CN208252954U - A kind of Pipe installing fixed structure for the ventilation equipment that freeze - Google Patents

A kind of Pipe installing fixed structure for the ventilation equipment that freeze Download PDF

Info

Publication number
CN208252954U
CN208252954U CN201820783990.4U CN201820783990U CN208252954U CN 208252954 U CN208252954 U CN 208252954U CN 201820783990 U CN201820783990 U CN 201820783990U CN 208252954 U CN208252954 U CN 208252954U
Authority
CN
China
Prior art keywords
fixedly connected
threaded rod
block
fixed
fixed link
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820783990.4U
Other languages
Chinese (zh)
Inventor
阮帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Aosua Refrigeration Co Ltd
Original Assignee
Zhejiang Aosua Refrigeration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Aosua Refrigeration Co Ltd filed Critical Zhejiang Aosua Refrigeration Co Ltd
Priority to CN201820783990.4U priority Critical patent/CN208252954U/en
Application granted granted Critical
Publication of CN208252954U publication Critical patent/CN208252954U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ventilation (AREA)

Abstract

The utility model discloses a kind of Pipe installing fixed structures of ventilation equipment that freeze, including top plate, sliding slot is offered on the left of the top plate lower surface, sliding block is slidably connected in the sliding slot, the lower surface of the sliding block is fixedly connected with movable block, the right side of the movable block is fixedly connected with the first fixture block, and first fixture block is connected in the first card slot that connecting plate left side opens up.By the way that the first in command is arranged, the first in command, which rotates forward, drives the rotation of the first threaded rod, first threaded rod is moved to the left the first threaded rod in the change of team of the first thread cap inward turning, first threaded rod, which is moved to the left, drives movable block to be moved to the left, to drive the first fixture block to be moved to the left, when the first fixture block is detached from the first card slot, it is moved to the left connecting plate again, the second fixture block is set to be detached from the second card slot, just the disassembly to pipeline is completed, people is not needed and uses multiple types of tools, disassembly process is simple, and the time of people is saved, it is brought convenience to people when dismantling pipeline.

Description

A kind of Pipe installing fixed structure for the ventilation equipment that freeze
Technical field
The utility model relates to pipe technology field, specially a kind of Pipe installing fixed structure for the ventilation equipment that freeze.
Background technique
Pipeline is connected into pipe, pipe connector and valve etc. for conveying gas, liquid or with solid particle Fluid device.In general, fluid flows to low pressure from the high pressure of pipeline after the pressurization such as air blower, compressor, pump and boiler The pressure or gravity conveying of fluid itself can also be used in place.Having many uses for pipeline is general, be used primarily in water supply, draining, heat supply, It gives gas, in long distance delivery oil and natural gas, agricultural irrigation, hydraulic engineering and various commercial plants.
In refrigeration ventilation equipment in use, needing the pipeline to refrigeration ventilation equipment to install, pipeline is for a long time Meeting aging after use, it is therefore desirable to dismounting and change is carried out to pipeline, and existing installation method is all that pipeline is passed through expanding screw Silk is fixed on metope, since setscrew is all built-in in wall, is needed to use multiple types of tools in disassembly, be torn open It is very and cumbersome to unload process, wastes people's time, makes troubles to people when dismantling pipeline.
Utility model content
In view of the deficiencies of the prior art, the utility model provides a kind of Pipe installing fixed knot of ventilation equipment that freeze Structure, solving existing installation method all is to be fixed in pipeline on metope by setscrew, all due to setscrew It is built-in in wall, needs to use multiple types of tools in disassembly, disassembly process is very and cumbersome problem.
To achieve the above object, the utility model provides the following technical solutions: a kind of Pipe installing for the ventilation equipment that freeze Fixed structure, including top plate offer sliding slot on the left of the top plate lower surface, sliding block, institute are slidably connected in the sliding slot The lower surface for stating sliding block is fixedly connected with movable block, and the right side of the movable block is fixedly connected with the first fixture block, and described first Fixture block is connected in the first card slot that connecting plate left side opens up, and the left side of the movable block is connected with auxiliary device, described The left end of auxiliary device is fixedly connected with the first threaded rod, and the surface of first threaded rod is threaded with the first thread cap, First thread cap is connected to the left side of the first fixed plate, and the upper surface of first fixed plate is fixedly connected on top plate The left end of lower surface, first threaded rod is fixedly connected with the first in command.
The right side of the connecting plate offers the second card slot, is connected with the second fixture block in second card slot, and described The right side of two fixture blocks is fixedly connected with the second fixed plate, and the upper surface of second fixed plate is fixedly connected on top plate lower surface Right side, the lower surface of the connecting plate is fixedly connected with the first fixed link, and the right end of first fixed link passes through activity dress It sets and is flexibly connected with the right end of the second fixed link.
The left end of first fixed link is fixedly connected with the first support plate, and the upper surface of first support plate is connected with Second thread cap, the second thread cap internal screw thread are connected with the second threaded rod, and the top of second threaded rod is fixedly connected There is second handle, the left end of second fixed link is fixedly connected with the second support plate, the upper surface card of second support plate It is connected to third thread cap, and third thread cap is corresponding with the position of the second thread cap.
Preferably, the auxiliary device includes bearing, and the bearing is connected to the left side of movable block, the bearing inner sleeve It is connected to shaft, the left end of the shaft is fixedly connected on the right end of the first threaded rod.
Preferably, the shape of first fixed link and the second fixed link is arc-shaped, under first fixed link Surface is fixedly connected with the first elastic cushion, and the upper surface of second fixed link is fixedly connected with the second elastic cushion, and the first bullet The material of property pad and the second elastic cushion is rubber.
Preferably, the upper surface of the top plate is opened up there are four through-hole, and four through-holes are located at the upper surface of top plate Four corners.
Preferably, the head includes the first link block, and the upper surface of first link block is fixedly connected on the The front of the right end of one fixed link, first link block is hinged by the back side of pin shaft and the second link block, and described second connects The lower surface for connecing block is fixedly connected on the right end of the second fixed link.
Preferably, the first in command includes connecting rod, and the left end of the right side of the connecting rod and the first threaded rod is solid It is fixed to connect, supporting block is fixedly connected with above the connecting rod left side.
The utility model provide it is a kind of freeze ventilation equipment Pipe installing fixed structure, have it is following the utility model has the advantages that
(1), the Pipe installing fixed structure of the refrigeration ventilation equipment, by the way that the first in command is arranged, the first in command rotates forward band Dynamic first threaded rod rotation, the first threaded rod are moved to the left the first threaded rod in the change of team of the first thread cap inward turning, the first screw thread Bar, which is moved to the left, drives movable block to be moved to the left, to drive the first fixture block to be moved to the left, when the first fixture block is detached from the first card slot When, then it is moved to the left connecting plate, so that the second fixture block is detached from the second card slot, just completes the disassembly to pipeline, be not required to very important person Use multiple types of tools, disassembly process is simple, and save people time, brought convenience to people when dismantling pipeline.
(2), the Pipe installing fixed structure of the refrigeration ventilation equipment, by the way that second handle is arranged, people place pipeline Between the first fixed link and the second fixed link, then second handle being rotated forward, second handle rotation drives the rotation of the second threaded rod, the Two threaded rods are moved down in the change of team of the second thread cap inward turning, just complete when the second threaded rod is rotated into third thread cap At the fixation to pipeline, pipeline can be made not move when fixed, make pipeline is fixed more to consolidate.
(3), the Pipe installing fixed structure of the refrigeration ventilation equipment, by the way that the first elastic cushion and the second elastic cushion is arranged, It can be avoided pipeline and directly contact the first fixed link and the second fixed link when fixed, lead to Pipeline damage, thus to pipeline Surface plays a protective role, and the utility model which has a compact structure and a reasonable design, it is practical.
Detailed description of the invention
Fig. 1 is the schematic diagram of the section structure that the utility model is faced;
Fig. 2 is the structural schematic diagram of the right view of the utility model;
Fig. 3 is the structural schematic diagram of the utility model part A amplification.
In figure: 1 top plate, 2 sliding slots, 3 sliding blocks, 4 movable blocks, 5 first fixture blocks, 6 first card slots, 7 connecting plates, 8 first screw threads Bar, 9 first fixed plates, 10 first thread caps, 11 first in command, 111 connecting rods, 112 supporting blocks, 12 second card slots, 13 second Fixture block, 14 second fixed plates, 15 first fixed links, 16 heads, 161 first link blocks, 162 pin shafts, 163 second connections Block, 17 second fixed links, 18 first support plates, 19 second thread caps, 20 second threaded rods, 21 second support plates, 22 third spiral shells Line cap, 23 first elastic cushions, 24 second elastic cushions, 25 second handles, 26 through-holes, 27 auxiliary devices, 271 shafts, 272 bearings.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
As shown in Figure 1-3, the utility model provides a kind of technical solution: it is a kind of freeze ventilation equipment Pipe installing fix Structure, including top plate 1, the upper surface of top plate 1 is opened up there are four through-hole 26, and four through-holes 26 are located at the upper table of top plate 1 The four corners in face can facilitate people to install top plate 1, so that people be facilitated to carry out pipeline by the way that through-hole 26 is arranged It installs, offers sliding slot 2 on the left of 1 lower surface of top plate, sliding block 3 is slidably connected in sliding slot 2, pass through setting sliding slot 2 and sliding block 3, movable block 4 can be made not tilt when moving left and right, tilt the first threaded rod 8 will not when moving left and right, to make First threaded rod 8 is more steady when moving left and right, and the lower surface of sliding block 3 is fixedly connected with movable block 4, the right side of movable block 4 Face is fixedly connected with the first fixture block 5, and the first fixture block 5 is connected in the first card slot 6 that 7 left side of connecting plate opens up, movable block 4 Left side is connected with auxiliary device 27, and auxiliary device 27 includes bearing 272, and bearing 272 is connected to the left side of movable block 4, axis It holds and is socketed with shaft 271 in 272, the left end of shaft 271 is fixedly connected on the right end of the first threaded rod 8, passes through setting auxiliary dress 27 are set, the first threaded rod 8 can be made not shake when rotated, thus keep the first threaded rod 8 more steady when moving left and right, The left end of auxiliary device 27 is fixedly connected with the first threaded rod 8, and the surface of the first threaded rod 8 is threaded with the first thread cap 10, the first thread cap 10 is connected to the left side of the first fixed plate 9, and the upper surface of the first fixed plate 9 is fixedly connected on top plate 1 Lower surface, the left end of the first threaded rod 8 are fixedly connected with the first in command 11, and the first in command 11 includes connecting rod 111, connecting rod 111 right side is fixedly connected with the left end of the first threaded rod 8, and connecting rod is fixedly connected with supporting block above 111 left side 112, by the way that the first in command 11 is arranged, the first in command 11, which rotates forward, drives the rotation of the first threaded rod 8, and the first threaded rod 8 is in the first spiral shell The change of team of 10 inward turning of line cap is moved to the left the first threaded rod 8, and the first threaded rod 8, which is moved to the left, drives movable block 4 to be moved to the left, from And the first fixture block 5 is driven to be moved to the left, when the first fixture block 5 is detached from the first card slot 6, then it is moved to the left connecting plate 7, makes the Two fixture blocks 13 are detached from the second card slot 12, just complete the disassembly to pipeline, do not need people and use multiple types of tools, disassembly process Simply, and save people time, brought convenience to people when dismantling pipeline.
The right side of connecting plate 7 offers the second card slot 12, and the second fixture block 13, the second fixture block are connected in the second card slot 12 13 right side is fixedly connected with the second fixed plate 14, and the upper surface of the second fixed plate 14 is fixedly connected on 1 lower surface of top plate Right side, the lower surface of connecting plate 7 are fixedly connected with the first fixed link 15, and the shape of the first fixed link 15 and the second fixed link 17 is equal To be arc-shaped, the lower surface of the first fixed link 15 is fixedly connected with the first elastic cushion 23, and the upper surface of the second fixed link 17 is fixed It is connected with the second elastic cushion 24, and the material of the first elastic cushion 23 and the second elastic cushion 24 is rubber, by the way that the first bullet is arranged Property pad 23 and the second elastic cushion 24, can be avoided pipeline directly contacts the first fixed link 15 and the second fixed link 17 when fixed, Lead to Pipeline damage, so that the surface to pipeline plays a protective role, the right end of the first fixed link 15 by head 16 with The right end of second fixed link 17 is flexibly connected, and head 16 includes the first link block 161, the upper surface of the first link block 161 It is fixedly connected on the right end of the first fixed link 15, the front of the first link block 161 passes through pin shaft 162 and the second link block 163 The back side is hinged, and the lower surface of the second link block 163 is fixedly connected on the right end of the second fixed link 17, by the way that head is arranged 16, head 16 can make the second fixed link 17 when rotating around pin shaft 162 without departing from the second link block 163.
The left end of first fixed link 15 is fixedly connected with the first support plate 18, and the upper surface of the first support plate 18 is connected with Two thread caps 19,19 internal screw thread of the second thread cap are connected with the second threaded rod 20, and the top of the second threaded rod 20 is fixedly connected with Second handle 25, the left end of the second fixed link 17 are fixedly connected with the second support plate 21, the upper surface clamping of the second support plate 21 There is third thread cap 22, and third thread cap 22 is corresponding with the position of the second thread cap 19, by the way that second handle 25, people is arranged Pipeline is placed between the first fixed link 15 and the second fixed link 17, then rotate forward second handle 25, second handle 25 rotates The second threaded rod 20 is driven to rotate, the second threaded rod 20 is moved down in the change of team of 19 inward turning of the second thread cap, when the second threaded rod 20 when be rotated into third thread cap 22, just completes the fixation to pipeline, and pipeline can be made not move when fixed, made Pipeline is fixed more to be consolidated.
In use, people rotate forward the first in command 11 first, the first in command 11, which rotates forward, drives the rotation of the first threaded rod 8, first Threaded rod 8 is moved to the left the first threaded rod 8 in the change of team of 10 inward turning of the first thread cap, and it is auxiliary that the first threaded rod 8 is moved to the left drive Device 27 is helped to be moved to the left, auxiliary device 27 drives movable block 4 to be moved to the left, to drive the first fixture block 5 to be moved to the left, when the When one fixture block 5 is detached from the first card slot 6, then it is moved to the left connecting plate 7, the second fixture block 13 is made to be detached from the second card slot 12, it is just complete At the disassembly to pipeline, when people install the pipeline of replacement, the second support plate 21 is pulled downwards, it will be to be installed Pipeline is placed between the first fixed link 15 and the second fixed link 17, then by the position of third thread cap 22 and the second threaded rod 20 It is corresponding, second handle 25 is rotated forward, the rotation of second handle 25 drives the rotation of the second threaded rod 20, and the second threaded rod 20 is in the second spiral shell The change of team of 19 inward turning of line cap moves down, and when the second threaded rod 20 is rotated into third thread cap 22, just completes to pipeline Fixation, people are corresponding with the position of the second card slot 12 by the second fixture block 13, are moved to the left connecting plate 7, make the second fixture block 13 It is clamped into the second card slot 12, in the reversion first in command 11, the first in command 11, which inverts, drives the rotation of the first threaded rod 8, thus band Dynamic movable block 4 moves right, and is clamped the first fixture block 5 into the first card slot 6, just completes the installation to pipeline.
Can to sum up obtain, the Pipe installing fixed structure of (1), the refrigeration ventilation equipment, by be arranged the first in command 11, first Handle 11, which rotates forward, drives the rotation of the first threaded rod 8, and the first threaded rod 8 makes the first threaded rod 8 in the change of team of 10 inward turning of the first thread cap It being moved to the left, the first threaded rod 8, which is moved to the left, drives movable block 4 to be moved to the left, so that the first fixture block 5 is driven to be moved to the left, when When first fixture block 5 is detached from the first card slot 6, then it is moved to the left connecting plate 7, so that the second fixture block 13 is detached from the second card slot 12, just The disassembly to pipeline is completed, people is not needed and uses multiple types of tools, disassembly process is simple, and saves the time of people, gives People bring convenience when dismantling pipeline.
(2), the Pipe installing fixed structure of the refrigeration ventilation equipment, by the way that second handle 25 is arranged, people put pipeline It sets between the first fixed link 15 and the second fixed link 17, then rotates forward second handle 25, handle rotation drives the second threaded rod 20 Rotation, the second threaded rod 20 is moved down in the change of team of 19 inward turning of the second thread cap, when the second threaded rod 20 is rotated into third screw thread When cap 22, the fixation to pipeline is just completed, pipeline can be made not move when fixed, fixes pipeline more steady Gu.
(3), the Pipe installing fixed structure of the refrigeration ventilation equipment passes through the first elastic cushion 23 of setting and the second elastic cushion 24, it can be avoided pipeline and directly contact the first fixed link 15 and the second fixed link 17 when fixed, lead to Pipeline damage, thus right The surface of pipeline plays a protective role, and the utility model which has a compact structure and a reasonable design, it is practical.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of Pipe installing fixed structure for the ventilation equipment that freeze, including top plate (1), it is characterised in that: under the top plate (1) It offers on the left of surface sliding slot (2), is slidably connected sliding block (3) in the sliding slot (2), the lower surface of the sliding block (3) is solid Surely it is connected with movable block (4), the right side of the movable block (4) is fixedly connected with the first fixture block (5), first fixture block (5) It is connected in the first card slot (6) that connecting plate (7) left side opens up, the left side of the movable block (4) is connected with auxiliary device (27), the left end of the auxiliary device (27) is fixedly connected with the first threaded rod (8), the surface spiral shell of first threaded rod (8) Line is connected with the first thread cap (10), and first thread cap (10) is connected to the left side of the first fixed plate (9), and described first The upper surface of fixed plate (9) is fixedly connected on the lower surface of top plate (1), and the left end of first threaded rod (8) is fixedly connected with The first in command (11);
The right side of the connecting plate (7) offers the second card slot (12), is connected with the second fixture block in second card slot (12) (13), the right side of second fixture block (13) is fixedly connected with the second fixed plate (14), second fixed plate (14) it is upper Surface is fixedly connected on the right side of top plate (1) lower surface, and the lower surface of the connecting plate (7) is fixedly connected with the first fixed link (15), the right end of first fixed link (15) is flexibly connected by head (16) with the right end of the second fixed link (17);
The left end of first fixed link (15) is fixedly connected with the first support plate (18), the upper table of first support plate (18) Face is connected with the second thread cap (19), and the second thread cap (19) internal screw thread is connected with the second threaded rod (20), and described second The top of threaded rod (20) is fixedly connected with second handle (25), and the left end of second fixed link (17) is fixedly connected with second The upper surface of support plate (21), second support plate (21) is connected with third thread cap (22), and third thread cap (22) with The position of second thread cap (19) is corresponding.
2. a kind of Pipe installing fixed structure of ventilation equipment that freeze according to claim 1, it is characterised in that: described auxiliary Helping device (27) includes bearing (272), and the bearing (272) is connected to the left side of movable block (4), and the bearing (272) is interior It is socketed with shaft (271), the left end of the shaft (271) is fixedly connected on the right end of the first threaded rod (8).
3. a kind of Pipe installing fixed structure of ventilation equipment that freeze according to claim 1, it is characterised in that: described the The shape of one fixed link (15) and the second fixed link (17) is arc-shaped, the fixed company in the lower surface of first fixed link (15) It is connected to the first elastic cushion (23), the upper surface of second fixed link (17) is fixedly connected with the second elastic cushion (24), and first The material of elastic cushion (23) and the second elastic cushion (24) is rubber.
4. a kind of Pipe installing fixed structure of ventilation equipment that freeze according to claim 1, it is characterised in that: the top The upper surface of plate (1) is opened up there are four through-hole (26), and four through-holes (26) are located at the quadrangle of the upper surface of top plate (1) Place.
5. a kind of Pipe installing fixed structure of ventilation equipment that freeze according to claim 1, it is characterised in that: the work Dynamic device (16) include the first link block (161), and the upper surface of first link block (161) is fixedly connected on the first fixed link (15) front of right end, first link block (161) is hinged by pin shaft (162) and the back side of the second link block (163), The lower surface of second link block (163) is fixedly connected on the right end of the second fixed link (17).
6. a kind of Pipe installing fixed structure of ventilation equipment that freeze according to claim 1, it is characterised in that: described the Leader (11) includes connecting rod (111), the fixed company in the right side of the connecting rod (111) and the left end of the first threaded rod (8) It connects, is fixedly connected with supporting block (112) above connecting rod (111) left side.
CN201820783990.4U 2018-05-24 2018-05-24 A kind of Pipe installing fixed structure for the ventilation equipment that freeze Expired - Fee Related CN208252954U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820783990.4U CN208252954U (en) 2018-05-24 2018-05-24 A kind of Pipe installing fixed structure for the ventilation equipment that freeze

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820783990.4U CN208252954U (en) 2018-05-24 2018-05-24 A kind of Pipe installing fixed structure for the ventilation equipment that freeze

Publications (1)

Publication Number Publication Date
CN208252954U true CN208252954U (en) 2018-12-18

Family

ID=66481990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820783990.4U Expired - Fee Related CN208252954U (en) 2018-05-24 2018-05-24 A kind of Pipe installing fixed structure for the ventilation equipment that freeze

Country Status (1)

Country Link
CN (1) CN208252954U (en)

Similar Documents

Publication Publication Date Title
CN206046521U (en) A kind of auto parts cleaning device
CN210233212U (en) Clamping device for pipeline cutting
CN208074287U (en) A kind of pipeline convenient for adjusting connects mounting device
CN101407036A (en) Device for grinding sealing face of valve seat of high temperature and high pressure valve
CN201291407Y (en) Grinding device for sealing surface of valve base of high-temperature, high-pressure valve
CN112194266B (en) Environment-friendly chemical industry is aeration equipment for sewage treatment
CN208252954U (en) A kind of Pipe installing fixed structure for the ventilation equipment that freeze
CN204988693U (en) Test bench is dismantled to drilling tool
CN107051951A (en) Steam turbine cylinder air chamber end mounting component frock
CN208138161U (en) A kind of dustless centrifugal fan
CN208223747U (en) A kind of building heating and ventilating pipeline gas leak detection device
CN209681527U (en) A kind of pipeline welding jigs and fixtures
CN108672748A (en) A kind of air-conditioning refrigerant storage gas cylinder production welding bench
CN208535320U (en) A kind of mineral heating system for oil support of pipelines
CN212943584U (en) Rotation control system for fog gun machine
CN107498412A (en) A kind of grinder for pipe end
CN208438147U (en) A kind of ball bearing ball derusting device
CN207508594U (en) A kind of pipeline welding equipment convenient for clamping docking
CN208138122U (en) A kind of air compressor machine volume adjusting apparatus
CN208138695U (en) A kind of hydraulic tube expander
CN207963381U (en) For composite microbe fertilizer dryer
CN208503945U (en) A kind of air cleaning air accumulator
CN215862224U (en) Quick-assembling direct joint for pipeline
CN209444889U (en) Temporary support in a kind of big-diameter pipeline
CN217482220U (en) Air inlet pipe fitting convenient to replace

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181218

Termination date: 20190524

CF01 Termination of patent right due to non-payment of annual fee