CN208251104U - Bored concrete pile concrete special has bad luck oil well cracking acid pumping truck - Google Patents

Bored concrete pile concrete special has bad luck oil well cracking acid pumping truck Download PDF

Info

Publication number
CN208251104U
CN208251104U CN201820363945.3U CN201820363945U CN208251104U CN 208251104 U CN208251104 U CN 208251104U CN 201820363945 U CN201820363945 U CN 201820363945U CN 208251104 U CN208251104 U CN 208251104U
Authority
CN
China
Prior art keywords
discharge port
concrete
cabinet shape
angle steel
concrete pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820363945.3U
Other languages
Chinese (zh)
Other versions
CN208251104U8 (en
Inventor
张敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN201820363945.3U priority Critical patent/CN208251104U8/en
Publication of CN208251104U publication Critical patent/CN208251104U/en
Application granted granted Critical
Publication of CN208251104U8 publication Critical patent/CN208251104U8/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a kind of bored concrete pile concrete specials to have bad luck oil well cracking acid pumping truck, solves the problems, such as that scene cannot carry out concrete delivery by large-scale dedicated filling concrete machinery and transport and large labor intensity low with existing construction efficiency is perfused with cast-in-place pile concrete when perfusion.It is included in priming concrete pile hole side and is provided with interim angle steel track (5), cabinet shape trolley (1) is provided on interim angle steel track (5), carriage walking roller (6) on cabinet shape trolley (1) is movably arranged on interim angle steel track (5), preceding discharge port (2) are provided on the front side board of cabinet shape trolley (1), discharging plate (8) before being provided on preceding discharge port (2), it is provided with left discharge port (3) on the left plate of cabinet shape trolley (1), left discharging plate (7) is provided on left discharge port (3).The utility model structure is simple, at low cost, and temporary track is laid with flexible.

Description

Bored concrete pile concrete special has bad luck oil well cracking acid pumping truck
Technical field
The utility model relates to a kind of bored concrete pile, prefabricated tubular pile, reinforcing piles etc. to perform equipment, in particular to a kind of bored concrete pile The dedicated device for having bad luck concrete and perfusion.
Background technique
Bored concrete pile has the characteristics that without friction, without squeezing soil and construction noise is small when construction, is suitable for intensive in City Building It is used in pre-reinforcement in area or tunnel.Currently, bored concrete pile is to use directly to pour or manually fill concrete into the side of stake core with spades What method was performed, it is vibrated and is flattened to concrete, carry out pouring maintenance after filling concrete, until final set.If site operation ground is flat Whole degree is poor, and when cannot carry out concrete delivery by large-scale dedicated filling concrete machinery, scene is usually manually to utilize small-sized appearance by pure What device or spades were had bad luck concrete and be perfused, it is low that there are construction efficiency, large labor intensity, directly influences the peace of construction period Phase completes.
Summary of the invention
The utility model provides a kind of bored concrete pile concrete special and has bad luck oil well cracking acid pumping truck, and solving scene cannot be by large size Dedicated filling concrete machinery carries out concrete delivery and transports and labor low with existing construction efficiency is perfused with cast-in-place pile concrete when perfusion The big technical problem of fatigue resistance.
The utility model is to solve the above technical problem by the following technical programs:
A kind of bored concrete pile concrete special has bad luck oil well cracking acid pumping truck, including priming concrete pile hole, is provided with temporarily in priming concrete pile hole side Angle steel track is provided with cabinet shape trolley on interim angle steel track, the carriage walking roller activity setting on cabinet shape trolley On interim angle steel track, discharge port before being provided on the front side board of cabinet shape trolley is provided with front dump on preceding discharge port Expect plate, left discharge port is provided on the left plate of cabinet shape trolley, left discharging plate is provided on left discharge port.
It is provided with right discharge port on the right side plate of cabinet shape trolley, right discharging plate is provided on right discharge port.
The utility model structure is simple, at low cost, and temporary track is laid with flexibly, and it is larger that single has bad luck concrete amount, reduces artificial Labor intensity shortens construction period, reduces engineering cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Specific embodiment
The utility model is described in detail with reference to the accompanying drawing:
A kind of bored concrete pile concrete special has bad luck oil well cracking acid pumping truck, including priming concrete pile hole, is provided with temporarily in priming concrete pile hole side Angle steel track 5 is provided with cabinet shape trolley 1 on interim angle steel track 5,6 activity of carriage walking roller on cabinet shape trolley 1 It is arranged on interim angle steel track 5, discharge port 2 before being provided on the front side board of cabinet shape trolley 1 is set on preceding discharge port 2 Discharging plate 8, left discharge port 3 is provided on the left plate of cabinet shape trolley 1, is provided with a left side on left discharge port 3 before being equipped with Discharging plate 7.
It is provided with right discharge port 4 on the right side plate of cabinet shape trolley 1, right discharging plate is provided on right discharge port 4. Cabinet shape trolley 1 is mainly made of compartment, skeleton and carriage walking roller 6;The left and right, preceding of compartment is respectively equipped with discharge port, side Just the discharging of different direction, carriage walking roller 6 can be matched with equal leg angle;Interim angle steel track 5 is parallel etc. using two Corner angle is laid with, and away from fixation and considers whether need place mat brick, steel under angle steel track to two interorbitals according to field ground situation Other adminiclies such as plate;Interim angle steel track 5 is routed to from blender fills stake place;Equal leg angle size is smooth according to field ground Situation and cart volume are chosen.

Claims (2)

1. a kind of bored concrete pile concrete special has bad luck oil well cracking acid pumping truck, including priming concrete pile hole, priming concrete pile hole side is provided with interim angle Steel track (5) is provided with cabinet shape trolley (1), the carriage walking roller on cabinet shape trolley (1) on interim angle steel track (5) Wheel (6) is movably arranged on interim angle steel track (5), which is characterized in that before being provided on the front side board of cabinet shape trolley (1) Discharge port (2), discharging plate (8) before being provided on preceding discharge port (2), is provided on the left plate of cabinet shape trolley (1) Left discharge port (3) is provided with left discharging plate (7) on left discharge port (3).
2. a kind of bored concrete pile concrete special according to claim 1 has bad luck oil well cracking acid pumping truck, which is characterized in that small in cabinet shape It is provided with right discharge port (4) on the right side plate of vehicle (1), right discharging plate is provided on right discharge port (4).
CN201820363945.3U 2018-03-18 2018-03-18 Bored concrete pile concrete special has bad luck oil well cracking acid pumping truck Active CN208251104U8 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820363945.3U CN208251104U8 (en) 2018-03-18 2018-03-18 Bored concrete pile concrete special has bad luck oil well cracking acid pumping truck

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820363945.3U CN208251104U8 (en) 2018-03-18 2018-03-18 Bored concrete pile concrete special has bad luck oil well cracking acid pumping truck

Publications (2)

Publication Number Publication Date
CN208251104U true CN208251104U (en) 2018-12-18
CN208251104U8 CN208251104U8 (en) 2019-04-19

Family

ID=64608070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820363945.3U Active CN208251104U8 (en) 2018-03-18 2018-03-18 Bored concrete pile concrete special has bad luck oil well cracking acid pumping truck

Country Status (1)

Country Link
CN (1) CN208251104U8 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110451191A (en) * 2019-08-30 2019-11-15 合肥市兴烨包装材料有限公司 A kind of rail mounted handling device
CN114313850A (en) * 2022-01-10 2022-04-12 青海中煤地质工程有限责任公司 Slope material loading machine is used in bank protection construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110451191A (en) * 2019-08-30 2019-11-15 合肥市兴烨包装材料有限公司 A kind of rail mounted handling device
CN110451191B (en) * 2019-08-30 2021-01-22 合肥市兴烨包装材料有限公司 Rail mounted handling device
CN114313850A (en) * 2022-01-10 2022-04-12 青海中煤地质工程有限责任公司 Slope material loading machine is used in bank protection construction
CN114313850B (en) * 2022-01-10 2023-08-01 青海中煤地质工程有限责任公司 Slope material loading machine for slope protection construction

Also Published As

Publication number Publication date
CN208251104U8 (en) 2019-04-19

Similar Documents

Publication Publication Date Title
CN208251104U (en) Bored concrete pile concrete special has bad luck oil well cracking acid pumping truck
CN203514345U (en) Connection type precast concrete retaining wall
CN207672558U (en) A kind of railroad embankment Pile slab-wall structure
CN105545323A (en) Construction method for open cut tunnel lining
CN102392447B (en) Given force variable stiffness discrete material pile ramming and expanding machine and application thereof
CN106988303B (en) A kind of pile foundation and its construction method
CN106014446A (en) Strengthening method for improving stability of high-ground-stress soft rock tunnel inverted arch structure
CN106930321A (en) Underground structure novel construction method is built in a kind of pipe-jacking with large diameter combination hole stake
CN207419519U (en) A kind of campshed supporting is with helping the structural system that arm-type barricade is combined
CN107761759B (en) L-shaped concrete retaining wall
CN208472713U (en) A kind of composite structure mini pile for administering small-sized landslide
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
CN104234269B (en) A kind of construction method of prefabricated round type shear wall
CN207672602U (en) The pull-type vertical retaining wall structure structure of anchor
CN102747737B (en) Soil discharge platform of foundation pit structure and construction method thereof
CN202767286U (en) Connection joint of precast concrete shear wall and main steel structure
CN106759391B (en) A kind of the antiskid pile group and its construction method of townhouse hollow section composite structure
CN105350566B (en) Ground pile structure of tower type electric power support
CN203668926U (en) Foundation for tapered concrete piles
CN209211389U (en) Bank slump repairs structure
CN207919323U (en) A kind of bridge abutment structure
CN207700198U (en) A kind of advanced support supporting construction
CN207974834U (en) A kind of Tunnel Engineering pipe curtain support construction
CN113047810A (en) Multifunctional grouting nozzle
CN207245718U (en) A kind of special section of jurisdiction of shield receiving terminal

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CU01 Correction of utility model

Correction item: Address of the patentee

Correct: 36 Shenbei Road, Shenyang New District, Shenyang City, Liaoning Province

False: 36 Shenbei Road, Shenbei New District, Liaoyang City, Liaoning Province

Number: 51-01

Page: The title page

Volume: 34

Correction item: Address of the patentee

Correct: 36 Shenbei Road, Shenyang New District, Shenyang City, Liaoning Province

False: 36 Shenbei Road, Shenbei New District, Liaoyang City, Liaoning Province

Number: 51-01

Volume: 34

CU01 Correction of utility model