CN208251181U - Civil engineering monoblock type static test heap carrying platform - Google Patents
Civil engineering monoblock type static test heap carrying platform Download PDFInfo
- Publication number
- CN208251181U CN208251181U CN201721739806.8U CN201721739806U CN208251181U CN 208251181 U CN208251181 U CN 208251181U CN 201721739806 U CN201721739806 U CN 201721739806U CN 208251181 U CN208251181 U CN 208251181U
- Authority
- CN
- China
- Prior art keywords
- steel structure
- platform
- girder
- structure platform
- civil engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to a kind of civil engineering monoblock type static test heap carrying platforms, with steel structure platform matrix, load, girder and hydraulic jack, the load is neat to be deposited on steel structure platform matrix, the steel structure platform matrix is fixedly connected with girder, the girder is in contact with hydraulic jack, it is characterized in that the steel structure platform matrix includes at least one piece of steel structure platform plate unit.This product good integrity, stress is good, securely and reliably, can save the cost, shorten detection non-cutting time and environmentally protective, and be the standardization of static load platform, seriation is made that basic contribution.Platform interior enclosure space provides basic guarantee for the development and utilization of platform new function.
Description
Technical field
The utility model relates to be related to static-loading test ballast when a kind of civil engineering groundwork and pile detection
The device that counter-force uses, especially a kind of civil engineering monoblock type static test heap carrying platform.
Background technique
Static-loading test ballast counter-force is mainly from 1, anchorage pile, anchor pole at present;2, artificial preloading;3, examination is utilized
Test the frictional resistance (self-balancing load box) of stake itself.But since site condition limits, anchorage pile or anchor pole cannot construct, self-balancing
Load box is also due to pile body frictional resistance is far smaller than the reasons such as bottom bearing, using being also restricted.Artificially preloading is basic again for face pressure
On do not influenced by site condition and pile body itself frictional resistance and bottom bearing ratio, adopted extensively in static-loading test
With.
Earliest artificial preloading is that manually sand pocket is carried on the back to pile on heap carrying platform, and present heap loading is moved mainly by hanging
Vehicle is completed, and pile is manually only completed.Artificially face pressure weight heap support method be: first centered on testing site construct girder buttress and time
Beam buttress, girder buttress is shorter than secondary beam buttress, and then girder is placed on girder buttress, then above girder with girder Vertical Square
Be placed on secondary beam buttress to secondary beam, girder with 20 millimeters of secondary beam vertical range or so, girder cannot contact compression, preloading with secondary
When girder buttress be not subject to top preloading loading be solely subjected to girder self weight.
The disadvantage is that adjust the height difference of girder buttress Yu secondary beam buttress, it is ensured that secondary beam is not pressed directly after the installation of primary and secondary beam
To girder, the right angle setting distance between girder and jack is not influenced.After being installed, between girder, secondary beam and secondary beam with
It is not connected with each other between secondary beam, is in granular media state, whole stress is poor, high when causing preloading if secondary beam buttress is uneven
Secondary beam elder generation stress, and low secondary beam elder generation stress when girder work rises be easy to cause secondary beam deformation excessive or even failure.
Secondary beam radical is more, repeatedly lifting, easily generation safety accident is needed when installation, and installation speed is slow.Each project
Each testing site will constantly repeat this process.Transporting and hoisting is inconvenient after detection, and stock management is also inconvenient.
It easily occurs under fixed load, is mostly used secondary beam radical or few phenomenon that happens occasionally with secondary beam radical, although
Multi-purpose secondary beam radical does not have serious consequence, but causes secondary beam deformation serious with secondary beam radical consequence less serious case less, and mechanical property becomes
Difference, consequence serious person is few to be influenced testing result with secondary beam radical platform cisco unity malfunction and causes safety accident.
In addition, being not fixed forming between secondary beam, the space between secondary beam can not be efficiently used.
If differential settlement occurs for platform ground, platform is easily tilted, and the test platform built is granular media formula structure, is not had
Method can adjust the balance of platform, in addition to being removed, can only just be allowed to tilt.In the case where failing to remove in time, if
Platform quick slant, heap, which is loaded in the load on platform and must will cause, to collapse, so that safety accident occur.And for vertical compression
The ballast load of static test institute preloading, usually tens tons, several hundred tons to kiloton or even a few kiloton rank.Weight is quite frightened
People, once safety accident occurs, consequence is extremely serious.
Each testing site of one project is both needed to even carry out the transfer of static load device, field with transport vehicle sometimes with crane
Interior easy fugitive dust, although the rainy day in this way, fugitive dust was not easy miriness in field to take on over-the-counter road again, crane transport vehicle exhaust emissions
Also air is polluted.
Loading heap carrying platform is always that formula is taken in granular media spelling for a long time in a word, and heap carrying platform does not form standardization, series
Change, to build the extensive backwardness of mode original, be unfavorable for the development of civil engineering dead-load detection.Dead-load detection developing water Pingyuan County is low at present
In the development of foundation basic construction technology, platform decades ago and preloading mode in addition to crane replace workers carry's ballast it
Outside, static load device and heap support method there is no big variation, development.
Therefore, preloading device existing defects used by existing static-loading test, need to improve.
Utility model content
The purpose of this utility model is a kind of good integrity, and stress is good, and securely and reliably, energy save the cost shortens inspection
It surveys non-cutting time and environmentally protective civil engineering monoblock type static test heap carrying platform, and is the standardization of static load platform,
Seriation is made that after basic contribution, platform interior enclosure space are opened and is protected as new platform functional development using basis is provided
Barrier.
The basic conception of the utility model is: finder charge is classified.Such as by maximum load amount point: 0-200 tons,
200-400 tons, 400-600 tons etc., i.e. 200 tons of ranks and so on carry out whole design, monoblock type preloading to landing beam
Platform standard is formed from several tons of small tonnage to each section of the big position of a few kiloton column of load one system standardization integral platform.Certainly
The classification of maximum load amount can be carried out by other methods.
It selects maximum value to carry out Platform Designing in given section load, is manufactured after the completion of design by design drawing, every time
The position of beam is fixed, and the position of girder and secondary beam is fixed, and is conducive to the connection between every beam.
Monolithic steel structure platform plate can add bolt to be attached into bigger platform, the more ballasts of preloading by steel plate
Object carries out more large-tonnage static test.
Monolithic platform board intersects that connection is integral, and upper and lower surface can be closed with steel plate or with steel plate be made into case with fashioned iron in length and breadth
Template.So, Integral-type platform stress performance is more preferable, certain part stress is excessive on platform gradually to pass to strength
Neighbouring platform board shares receiving, reduces accident odds.Even if by will appear the danger toppled and collapsed, due to stress
Shared by entire platform, also delayed 1 boundary's point of dangerous generation significantly, to discovery danger, adjusts platform in balance and unload carrying platform
Valuable time has been striven in loading, can be avoided bigger accident and occurs, namely increases the ability to ward off risks.Without such as existing
Granular media formula heap carrying platform, certain part stress is slightly strong, will occur the danger toppled and collapsed immediately.
Monolithic platform board physical dimension will meet transport and require, 2.4-3.0 meters wide, 6 meters of length, 9,12,15,18,21 etc. 3
Multiple.Jack warehouse is set in the middle part of Platform center plate, facilitates the installation of jack.Space can be used as hydraulic oil container, installation in plate
Oil pump, motor and oil circuit, water pump, water pipe line, it is also possible to make detection instrument case, data cabinet, static test automatic recording instrument,
Monitor, global position system etc..After platform is made and maximum allowable load load listed mark on platform is designed, prevent
Platform overload work.
Platform described in the utility model is substantially integral steel structure platform, with the purposes mostly wide spy with applicability
Point.Running gear can be installed on the outside of integral platform, allow platform being capable of whole self-propelled movement.Automatic moving described here refers to
During the detection of entire project test, the multiple testing sites of single site survey are included in, the platform can be by walking
Device is whole to be moved to another testing site from a testing site, without removing platform after a testing site is detected, hanging
Assembling platform component nearby, in next testing site builds platform to next testing site.
If heap jumbo bag can conveniently allow surrounding steel-work fence to connect, such as the Chinese patent application of the applicant
201720761426.8 monoblock type granular media jumbo bag preloading device disclosed in number.
Tank column can be allowed to connect with platform if preloading heap tank column also facilitates, tank column bottom intake-outlet passes through deck roof
Plate is directly connect with water pipe line preassembled in platform, and such as Chinese patent application 201710439090.8 of the applicant
Disclosed civil engineering static-loading test large size foundation pile ground ballast heap support method.
Two opposite parallel edges of four side of platform can respectively be equipped with one group of hydraulic moving mechanism device (hydraulic moving mechanism walking chassis),
The vertical oil cylinder in two, every side, a cross cylinder, the double-deck walking support plate, totally eight vertical oil cylinders, four cross cylinders,
Four double-deck walking support plates;It is not in contact with the ground that vertical oil cylinder receives highest point support plate;When vertical oil cylinder is to minimum point, steel
Based platform can leave 300 millimeters of ground.Hydraulic moving mechanism walking chassis described in the utility model (hydraulic moving mechanism device) uses
Hydraulic walking mechanism used in the matured products such as existing commercially available hydraulic moving mechanism churn or hydraulic walking piling machine.
Therefore integral platform can standardize, after seriation, be conducive to the later transformation of platform, optimization and upgrading.As collection
Vanning is initial to be occurred equally, generates significant impact to later industry development.
Integral steel structure platform advantage is in summary: 1, good integrity, stress are good.2, detection is facilitated to use, it can be fast
Fast installing and dismounting.3, mobile transport is quick and convenient.4, different maximum load amounts corresponds to different platforms, and use is safe.5, whole
Body formula is convenient for management.6, it provides the foundation guarantee after space can be opened with enclosure space in plate for the rear development and utilization of platform.7,
Enclosure space is not easy to corrode.8, the error of secondary beam radical is less prone to when detecting, such as platform bearer scarce capacity phenomenon.9, safety makes
With platform and the service life of platform can be extended.10, facilitate the stacking of the above loading of platform, whether granular media stacking or water tank
Or the stacking of tank column is all very convenient.11, it is easy to understand the use and distribution situation of equipment using global position system, is convenient for equipment pipe
Reason.12, facilitate the upgrading of platform from now on, platform feature can continue to develop.
Specifically, civil engineering described in the utility model monoblock type static test heap carrying platform has steel construction
Platform matrix, load, girder and hydraulic jack, the load is neat to be deposited on steel structure platform matrix, the steel knot
Structure platform matrix is fixedly connected with girder, and the girder is in contact with hydraulic jack, it is characterized in that the steel structure platform base
Body includes at least one piece of steel structure platform plate unit.I.e. monolithic steel structure platform plate unit also can be used, two or more than two
Steel structure platform plate unit is the large platform of splicing, is mainly controlled by traffic condition.
Steel structure platform matrix described in the utility model may include three pieces and the above steel structure platform plate unit, described
Adjacent steel structure platform plate unit is in the same plane and is parallel to each other, and the end face of the adjacent steel structure platform plate unit is neat
It is flat, entirety is fixedly connected as by fixation member between the adjacent steel structure platform plate unit.
Girder described in the utility model can be located at below steel structure platform matrix, below the steel structure platform matrix
Two sides also have buttress, and the buttress is contacted with external ground, one end of the hydraulic jack and external test point contact,
The other end of the hydraulic jack is in contact with girder.
Girder described in the utility model can be located at steel structure platform matrix above, the steel structure platform matrix with
The steel structure platform plate unit center that girder is directly fixedly connected has jack warehouse, and the hydraulic jack passes through jack
Warehouse is in contact with girder.The i.e. described hydraulic jack is directly contacted across jack warehouse with girder or hydraulic jack is logical
Cross pushing tow jack warehouse and girder mediate contact.Jack warehouse can use bearing plate.
Steel structure platform plate unit described in the utility model can have inner space, can install in the space
There are hydraulic oil container, oil pump, motor, oil circuit and water pump, water pipe line, or detection instrument case, data cabinet, static load examination are installed
Test automatic recording instrument, monitor, global position system etc..
Load described in the utility model can be jumbo bag or tank column.
Adjacent steel structure platform plate unit described in the utility model can intersect fixed company by fashioned iron or box beam in length and breadth
It is connected into entirety, the two sides of the steel structure platform matrix being made of steel structure platform plate unit is equipped with steel plate or steel construction
Plate.
The two sides of steel structure platform matrix described in the utility model can be fixedly connected to hydraulic moving mechanism device.
Two opposite parallel edges of four sides of steel structure platform matrix described in the utility model can respectively be equipped with one group of liquid
Walking device is pressed, one group of hydraulic moving mechanism device on every side includes two vertical oil cylinders, a cross cylinder, the double-deck row
Support plate is walked, two groups of hydraulic moving mechanism devices include eight vertical oil cylinders, four cross cylinders, four double-deck walking support plates altogether;
It is not in contact with the ground that vertical oil cylinder receives highest point support plate;When vertical oil cylinder bottoms out, base steel platform can leave ground
300 millimeters.
Entirety is fixedly connected as by fixation member between adjacent steel structure platform plate unit described in the utility model.Its
The fixation member can add bolt to be fixedly connected etc. for screw bolt and nut or steel plate.
Compared with the aforementioned existing similar products, the civil engineering of the utility model is whole with monoblock type static test heap carrying platform
Body is good, and stress is good, securely and reliably, can save the cost, shorten detection non-cutting time and environmentally protective, and be static load platform
Standardization, seriation is made that basic contribution, and platform interior enclosure space provides base for the development and utilization of platform new function
This guarantee.
The content of the utility model is further described with the following Examples, but the content of the utility model is not only
It is limited to content involved in embodiment.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of civil engineering monoblock type static test heap carrying platform in embodiment 1.
Fig. 2 is the structural schematic diagram of steel structure platform matrix in embodiment 1.
Fig. 3 is the structure of the steel structure platform matrix of civil engineering monoblock type static test heap carrying platform in embodiment 2
Schematic diagram.
Fig. 4 is the structure of the steel structure platform matrix of civil engineering monoblock type static test heap carrying platform in embodiment 3
Schematic diagram.
Fig. 5 is the side of the steel structure platform matrix of civil engineering monoblock type static test heap carrying platform in embodiment 3
Structural schematic diagram.
Specific embodiment
Embodiment 1: as shown in Fig. 1~2, the monoblock type static test heap carrying platform of civil engineering described in the present embodiment,
With steel structure platform matrix 1, load 2, girder 3 and hydraulic jack 4, the load 2 it is neat be deposited in steel structure platform
On matrix 1, the steel structure platform matrix 1 is fixedly connected with girder 3, and the girder 3 is in contact with hydraulic jack 4, described
Steel structure platform matrix 1 includes three pieces of steel structure platform plate units 11,12,13, and the adjacent steel structure platform plate unit is located at
On same plane and it is parallel to each other, the end face of the adjacent steel structure platform plate unit, the adjacent steel structure platform plate
Entirety is fixedly connected as by fixation member between unit.
Girder 3 described in the present embodiment is located at 1 lower section of steel structure platform matrix, 1 lower section two of steel structure platform matrix
Side also has buttress 5, and the buttress 5 is contacted with external ground 6, and one end of the hydraulic jack 4 connects with external testing site 7
Touching, the other end of the hydraulic jack 4 are in contact with girder 3.
Load 2 described in the present embodiment is tank column.
Adjacent steel structure platform plate unit described in the present embodiment by fashioned iron 8 intersect in length and breadth be fixedly connected it is integral.
Embodiment 2: as shown in figure 3, the present embodiment is similar to Example 1, except that the girder 3 is located at steel construction
1 top of platform matrix, 12 center of steel structure platform plate unit of the steel structure platform matrix being directly fixedly connected with girder 3
With jack warehouse 9, the hydraulic jack 4 is in contact by jack warehouse 9 with girder 3.
The two sides for the steel structure platform matrix being made of described in the present embodiment steel structure platform plate unit is equipped with steel
Plate 10.
Embodiment 3: as shown in Figures 4 and 5, the present embodiment is similar to Example 1, except that the steel structure platform base
Body 1 only includes one piece of steel structure platform plate unit and two sides are fixedly connected to hydraulic moving mechanism device 14.
Claims (8)
1. a kind of civil engineering monoblock type static test heap carrying platform, there is steel structure platform matrix, load, girder and hydraulic
Jack, the load is neat to be deposited on steel structure platform matrix, and the steel structure platform matrix is fixedly connected with girder,
The girder is in contact with hydraulic jack, it is characterized in that the steel structure platform matrix includes three pieces of steel structure platform plate lists
Member, the adjacent steel structure platform plate unit is in the same plane and is parallel to each other, the adjacent steel structure platform plate unit
End face, entirety is fixedly connected as by fixation member between the adjacent steel structure platform plate unit.
2. civil engineering as described in claim 1 monoblock type static test heap carrying platform, it is characterized in that the girder is located at
Below steel structure platform matrix, two sides also have buttress, the buttress and external ground below the steel structure platform matrix
Contact, one end of the hydraulic jack and external test point contact, the other end of the hydraulic jack are in contact with girder.
3. civil engineering as described in claim 1 monoblock type static test heap carrying platform, it is characterized in that the girder is located at
Above steel structure platform matrix, in the steel structure platform plate unit of the steel structure platform matrix being directly fixedly connected with girder
The heart has jack warehouse, and the hydraulic jack is in contact by jack warehouse with girder.
4. civil engineering as described in claim 1 monoblock type static test heap carrying platform, it is characterized in that the steel construction is flat
The available space that platen unit has is equipped with hydraulic oil container, oil pump, motor and oil circuit, water pump, water pipe, inspection in space
Survey tool box, static load automatic recording instrument, global position system and monitor.
5. civil engineering as described in claim 1 monoblock type static test heap carrying platform, it is characterized in that the load is ton
Bag or tank column.
6. the civil engineering monoblock type static test heap carrying platform as described in one of claim 1 to 5, it is characterized in that institute
State adjacent steel structure platform plate unit by fashioned iron intersect in length and breadth be fixedly connected it is integral, it is described by steel structure platform plate unit structure
At steel structure platform matrix two sides be equipped with steel plate or paving steel construction plate.
7. civil engineering as claimed in claim 6 monoblock type static test heap carrying platform, it is characterized in that the steel construction is flat
The two sides of stylobate body are fixedly connected to hydraulic moving mechanism device.
8. civil engineering as claimed in claim 6 monoblock type static test heap carrying platform, it is characterized in that the steel construction is flat
Two opposite parallel edges of four sides of stylobate body are respectively equipped with one group of hydraulic moving mechanism device, one group of hydraulic moving mechanism device on every side
Comprising two vertical oil cylinders, a cross cylinder, the double-deck walking support plate, two groups of hydraulic moving mechanism devices include eight perpendicular altogether
To oil cylinder, four cross cylinders, four double-deck walking support plates;It is not in contact with the ground that vertical oil cylinder receives highest point support plate;
When vertical oil cylinder bottoms out, base steel platform can leave 300 millimeters of ground.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721739806.8U CN208251181U (en) | 2017-12-14 | 2017-12-14 | Civil engineering monoblock type static test heap carrying platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721739806.8U CN208251181U (en) | 2017-12-14 | 2017-12-14 | Civil engineering monoblock type static test heap carrying platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208251181U true CN208251181U (en) | 2018-12-18 |
Family
ID=64619738
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721739806.8U Expired - Fee Related CN208251181U (en) | 2017-12-14 | 2017-12-14 | Civil engineering monoblock type static test heap carrying platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208251181U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109987160A (en) * | 2019-05-10 | 2019-07-09 | 四川中亿创新重型装备有限公司 | A kind of dual-gripper crawler travel combined type static load device and method |
CN112211175A (en) * | 2020-09-28 | 2021-01-12 | 青海省建筑建材科学研究院有限责任公司 | Geotechnical engineering static load test detection equipment and detection method thereof |
-
2017
- 2017-12-14 CN CN201721739806.8U patent/CN208251181U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109987160A (en) * | 2019-05-10 | 2019-07-09 | 四川中亿创新重型装备有限公司 | A kind of dual-gripper crawler travel combined type static load device and method |
CN112211175A (en) * | 2020-09-28 | 2021-01-12 | 青海省建筑建材科学研究院有限责任公司 | Geotechnical engineering static load test detection equipment and detection method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101560779A (en) | Foundation pile static test loading counterforce test method and weight boxes used by same | |
CN208251181U (en) | Civil engineering monoblock type static test heap carrying platform | |
CN103061360B (en) | Stress application system for large-tonnage static load tests | |
CN206189478U (en) | Horizontal pile foundation single pile horizontal load test device | |
CN201795926U (en) | Climbing testboard for heavy crawler crane | |
CN103147465A (en) | Load box for testing open caisson with self-balancing method | |
CN103697979B (en) | A kind of method that self-elevating drilling platform cantilever beam is weighed | |
CN105275027A (en) | Water bag static load test device | |
CN102889984B (en) | In-situ static-loading safety performance detection method of waveform beam guardrail | |
CN103523665B (en) | A kind of transport device and method of high pedestal jib crane | |
CN210917508U (en) | Large-tonnage foundation pile static load high-precision detection device | |
CN201268853Y (en) | Box type girder for foundation pile statical test loading reaction test system | |
CN110146246B (en) | Impact test platform, test device and hoisting buffer test method | |
CN102021918B (en) | Detection method of bearing capacity of big tonnage full sized foundation in simulated conditions | |
CN207194045U (en) | A kind of building pile foundation dead-load detection device | |
CN208520595U (en) | A kind of high-altitude operation vehicle inclining experiment platform | |
CN203759268U (en) | Vehicle-mounted mobile security check platform | |
CN106522287B (en) | A kind of skirt piles vertical bearing capacity detection method | |
CN208251191U (en) | Civil engineering large-tonnage static load system mobile chassis | |
CN106320402A (en) | Vertical pressure-resistant static load test device for engineering piles | |
CN108483334A (en) | A kind of truck scale table top lifting device | |
CN208251180U (en) | Civil engineering Integral Steel based platform static test preloading device | |
CN205642989U (en) | Utilize assembled reaction frame loading device of old and useless roof beam body for counter weight | |
CN203496738U (en) | Improved beam structure of dumper | |
CN203658159U (en) | Basic raft testing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181218 Termination date: 20201214 |