CN208236024U - A kind of bilayer combination integral type crow - Google Patents

A kind of bilayer combination integral type crow Download PDF

Info

Publication number
CN208236024U
CN208236024U CN201820716004.3U CN201820716004U CN208236024U CN 208236024 U CN208236024 U CN 208236024U CN 201820716004 U CN201820716004 U CN 201820716004U CN 208236024 U CN208236024 U CN 208236024U
Authority
CN
China
Prior art keywords
sentry box
stair
lower layer
fixed
integral type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820716004.3U
Other languages
Chinese (zh)
Inventor
纳安宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KUNMING JUEXIN INDUSTRY & TRADE Co Ltd
Original Assignee
KUNMING JUEXIN INDUSTRY & TRADE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KUNMING JUEXIN INDUSTRY & TRADE Co Ltd filed Critical KUNMING JUEXIN INDUSTRY & TRADE Co Ltd
Priority to CN201820716004.3U priority Critical patent/CN208236024U/en
Application granted granted Critical
Publication of CN208236024U publication Critical patent/CN208236024U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model discloses a kind of bilayer combination integral type crows, are related to road traffic facility technical field.The crow includes concrete pedestal, sentry box lower layer, sentry box upper layer and stair, is provided on built-in fitting and face in concrete pedestal and offers preformed hole;Sentry box lower layer is welded on built-in fitting and is tightly connected between bottom surrounding and concrete pedestal surface;The stabilizer blade of stair is plugged in preformed hole.Sentry box upper layer is fixed by bolts in the lower layer of sentry box, then stair stabilizer blade is plugged in the preformed hole on concrete pedestal surface, while side wall is fixed by bolts on sentry box lower layer side wall, double-deck crow obtains preliminary installation process and just completes.Arrange that above office desk and chair and office equipment can meet traffic police's routine work needs in the upper layer of sentry box, mountable Simple machinery room equipment is for equipment power supply and monitoring etc. in the lower layer of sentry box, and stair are convenient for passage.Such bilayer combination integral type crow structure is simple, easy for installation, is convenient for mass production.

Description

A kind of bilayer combination integral type crow
Technical field
The utility model relates to road traffic facility technical fields, and in particular to a kind of bilayer combination integral type traffic post Pavilion.
Background technique
Crow is mainly set to each arterial street and important traffic road as the critical facility for assisting traffic police's work Mouthful, as protection, for protecting law enforcement officer not by wind and weather.Current crow is usually by steel structure keel, liner The composition such as insulation board, external application color steel plate, steelframe are mostly manufactured by light weight and hard metal alloy.
For cooperation traffic police on duty and work, existing crow, which usually requires that, is formulated with Simple machinery room, air-conditioning, office facility Or heating equipment etc., such crow need to usually use double layer design.Current sentry box structure is simple, and lower layer is simply solid Due to ground, upper layer is buckled at the top of lower layer, and seam crossing is sealed using sealant, the easy leak of seam crossing, while intensity difference, can not Meets the needs of traffic police on duty and work.
Utility model content
The purpose of this utility model is to provide a kind of bilayer combination integral type crows, solve current crow Intensity difference is unable to satisfy the problem of traffic police's routine work demand.
In order to solve the above technical problems, the utility model uses following technical scheme: a kind of bilayer combination integral type friendship Logical sentry box, including concrete pedestal, sentry box lower layer, sentry box upper layer and stair, concrete pedestal are set on ground, sentry box lower layer It is fixed on concrete pedestal, sentry box upper layer is fixed in the lower layer of sentry box, is provided with stair, feature on sentry box lower layer lateral wall It is: is provided in the concrete pedestal on built-in fitting and face and offers preformed hole;The sentry box lower layer is welded in built-in fitting It is tightly connected above and between bottom surrounding and concrete pedestal surface;The stabilizer blade of the stair is plugged in preformed hole.
Further technical solution is that the built-in fitting is bent into inverted U-shaped steelframe by bottom and is welded at the top of steelframe Steel plate constitute, steelframe is inserted into concrete pedestal, and steel plate is exposed to concrete pedestal surface, and sentry box lower level floor and steel plate weld Connect fixation.
Further technical solution is the sentry box lower layer by braced frame and is fixed on braced frame lateral wall Color steel sheet is constituted, and offers louver air hole on color steel sheet.
Further technical solution is the braced frame by the column of vertical direction on quadrangle and is separately connected adjacent The upper end of the column, lower end horizontal beam be welded, be welded with groined type hog frame on braced frame four sides, at the top of color steel sheet and Bottom is welded on horizontal beam up and down, the prominent color steel sheet lateral wall of horizontal beam lateral wall.
Further technical solution is to fix in the braced frame close to being tiltedly installed with stair in the one side of stair Beam offers fixation hole in stair fixed beam, and stairway side wall is fixed by bolts in stair fixed beam.
Further technical solution is to be welded with fixinig plate at the top of the braced frame quadrangle, offers spiral shell on fixinig plate Bolt location hole, sentry box upper layer bottom are fixed by bolt and sentry box lower layer, and bolt is fixed on fixinig plate, sentry box upper layer bottom four Week is tightly connected at the top of the lower layer of sentry box.
Further technical solution is that the sentry box upper layer is made of braced frame, color steel sheet and wallboard, support frame It is welded with color steel sheet on frame lateral wall and inner sidewall and top assembled wallboard, wallboard have heat-insulating, fire-preventing insulation board by central filler The double-deck cold-rolled steel sheet constitute, lookout window has been opened up on wallboard, wherein being provided with door on the wallboard of stair side.
Further technical solution is to be provided with electronic display on the lateral wall of sentry box top of the upper layer four sides, electricity Identification field is provided with above sub- display screen, identification field two sides are respectively arranged with red and blue warning lamp.
Further technical solution is to be provided with top cover, the pillar that top cover passes through quadrangle above the sentry box top of the upper layer Fixed, top cover upper and lower surface is waveform.
Further technical solution is to be provided with solar panel at the top of the top cover.
Working principle: sentry box lower layer, sentry box upper layer and each module of stair are transported to erecting bed, first concrete when use Then sentry box lower layer is welded on the built-in fitting of concrete pedestal by soil matrix seat, sentry box upper layer is fixed by bolts in sentry box In lower layer, then stair stabilizer blade is plugged in the preformed hole on concrete pedestal surface, while side wall is fixed by bolts in sentry box On lower layer's side wall, double-deck crow obtains preliminary installation process and just completes.Arranged in the upper layer of sentry box upper office desk and chair and Office equipment can meet traffic police's routine work needs, and mountable Simple machinery room equipment is powered and supervised for equipment in the lower layer of sentry box Survey etc., stair are convenient for passage.
To keep stair reliable and stable, it is provided with stair fixed beam in the braced frame of sentry box lower layer, is fixed on stair In braced frame;Simultaneously in order to keep contact area between the upper and lower level of sentry box bigger, assembly is more reliable and more stable, and sentry box upper and lower level passes through It is bolted, horizontal beam is contact surface, and the color steel sheet in the prominent sentry box of horizontal beam increases contact area, rainwater while beautiful It is difficult to infiltrate through in sentry box.
Compared with prior art, the utility model has the beneficial effects that providing a kind of modularized production, combined type installation Sentry box lower layer is welded on the built-in fitting of concrete pedestal by crow, and sentry box upper layer is fixed by bolts under sentry box On layer, then stair stabilizer blade is plugged in the preformed hole on concrete pedestal surface, while side wall is fixed by bolts under sentry box On layer side wall, crow is tentatively installed, and sentry box upper layer meets traffic police's routine work needs, mountable letter in the lower layer of sentry box Easy calculator room equipment, stair are convenient for passage.Such bilayer combination integral type crow structure is simple, installation is simple, stable and firm, Convenient for mass production.
Detailed description of the invention
Fig. 1 is the assembling schematic diagram of the utility model bilayer combination integral type crow.
Fig. 2 is the structural schematic diagram of concrete pedestal in the utility model.
Fig. 3 is the structural schematic diagram of sentry box lower layer in the utility model.
Fig. 4 is the schematic diagram of internal structure on sentry box upper layer in the utility model.
Fig. 5 is the structural schematic diagram of top cover in the utility model.
In figure: 1- concrete pedestal, the sentry box 2- lower layer, the sentry box 3- upper layer, 4- stair, 5- built-in fitting, 6- preformed hole, 7- steel Frame, 8- steel plate, 9- braced frame, 10- color steel sheet, 11- column, 12- horizontal beam, 13- stair fixed beam, 14- fixation hole, 15- fixinig plate, 16- bolt positioning hole, 17- wallboard, 18- lookout window, 19- electronic display, 20- identification field, 21- warning lamp, 22- top cover, 23-, 24- pillar, 25- louver air hole, 26- groined type hog frame.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only used to explain The utility model is not used to limit the utility model.
Embodiment 1
As shown in Figure 1, a kind of bilayer combination integral type crow, including concrete pedestal 1, sentry box lower layer 2, on sentry box Layer 3 and stair 4, concrete pedestal 1 are set on ground, and sentry box lower layer 2 is fixed on concrete pedestal 1, and sentry box upper layer 3 is fixed In in sentry box lower layer 2, stair 4 are provided on 2 lateral wall of sentry box lower layer, it is characterised in that: are provided in the concrete pedestal 1 Preformed hole 6 is offered on built-in fitting 5 and face;The sentry box lower layer 2 is welded on built-in fitting 5 and bottom surrounding and concrete pedestal It is tightly connected between 1 surface;The stabilizer blade of the stair 4 is plugged in preformed hole 6.Such crow facilitates modularized production, makes Each module is transported to erecting bed by the used time, then sentry box lower layer 2 is welded in concrete pedestal 1 by first precast concrete pedestal 1 On built-in fitting 5, sentry box upper layer 3 is fixed by bolts in sentry box lower layer 2, then 4 stabilizer blade of stair is plugged in concrete pedestal 1 In the preformed hole 6 on surface, while side wall is fixed by bolts on 2 side wall of sentry box lower layer, and double-deck crow, which obtains, tentatively pacifies Dress process just completes.Arrange that upper office desk and chair and office equipment can meet traffic police's routine work needs in sentry box upper layer 3, Mountable Simple machinery room equipment is for equipment power supply and monitoring etc. in sentry box lower layer 2, and stair 4 are convenient for passage.Such bilayer combination Integral type crow is directly fixed on stable and firm on concrete pedestal, while structure is simple, easy for installation, is convenient for mass Production.
Embodiment 2
To advanced optimize the technical solution in embodiment 1, built-in fitting 5 described in the present embodiment is bent into down U by bottom The steelframe 7 of shape and the steel plate 8 for being welded in 7 top of steelframe are constituted, and steelframe 7 is inserted into concrete pedestal 1, and steel plate 8 is exposed to coagulation 1 surface of soil matrix seat, 2 bottom of sentry box lower layer are welded and fixed with steel plate 8.As shown in Fig. 2, steelframe 7 is bent by round steel, it is embedded in In concrete pedestal 1, keep 2 fixation of sentry box lower layer welded with steel plate 8 reliable.
Embodiment 3
To advanced optimize the technical solution in embodiment 1, sentry box lower layer described in the present embodiment 2 is by 9 He of braced frame The color steel sheet 10 being fixed on lower layer support frame lateral wall is constituted, and offers louver air hole 25 on color steel sheet 10.Such as Shown in Fig. 3, braced frame 9 is the load-carrying members of entire crow;It is advanced police white on the outside of color steel sheet 10, blue, Inside is white;Louver air hole 25 is used for calculator room equipment ventilation and heat.
Embodiment 4
To advanced optimize the technical solution in embodiment 3, braced frame 9 described in the present embodiment is by side vertical on quadrangle To column 11 and connection adjacent columns 11 horizontal beam 12 be welded, be welded on 9 four sides of braced frame groined type reinforcement Frame 26 is welded at the top and bottom of color steel sheet 10 on horizontal beam 12 up and down, outside the prominent color steel sheet 10 of 12 lateral wall of horizontal beam Side wall.Outer framework structure is overlapped by column 11 and horizontal beam 12, while welding groined type hog frame 26 on four sides, is further increased Add 9 intensity of braced frame.Horizontal beam 12 is the contact surface on sentry box upper layer 3 and sentry box lower layer 2, the colour in the prominent sentry box of horizontal beam 12 Steel plate 10, increases contact area while beautiful, rainwater is difficult to infiltrate through in sentry box.
Embodiment 5
To advanced optimize the technical solution in embodiment 4, close to stair 4 in braced frame 9 described in the present embodiment It is tiltedly installed with stair fixed beam 13 on one side, fixation hole 14 is offered in stair fixed beam 13,4 side wall of stair is solid by bolt Due in stair fixed beam 13.As shown in figure 4, stair 4 are fixed in stair fixed beam 13, that is, it is fixed in braced frame 9, Keep the fixation of stair 4 relatively reliable.
Embodiment 6
To advanced optimize the technical solution in embodiment 4, it is welded at the top of braced frame 9 four described in the present embodiment jiao Fixinig plate 15 offers bolt positioning hole 16 on fixinig plate 15, and 3 bottom of sentry box upper layer is fixed by bolt and sentry box lower layer 2, spiral shell Bolt is fixed on fixinig plate 15, is tightly connected at the top of 3 bottom surrounding of sentry box upper layer and sentry box lower layer 2.Pass through fixinig plate 15 and spiral shell Bolt connects sentry box upper layer 3 and sentry box lower layer 2, firm and reliable connection, while the two contact surface being sealed, and rainwater is avoided to enter hilllock Inside pavilion.
Embodiment 7
To advanced optimize the technical solution in embodiment 4, sentry box upper layer described in the present embodiment 3 is by braced frame 9, coloured silk Color steel plate 10 and wallboard 17 are constituted, and are welded with color steel sheet 10 on 9 lateral wall of braced frame and inner sidewall and top assembled wallboard 17, wallboard 17 has the double-deck cold-rolled steel sheet of heat-insulating, fire-preventing insulation board to constitute by central filler, and lookout window 18 has been opened up on wallboard 17, Wherein door 23 is provided on the wallboard 17 of 4 side of stair.Sentry box upper layer 3 is connected to by door 23 with stair 4, Tong Guo lookout window 18 The traffic conditions of affiliated area to be observed and managed, achieve the purpose that heat-insulating, fire-preventing is kept the temperature by wallboard 17, structure is simple, It is easy to assembly, it is convenient for mass production.
Embodiment 8
To advanced optimize the technical solution in embodiment 7,3 top four sides lateral wall of sentry box upper layer described in the present embodiment On be provided with electronic display 19, identification field 20 is provided with above electronic display 19,20 two sides of identification field are respectively set There is red and blue warning lamp 21.20 back side of identification field is installed with lamp, convenient for the people on street at night it is also noted that sentry box Position, while red and blue warning lamp 21 flashes, and comes into the picture.Sentry box four sides is provided with identification field 20 and police Show lamp 21.
Embodiment 9
To advanced optimize the technical solution in embodiment 7,3 over top of sentry box upper layer described in the present embodiment is provided with Top cover 22, top cover 22 is fixed by the pillar 24 of quadrangle, and 22 upper and lower surface of top cover is waveform.As shown in figure 5,22 face of top cover Product is greater than 3 topside area of sentry box upper layer, and the effect of windproof rain cover is played while beauty.
Embodiment 10
To advanced optimize the technical solution in embodiment 9, solar energy is provided at the top of top cover 22 described in the present embodiment Solar panel.It the use of solar energy is to provide electric energy in sentry box, it is energy saving.
Although reference be made herein to the utility model is described in multiple explanatory embodiments of the utility model, still, It should be understood that those skilled in the art can be designed that a lot of other modification and implementations, these modifications and implementations It will fall within scope and spirit disclosed in the present application.More specifically, it discloses in the application, drawings and claims In range, can building block to theme combination layout and/or layout carry out a variety of variations and modifications.In addition to building block And/or outside the modification and improvement of layout progress, to those skilled in the art, other purposes also be will be apparent.

Claims (10)

1. a kind of bilayer combination integral type crow, including concrete pedestal (1), sentry box lower layer (2), sentry box upper layer (3) and Stair (4), concrete pedestal (1) are set on ground, and sentry box lower layer (2) is fixed on concrete pedestal (1), sentry box upper layer (3) it is fixed on sentry box lower layer (2), is provided with stair (4) on sentry box lower layer (2) lateral wall, it is characterised in that: the concrete It is provided on built-in fitting (5) and face in pedestal (1) and offers preformed hole (6);The sentry box lower layer (2) is welded in built-in fitting (5) It is tightly connected above and between bottom surrounding and concrete pedestal (1) surface;The stabilizer blade of the stair (4) is plugged in preformed hole (6).
2. a kind of bilayer combination integral type crow according to claim 1, it is characterised in that: the built-in fitting (5) It is made of the steel plate (8) that bottom is bent into inverted U-shaped steelframe (7) and is welded at the top of steelframe (7), steelframe (7) is inserted into concrete In pedestal (1), steel plate (8) is exposed to concrete pedestal (1) surface, and sentry box lower layer (2) bottom is welded and fixed with steel plate (8).
3. a kind of bilayer combination integral type crow according to claim 1, it is characterised in that: the sentry box lower layer (2) it is made of braced frame (9) and the color steel sheet (10) being fixed on braced frame (9), color steel sheet offers on (10) Louver air hole (25).
4. a kind of bilayer combination integral type crow according to claim 3, it is characterised in that: the braced frame (9) by the column (11) of vertical direction on quadrangle and be separately connected adjacent columns (11) upper end, lower end horizontal beam (12) weld It forms, is welded with groined type hog frame (26) on braced frame (9) four sides, is welded at the top and bottom of color steel sheet (10) up and down On horizontal beam (12), prominent color steel sheet (10) lateral wall of horizontal beam (12) lateral wall.
5. a kind of bilayer combination integral type crow according to claim 4, it is characterised in that: the braced frame (9) close to being tiltedly installed with stair fixed beam (13) in the one side of stair (4) on, stair fixed beam offers fixation hole on (13) (14), stair (4) side wall is fixed by bolts on stair fixed beam (13).
6. a kind of bilayer combination integral type crow according to claim 4, it is characterised in that: the braced frame (9) it is welded with fixinig plate (15), is offered on fixinig plate (15) bolt positioning hole (16), sentry box upper layer (3) bottom at the top of quadrangle Fixed by bolt and sentry box lower layer (2), bolt is fixed on fixinig plate (15), under sentry box upper layer (3) bottom surrounding and sentry box It is tightly connected at the top of layer (2).
7. a kind of bilayer combination integral type crow according to claim 4, it is characterised in that: the sentry box upper layer (3) it is made of braced frame (9), color steel sheet (10) and wallboard (17), color steel sheet (10) is welded in braced frame (9), And inner sidewall and top assembled wallboard (17), wallboard (17) are had the double-deck cold-rolled steel sheet structure of heat-insulating, fire-preventing insulation board by central filler At, opened up on wallboard (17) lookout window (18), wherein being provided with door (23) on the wallboard (17) of stair (4) side.
8. a kind of bilayer combination integral type crow according to claim 7, it is characterised in that: the sentry box upper layer (3) it is provided with electronic display (19) on the lateral wall of top four sides, is provided with identification field above electronic display (19) (20), identification field (20) two sides are respectively arranged with red and blue warning lamp (21).
9. a kind of bilayer combination integral type crow according to claim 7, it is characterised in that: the sentry box upper layer (3) over top is provided with top cover (22), and top cover (22) is fixed by the pillar (24) of quadrangle, and top cover (22) upper and lower surface is Waveform.
10. a kind of bilayer combination integral type crow according to claim 9, it is characterised in that: the top cover (22) Top is provided with solar panel.
CN201820716004.3U 2018-05-15 2018-05-15 A kind of bilayer combination integral type crow Active CN208236024U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820716004.3U CN208236024U (en) 2018-05-15 2018-05-15 A kind of bilayer combination integral type crow

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820716004.3U CN208236024U (en) 2018-05-15 2018-05-15 A kind of bilayer combination integral type crow

Publications (1)

Publication Number Publication Date
CN208236024U true CN208236024U (en) 2018-12-14

Family

ID=64579964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820716004.3U Active CN208236024U (en) 2018-05-15 2018-05-15 A kind of bilayer combination integral type crow

Country Status (1)

Country Link
CN (1) CN208236024U (en)

Similar Documents

Publication Publication Date Title
CN109403663A (en) A kind of removable module fire-fighting Support Equipment on duty
CN103628710B (en) A kind of portable detachable box-type medium-voltage frequency conversion chamber
CN201850674U (en) Installing and adjusting structure of building curtain wall stand column and building main body
CN209308470U (en) A kind of removable module fire-fighting Support Equipment on duty
CN208236024U (en) A kind of bilayer combination integral type crow
CN106223714A (en) A kind of bounding wall guardrail
CN201802114U (en) Communication iron tower
CN104818867A (en) Movable assembly type public toilet
CN2812190Y (en) Vertical plane triquetrous box type bus stop board
CN108049534B (en) Energy-saving and environment-friendly type public building horizontal and vertical hidden glass curtain wall
CN205530675U (en) Frame arch over a gate can be dismantled in concatenation
CN208650595U (en) A kind of ceiling is the carport of solar panels
CN201605695U (en) Unit assembled-type curved surface daylighting roof
CN110670719A (en) Sunshine room
CN207489258U (en) A kind of energy-saving and environment-friendly LED traffic lights
CN2611461Y (en) Glass fibre reinforced plastic movable dwellings
CN206487186U (en) A kind of novel assembled high intensity is solar vehicle-shed
CN212961254U (en) Whole set of lamps and lanterns in subway ground
CN206873773U (en) A kind of installation fixed structure of circular glass lighting roof
CN204754301U (en) Remove assembled public latrine
CN212176709U (en) Bus shelter
CN205172123U (en) Multi -functional camouflage communication tower
CN221345887U (en) Unit type auxiliary house capable of assembling and disassembling awning on site
CN206158233U (en) Multi -functional indoor sentry box
CN214886403U (en) Multipurpose frame for mounting door and window

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant