CN205530675U - Frame arch over a gate can be dismantled in concatenation - Google Patents

Frame arch over a gate can be dismantled in concatenation Download PDF

Info

Publication number
CN205530675U
CN205530675U CN201620224917.4U CN201620224917U CN205530675U CN 205530675 U CN205530675 U CN 205530675U CN 201620224917 U CN201620224917 U CN 201620224917U CN 205530675 U CN205530675 U CN 205530675U
Authority
CN
China
Prior art keywords
frame
framework
gate
gatepost
roof beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620224917.4U
Other languages
Chinese (zh)
Inventor
宋康
刘�东
赵川
井维东
刘稳军
李函
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN201620224917.4U priority Critical patent/CN205530675U/en
Application granted granted Critical
Publication of CN205530675U publication Critical patent/CN205530675U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a frame arch over a gate can be dismantled in concatenation, including base and frame, be equipped with rag bolt on the base, the frame comprises gatepost frame and door roof beam frame, the bight at both ends is equipped with first connection iron on the gatepost frame, the bight at both ends is equipped with the and connect iron on the door roof beam frame, first connection iron and second connection iron that gatepost frame AND gate roof beam frame is adjacent are equipped with connecting bolt. The utility model discloses a need not artifical field weld and assembling, also need not artifical on -the -spot arc cutting, fundamentally has solved the circulation and has utilized the problem, and it is extravagant to have reduced the material, furthest's saving the material, practice thrift the cost of labor, utilizing the top from taking solar panel to generate electricity, can satisfying arch over a gate illumination needs, the night shift room power consumption can be supplied with to unnecessary electric quantity simultaneously, has practiced thrift project life cost, the construction has certain significant results to building site green to utilize recovered material and solar energy power generation simultaneously.

Description

Splicing detachable frame bar
Technical field
This utility model belongs to building field, particularly relates to a kind of splicing detachable frame bar.
Summary of the invention
The purpose of this utility model is the shortcoming overcoming above-mentioned prior art, it is provided that a kind of simple in construction, and practicality is good, it is simple to dismounting, is hardly damaged, a kind of splicing detachable frame bar with low cost.
This utility model is achieved through the following technical solutions:
A kind of splicing detachable frame bar, including base and framework, described base is provided with foundation bolt, described framework is made up of door pillar framework and door beam framework, on described door pillar framework, the corner at two ends is provided with the first connection ferrum, on described door beam framework, the corner at two ends is provided with the and connects ferrum, and the first connection ferrum and second that described door pillar framework is adjacent with door beam framework connects ferrum and is provided with connecting bolt.
Described door pillar framework is assembled by multistage, and described door beam framework is assembled by multistage.
Being provided with solar panel on door beam framework, door beam lower frame is provided with LED illumination lamp.
The utility model has the advantages that: of the present utility model weld assembly without manual site, without manual site's ARC CUTTING, fundamentally solve and circulate in Utilizing question, decrease waste of material, saved material to greatest extent, save cost of labor;Utilizing top to carry solar panel to generate electricity, can meet bar illumination needs, the most unnecessary electricity can supply night shift room electricity consumption, has saved project living cost;Utilize recovered material and solar electrical energy generation that environmental protection construction in building site is had certain significant results simultaneously.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Embodiment: splicing detachable frame bar as shown in the figure, including base 6 and framework, described base 6 is provided with foundation bolt 5, described framework is made up of door pillar framework 4 and door beam framework 1, on described door pillar framework 4, the corner at two ends is provided with the first connection ferrum 7, on described door beam framework 1, the corner at two ends is provided with the and connects ferrum 2, and the first connection ferrum 7 and second that described door pillar framework 4 is adjacent with door beam framework 1 connects ferrum 2 and is provided with connecting bolt 3.
For the ease of dismounting and transport, described door pillar framework 4 is assembled by multistage, and described door beam framework 1 is assembled by multistage.
Being provided with solar panel 8 on door beam framework 1, door beam framework 1 bottom is provided with LED illumination lamp 9, and LED illumination lamp 9 can be that multiple arrangement is arranged on beam framework 1 bottom.
This utility model pre-buried bar frame foundation base, after concrete reaches design strength, starts to install door pillar framework 4, by foundation bolt 5 fastening seat 6 on base 6 and door pillar framework 4.Again door beam framework 1 is placed on door pillar framework 4 upper end, by connecting bolt, they is fastened.This utility model can also first be about to door pillar framework on ground and door beam framework splices, then rivet clasp sheet iron, finally carries out handling installation, but needs reserved side so that fastening bolt.
After project terminates, remove and remove sheet iron, remove solar panels and lamp source, then remove fastening bolt, handling framework and miscellaneous part and be continuing with to the splicing of next building site.(when new projects building site uses this framework, it is only necessary to joint frame shelf structure again, new sheet iron is then used just to anchor.

Claims (3)

1. a splicing detachable frame bar, including base and framework, it is characterized in that: described base is provided with foundation bolt, described framework is made up of door pillar framework and door beam framework, on described door pillar framework, the corner at two ends is provided with the first connection ferrum, on described door beam framework, the corner at two ends is provided with the and connects ferrum, and the first connection ferrum and second that described door pillar framework is adjacent with door beam framework connects ferrum and is provided with connecting bolt.
Splicing detachable frame bar the most according to claim 1, is characterized in that: described door pillar framework is assembled by multistage, and described door beam framework is assembled by multistage.
Splicing detachable frame bar the most according to claim 1, is characterized in that: be provided with solar panel on door beam framework, and door beam lower frame is provided with LED illumination lamp.
CN201620224917.4U 2016-03-23 2016-03-23 Frame arch over a gate can be dismantled in concatenation Expired - Fee Related CN205530675U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620224917.4U CN205530675U (en) 2016-03-23 2016-03-23 Frame arch over a gate can be dismantled in concatenation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620224917.4U CN205530675U (en) 2016-03-23 2016-03-23 Frame arch over a gate can be dismantled in concatenation

Publications (1)

Publication Number Publication Date
CN205530675U true CN205530675U (en) 2016-08-31

Family

ID=56783759

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620224917.4U Expired - Fee Related CN205530675U (en) 2016-03-23 2016-03-23 Frame arch over a gate can be dismantled in concatenation

Country Status (1)

Country Link
CN (1) CN205530675U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035436A (en) * 2017-12-22 2018-05-15 武汉建工集团股份有限公司 A kind of standard knot formula building site bar that can be recycled
CN110344743A (en) * 2019-06-19 2019-10-18 五冶集团上海有限公司 A kind of construction site can be used in turn standardization gate posts and its installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035436A (en) * 2017-12-22 2018-05-15 武汉建工集团股份有限公司 A kind of standard knot formula building site bar that can be recycled
CN110344743A (en) * 2019-06-19 2019-10-18 五冶集团上海有限公司 A kind of construction site can be used in turn standardization gate posts and its installation method

Similar Documents

Publication Publication Date Title
CN204126053U (en) Large span prestressed concrete T plate
CN205530675U (en) Frame arch over a gate can be dismantled in concatenation
CN103628710B (en) A kind of portable detachable box-type medium-voltage frequency conversion chamber
CN203769067U (en) Novel assembly type intelligent house
CN104863313A (en) Application structure of solar photovoltaic wall tiles on roof
CN203905282U (en) Precast wall-panel and precast wall thereof
CN207776090U (en) Integrated assembled type steel building
CN203951411U (en) Universal standing-seam color steel roofing fixture
CN102903776A (en) Solar combined heat and power supply and building integrated installation bracket
CN205777182U (en) A kind of steel structure glass curtain wall awning
CN204663033U (en) Live people's container
CN211424203U (en) Multi-section silicon-based golden yellow light lamp
CN210267048U (en) Solar street lamp of easy equipment
CN204442237U (en) A kind of roof photovoltaic bracket
CN207880696U (en) A kind of urban construction independence public utility photovoltaic illumination and lighting structure
CN202969759U (en) Honeycombed spliced solar photovoltaic tile and framework device
CN201412764Y (en) 7-shaped outdoor solar lamp
CN101902156A (en) Frame-embedded photovoltaic power-generating roof bracket
CN204804206U (en) Take archaize building tile of LED lamp
CN206540059U (en) A kind of multifuctional solar Environmental protection lamp
CN219316148U (en) Assembled type combined arched heavy roof structure
CN206157767U (en) Utility tunnel
CN205829538U (en) A kind of pitched roof photovoltaic supporting construction
CN203218293U (en) Reinforced photovoltaic assembly framework
CN204754301U (en) Remove assembled public latrine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160831

Termination date: 20210323