CN208235984U - A kind of interim mud-guards - Google Patents
A kind of interim mud-guards Download PDFInfo
- Publication number
- CN208235984U CN208235984U CN201820644836.9U CN201820644836U CN208235984U CN 208235984 U CN208235984 U CN 208235984U CN 201820644836 U CN201820644836 U CN 201820644836U CN 208235984 U CN208235984 U CN 208235984U
- Authority
- CN
- China
- Prior art keywords
- mud
- guards
- ontology
- support component
- interim
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of interim mud-guards, the interim mud-guards include mud-guards ontology (1), left support component (2) are equipped in the side of mud-guards ontology (1), right support component (3) are equipped in the other side of mud-guards ontology (1), right support component (3) and left support component (2) are opposite each other, form bilateral symmetry.This practical new design structure is simple, it is flexible for installation, improve efficiency, guarantee quality, construction cost can be reduced, hidden danger of quality can also be reduced, simultaneously, due to being also equipped with compatible soil collection device therewith in the bottom of mud-guards ontology and being additionally provided with non-slip mat on the soil collection device, therefore, realize the effect for having not only acted as interim gear soil, it also achieves simultaneously and environmental protection is also achieved while alleviating the labor intensity of operator to alleviate the work that operator cleans soil to the centralized collection processing of soil.
Description
Technical field
The utility model relate generally to it is a kind of build a kind of interim mud-guards of work equipment, especially basement construction,
Mainly apply to basement construction, unload soil for construction personnel, prevents the soil on construction personnel's shoes from bringing into raft plate 4,
Make plate face and reinforcing bar not by clay contaminated, belongs to and build work auxiliary material field.
Background technique
Mud measure is kept off with timber layer plate in industrial building engineering, is taken in basement construction civilian, timber layer plate keeps off mud effect
Difference, construction personnel bring the soil on shoes in basement raft plate into, lead to our basement raft plate plate faces, reinforcing bar, waterproof layer, by
To the pollution of soil;There is folder mud phenomenon during concrete placings, in concrete, there are biggish security-hidden troubles.
Traditional construction method is to use timber layer plate place mat, and such method is more extensive, and conventional construction method has following lack
Fall into: construction personnel brings the soil on shoes in basement raft plate into, leads to plate face, reinforcing bar, waterproof layer, the pollution by soil;
There is folder mud phenomenon during concrete placings, in concrete, there are biggish security-hidden troubles.
Therefore, a kind of functional reliability height need to be developed and a kind of practical interim mud-guards are to solve above-mentioned technology to ask
The key point of topic.
Summary of the invention
To solve the above-mentioned problems of the prior art and defect, for during traditional basement construction, commonly use
Construction method timber layer plate place mat, such method is more extensive, and conventional construction method has following defects that construction personnel by shoes
On soil bring into basement raft plate, lead to plate face, reinforcing bar, waterproof layer, the pollution by soil;During concrete placings, concrete
Middle to there is folder mud phenomenon, there are biggish security-hidden troubles.The utility model is improved this and is innovated, it is desirable to provide one
Kind can not only realize that peace is torn open simple, convenient, fast, while can also improve working efficiency, accelerate construction progress, economize on resources and
Cost, a kind of interim mud-guards of energy regularization processing.
In order to solve the above problem and reach above-mentioned purpose of utility model, a kind of this practical interim mud-guards be by using
It following design structure and is realized using following technical solution:
As a kind of improvement of interim mud-guards of the utility model, which includes mud-guards ontology (1), is being kept off
The side of mud frame ontology (1) is equipped with left support component (2), is equipped with right support component (3) in the other side of mud-guards ontology (1),
Right support component (3) and left support component (2) are opposite each other, form bilateral symmetry.
The improvement above-mentioned as the utility model, " stair shape " structure of the mud-guards ontology (1) generally hollow out,
The bottom of the mud-guards ontology (1) of the stair shape " structure is also equipped with compatible soil collection device (11) therewith, in soil
The bottom of collection device (11) is equipped with compatible non-slip mat (111) therewith, and non-slip mat (111) is rubber antiskid pad.
The further improvement above-mentioned as the utility model, the total length of the mud-guards ontology (1) are 80cm, overall width
For 50cm;The L shape steel plate of the soil collection device (11) generally steel, the L shape steel plate are welded on mud-guards ontology (1)
It is attached thereto and is integral.
The further improvement above-mentioned as the utility model, the left support component (2) are integrally in " sickle shaped " structure
Either " L shape " structure;The left support component (2) includes left support part (21) and left fixing piece (22), wherein left support
One end of part (21) is connected with mud-guards ontology (1), one end phase of the other end and left fixing piece (22) of left support part (21)
Connection, the other end of left fixing piece (22) are connected with mud-guards ontology (1).
The further improvement above-mentioned as the utility model, the left support part (21) and the left fixing piece (22) are equal
For angle steel.
The further improvement above-mentioned as the utility model, the right support component (3) are integrally in " sickle shaped " structure
Either " L shape " structure.
The again further improvement above-mentioned as the utility model, the right support component (3) includes right support (31)
With right fixing piece (32), wherein one end of right support (31) is connected with mud-guards ontology (1), right support (31) it is another
One end is connected with the one end of right fixing piece (32), and the other end of right fixing piece (32) is connected with mud-guards ontology (1).
The again again further improvement above-mentioned as the utility model, the right support (31) and the right fixing piece
It (32) is angle steel.
It is more further improved again again as the utility model is above-mentioned, the left support component (2) and mud-guards ontology
(1) described to be fixedly connected as directly being welded as one between left support component (2) and mud-guards ontology (1) to be fixedly connected between
Body is either machined directly to integrated formed structure.
The also again again further improvement above-mentioned as the utility model, the right support component (3) and mud-guards ontology
(1) described to be fixedly connected as directly being welded as one between right support component (3) and mud-guards ontology (1) to be fixedly connected between
Body is either machined directly to integrated formed structure.
Working principle is: a kind of interim mud-guards of above-mentioned design structure need to be carried out group before being worked
It pretends to be spare.
In use, before cushion cap raft plate (4) construction, it is only necessary to place the utility model design structure at exit passageway mouth
A kind of interim mud-guards, wait raft plate (4) concrete placings after, be placed at next exit passageway mouth, be recycled.
Utility model has the following beneficial effects compared with the prior art: this practical new unloads soil for construction personnel
With, it prevents the soil on construction personnel's shoes from bringing into raft plate, has design structure simple, it is flexible for installation, improve efficiency, guarantee matter
Amount, can reduce construction cost, can also reduce the plurality of advantages of hidden danger of quality.
Detailed description of the invention
Specific embodiment of the present utility model is described in further detail with reference to the accompanying drawing, in which:
Fig. 1 is one of overall structure diagram of the first design structure of the utility model;
Fig. 2 is the two of the overall structure diagram of the first design structure of the utility model;
Fig. 3 is the use state of the first design structure of the utility model with reference to figure;
Fig. 4 is one of the overall structure diagram of second of design structure of the utility model;
Fig. 5 is one of the overall structure diagram of second of design structure of the utility model;
The use state of second of design structure of Fig. 6 the utility model is with reference to figure;
Wherein, figure label: 1-mud-guards ontology, 11-soil collection devices, 111-non-slip mats;
2-left support components, 21-left support parts, 22-left fixing pieces;
3-right support components, 31-right supports, 32-right fixing pieces;
4-raft plates 4;
5-soil.
Specific embodiment
In order to make technological means of the utility model, create feature, reach purpose and effect is easy to understand, under
Further detailed description is made to the technical solution of the utility model in conjunction with attached drawing and specific embodiment in face.
A kind of interim mud-guards as shown in Figure of description 1 to Figure of description 3, which includes mud-guards
Ontology 1, is equipped with left support component 2 in the side of mud-guards ontology 1, is equipped with right support component in the other side of mud-guards ontology 1
3, right support component 3 and left support component 2 are opposite each other, form bilateral symmetry.
Further, the mud-guards of " stair shape " structure of the generally hollow out of mud-guards ontology 1, in the stair shape " structure
The bottom of ontology 1 is also equipped with compatible soil collection device 11 therewith, the bottom of soil collection device 11 be equipped with
Compatible non-slip mat 111, non-slip mat 111 be rubber antiskid pad.
Specifically, the total length of mud-guards ontology 1 is 80cm, overall width 50cm;The generally steel of soil collection device 11
The L shape steel plate of system, which, which is welded on to be attached thereto on mud-guards ontology 1, is integral.
More specifically, it is in " sickle shaped " structure either " L shape " structure that left support component 2 is whole;Left support component 2 wraps
Include left support part 21 and left fixing piece 22, wherein one end of left support part 21 is connected with mud-guards ontology 1, left support part 21
The other end be connected with one end of left fixing piece 22, the other end of left fixing piece 22 is connected with mud-guards ontology 1.
More specifically, left support part 21 and left fixing piece 22 are angle steel.
Further, it is in " sickle shaped " structure either " L shape " structure that right support component 3 is whole.
Specifically, right support component 3 include right support 31 and right fixing piece 32, wherein one end of right support 31 with
Mud-guards ontology 1 is connected, and the other end of right support 31 is connected with one end of right fixing piece 32, right fixing piece 32 it is another
End is connected with mud-guards ontology 1.
More specifically, right support 31 and right fixing piece 32 are angle steel.
Further, left support component 2 is fixedly connected as to be fixedly connected between left support component 2 and mud-guards ontology 1
Integrated formed structure is directly welded as a whole or is machined directly between mud-guards ontology 1.
Further, right support component 3 is fixedly connected as to be fixedly connected between right support component 3 and mud-guards ontology 1
Integrated formed structure is directly welded as a whole or is machined directly between mud-guards ontology 1.
In conclusion more specifically embodiment is the utility model:
A kind of interim mud-guards of above-mentioned design structure need to be carried out assembling as spare before being worked.
When production, as depicted in figs. 1 and 2, make the mud-guards that the utility model design structure is welded into using angle steel.
In use, before the construction of cushion cap raft plate 4, it is only necessary to place the utility model design structure at exit passageway mouth
A kind of interim mud-guards, unload soil for construction personnel, prevent the soil on construction personnel's shoes from bringing into raft plate 4, pollution
4 reinforcing bar of raft plate, waterproof etc.;After waiting 4 concrete placings of raft plate, it is placed at next exit passageway mouth, circuiting sequentially turnover makes
With.
Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention,
It is not the limitation for making other forms to the utility model, any person skilled in the art is possibly also with upper
State the technology contents make modifications or to change or modify the equivalent equivalent Example of announcement.But it is all without departing from the utility model
Technical solution content, any simple modification made by the above technical examples according to the technical essence of the present invention, equivalent variations
With remodeling, the protection scope of technical solutions of the utility model is still fallen within.
Claims (10)
1. a kind of interim mud-guards, it is characterised in that: the interim mud-guards include mud-guards ontology (1), in mud-guards ontology (1)
Side be equipped with left support component (2), the other side of mud-guards ontology (1) be equipped with right support component (3), right support component
(3) opposite each other with left support component (2), form bilateral symmetry.
2. a kind of interim mud-guards according to claim 1, it is characterised in that: the mud-guards ontology (1) is generally engraved
The bottom of the mud-guards ontology (1) of empty " stair shape " structure, in the stair shape " structure is also equipped with compatible soil therewith
Collection device (11) is equipped with compatible non-slip mat (111) therewith, non-slip mat in the bottom of soil collection device (11)
It (111) is rubber antiskid pad.
3. a kind of interim mud-guards according to claim 2, it is characterised in that: the total length of the mud-guards ontology (1)
For 80cm, overall width 50cm;The L shape steel plate of the soil collection device (11) generally steel, the L shape steel plate are welded on gear
It is attached thereto and is integral on mud frame ontology (1).
4. a kind of interim mud-guards according to claim 3, it is characterised in that: the left support component (2) is integrally in " sickle
Knife-like " structure either " L shape " structure;The left support component (2) includes left support part (21) and left fixing piece (22),
In, one end of left support part (21) is connected with mud-guards ontology (1), the other end of left support part (21) and left fixing piece (22)
One end be connected, the other end of left fixing piece (22) is connected with mud-guards ontology (1).
5. a kind of interim mud-guards according to claim 4, it is characterised in that: the left support part (21) and the left side are solid
Determining part (22) is angle steel.
6. a kind of interim mud-guards according to claim 1, it is characterised in that: the right support component (3) is integrally in " sickle
Knife-like " structure either " L shape " structure.
7. a kind of interim mud-guards according to claim 6, it is characterised in that: the right support component (3) includes right branch
Support member (31) and right fixing piece (32), wherein one end of right support (31) is connected with mud-guards ontology (1), right support
(31) the other end is connected with the one end of right fixing piece (32), the other end and mud-guards ontology (1) phase of right fixing piece (32)
Connection.
8. a kind of interim mud-guards according to claim 7, it is characterised in that: the right support (31) and the right side are solid
Determining part (32) is angle steel.
9. a kind of interim mud-guards according to claim 1, it is characterised in that: the left support component (2) and mud-guards
It is described to be fixedly connected as directly welding between left support component (2) and mud-guards ontology (1) to be fixedly connected between ontology (1)
It is integrated or is machined directly to integrated formed structure.
10. a kind of interim mud-guards according to claim 1, it is characterised in that: the right support component (3) and mud-guards
It is described to be fixedly connected as directly welding between right support component (3) and mud-guards ontology (1) to be fixedly connected between ontology (1)
It is integrated or is machined directly to integrated formed structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820644836.9U CN208235984U (en) | 2018-05-02 | 2018-05-02 | A kind of interim mud-guards |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820644836.9U CN208235984U (en) | 2018-05-02 | 2018-05-02 | A kind of interim mud-guards |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208235984U true CN208235984U (en) | 2018-12-14 |
Family
ID=64581756
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820644836.9U Active CN208235984U (en) | 2018-05-02 | 2018-05-02 | A kind of interim mud-guards |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208235984U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109701984A (en) * | 2019-02-27 | 2019-05-03 | 中交路桥建设有限公司 | A kind of environment-friendly type dregs hole mud retaining net |
-
2018
- 2018-05-02 CN CN201820644836.9U patent/CN208235984U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109701984A (en) * | 2019-02-27 | 2019-05-03 | 中交路桥建设有限公司 | A kind of environment-friendly type dregs hole mud retaining net |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110407097A (en) | The construction method of the novel phase modifier of lifting based on portal frame and Lao Xinge device | |
CN102720356B (en) | Steel beam grid floor formwork system | |
CN208235984U (en) | A kind of interim mud-guards | |
CN103669665B (en) | The elevation difference node construction technique of steel bar truss floor support plate construction | |
CN204916049U (en) | Fixing device of child flange reason is pasted in hull segmentation | |
CN101857067B (en) | Special support tooling for installing translational hatch cover of bulk carrier and installation method thereof | |
CN106078105A (en) | A kind of production technology of aluminum alloy pattern plate | |
CN201762651U (en) | Tunnel inverted arch trestle bridge | |
CN206049969U (en) | A kind of door frame for shelving and transporting ultra-large type hull cabin | |
CN105155836B (en) | Aluminum alloy mould plate for building and its using method | |
CN207360534U (en) | Load-bearing construction platform locking device waterborne | |
CN207812771U (en) | A kind of multi-laminate plywood of framework of steel reinforcement interval adjustable | |
CN207309279U (en) | Bulk freighter T row's structure levels close up seam butting tooling | |
CN206048484U (en) | A kind of lightweight plate pours device | |
CN206737466U (en) | A kind of ancient building pin for replacing reel reparation | |
CN206091308U (en) | Be used for reinforced (rfd) supporting platform device of big steel form of outer wall | |
CN210618177U (en) | Reinforcing bar transfer car (buggy) for building site | |
CN209703716U (en) | A kind of architectural engineering hole mending machine | |
CN207686272U (en) | Cylindrical concrete, which pours, uses aluminum alloy pattern plate | |
CN207513153U (en) | The beam column cast-in-place node dedicated aluminium alloy template of assembly concrete frame structure | |
CN202672701U (en) | Overhanging scaffold pre-buried ring capable of being repeatedly used | |
CN206529055U (en) | Suspension type lumber jack | |
CN204983705U (en) | Assembled removal packway finished product protection device | |
CN206667744U (en) | A kind of basement roof post-cast strip side template support system | |
CN205775851U (en) | Aperture apparatus crossed by a kind of mobile formwork bed die |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |