CN209211389U - Bank slump repairs structure - Google Patents

Bank slump repairs structure Download PDF

Info

Publication number
CN209211389U
CN209211389U CN201821867807.5U CN201821867807U CN209211389U CN 209211389 U CN209211389 U CN 209211389U CN 201821867807 U CN201821867807 U CN 201821867807U CN 209211389 U CN209211389 U CN 209211389U
Authority
CN
China
Prior art keywords
gabion
water level
ordinary water
bank
timber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821867807.5U
Other languages
Chinese (zh)
Inventor
陈晚华
李永森
唐桢
朱川
丁冬冬
周昕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Port And Navigation Construction Engineering Co Ltd
Original Assignee
Sichuan Port And Navigation Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Port And Navigation Construction Engineering Co Ltd filed Critical Sichuan Port And Navigation Construction Engineering Co Ltd
Priority to CN201821867807.5U priority Critical patent/CN209211389U/en
Application granted granted Critical
Publication of CN209211389U publication Critical patent/CN209211389U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to bank slumps to repair structure, mainly include bank slope, sandy gravel, the above gabion of ordinary water level, anti-filter geotextiles, planting soil, concrete prefabricated sash beam, grass planting slope protection, prefabricated concrete board, normal water bit line, spud pile bottom plate, peplos bag slip casting gabion lock foot, dredge grooving, timber, L-type steel plate, steel nail, U-shaped steel plate, the pre-buried fixed link of gabion, concrete prefabricated sash beam preformed hole, the following gabion of ordinary water level, steel plate, sash slot;After the completion of bank slope excavates, backfills sandy gravel and roll;The following gabion construction of ordinary water level and the above gabion construction of ordinary water level;Setting peplos bag slip casting gabion locks foot on the outside of timber;The above gabion of ordinary water level is laid with anti-filter geotextiles;Concrete prefabricated sash beam is laid in anti-filter geotextiles;Laying planting soil in sash slot, grass planting slope protection.The utility model can be effectively reduced engineering cost, accelerate speed of application, and repairing effect is significant, applied to can obtain preferable technical economic benefit in Practical Project.

Description

Bank slump repairs structure
Technical field
The utility model relates to hydraulic engineering fields, and in particular to a bank slump repairs structure, suitable for applying for bank slump reparation Work.
Background technique
Reservoir bank slump causes water front to move back, and reduces the arable land around reservoir area year by year.And after the arable land of local villager collapses, Living condition is more severe, and peasant is difficult to bear, and causing huge economic loss to become to the villages and small towns on bank slump reservoir area periphery influences The stable social concern in reservoir area periphery.Simultaneously as bank slump, which makes a large amount of soil bodys collapse, is put in storage generation siltation, reduce storage capacity.
In practice of construction, construction personnel should carry out the supervision of construction quality, construct according to the standard of detail design, Reinforce the management of construction, improve the quality that bank slump repairs structure construction, it is ensured that the globality of entire slope surface reparation.Preferably with this Serve society.
Utility model content
The purpose of this utility model is to provide a bank slumps to repair structure, solving the problems, such as bank slump repairing construction, completely The demand of sufficient structure construction.
To realize the above technology, the utility model uses following technical scheme:
Bank slump repairs structure, is arranged on bank slope, wherein being laid with sandy gravel on the bank slope, including the above stone of ordinary water level Cage and the following gabion of ordinary water level, wherein the above gabion of the ordinary water level refers to the gabion for being located at normal water bit line or more, Accordingly, the following gabion of the ordinary water level refers to being located at normal water bit line gabion below, the following stone of ordinary water level Cage is fastened on the bank slope, and anti-filter geotextiles and concrete prefabricated sash are arranged on the above gabion of ordinary water level Beam.
In some embodiments, the following gabion of the ordinary water level loads on the ground, the following gabion of ordinary water level Pre-buried spud pile bottom plate and timber, the spud pile bottom plate are connect with the timber by L-type steel plate, U-shaped steel plate and steel nail.
In some embodiments, the position that the spud pile bottom plate is connected with single timber, institute is arranged in the L-type steel plate The position that the spud pile bottom plate and the connection of two timbers is arranged in U-shaped steel plate is stated, the steel nail is inserted into the spud pile bottom plate With the timber to connect the spud pile bottom plate and the timber.
In some embodiments, the timber is inserted into bank slope, the above gabion pre-embedded steel slab of ordinary water level, and gabion is pre- Fixed link is buried to be welded on the steel plate.
In some embodiments, the above gabion top of the ordinary water level is laid with anti-filter geotextiles and concrete prefabricated frame Lattice beam, the concrete prefabricated sash beam form multiple spaced sash slots.
In some embodiments, concrete prefabricated sash beam preformed hole, the stone is arranged in the concrete prefabricated sash beam The pre-buried fixed link of cage is inserted into the concrete prefabricated sash beam preformed hole, laying planting soil and grass planting shield in the sash slot Slope.
In some embodiments, it dredges grooving to be arranged on the outside of the timber, described dredge places gabion in grooving, on the outside of gabion Geotechnological cloth bag is wrapped up, grouting behind shaft or drift lining forms peplos bag slip casting gabion and locks foot.
Technical solution provided by the utility model compared with prior art, has the following beneficial effects:
(1) the following gabion construction of ordinary water level, pre-buried spud pile bottom plate and timber, pre-buried spud pile bottom plate pass through with timber L-type steel plate, U-shaped steel plate, steel nail connection, filling cobble finish lifting to position below the water surface, and timber is inserted into soil, is effectively protected Demonstrate,prove the protection against erosion ability of gabion.
(2) concrete prefabricated sash beam preformed hole is arranged in concrete prefabricated sash beam, and the pre-buried fixed link of gabion is inserted into coagulation In native prefabricated frame lattice beam preformed hole, the globality of sash beam is improved.
(3) it dredges grooving to be arranged on the outside of timber, dredges and place gabion in grooving, geotechnological cloth bag, grouting behind shaft or drift lining are wrapped up on the outside of gabion It forms peplos bag slip casting gabion and locks foot, improve the protection against erosion ability of gabion.
Detailed description of the invention
Fig. 1 is that the bank slump of an embodiment according to the present utility model repairs the sectional schematic diagram of structure.
Fig. 2 is that the connection of the timber and spud pile bottom plate of the bank slump reparation structure of an embodiment according to the present utility model is shown It is intended to.
Fig. 3 is the floor map that the bank slump of an embodiment according to the present utility model repairs the slope protection of structure.
Fig. 4 is the floor map of A-A slope surface in Fig. 3.
Fig. 5 is that the plane of the concrete prefabricated sash beam of the bank slump reparation structure of an embodiment according to the present utility model is shown It is intended to.
In figure: 1- bank slope, 2- sandy gravel, the above gabion of 3- ordinary water level, 4- anti-filter geotextiles, 5- planting soil, 6- coagulation Native prefabricated frame lattice beam, 7- grass planting slope protection, the prefabricated concrete board of 8-, 9- normal water bit line, 10- spud pile bottom plate, 11- peplos bag note Slurry gabion lock foot, 12- dredge grooving, 13- timber, 14-L shape steel plate, 15- steel nail, 16-U shape steel plate, the land and water 17- line of demarcation, 18- The concrete prefabricated sash beam seam of the pre-buried fixed link of gabion, 19-, the concrete prefabricated sash beam preformed hole of 20-, 21- ordinary water level with Lower gabion, 22- steel plate, 23- sash slot.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art's every other embodiment obtained, all belongs to In the range of the utility model protection.
It will be understood by those skilled in the art that in the exposure of the utility model, term " longitudinal direction ", " transverse direction ", "upper", The orientation of the instructions such as "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside" or position are closed System is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of describing the present invention and simplifying the description, without It is that the device of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, therefore on Stating term should not be understood as limiting the present invention.
It is understood that term " one " is interpreted as " at least one " or " one or more ", i.e., in one embodiment, The quantity of one element can be one, and in a further embodiment, the quantity of the element can be it is multiple, term " one " is no It can be interpreted as the limitation to quantity.
The construction technical requirements such as bank slope excavates in the utility model embodiment, gabion lifts repeat no more, and emphasis illustrates Embodiments of the present invention, invention is further described in detail with reference to the accompanying drawing and by embodiment, and the explanation is not It is confined to following embodiment.
As shown in Figs. 1-5, the structural schematic diagram that the bank slump of an embodiment according to the present utility model repairs structure is demonstrated, It includes bank slope (1), sandy gravel (2), the above gabion of ordinary water level (3), anti-filter geotextiles (4), plantation that the bank slump, which repairs structure, Native (5), concrete prefabricated sash beam (6), grass planting slope protection (7), prefabricated concrete board (8), normal water bit line (9), spud pile bottom plate (10), peplos bag slip casting gabion locks foot (11), dredges grooving (12), timber (13), L-type steel plate (14), steel nail (15), U-shaped steel Plate (16), land and water line of demarcation (17), the pre-buried fixed link of gabion (18), concrete prefabricated sash beam stitch (19), concrete prefabricated frame Lattice beam preformed hole (20), the following gabion of ordinary water level (21), steel plate (22), sash slot (23).
The bank slump repairs structure, is arranged on bank slope (1), wherein sandy gravel (2) are laid on the bank slope (1), including The above gabion of ordinary water level (3) and the following gabion of ordinary water level (21), wherein the above gabion of the ordinary water level (3) refers to position Gabion more than normal water bit line (9), accordingly, the following gabion of ordinary water level (21) refer to being located at normal water bit line (9) gabion below, the following gabion of ordinary water level (21) are fastened on the bank slope (1), the ordinary water level with Anti-filter geotextiles (4) and concrete prefabricated sash beam (6) are set on upper gabion (3).
The following gabion of ordinary water level (21) is loaded on the ground, the pre-buried fixation of the following gabion of ordinary water level (21) Stake bottom plate (10) and timber (13), the spud pile bottom plate (10) and the timber (13) pass through L-type steel plate (14), U-shaped steel plate (16) and steel nail (15) connects, specifically, the L-type steel plate (14) is arranged in the spud pile bottom plate (10) and single wood The position of stake (16) connection, U-shaped steel plate (16) setting are connected in the spud pile bottom plate (10) and two timbers (16) Position, the steel nail (15) are inserted into the spud pile bottom plate (10) and the timber (16) to connect the spud pile bottom plate (10) With the timber (16).
Filling cobble finishes lifting to water level (9) following position, and the timber (13) is inserted into soil;The ordinary water level The above gabion (21) is loaded in situ in slope surface, and pre-embedded steel slab (22), the pre-buried fixed link of gabion (18) are welded on the steel plate (22) on.
The above gabion of ordinary water level (21) top is laid with anti-filter geotextiles (4) and concrete prefabricated sash beam (6), The concrete prefabricated sash beam (6) forms multiple spaced sash slots (23), specifically, the concrete prefabricated frame Concrete prefabricated sash beam preformed hole (20) is arranged in lattice beam (6), and it is pre- that the pre-buried fixed link of gabion (18) is inserted into the concrete In sash beam preformed hole (20) processed, laying planting soil (5) and grass planting slope protection (7) in the sash slot (23).
Grooving (12) setting is dredged on the outside of the timber (13), described dredge places gabion in grooving (12), packet on the outside of gabion Geotechnological cloth bag is wrapped up in, grouting behind shaft or drift lining forms peplos bag slip casting gabion lock foot (11).
The utility model is not limited to above-mentioned preferred forms, anyone can obtain under the enlightenment of the utility model Other various forms of products, however, make any variation in its shape or structure, it is all that there is same as the present application or phase Approximate technical solution, all falls within the protection scope of the utility model.

Claims (7)

1. bank slump repairs structure, it is arranged on bank slope (1), wherein being laid with sandy gravel (2) on the bank slope (1), which is characterized in that
Including the above gabion of ordinary water level (3) and the following gabion of ordinary water level (21), wherein the above gabion of the ordinary water level (3) Refer to the gabion for being located at normal water bit line (9) or more, accordingly, the following gabion of ordinary water level (21) refers to being located at just Normal water line (9) gabion below, the following gabion of ordinary water level (21) are fastened on the bank slope (1), it is described just Anti-filter geotextiles (4) and concrete prefabricated sash beam (6) are set on the above gabion of ordinary water level (3).
2. bank slump according to claim 1 repairs structure, which is characterized in that the following gabion of ordinary water level (21) is on ground It is loaded on face, the pre-buried spud pile bottom plate (10) of the following gabion of ordinary water level (21) and timber (13), the spud pile bottom plate (10) it is connect with the timber (13) by L-type steel plate (14), U-shaped steel plate (16) and steel nail (15).
3. bank slump according to claim 2 repairs structure, which is characterized in that the L-type steel plate (14) is arranged described solid Determine the position of stake bottom plate (10) and single timber (13) connection, the U-shaped steel plate (16) is arranged in the spud pile bottom plate (10) With the position of two timbers (13) connection, the steel nail (15) is inserted into the spud pile bottom plate (10) and the timber (13) with even Connect the spud pile bottom plate (10) and the timber (13).
4. bank slump according to claim 3 repairs structure, which is characterized in that the timber (13) is inserted into the bank slope (1) In, the above gabion of ordinary water level (3) pre-embedded steel slab (22), the pre-buried fixed link of gabion (18) is welded on the steel plate (22) On.
5. bank slump according to claim 4 repairs structure, which is characterized in that the above gabion of ordinary water level (21) top It is laid with anti-filter geotextiles (4) and concrete prefabricated sash beam (6), the concrete prefabricated sash beam (6) forms multiple intervals The sash slot (23) of setting.
6. bank slump according to claim 5 repairs structure, which is characterized in that concrete prefabricated sash beam (6) setting Concrete prefabricated sash beam preformed hole (20), it is reserved that the pre-buried fixed link of gabion (18) is inserted into the concrete prefabricated sash beam In hole (20), laying planting soil (5) and grass planting slope protection (7) in the sash slot (23).
7. repairing structure to 6 any bank slumps according to claim 1, which is characterized in that dredge grooving (12) and be arranged in timber (13) outside, described dredge place gabion, geotechnological cloth bag are wrapped up on the outside of gabion in grooving (12), grouting behind shaft or drift lining forms the slip casting of peplos bag Gabion locks foot (11).
CN201821867807.5U 2018-11-13 2018-11-13 Bank slump repairs structure Active CN209211389U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821867807.5U CN209211389U (en) 2018-11-13 2018-11-13 Bank slump repairs structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821867807.5U CN209211389U (en) 2018-11-13 2018-11-13 Bank slump repairs structure

Publications (1)

Publication Number Publication Date
CN209211389U true CN209211389U (en) 2019-08-06

Family

ID=67459295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821867807.5U Active CN209211389U (en) 2018-11-13 2018-11-13 Bank slump repairs structure

Country Status (1)

Country Link
CN (1) CN209211389U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113356140A (en) * 2021-06-25 2021-09-07 中铁第四勘察设计院集团有限公司 Slope protection building block, ecological slope protection suitable for rain source type river channel and construction method of ecological slope protection

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113356140A (en) * 2021-06-25 2021-09-07 中铁第四勘察设计院集团有限公司 Slope protection building block, ecological slope protection suitable for rain source type river channel and construction method of ecological slope protection

Similar Documents

Publication Publication Date Title
CN102691300B (en) Construction method of foundation pit earthwork
CN106499413B (en) A kind of Shallow-buried section tunnel stratum consolidation construction method
CN106759473B (en) The constructing structure and its construction method of underground pipe gallery and road
CN104500077B (en) A kind of shallow-depth-excavation tunnel passes through cottage area construction method
CN102094425B (en) Foundation pit construction method adopting shallow buried depth Larsen steel plate pile as protective cofferdam
CN103195158B (en) Municipal drainage pipeline slurry balance pipe-jacking construction method
CN100580190C (en) Building foundation pit supporting construction
CN105951711A (en) Enclosing construction method of underground continuous wall of seashore power station
CN102434717B (en) Construction method of joist steel pipe-jacking work pit
CN106930321B (en) The construction method of underground structure is built in a kind of stake of pipe-jacking with large diameter combination hole
CN104264680B (en) The method for processing foundation of Tian Wa joint portion, a kind of collapsible loess slope
CN102748040A (en) Main structure for metro long-span station and pillar arching construction method thereof
CN102758458B (en) Underground continuous wall repairing method
CN106049195A (en) Method for strengthening subgrade basement of existing high speed railway line
CN110438999A (en) A kind of deep basal pit slope excavation construction method of rich groundwater
CN106498957A (en) Steel sheet pile cofferdam construction platform and integral construction method
CN108867723A (en) The method of frame structure building rectification and underground increasing layer
CN105239530A (en) Externally bonded landscape flood prevention wall structure
CN203716156U (en) Pit-in-pit city gate hole type excavation construction structure in deep foundation pit
CN109306676A (en) The construction method of bank slump reparation structure
CN208934002U (en) A kind of barrier wall structure
CN209211389U (en) Bank slump repairs structure
CN207525567U (en) A kind of pile plate composite structure suitable for Steep Slope Embankment
CN104453915B (en) Big cross section vertical shaft pre-pouring grout reinforces Rapid Excavation method
CN109487793A (en) Inner support of pile foundation pit permanent support structure is perfused in a kind of solid matter under complex environment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant