granted Critical
Publication of CN208266792U publication Critical patent/CN208266792U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to one kind be based on sponge ecosystem ecology deal pile water front line type control device, it is characterised in that: including deal pile line type control frame, anchor assemblies;The deal pile line type control frame includes preceding control beam and rear control beam, it is described after the both ends of control beam be respectively articulated with left control assembly and right control assembly, the left control assembly and right control assembly respectively with the left end of preceding control beam and the removable connection of right end;The lower surface of control beam and rear control beam is separately installed with ground anchor assemblies before described.The utility model can be used for along the nearly slopes of bank slope setting deal pile, row constraint is put into pine, deal pile is set to be inserted perpendicularly into clay, quickly establish the deal pile ecological revetment to prevent erosion, the line style of deal pile water front after guaranteeing construction is consistent with the shape of revetment, substantially increases the efficiency set, alleviates labor intensity, with the stabilization for the engineering that conserves water and soil, it is ecological to improve revetment;In addition the utility model also has many advantages, such as that structure is simple, easy for construction and engineering cost is lower.

Description

One kind being based on sponge ecosystem ecology deal pile water front line type control device
Technical field
The utility model belongs to sponge ecosystem ecological bank line bulkhead tech field, is based on sponge more particularly to one kind Ecosystem ecology deal pile water front line type control device.
Background technique
With the rapid development of economy, living standards of the people are gradually increased, city people are pursuing the same of Modern Live When, also increasingly pay attention to live taste, the promotion of ecological environment, idyllic life view is pursued, under this requirement, city Dredging waterway and grassroot project are more and more.Urban waterlogging disaster, the pollution of water environment and shortage of resources are also following, then Sponge the idea of the city comes into being.In " 2012 low carbon cities and the regional development science and technology forum " in April, 2012, " sponge city City " concept is put forward for the first time, and sponge city is new generation of city storm water man- agement concept, refers to that city is adapting to environmental change and reply Rainwater bring natural calamity etc. has good " elasticity ", water suction, water storage, infiltration, water purification when raining, and will store when needing The water " release " deposited simultaneously is used.
Sponge city refers to that city can have in terms of adapting to environmental change and reply as sponge Good " elasticity ", water suction, water storage, infiltration, water purification when raining, the water stored when needing discharged and be used.Sponge city City's construction should follow the principles such as Ecology Precedence, and natural way is combined with artificial measures, ensure municipal drainage prevention waterlogging safety Under the premise of, realize that rainwater in the accumulation, infiltration and purification of urban area, promotes the utilization and life of rainwater resource to the maximum extent State environmental protection.
Comprehensive harness of inland rivers is enhancing urban flood defence ability, improves city taste, improve environment, beautifying city, benefit residence The people there is an urgent need to.The primary technical problem of comprehensive improvement is river clearly in, embankment line taking rationalization and revetment trimming.Existing city City inland river revetment system recent decades are built successively, most laid dry, and basis is shallow, wall integrity is poor, do not meet existing correlation completely Code requirement should theoretically remove reconstruction.However, city inland river two sides be usually all surface structures gather, underground utilities solid matter, Trees are various on embankment, these unfavorable factors reform construction technology to revetment and propose strict requirements.
In water body revetment process of construction, the processing of loose media side slope is kept off frequently with rigid protection system such as concrete Plate or block stone cause the hard obturator of large area when wall etc., completely cut off contact of the water body with soil, destroy following for the ecosystem Ring.And the deal pile revetment largely used in recent years solves the problems, such as that conventional rigid revetment cannot achieve ecological circulation;So, Deal pile is used to have some unique performances when basement process, and specific as follows: 1) high-intensitive and density is small, has high-strength light The advantages of;2) elastic good toughness, can absorb impact and effect of vibration;3) under the conditions of maintenance appropriate, there is preferable durability; 4) coupling arrangement is simple, easy to process, can be made into product of various shapes;5) deal pile has stronger hygroscopicity and bulking dry Contracting, when drying pine moisture absorption, with the increase of absorption water, volume expansion will occur for pine;6) due to the institutional framework of pine Feature, so that it has preferable tension, four kinds of resistance to compression, bending resistance and shearing resistance intensity;
Summary of the invention
The utility model is to solve technical problem present in well-known technique and provide that a kind of structure is simple, the side of installing and using Just, working efficiency is improved.
The utility model is adopted the technical scheme that solve technical problem present in well-known technique:
The utility model can also use following technical measures:
The utility model has the advantages and positive effects of: since the utility model is structure is simple, easy for construction The ecological revetment to prevent erosion, to solve the problems, such as slope retaining and side slope face Improvement of Ecological Environment.
The technical scheme adopted by the utility model is the utility model can be used for along the nearly slopes of bank slope setting pine Stake puts into row constraint to pine, so that deal pile is inserted perpendicularly into clay, quickly establish the deal pile ecology to prevent erosion and refute The line style of bank, the deal pile water front after guaranteeing construction is consistent with the shape of revetment, substantially increases the efficiency set, alleviates labor It is ecological to improve revetment with the stabilization for the engineering that conserves water and soil for fatigue resistance;In addition the utility model also has that structure is simple, construction The advantages that convenient and engineering cost is lower.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model embodiment 1;
Fig. 2 is the perspective view of embodiment 1;
Fig. 3 is the preceding control girder construction schematic diagram of embodiment 1;
Fig. 4 controls beam stretching structure schematic diagram after being;
Fig. 5 is the rear control girder construction schematic diagram of embodiment 1;
Fig. 6 is left control assembly in embodiment 1, right control assembly and rear control beam attachment structure schematic diagram;
Fig. 7 is 2 structural schematic diagram of the utility model embodiment;
Fig. 8 is preceding control girder construction schematic diagram in the utility model embodiment 2;
Fig. 9 is 3 structural schematic diagram of the utility model embodiment;
Figure 10 is deal pile water front structural schematic diagram.
In figure: 1, deal pile line type control frame;1-1, preceding control beam;1-2, beam is controlled afterwards;1-3, left control assembly; 1-30, left control panel;1-31, screw rod;1-32, location nut;1-33, locking nut;1-34, handle;1-35, wirerope;1- 4, right control assembly;1-40, right control panel;1-41, screw rod;1-42, location nut;1-43, locking nut;1-44, handle;1- 45, wirerope;1-5, hoisting ring;2, anchor assemblies;2-1, anchor pole;2-2, anchor head;3, preceding deal pile line style adjustment block;3-1, spiral shell Bar;3-2, location nut;3-3, locking nut;3-4, handle;4, rear deal pile line style adjustment block;4-1, screw rod;4-2, positioning Nut;4-3, locking nut;4-4, handle;5, deal pile.
Specific embodiment
For the invention, features and effects that can further appreciate that the utility model, the following examples are hereby given, and cooperates Detailed description are as follows for attached drawing:
Embodiment 1 please refers to Fig. 1 to Fig. 6, Figure 10, and one kind being based on the water front line style control of sponge ecosystem ecology deal pile Device processed, including deal pile line type control frame 1, anchor assemblies 2;The deal pile line type control frame 1 includes preceding control beam 1-1 With rear control beam 1-2, the both ends that beam 1-2 is controlled after described have been respectively articulated with left control assembly 1-3 and right control assembly 1-4, institute State left control assembly 1-3 and right control assembly 1-4 respectively with it is preceding control beam 1-1 left end and the removable connection of right end;Before described The lower surface of control beam 1-1 and rear control beam 1-2 are separately installed with ground anchor assemblies 2.
In above structure, described ground anchor assemblies 2 include that cone cell anchor head 2-1 and column anchor pole 2-2, the anchor head are screwed on anchor The lower end of bar, the lower end surface of control beam 1-1 and rear control beam 1-2 before the upper end of the anchor pole 2-2 is fixedly connected, and with Preceding control beam and rear control beam are vertical setting.
In order to meet the needs of varying environment, the anchor pole 2-2 is assembled by several anchor pole monomers, two adjacent anchors Bar monomer is threadedly coupled.It is also beneficial to transport and manage using separate structure.
For the ease of construction, the upper surface that beam 1-1 and rear control beam 1-2 are controlled before described is equipped with hoisting ring 1-5.
In order to meet the construction demand of varying environment, it is telescopic structure that beam 1-1 and rear control beam 1-2 are controlled before described, It is preferred that plug-in mounting structure, according to being illustrated for rear control beam 1-1, the rear beam that controls uses separate structure, control beam after one of them Connecting pin be equipped with jack, it is corresponding after control beam 1-2 be equipped with bolt, the bolt is inserted into jack, on preceding control beam The positioning fastening that the two is realized equipped with tight fixed bolt, please refers to Fig. 4.
In the present embodiment, it is preferred that the left control assembly 1-3 includes left control panel 1-30, and the one of the left control panel End is controlled after being hinged on by pin shaft on the hinged seat of the left end beam 1-2, and the other end of the left control panel 1-3 is fixedly connected with spiral shell Bar 1-31 is fitted with location nut 1-32 and locking nut 1-33 on the screw rod;The left end of control beam 1-1 is equipped with U before described The location nut 1-32 and locking nut 1-33 being equipped on type opening 1-10, the screw rod 1-31 are located at preceding control beam 1-1 left end U The two sides of type opening, control the side beam 1-2 after wherein location nut 1-32 is located at, locking nut 1-33 is located at preceding control beam 1-1's Outside is fixed with handle 1-34 in the excircle of locking nut 1-33.
Preferably, the right control assembly 1-4 includes right control panel 1-40, and one end of the right control panel 1-40 passes through pin Axis is controlled after being hinged on the hinged seat of beam 1-2 right end, and the other end of the right control panel 1-40 is fixedly connected with screw rod 1-41, Location nut 1-42 and locking nut 1-43 are fitted on the screw rod 1-41;The right end of control beam 1-1 is equipped with U-shaped open before described Mouthful, the location nut 1-42 and locking nut 1-43 being equipped on the screw rod 1-41 are located at the two of preceding control beam right end U-shaped opening Side, controls the side beam 1-2 after wherein location nut 1-42 is located at, locking nut 1-43 is located at the outside of preceding control beam 1-1, is locking The excircle of nut 1-43 is fixed with handle 1-44.
Can be constrained the line style of revetment straightway deal pile using above-mentioned control device, guarantee the line style of ecological deal pile with The line style of water front is consistent, improves the stability and globality of deal pile water front, while also having and improving construction efficiency, reduces labour The advantages that intensity.
Embodiment 2, please refers to Fig. 7 and Fig. 8, extends pine to be useful on the basis of the deal pile for having set completion Stake water front, the left control assembly and right control assembly can also use flexible structure, i.e., the described left control assembly 1-3 includes steel On the hinged seat for controlling the left end beam 1-2 after one end connection of cord 1-35, the wirerope 1-35, wirerope 1-35's is another End is connected with screw rod 1-31, and location nut 1-32 and locking nut 1-33 are fitted on the screw rod;Control beam 1-1 before described Left end is equipped with mounting hole 1-11, and the screw rod installed mounting hole, the location nut 1-32 and locking screw being equipped on the screw rod Female 1-33 is located at the two sides of preceding control beam 1-1, beam side is controlled after wherein location nut 1-32 is located at, before locking nut 1-33 is located at The outside for controlling beam 1-1, is fixed with handle 1-34 in the excircle of locking nut 1-33.Preferably, the right control assembly 1-4 includes wirerope 1-45, on the hinged seat that beam 1-2 right end is controlled after one end connection of the wirerope 1-45, wirerope The other end is connected with screw rod 1-40, and location nut 1-41 and locking nut 1-42 are fitted on the screw rod;Beam is controlled before described The right end of 1-1 is equipped with mounting hole 1-13, and the screw rod 1-40 installed mounting hole, the location nut 1-41 being equipped on the screw rod It is located at the two sides of preceding control beam 1-1 with locking nut 1-42, the side beam 1-2, locking screw is controlled after wherein location nut 1-41 is located at Female 1-42 is located at the outside of preceding control beam 1-1, is fixed with handle 1-43 in the excircle of locking nut 1-42.Actually make Used time fixes the wirerope on its left side or right side with the deal pile water front for completing to set is realized, guarantees the deal pile set in advance With it is neighbouring between the deal pile completed, reduce gap between the two, prevent from causing because there is biggish gap here Soil losses, while the fastness of whole deal pile is improved, remaining feature of the present embodiment is identical as embodiment.
Embodiment 3, referring to Fig. 9, controlling the inside of beam 1-1 before described equipped with several to meet revetment Curve Preceding deal pile line style adjustment block 3, the deal pile line style adjustment block are connect by screw rod 3-1 with preceding control beam 1-1, the screw rod Before 3-1 is installed on control beam 1-1, it is equipped with location nut 3-2 in the inside of preceding control beam, is equipped with lock in the outside of preceding control beam Tight nut 3-3, the excircle of the locking nut 3-3 are fixed with handle 3-4, several preceding deal pile line style adjustment blocks 3 it is outer The deal pile supporting surface that side is formed is consistent with the shape of bank line;Pine anchoring wire before the inside of control beam 1-2 is corresponding after described 3 position of type adjustment block is equipped with rear deal pile line style adjustment block 4, and the rear deal pile line style adjustment block 4 is connected by screw rod 4-1 After control beam, screw rod 4-1 is controlled on beam 1-2 after being installed on, and location nut 4-2 is equipped in the inside of rear control beam, in rear control The outside of beam is equipped with locking nut 4-3, and the excircle of locking nut 4-3 is fixed with handle 4-4;Deal pile line style after described Pine deal pile placement space is formed between adjustment block and preceding pine deal pile line style adjustment block;Deal pile line style adjustment after described The deal pile supporting surface that the medial surface of block is formed is consistent with the shape of bank line.
In conclusion the utility model can be used for along the nearly slopes of bank slope setting deal pile, row constraint is put into pine, So that deal pile is inserted perpendicularly into clay, quickly establishes the deal pile ecological revetment to prevent erosion, the deal pile after guaranteeing construction The line style of water front and the shape of revetment are consistent, substantially increase the efficiency set, alleviate labor intensity, with the engineering that conserves water and soil Stabilization, improve revetment it is ecological;In addition the utility model also has that structure is simple, easy for construction and engineering cost is more low excellent Point.
The above is only the preferred embodiment to the utility model, is not made in any form to the utility model Limitation, it is all according to the technical essence of the utility model any simple modification made to the above embodiment, equivalent variations with Modification, is all within the scope of the technical scheme of the utility model.

Claims (10)

1. one kind is based on sponge ecosystem ecology deal pile water front line type control device, it is characterised in that: including pine anchoring wire Type control framework, anchor assemblies;The deal pile line type control frame includes preceding control beam and rear control beam, controls beam after described Both ends have been respectively articulated with left control assembly and right control assembly, the left control assembly and right control assembly respectively with preceding control beam Left end and the removable connection of right end;The lower surface of control beam and rear control beam is separately installed with ground anchor assemblies before described.
2. according to claim 1 be based on sponge ecosystem ecology deal pile water front line type control device, feature exists In: the left control assembly includes left control panel, and one end of the left control panel controls beam left end after being hinged on by pin shaft On hinged seat, the other end of the left control panel is fixedly connected with screw rod, is fitted with location nut and locking screw on the screw rod It is female;The left end of control beam is equipped with U-shaped opening before described, and the location nut and locking nut being equipped on the screw rod are located at preceding control The two sides of beam left end U-shaped opening control beam side after wherein location nut is located at, locking nut is located at the outside of preceding control beam, The excircle of locking nut is fixed with handle.
3. according to claim 1 be based on sponge ecosystem ecology deal pile water front line type control device, feature exists In: the left control assembly includes wirerope, on the hinged seat that beam left end is controlled after one end connection of the wirerope, wirerope The other end be connected with screw rod, be fitted with location nut and locking nut on the screw rod;The left end of control beam is equipped with before described Mounting hole, the screw rod installed mounting hole, and the location nut and locking nut being equipped on the screw rod are located at preceding control beam Two sides control beam side after wherein location nut is located at, locking nut is located at the outside of preceding control beam, in the excircle of locking nut It is fixed with handle.
4. according to claim 2 or 3 be based on sponge ecosystem ecology deal pile water front line type control device, feature Be: the right control assembly includes right control panel, and one end of the right control panel controls beam right end after being hinged on by pin shaft Hinged seat on, the other end of the right control panel is fixedly connected with screw rod, is fitted with location nut and locking on the screw rod Nut;The right end of control beam is equipped with U-shaped opening before described, and the location nut and locking nut being equipped on the screw rod are located at preceding control The two sides of beam right end U-shaped opening processed control beam side after wherein location nut is located at, locking nut is located at the outside of preceding control beam, Handle is fixed in the excircle of locking nut.
5. according to claim 2 or 3 be based on sponge ecosystem ecology deal pile water front line type control device, feature Be: the right control assembly includes wirerope, on the hinged seat that beam right end is controlled after one end connection of the wirerope, steel wire The other end of rope is connected with screw rod, is fitted with location nut and locking nut on the screw rod;The right end of control beam is set before described There is mounting hole, the screw rod installed mounting hole, and the location nut and locking nut being equipped on the screw rod are located at preceding control beam Two sides, after wherein location nut is located at control beam side, locking nut be located at it is preceding control beam outside, in the outer circle of locking nut Week is fixed with handle.
6. according to claim 1 be based on sponge ecosystem ecology deal pile water front line type control device, feature exists In: the inside of control beam is equipped with several preceding deal pile line style adjustment blocks before described, and the deal pile line style adjustment block passes through screw rod It is connect with preceding control beam, before the screw rod is installed on control beam, location nut is equipped in the inside of preceding control beam, in preceding control The outside of beam is equipped with locking nut, and the excircle of the locking nut is fixed with handle, several preceding deal pile line style adjustment blocks Lateral surface formed deal pile supporting surface it is consistent with the shape of bank line;
The corresponding preceding deal pile line style adjustment block position in the inside of control beam is equipped with rear deal pile line style adjustment block after described, after described Deal pile line style adjustment block controls beam after connecting by screw rod, screw rod is controlled on beam after being installed on, set on the inside of rear control beam There is location nut, is equipped with locking nut in the outside of rear control beam, the excircle of locking nut is fixed with handle;Pine after described Pine deal pile placement space is formed between timber line style adjustment block and preceding pine deal pile line style adjustment block;Deal pile after described The deal pile supporting surface that the medial surface of line style adjustment block is formed is consistent with the shape of bank line.
7. according to claim 1 be based on sponge ecosystem ecology deal pile water front line type control device, feature exists Include cone cell anchor head and column anchor pole in: described ground anchor assemblies, the anchor head is screwed on the lower end of anchor pole, the anchor pole it is upper The lower end surface of control beam and rear control beam before end is fixedly connected, and be vertical setting with preceding control beam and rear control beam.
8. according to claim 7 be based on sponge ecosystem ecology deal pile water front line type control device, feature exists In: the anchor pole is assembled by several anchor pole monomers, and two adjacent anchor pole monomers are threadedly coupled.
9. according to claim 1 be based on sponge ecosystem ecology deal pile water front line type control device, feature exists In: the upper surface of control beam and rear control beam is equipped with hoisting ring before described.
10. according to claim 1 be based on sponge ecosystem ecology deal pile water front line type control device, feature exists In: control beam and rear control beam are telescopic structure before described.
CN201820664702.3U 2018-05-04 2018-05-04 One kind being based on sponge ecosystem ecology deal pile water front line type control device Expired - Fee Related CN208266792U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820664702.3U CN208266792U (en) 2018-05-04 2018-05-04 One kind being based on sponge ecosystem ecology deal pile water front line type control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820664702.3U CN208266792U (en) 2018-05-04 2018-05-04 One kind being based on sponge ecosystem ecology deal pile water front line type control device

Publications (1)

Publication Number Publication Date
CN208266792U true CN208266792U (en) 2018-12-21

Family

ID=64681264

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820664702.3U Expired - Fee Related CN208266792U (en) 2018-05-04 2018-05-04 One kind being based on sponge ecosystem ecology deal pile water front line type control device

Country Status (1)

Country Link
CN (1) CN208266792U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113914315A (en) * 2021-11-05 2022-01-11 上海二十冶建设有限公司 Guide rail device for landscape bank protection wood-like pile construction and use method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113914315A (en) * 2021-11-05 2022-01-11 上海二十冶建设有限公司 Guide rail device for landscape bank protection wood-like pile construction and use method thereof

Similar Documents

Publication Publication Date Title
CN107489128A (en) A kind of protector for Hydraulic and Hydro-Power Engineering side slope
CN206986900U (en) A kind of band is advantageous to the pattern foundation pit supporting structure of discharge structure
CN208266792U (en) One kind being based on sponge ecosystem ecology deal pile water front line type control device
CN207436072U (en) A kind of Anchored frame beam
CN214328888U (en) Soil nailing wall supporting structure for reinforcement
CN107044132B (en) A kind of construction method of quake-resistant safety ground
CN212582712U (en) Novel sand beach enclosure structure
CN213709368U (en) Removable combination formula ecological retaining wall
CN205610534U (en) Solar photovoltaic power generation facility with flexible shelves structure
CN213709654U (en) Foundation cushion block reinforcing structure in building deviation rectifying process
CN212336550U (en) Green building energy-saving environment-friendly roof capable of collecting rainwater to be utilized
CN208701602U (en) A kind of formula ecological bank protection structure
CN207130925U (en) A kind of assembled architecture interior wall attachment structure
CN112832287A (en) Inclined retaining wall
CN207228176U (en) A kind of bottom plate overhanging float Structure in rock stratum
CN211644780U (en) Ecological floating island anchoring system
CN209875163U (en) Tunnel type underground reservoir surveys entrance bearing structure
CN211665700U (en) Hydraulic engineering is with consolidating bank protection
CN205368930U (en) Tree encloses money formula sponge
CN205387721U (en) Highway retaining wall reinforced structure
CN216787157U (en) Vegetation bank protection soil and water adds protects device
CN209211391U (en) The safety device of lake side slope
CN214832393U (en) Hydraulic engineering's reservoir spillway reinforced structure
CN215758828U (en) Grass planting type bank protection component
CN215289982U (en) Ecological dykes and dams of hydraulic engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181221