CN208251180U - Civil engineering Integral Steel based platform static test preloading device - Google Patents

Civil engineering Integral Steel based platform static test preloading device Download PDF

Info

Publication number
CN208251180U
CN208251180U CN201721739718.8U CN201721739718U CN208251180U CN 208251180 U CN208251180 U CN 208251180U CN 201721739718 U CN201721739718 U CN 201721739718U CN 208251180 U CN208251180 U CN 208251180U
Authority
CN
China
Prior art keywords
platform
steel
girder
base
base steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721739718.8U
Other languages
Chinese (zh)
Inventor
张宗毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721739718.8U priority Critical patent/CN208251180U/en
Application granted granted Critical
Publication of CN208251180U publication Critical patent/CN208251180U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model relates to civil engineering Integral Steel based platform static test preloading devices, the steel construction matrix having includes girder, base steel platform, steel structure base platform short side attachment beam, jack, load, datum line beam and datum line beam earth anchor, base steel platform is directly placed on ground on one side, girder is arranged on the another side center line of base steel platform and is fixedly connected with base steel platform, base steel platform central has steel structure base platform through-hole, jack passes through steel structure base platform through-hole and contacts with girder, the both ends of base steel platform are fixedly installed steel structure base platform short side attachment beam and parallel with girder, datum line beam is vacantly arranged in above girder and consistent with girder axis, the both ends of datum line beam are fixedly connected with datum line beam earth anchor, datum line beam earth anchor is vertical with datum line beam and is inserted into firm ground, load is fitly piled up in steel On the another side of based platform.Can save the cost, shorten detection non-cutting time, and exclude large-tonnage load preloading security risk and environmentally protective.

Description

Civil engineering Integral Steel based platform static test preloading device
Technical field
The utility model relates to be related to static-loading test ballast counter-force when a kind of civil engineering pile detection to make Device, especially a kind of civil engineering Integral Steel based platform static test preloading device.
Background technique
Static-loading test ballast counter-force is mainly from 1, anchorage pile, anchor pole at present;2, artificial preloading;3, it utilizes The frictional resistance (self-balancing load box) of test pile itself.But since site condition limits, anchorage pile or anchor pole cannot construct, certainly flat Load box weigh also due to pile body frictional resistance is far smaller than the reasons such as bottom bearing, using being also restricted.Artificially face pressure preloading base again It is not influenced by site condition and pile body itself frictional resistance and bottom bearing ratio in sheet, is adopted extensively in static-loading test With the mode of ballast preloading at present has sand pocket, stone bag, earth bag, water bag, sandbox, stone case, native case, water tank, metal material, concrete Prefabricated component, the rectangular slab of stone, block stone have tank column accumulation load method again recently.These preloading modes carry the vertical compression of ground and pile foundation Power test has played important function.But with the rapid advances of China's manufacturing industry level, ground and pile foundation construction are mechanical horizontal Raising rapidly, especially big machinery emerge in large numbers, and civil engineering tall and bigization, the two require ground and bearing capacity of pile foundation ton in addition Position greatly improves.Current large-tonnage loading test difficulty is big, costly, and some bearing capacity of single pile majorities reach several hundred tons, on Kiloton even thousands of tons of.Existing country's pile measurement specification regulation can be carried when condition does not have with drill core test pile foundation Power.Actually core drilling method at all can not detection of pier foundation bearing capacity, deduction bearing capacity of pile foundation is only carried out according to correlated condition, strictly On say that this is not very not scientific also rigorous.But sorry is that the loading test of current domestic many large-scale pile foundations in place generallys use brill The detection of core method.It is difficult to be primarily due to top heap carrying capacity preloading, prior art economic condition is unable to reach, second is that because large-tonnage Very high to platform bearer power and platform buttress foundation requirement, platform bearer power is easy to solve by Steel Structural Design, and platform Buttress ground solves difficulty, and detection scene is often disturbed soil, and bearing capacity is smaller, therefore requires foundation soil under detection device Height needs to carry out special disposal and is just able to satisfy test requirements document, and each testing site needs to handle, and time-consuming and laborious and cost is too high.
And after the completion of each testing site, need to install second platform in advance, waits on first testing site platform Ballast be transferred on second platform after, secondary beam, girder and buttress etc. on first test platform could be removed, remove After be pre-installed on third testing site.Ballast after to second testing site on second point turns to try in third It tests on platform.The continuous transfer that platform and buttress girder, heap loading are constantly carried out with this, until on-the-ground test point all tie by detection Beam.
The transfer work of the ballast between testing site can be greatly reduced with water load, but not can be reduced static test Buttress, girder, secondary beam and water containing device installation, dismantlement work and buttress, girder, secondary beam and water containing device transfer work.
Since the structure of existing static-loading test ballast heap carrying platform is to be placed on testing site by jack Girder places the platform that secondary beam is constituted on girder, platform both sides setting buttress support platform weight and allow platform to keep steady It is fixed, the preloading ballast on platform.It is therefore seen that girder and buttress are in together below platform, and as finder charge increases, girder Accordingly become larger with secondary beam section, because girder test carry out when will bear platform on heap loading weight, then by weight pass through with The jack of any is concentrated to pass to testing site on girder, in order to allow girder and secondary beam anti-bending strength to keep good, it is necessary to increase Height is to maintain girder not to be bent (bending resistance and main depth of beam of girder are at 2 power relationships) when by jack pushing tow And then mounting height also increases with it, buttress must also be increased to adapt to the installation of girder.That is, finder charge is bigger, Girder must just increase adaptation load, in order that achieving the purpose that bending resistance, and as girder increases, in order to install girder with regard to necessary Increase buttress, the buttress increased causes platform further to be raised again, and originally on platform the load height of preloading with tonnage Increase is also increasing, and then whole center of gravity is got higher, and becomes top-heavy state, stability decline.In other words, finder charge Heavier, entire platform is higher, and stability is poorer, and building operation amount increases, and testing cost increases, and detection time increases Long, also high to buttress foundation requirement, buttress ground generally requires just to can be carried out buttress installation after carrying out special basement process, not so Foundation pressure concentration can settle at buttress, directly affect platform in balance, and then platform inclination is caused to cause safety accident.However, For safety, heavier platform more needs to stablize, it is clear that the prior art has implacable contradiction on this problem. Buttress height wastes valuable buttress preloading space simultaneously, this point is more important to large-tonnage preloading.Currently in order to reducing buttress Highly, girder is done it is short, girder do it is short after Lack of support when again horizontal direction spell plus girder, and cause main beam stress unreasonable It is not scientific.The problem of tank column method preloading needs the long period there is also buttress cost issues and installation buttress.
The ballast preloading of existing each testing site requires to carry out lifting buttress, platform and construction to build, and test is completed Afterwards, it is necessary to carry out ballast preloading lifting unloading, then remove platform.Regardless of next testing site is apart from a upper testing site distance How is distance, also to repeat the above steps, and also needs Automobile Transportation in field when apart from farther out, also very numb when testing site is close Tired, the platform of first testing site may influence building for second platform, so ballast and buttress, platform must be hung It opens, then hangs again and buttress could be installed back, builds platform, last preloading ballast.It hangs and turns or under running in platform removal A testing site also needs to repeat the build process of above-mentioned test platform.The disadvantage is that: each testing site requires to build and tear open Except test platform, loads and unloading ballast load, time-consuming and laborious increase testing cost, extend project at growth detection non-cutting time Duration.And if differential settlement occurs for platform ground, platform is easily tilted, and the test platform built is granular media formula structure, is not had There is method that can adjust the balance of platform, in addition to being removed, can only just be allowed to tilt.In the case where failing to remove in time, such as Fruit platform quick slant, heap, which is loaded in the load on platform and must will cause, to collapse, so that safety accident occur.And for vertically resisting Press the ballast load of static test institute preloading, usually hundred tons to kiloton or even a few kiloton rank.Weight is quite surprising, once Safety accident occurs, consequence is extremely serious.
Crane and transport vehicle are frequently used during test, discharges exhaust gas and fugitive dust, pollute air and environment.
Therefore, preloading device existing defects used by existing static-loading test, need to improve.
Utility model content
The purpose of the utility model is to provide a kind of energy save the costs, shorten detection non-cutting time, and exclude large-tonnage lotus Carry preloading security risk and environmentally protective civil engineering Integral Steel based platform static test preloading device.
The basic conception of the utility model is: changing existing artificially face pressure preloading mode again, buttress is cancelled, using steel Structure basis increases the horizontal area of steel structure base, and shape increases the contact area with ground similar to steel construction plate, will be upper Portion's preloading load is distributed on ground as big as possible, greatly reduces foundation soil stress.Steel structure base vertical structure uses Box beam or fashioned iron, horizontal direction structure use steel plate or steel construction plate, horizontal steel can also do not had to when vertical structure horizontal space is small Structural slab.Horizontal and vertical steel structure connection is at an entirety, and single component maximum physical dimension is controlled by traffic condition, structure Size need to be designed specially.
Increased using foundation area after steel structure base, testing load can be deposited on steel structure base, such steel knot Structure basis just instead of original heap carrying platform and buttress, forms a steel structure base platform being placed directly on ground.It is main Beam is placed on steel structure base center, and mounting height is controlled by very heavy heights of roofs and testing site designed elevation.In order to steel knot Load on the basis of structure passes on jack and testing site, effectively connects between girder and case base basis.Main depth of beam etc. is cut Face size influences very little to pilot system, only influences girder volume size ballast and stacks space, so girder can be done more Height, girder work stress are more reasonable.
Steel structure base plays the platform action for stacking ballast again for top, actually plays basis and platform Fuel tank, oil pipe, oil pump and motor and circuit etc. can be set in platform, hydraulic control is provided with outside platform for double action Platform and hydraulic moving mechanism device processed, Platform center plate center are additionally provided with jack storehouse and place jack.Jack after stage+module is good Upper accessible girder center, it is lower can be according to pushing testing site rigidity pressing plate center.Therefore steel structure base may be simply referred to as base steel platform, Its component parts is referred to as base steel platform board.
Heap loading directly passes through base steel platform and is placed on foundation surface, and is responsible for the girder of stress by being located at base steel platform Top (flatness that girder does not influence base steel platform platform Yu foundation surface contact surface), and pass through fixed connecting part for base steel Platform connect with girder (fixed connecting part links together girder and base steel platform, and static test carry out when receiving The weight of heap loading), it presents under stress and allows state of the base steel platform hanging on girder (girder can be by being attached to The beam that increases between girder and base steel platform is increased, and increases the weight that beam only needs to bear girder, because of static test When progress, girder is by the reversed pushing tow of jack, and the weight of heap loading is by the fixed connecting part that connect with girder and base steel platform It bears, thus increases beam when static test carries out, the girder weight born instead can become smaller.After increasing girder, jack peace Can be more loose between emptying, and other loose spaces can more effectively be utilized, such as setting detection instrument, adjustment benchmark Beam etc.).Girder center lower end directly contacts and (certainly when necessary, can also be fixedly connected) jack, allows the pushing tow of jack End is matched across base steel Platform center through-hole with the test dot center for being exposed to foundation surface.When the pushing end of jack is opened When beginning pushing tow tests dot center, jack is subject to the girder barrier force directly contacted with jack, and the barrier force of girder Again from the base steel platform for the receiving heap loading weight being firmly connected with it, and then the weight of heap loading is allowed successively to pass through base steel Platform, the fixed connecting part of base steel platform and girder, girder, jack, most the pushing end through jack loads on test afterwards On the rigidity pressing plate of dot center.Before the pushing end of jack starts the rigidity pressing plate of pushing tow test dot center, base steel platform It is directly placed at foundation surface, eliminate causes heap loading to be collapsed a possibility that causing the accident because of buttress unbalance stress.Secondly, It is more convenient that preloading object is lifted on base steel platform, i.e., the ballast heap carrying platform the low more is conducive to the fast hoisting of heap loading, It not only saves the time, can more effectively reduce cost.In addition, the base steel platform being directly placed on ground, due to contact ground Area is significantly increased compared with buttress, i.e. the pressure of unit area accordingly reduces, and the requirement to ground is also greatly reduced, that is, does not have to as existing Have needs to do ground special disposal before building buttress, has not only saved expense and time, but also more consolidate durable.Directly place Base steel platform on ground reduces whole height of C.G., and in the case where same stack loading capacity, detection device is safer.It puts The base steel platform on ground is set, huge heap loading capacity can be distributed on bigger ground, ground stress is small, facilitates progress Big position tonnage preloading provides reliable ground guarantee to the static test of current large-scale pile foundation, is conducive to civil engineering large size Static test summary can directly carry out static test detection to large-scale pile foundation, and national pile measurement specification regulation pair at present Large-scale pile foundation can detect large-scale bearing capacity of pile foundation detection with indirect methods such as core drilling methods, this is very not scientific also not rigorous.But it loses Regret is that the loading test of current domestic many large-scale pile foundations in place generallys use drill core test.
This structure also has the advantage that, it is only necessary to one of examination in multiple testing sites (test point) in a building site It tests and a little builds device for the first time and tested, and other testing sites do not need to remove device after building device for the first time and completing test It is shifted and is built again, that is, needed when next testing site is tested, it is only necessary to which the device for building completion for the first time is whole It is moved to next testing site.Its main feature is that each project march into the arena after be an entirety after preloading platform building, no longer Installation is removed once in each testing site, saves a large amount of detection non-cutting times and testing cost, and safer.Relative to existing granular media For formula static test preloading mode, the utility model Integral Steel based platform static test preloading device can be saved significantly Installation, disassembly cost, and heap loading collapse accident caused by capable of effectively avoiding because of platform inclination.It can even build At stage apparatus on the outside of existing hydraulic moving mechanism running gear is installed, allow its stabilization to be moved to next testing site.Wherein, hydraulic step Mobile steel based platform can not only be stablized by fulfiling walking apparatus, and can appropriateness play the role of adjust base steel platform in balance, enable steel Based platform is more stable.The present apparatus be able to achieve static load platform overall movement, thus reduce each testing site platform building and Dismounting and energy automatic moving, to reduce the platform transfer work that crane or transport vehicle are completed.If using tank column ballast heap Load method is first vented the water in tank column, and base steel platform can be moved together with slack tank cylinder, if middle-size and small-size loading test, platform It can also be moved together with ballast, without removing platform, mounting platform, lifting machine, personnel can be saved, more with complete off-load It is important that a large amount of detection times can be saved, accelerate detection progress, save project duration, reduction device, which removes installation and turns to hang, to be turned A possibility that safety accident occurs during fortune.The hydraulic vertical prop lifting platform height of platform adjusts plateau levels degree, if Platform inclination can carry out well straightening to platform, enable platform trouble free service.The transfer of platform is not required to crane and transport between testing site Vehicle can rely on hydraulic moving mechanism walking chassis automatic moving.If platform heap carrying capacity is very big, after fractional load can be shed when mobile Integrated moveable again, this mode are suitable for the preloading stage apparatus of kiloton or more.Levelling function: this stage apparatus can pass through Hydraulic moving mechanism walking mechanism adjusts the balance of platform entirety, can not only prevent platform inclination by adjusting said mechanism, moreover it is possible to It tilts under inevitable extreme case, effectively extends the platform inclination time by adjusting said mechanism, to win to the full extent The time of disassembly ballast load is taken, to avoid collapsing, guarantees platform safety, eliminates security risk.
Other than at the beginning and end of static test using crane and transport vehicle is used, formal detection process only uses electronic Machine, water pump and oil pump, exhaust gas and fugitive dust zero-emission, it is environmentally protective.
The groundwork process of experimental rig is as follows in the utility model:
1, according to the model and jack quantity of test lotus size selection jack.
2, according to the height of jack, base steel podium level, design requirement testing site absolute altitude determines ground elevation.
3, smooth location after ground elevation is determined, levelling of the land range is not less than base steel platform size.
4, ground unwrapping wire on the scene determines the outer edge line of base steel platform centered on testing site, so that platform center of gravity and test Dot center is overlapped.
5, completely spread medium coarse sand in testing site top board levelling and put rigidity pressing plate, rigidity pressing plate center of gravity and test dot center weight It closes, and requires rigidity pressing plate horizontal.The reference for installation beam and in testing site in the pre-buried 300 mm diameter pipeline of subsurface, pipeline 2 or 4 dial gauges are according to circumstances installed between datum line beam, section of tubing needs cross-section between testing site and datum line beam, So as to dial gauge installation.
6, base steel Platform center plate is put, center of gravity is overlapped with test dot center, is a centrally located connection later with central plate Other base steel platform boards, entire base steel platform center of gravity are overlapped with test dot center.It is interconnected into integral slab between base steel platform board, The size of single base steel platform board is able to satisfy transport and requires, general 2.4 meters -3 meters wide, 6 meters 9 meters 12 meters 15 meters 18 meters equal 3 whole Several times are long.Integral slab installation is fast, good integrity.Due to place jack at Platform center testing site, it is desirable that in base steel platform The center of core will reserve the position of jack.The mountable steel plate in base steel platform board lower surface or steel construction plate, base steel platform board For the ease of stacking ballast, steel plate is also installed in upper surface for upper surface.But straining beam to be installed in the middle part of base steel platform board, for convenience The uneasy cartridge plate of upper and lower surface at straining beam is installed at the connection of base steel platform and girder, base steel platform middle part.Base steel platform board peace After dress, the globality of base steel platform is reinforced in the whole long attachment beam edge sealing connection of base steel platform board short side edge body.
7, the piston of jack is crossed base steel platform board and is firstly placed in base steel platform, jack center of gravity and test dot center, steel Based platform center is overlapped, and jack is put upside down, i.e., piston is downward, and cylinder body is upward, and cylinder body directly contacts with girder or pass through steel construction Pad contact.Jack piston can be recovered in base steel platform when experimental rig is mobile.
8, video camera is installed in base steel Platform center plate, facilitates the working condition of real time monitoring jack.
9, girder is placed on base steel platform, the center of gravity of girder is overlapped with jack center of gravity.And jack cylinder body and master Beam effectively contacts, and base steel platform is effectively connect with girder.(pull rod is connected with nut with short beam) girder section specification is according to test Load is determining, a length of 6 meters, 9 meters, 12 meters, 15 meters, 18 meters of girder etc. 3 of integral multiple.
10, datum line beam is placed above girder, dial gauge is fixed on datum line beam, and girder two sides pass through secondary beam analysis and testing Vertical steel pipe is placed on the rigidity pressing plate of point and is effectively fixed, and the settlement measurement bar of testing site, the measurement of dial gauge are put in steel pipe Bar is placed on settlement measurement bar.Or in testing site side subsurface 300 millimeters of steel pipes of pre-buried diameter, manage interior reference for installation beam, percentage Table is mounted on base steel platform datum line beam below and test pile.
11, it stacks loading (jumbo bag, concrete loading block etc.) and introduces tank column accumulation load method here, tank column is first placed on steel On based platform, tank column bottom is bolted with base steel platform, and tank top end is connected with.Finally make base steel platform, girder and tank Column is linked to be an entirety.
12, filling clear water is carried out to tank column after being installed, adding will symmetrically add when water, in a word the center of gravity of platform always with examination Dot center's coincidence is tested, amount of water is determined according to test requirements document.
13, it can be loaded into test after checkout facility instrument and meter Pass Test requires after amount of water to defined amount.It (adopts With tank column method also gradable load)
14, the clear water in tank column is evacuated by water pump after the test.
15, base steel platform, girder and tank column integrally move on to next testing site, repeat the above process, until entire project Testing site detection terminate.
This static test weight has following 5 aspect feature:
1, cancel and do steel structure base on the ground where buttress is placed directly in testing site, steel structure base can double as ballast Platform eliminates pervious platform.
2, test weight integration does not need constantly to be installed between testing site, dismantles.
3, test weight can voluntarily walk, and do not need crane and hang to turn or transport vehicle transhipment, it is convenient to reduce detection process Detect operation.
4, the course of work is safe and reliable, simple and easy.
5, the frequent use for reducing crane and transport vehicle reduces noise, exhaust gas discharge and dust from land surface, more afforests more Environmental protection.
It is had the following advantages that due to the above 5 aspect feature.
One, cancel and do steel structure base advantage on the ground where buttress is placed directly in testing site:
1, the center of gravity for reducing experimental rig, the center of gravity of this experimental rig is lower under identical load, also more stable.
2, experimental rig is low facilitates testing staff's installing and dismounting and Transfer Experiment device and heap to unload ballast.
3, steel structure base and contact area of ground are big, small to foundation pressure, and foundation soil is not easily settled, tilts.
4, since base steel platform is small to foundation pressure, the basis with large bearing capacity is provided for large size static test and is protected Barrier.The ballast preloading of more large-tonnage can be achieved on identical place.Under identical preloading altitudes, buttress space ratio has been saved Traditional heap support method preloading amount is bigger, the static load preloading requirement to that can meet thousands of tonnes after basement process, is conducive to large-scale quiet The development and application for carrying test, are conducive to the development of national large scale civil engineering technology.
5, reduce expense and the time of installing and dismounting buttress, accelerate detection progress, saved project duration.
6, due to reducing the pressure of experimental rig center of gravity, utmostly dispersion heap loading base over the ground, make testing staff and Experimental rig is safer.
Two, test weight integration does not need constantly to be installed between testing site, dismantles.
1, test each master unit of weight effectively connects into an entirety, complete to change by granular media place in a manner of, Experimental rig is integrally well more firm.
2, reduce continuous installation and disassembly between testing site, save the time, reduce lifting work and personnel's assembling Work.
3, reduce the possibility that safety accident occurs.
Three, test weight can voluntarily walk, and do not need crane and hang to turn or transport vehicle transhipment, it is convenient to reduce detection process Detect operation
1, hydraulic walking device can be gone up and down and be leveled to experimental rig, increase the safety of experimental rig and reliable Property.
2, it realizes and is voluntarily shifted between testing site, do not need lifting operation, and the time is saved in transfer fastly.
3, voluntarily walking realizes that the transfer ratio crane transport vehicle operation between testing site is safer.
Four, the course of work is safe and reliable, simple and easy.
Five, reduce the frequent use of crane and transport vehicle, detection process reduces detection noise, exhaust gas discharge and ground Fugitive dust is more afforested more environmentally friendly.
The safety of above five aspects finds out that the present apparatus reduces a large amount of installing and dismountings work of weight, reduces Crane dosage, increases the stability of device, stationarity, can also working water Pingdu to device be adjusted, reduce examination Experiment device center of gravity, has utmostly dispersed the pressure of heap loading base over the ground, the levelness of also adjustable base steel platform, this test fills Set more secure and reliable, more environmentally protective.
Base steel stage apparatus described in the utility model is made of multiple box beam units or fashioned iron unit spliced, spreads at first If base steel platform board, i.e., the unit base steel platform board being fixedly connected with girder is individually designed, and center offers through-hole, In order to which hydraulic jack passes through and positions.Baffle can be fixedly installed in its both ends, it can allow this block base steel platform plate unit Shape is I-steel based platform unit, and the base steel platform unit then spliced with it can quickly prolong baffle positioning and be spelled It connects, is conducive to the speed for accelerating splicing base steel platform.
In other words, the present apparatus have the special feature that first is that each project march into the arena after be one whole after preloading platform building Installation is removed once in body, no longer each testing site, saves a large amount of detection non-cutting times and testing cost, and safer.Testing site Between the transfer of platform be not required to crane and transport vehicle, hydraulic moving mechanism walking chassis automatic moving can be relied on.
If platform heap carrying capacity is very big, since heap carrying capacity is big when mobile, integrated moveable again can be shed after fractional load.
The platform is with function: girder, base steel platform constitute completely stable entirety, and non-granular media is placed, energy The adjustment of monolithic stability balances.Preloading function is carried, platform girder and base steel platform and hydraulic can be carried out according to different bearer power Walking device etc. is specially designed.Horizontally moving functions, platform can smoothly be moved to next test from a testing site Point.The functions of pumping stations can easily provide hydraulic to test jack and hydraulic moving mechanism device.Elevating function, it is very heavy convenient for testing The installation and removal on top.Levelling function, this platform can pass through the hydraulic pressure support that has substantially, the first hydraulic moving mechanism walking mechanism With the balance of the second hydraulic moving mechanism walking mechanism adjustment platform entirety, platform inclination can not only be prevented by adjusting said mechanism, The platform inclination time can also effectively be extended in the case where tilting inevitable extreme case by adjusting said mechanism, with maximum journey The time of disassembly ballast load is got on degree, to avoid collapsing, is guaranteed platform safety, is eliminated security risk.
Specifically, civil engineering described in the utility model automatic moving monoblock type static test preloading device, tool There is steel construction matrix, it is characterized in that the steel construction matrix includes girder, base steel platform, the connection of steel structure base platform short side Beam, jack, load, datum line beam and datum line beam earth anchor, the base steel platform are directly placed on ground on one side, the girder It is arranged on the another side center line of base steel platform and is fixedly connected with base steel platform, at least described base steel platform central has steel Structure basis platform through-hole, the jack pass through steel structure base platform through-hole and contact with girder, and the two of the base steel platform End is fixedly installed steel structure base platform short side attachment beam and parallel with girder, and the datum line beam is vacantly arranged on girder Fang Bingyu girder axis is consistent, and the both ends of the datum line beam are fixedly connected with datum line beam earth anchor, the datum line beam earth anchor and benchmark Beam is vertical and is inserted into firm ground, and the load is fitly piled up on the another side of base steel platform.
Girder two sides described in the utility model can be fixedly connected with hydraulic moving mechanism walking mechanism.
Two opposite parallel edges of four side of base steel platform described in the utility model can respectively be equipped with one group of hydraulic moving mechanism dress It sets, one group of hydraulic moving mechanism device on every side includes two vertical oil cylinders, a cross cylinder, the double-deck walking support Plate, two groups of hydraulic moving mechanism devices include eight vertical oil cylinders, four cross cylinders, four double-deck walking support plates altogether;Vertical oil It is not in contact with the ground that cylinder receives highest point support plate;When vertical oil cylinder bottoms out, base steel platform can leave 300 milli of ground Rice.Oil circuit, oil pump, fuel tank, circuit, motor etc. can be set in platform, hydraulic control panel is set outside platform.
Load described in the utility model can be the tank column that can be filled the water, and the tank column is vertically piled up in the another of base steel platform It above and with base steel platform is fixedly connected on one side.
In order to preferably fixed and positioned, it is flat that jack outer wall described in the utility model can be fixed on steel structure base In platform through-hole.
Hydraulic moving mechanism walking mechanism described in the utility model or hydraulic moving mechanism device are all made of existing commercially available hydraulic step Carry out hydraulic walking chassis used in the matured products such as churn or hydraulic walking piling machine.
Compared with the aforementioned existing similar products, the civil engineering of the utility model Integral Steel based platform static test heap It carries and sets energy save the cost, shorten detection non-cutting time, and exclude large-tonnage load preloading security risk.Detection process is pollution-free It is environmentally protective.
The content of the utility model is further described with the following Examples, but the content of the utility model is not only It is limited to content involved in embodiment.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of civil engineering Integral Steel based platform static test preloading device in embodiment.
Fig. 2 is the side structure signal of civil engineering Integral Steel based platform static test preloading device in embodiment Figure.
Fig. 3 is the base steel platform and girder of civil engineering Integral Steel based platform static test preloading device in embodiment Schematic perspective view.
Specific embodiment
As shown in Figures 1 to 3, civil engineering described in the present embodiment is carried with Integral Steel based platform static test heap It sets, there is steel construction matrix, it is characterized in that the steel construction matrix includes that girder 4, base steel platform 3, steel structure base platform are short Side attachment beam 10, jack 2, load 6, datum line beam 7 and datum line beam earth anchor 8, the base steel platform are directly placed at ground on one side On base 5, the girder is arranged on the another side center line of base steel platform and is fixedly connected with base steel platform, at least described base steel Platform central has steel structure base platform through-hole 9, and the jack passes through steel structure base platform through-hole and contacts with girder, institute The both ends for stating base steel platform are fixedly installed steel structure base platform short side attachment beam and parallel with girder, and the datum line beam is outstanding Sky setting is above girder and consistent with girder axis, and the both ends of the datum line beam are fixedly connected with datum line beam earth anchor, the base Quasi- beam earth anchor is vertical with datum line beam and is inserted into firm ground, and the load is fitly piled up on the another side of base steel platform.This Jack in steel structure base platform through-hole and can position in embodiment.
Load described in the present embodiment is the tank column that can be filled the water, and the tank column is vertically piled up on the another side of base steel platform And it is fixedly connected with base steel platform.There is test pile 1,1 upper end of test pile and the pushing end of jack 2 are matched in the present embodiment It closes, jack 2 passes through base steel platform 3 (steel structure base platform) and is fixedly connected with girder 4, is fixedly connected with master on base steel platform 3 Beam 4, base steel platform 3 are placed on ground 5, and load 6 is stacked on base steel platform 3.Datum line beam 7 is arranged in girder 4 in the present embodiment Top, datum line beam 7 is across base steel platform 3 and both ends are fixed by datum line beam earth anchor 8.As shown in figure 3, base steel is flat in the present embodiment Platform 3 and 4 fixed connection place of girder have steel structure base platform through-hole 9, and the steel structure base platform through-hole 9 is also as very heavy Push up positioning through hole.3 both ends of the surface of base steel platform all have steel structure base platform short side attachment beam 10.

Claims (5)

1. a kind of civil engineering Integral Steel based platform static test preloading device has steel construction matrix, it is characterized in that institute Stating steel construction matrix includes girder, base steel platform, steel structure base platform short side attachment beam, jack, load, datum line beam and base Quasi- beam earth anchor, the base steel platform are directly placed on ground on one side, and the girder is arranged in the another side of base steel platform Be fixedly connected on heart line and with base steel platform, at least described base steel platform central have steel structure base platform through-hole, described thousand Jin top is contacted across steel structure base platform through-hole with girder, and the both ends of the base steel platform are fixedly installed steel structure base Platform short side attachment beam is simultaneously parallel with girder, the datum line beam be vacantly arranged in it is above girder and consistent with girder axis, it is described The both ends of datum line beam are fixedly connected with datum line beam earth anchor, and the datum line beam earth anchor is vertical with datum line beam and is inserted into firm ground, institute Load is stated fitly to pile up on the another side of base steel platform.
2. civil engineering as described in claim 1 Integral Steel based platform static test preloading device, it is characterized in that also having There is hydraulic moving mechanism walking mechanism, the girder two sides are fixedly connected with hydraulic moving mechanism walking mechanism.
3. civil engineering as described in claim 1 Integral Steel based platform static test preloading device, it is characterized in that base steel Two opposite parallel edges of four side of platform are respectively equipped with one group of hydraulic moving mechanism device, and one group of hydraulic moving mechanism device on every side includes Two vertical oil cylinders, a cross cylinder, the double-deck walking support plate, two groups of hydraulic moving mechanism devices include eight vertical oil altogether Cylinder, four cross cylinders, four double-deck walking support plates;It is not in contact with the ground that vertical oil cylinder receives highest point support plate;Vertically When oil cylinder bottoms out, base steel platform can leave 300 millimeters of ground.
4. the civil engineering Integral Steel based platform static test preloading device as described in claims 1 or 2 or 3, feature It is the load is the tank column that can be filled the water, the tank column is vertically piled up on the another side of base steel platform and fixed with base steel platform Connection.
5. civil engineering as claimed in claim 4 Integral Steel based platform static test preloading device, it is characterized in that described Jack outer wall is fixed in steel structure base platform through-hole.
CN201721739718.8U 2017-12-14 2017-12-14 Civil engineering Integral Steel based platform static test preloading device Expired - Fee Related CN208251180U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721739718.8U CN208251180U (en) 2017-12-14 2017-12-14 Civil engineering Integral Steel based platform static test preloading device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721739718.8U CN208251180U (en) 2017-12-14 2017-12-14 Civil engineering Integral Steel based platform static test preloading device

Publications (1)

Publication Number Publication Date
CN208251180U true CN208251180U (en) 2018-12-18

Family

ID=64619706

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721739718.8U Expired - Fee Related CN208251180U (en) 2017-12-14 2017-12-14 Civil engineering Integral Steel based platform static test preloading device

Country Status (1)

Country Link
CN (1) CN208251180U (en)

Similar Documents

Publication Publication Date Title
CN101560779A (en) Foundation pile static test loading counterforce test method and weight boxes used by same
CN110359374A (en) A kind of Hanging Basket precompressed counter-force bracket and its construction method
CN201386291Y (en) Static load test device of composite foundation
CN208668482U (en) A kind of foundation bearing force checking device
CN110106881A (en) A kind of steel-pipe pile construction guidance locating rack and construction method
CN110820950B (en) Integral synchronous jacking construction method for large-span combined type overweight eccentric slope angle steel structure
CN109235275A (en) Frock suitable for continuous rigid frame overweight 0# piece bracket pre-compaction of high mound large-span
CN208009501U (en) The mobile base apparatus of civil engineering static load platform
CN208251180U (en) Civil engineering Integral Steel based platform static test preloading device
CN208251181U (en) Civil engineering monoblock type static test heap carrying platform
CN210621787U (en) Pile foundation static load test detection structure
CN108775995B (en) Multifunctional loading frame and pile anti-seismic test method
CN109883673B (en) Shed frame test method in pilot tunnel excavation process
CN209144666U (en) Frock suitable for continuous rigid frame overweight 0# piece bracket pre-compaction of high mound large-span
CN107975077A (en) A kind of civil engineering Integral Steel based platform static test heap support method
CN106522287B (en) A kind of skirt piles vertical bearing capacity detection method
CN106153443A (en) A kind of loading counter weight device and loading method thereof
CN208251191U (en) Civil engineering large-tonnage static load system mobile chassis
CN212670670U (en) Loading device and test equipment for foundation pile compression-resistant static load test
CN107217693B (en) Civil engineering static-loading test large size foundation pile ground ballast heap support method
CN111894049A (en) Loading device and test equipment for foundation pile compression-resistant static load test
CN101709344B (en) Method for hoisting terrace for furnace top raw gas pipeline
CN213329138U (en) Loading device and test equipment for foundation pile pulling-resistant static load test
CN210369074U (en) Integral steel structural framework ballast weight pile carrier
CN105544624B (en) A kind of test for static load device of asymmetric counterweight

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181218

Termination date: 20201214

CF01 Termination of patent right due to non-payment of annual fee