CN208235584U - Ring-like assembled overlaps piping lane - Google Patents

Ring-like assembled overlaps piping lane Download PDF

Info

Publication number
CN208235584U
CN208235584U CN201820258197.2U CN201820258197U CN208235584U CN 208235584 U CN208235584 U CN 208235584U CN 201820258197 U CN201820258197 U CN 201820258197U CN 208235584 U CN208235584 U CN 208235584U
Authority
CN
China
Prior art keywords
piping lane
ring
prefabricated
segment
assembled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820258197.2U
Other languages
Chinese (zh)
Inventor
路海涛
邓博团
白亮
马宗源
白贝贝
杨腾飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hancheng Weili Ambitious Construction Industry Co Ltd
Original Assignee
Hancheng Weili Ambitious Construction Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hancheng Weili Ambitious Construction Industry Co Ltd filed Critical Hancheng Weili Ambitious Construction Industry Co Ltd
Priority to CN201820258197.2U priority Critical patent/CN208235584U/en
Application granted granted Critical
Publication of CN208235584U publication Critical patent/CN208235584U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of ring-like assembled overlapping piping lane, ring-like assembled overlapping piping lane is at least connected by 2 ring-like prefabricated component piping lanes, the ring-like prefabricated component piping lane is made up of the prefabricated piping lane segment of circumference in equal parts attachment device connection, stepped port is processed at the both ends of wherein one prefabricated piping lane segment, the both ends processing for other two the prefabricated piping lane segment docked with the both ends of prefabricated piping lane segment and overlapped for ladder port another ladder port, passageway is arranged in bottom in ring-like prefabricated component piping lane, in one end of ring-like assembled overlapping piping lane, insertion end is set, socket end is arranged in another ring-like assembled overlapping piping lane one end, sealing device is set between insertion end and socket end.The utility model can be improved the globality and waterproofness of piping lane, and when transport reduces the self weight of prefabricated components, improves the compression strength of piping lane, shortens construction period.

Description

Ring-like assembled overlaps piping lane
Technical field
The utility model belongs to the technical field of underground pipe gallery structure, and in particular to one kind by the ring-like prefabricated piping lane of multistage The ring-like overlapping piping lane of segment assembly.
Background technique
Recently as the fast development of urban pipe network system, because road caused by pipeline dilatation, update, maintenance etc. is anti- Again excavate phenomenon it is very common, not only cause inconvenience to the normal life of resident, at the same bring environmental pollution, noise pollution, Cross pipe-line damage, urban traffic blocking, commercial interest loss etc. influence, and cause social cost to dramatically increase, reach and restrict city The bottleneck of city's infrastructure development and enhancement of environment.Currently used underground pipe gallery main structure construction method mainly has traditional Three kinds of cast-in-place method, domain piping lane prefabrication and full prefabrication etc..
Cast-in-place method is live assembling reinforcement, shuttering then gradually casting concrete shape from bottom to up after excavation of foundation pit At final Pipe rack.Although this method formed Pipe rack seam is few, structural integrity and good waterproof performance, structure size Can be flexible and changeable as needed, but construction efficiency is lower, long construction period, especially when piping lane internal structure complexity, such as Double-deck four cabin structures need to carry out bottom plate, side wall, lower layer's mid-board, middle plate, upper layer mid-board, top plate etc. and pour by several times, and need Middle plate can just be poured by reaching some strength to lower layer's mid-board, and middle plate, which reaches some strength, could set up upper former progress upper layer Structure pours, and working procedure is complicated, long in time limit.
Domain piping lane prefabrication is the prefabricated domain piping lane near factory or place, is then opened by pipe pushing technology or foundation pit The method of integral hoisting after digging passes through the method for forming Pipe rack longitudinally connected between prefabricated ring.This method construction efficiency is high, Only along the interannular connector of piping lane longitudinal direction, structural integrity and waterproofness are preferable, however are transported and lifted by prefabricated tube coupling and limited System, is chiefly used in single cabin or double lesser piping lanes of cabin size, is not suitable for the Pipe rack that structure size is big, internal structure is complicated.
Full prefabrication is piping lane longitudinally to be divided ring, lateral piecemeal are then prefabricated in the factory, and the prefabricated component scene of transporting is laggard The method that row assembling circularizes into Pipe rack.Although each preform sizes of this method can be sized as needed, adapt to The piping lane of different structure size, but structure piecemeal is more, globality and waterproofness are poor;When Pipe rack change in size is more When, there are many pre-forms needed, and corresponding template investment and cost improve.
Summary of the invention
The technical problem to be solved by the utility model is to overcome the above-mentioned prior art, a kind of transport is provided and is hung The ring-like assembled that dressing is easy, on-site construction processes are simple, structure is reasonable overlaps piping lane.
Solving technical solution used by above-mentioned technical problem is: ring-like assembled overlapping piping lane is at least ring-like pre- by 2 The connection of product piping lane, the ring-like prefabricated component piping lane couple structure by attachment device by the prefabricated piping lane segment of circumference in equal parts At, stepped port is processed on a prefabricated piping lane segment wherein, docked with the both ends of prefabricated piping lane segment other two Overlapped the processing of prefabricated piping lane segment and ladder port another ladder port, bottom was arranged in ring-like prefabricated component piping lane Insertion end is arranged in one end of ring-like assembled overlapping piping lane in road, another ring-like assembled overlapping piping lane one end setting is inserted Mouth end, is arranged sealing device between insertion end and socket end.
Hanging ring is set on the prefabricated piping lane segment of the utility model.
The attachment device of the utility model is prestress wire.
The stepped port of the utility model are as follows: be arranged on the inside of the both ends of a prefabricated piping lane segment inner side step, in Between be arranged intermediate step, outside setting outside step, water-proof strip is set in the groove of intermediate step.
Angle between the intermediate step and horizontal plane of the utility model is 20 °~35 °, inner side step, outside step Height is 105~125mm, width is 110~130mm, gradient 105:75~130:60.
The sealing device of the utility model are as follows: steel loop is set on duct, and the one end in duct is connected to joint filling board, the other end is stretched Enter on the inside of ring-like assembled overlapping piping lane, is provided with sealant in joint filling board.
The joint filling board of the utility model is polyethylene foamed joint filling board, and the sealant is polysulfide sealant.
The utility model uses ring-like assembled overlapping piping lane and is tightly connected by the ring-like prefabricated piping lane segment of multistage, work Skill is simple, and when transport can reduce the self weight of prefabricated components, and the ring-like assembled overlapping piping lane of multistage is tightly connected, and improves piping lane Globality and waterproofness.Ring-like assembled overlapping piping lane uses the form of circular cross-section, is conducive to play soil arching effect, improves pipe The compression strength of corridor shortens construction period convenient for the popularization of shield construction.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model one embodiment.
Fig. 2 is the right view of Fig. 1.
Fig. 3 is the structural schematic diagram that connects between the ring-like prefabricated piping lane segment of the utility model.
Fig. 4 is that the ring-like assembled of the utility model overlaps the structural schematic diagram connected between piping lane.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only used to explain The utility model is not used to limit the utility model.
Embodiment 1
As shown in Figs 1-4, the ring-like assembled overlapping piping lane of the present embodiment is answered by the first ring-like prefabricated piping lane segment 1, in advance The ring-like prefabricated piping lane segment 3 of power steel strand wires 2, second, socket end 4, insertion end 5, the ring-like prefabricated piping lane segment 6 of third, passageway 7, Water-proof strip 8, inner side step 9, intermediate step 10, outside step 11, sealant 12, joint filling board 13, steel loop 14, duct 15 couple structure At.
Ring-like assembled overlapping piping lane is connected by 2 ring-like prefabricated component piping lanes, and ring-like prefabricated component piping lane is by the 3 of circumference in equal parts A prefabricated piping lane segment is coupled by attachment device to be constituted, and the attachment device of the present embodiment is prestress wire 2,3 prefabricated Piping lane section is respectively the first prefabricated piping lane segment 1, the second prefabricated piping lane segment 3 and the prefabricated piping lane segment 6 of third, the first prefabricated pipe No. 16 reinforcing bars and No. 14 spacing of reinforcement cloth are respectively adopted in corridor segment 1, the second prefabricated piping lane segment 3 and the prefabricated piping lane segment 6 of third It sets, the prefabricated piping lane segment 1 of the first of the present embodiment, the second prefabricated piping lane segment 3, third install hanging ring on prefabricated piping lane segment 6, Hanging ring is for lifting.Stepped port, the both ends pair with the first prefabricated piping lane segment 1 are processed on the first prefabricated piping lane segment 1 Processing and overlapped for ladder port another stepped end on the prefabricated piping lane segment 3 of second connect and the prefabricated piping lane segment 6 of third Mouthful, the stepped port of the present embodiment are as follows: inner side step 9, intermediate processing way station are processed on the inside of the first prefabricated piping lane segment 1 Rank 10, outside processing outside step 11, place water-proof strip 8, the intermediate step of this present embodiment in the groove of intermediate step 10 Angle between 10 and horizontal plane is 25 °, and inner side step 9, the height of outside step 11 be 110mm, width 120mm, the gradient 110:70.The bottom making passageway 7 in prefabricated component piping lane, the upper end horizontal homogeneous in passageway 7 are inserted into No. 16 reinforcing bars, lower end level No. 14 reinforcing bars of even insertion process insertion end 5 in one end of ring-like assembled overlapping piping lane, another ring-like assembled overlapping pipe Corridor one end processes socket end 4, and sealing device, the sealing device of the present embodiment are as follows: hole are installed between insertion end 5 and socket end 4 Steel loop 14 is installed, the one end in duct 15 is connected to joint filling board 13, and the other end in duct 15 protrudes into ring-like assembled overlapping on road 15 On the inside of piping lane, joint filling board 13 is polyethylene foamed joint filling board, and duct 15 is used for slip casting between socket end 4 and insertion end 5, joint filling Sealant 12 is filled in plate 13, sealant 12 is polysulfide sealant.
Embodiment 2
Ring-like assembled overlapping piping lane is connected by 10 ring-like prefabricated component piping lanes, and ring-like prefabricated component piping lane is by circumference in equal parts 3 prefabricated piping lane segments are coupled by attachment device to be constituted, and the attachment device of the present embodiment is prestress wire 2,3 prefabricated Piping lane section is respectively the first prefabricated piping lane segment 1, the second prefabricated piping lane segment 3 and the prefabricated piping lane segment 6 of third, the present embodiment First prefabricated piping lane segment 1, the second prefabricated piping lane segment 3, third install hanging ring on prefabricated piping lane segment 6.In the first prefabricated pipe Process stepped port on corridor segment 1, the second prefabricated piping lane segment 3 docked with the both ends of the first prefabricated piping lane segment 1 and the Processing and overlapped for ladder port another ladder port, the stepped port of the present embodiment on three prefabricated piping lane segments 6 are as follows: Inner side step 9, intermediate processing intermediate step 10, step 11 on the outside of the processing of outside are processed on the inside of the first prefabricated piping lane segment 1, Water-proof strip 8 is placed in the groove of intermediate step 10, the angle between the intermediate step 10 and horizontal plane of this present embodiment is 20 °, Inner side step 9, the height of outside step 11 be 105mm, width 110mm, gradient 105:75.Bottom is spread in prefabricated component piping lane Passageway 7 is built, processes insertion end 5 in one end of ring-like assembled overlapping piping lane, another ring-like assembled overlaps piping lane one end If processing socket end 4, sealing device, the sealing device of the present embodiment are installed between insertion end 5 and socket end 4 are as follows: duct 15 Upper installation steel loop 14, the one end in duct 15 is connected to joint filling board 13, the other end protrudes on the inside of ring-like assembled overlapping piping lane, joint filling Sealant 12 is filled in plate 13.
The connecting relation of other components and components is same as Example 1, and working principle is same as Example 1.
Embodiment 3
Ring-like assembled overlapping piping lane is connected by 20 ring-like prefabricated component piping lanes, and ring-like prefabricated component piping lane is by circumference in equal parts 3 prefabricated piping lane segments are coupled by attachment device to be constituted, and the attachment device of the present embodiment is prestress wire 2,3 prefabricated Piping lane section is respectively the first prefabricated piping lane segment 1, the second prefabricated piping lane segment 3 and the prefabricated piping lane segment 6 of third, the present embodiment First prefabricated piping lane segment 1, the second prefabricated piping lane segment 3, third install hanging ring on prefabricated piping lane segment 6.In the first prefabricated pipe Process stepped port on corridor segment 1, the second prefabricated piping lane segment 3 docked with the both ends of the first prefabricated piping lane segment 1 and the Processing and overlapped for ladder port another ladder port, the stepped port of the present embodiment on three prefabricated piping lane segments 6 are as follows: Inner side step 9, intermediate processing intermediate step 10, step 11 on the outside of the processing of outside are processed on the inside of the first prefabricated piping lane segment 1, Water-proof strip 8 is placed in the groove of intermediate step 10, the angle between the intermediate step 10 and horizontal plane of this present embodiment is 35 °, Inner side step 9, the height of outside step 11 be 125mm, width 130mm, gradient 130:60.Bottom is spread in prefabricated component piping lane Passageway 7 is built, processes insertion end 5 in one end of ring-like assembled overlapping piping lane, another ring-like assembled overlaps piping lane one end If processing socket end 4, sealing device, the sealing device of the present embodiment are installed between insertion end 5 and socket end 4 are as follows: duct 15 Upper installation steel loop 14, the one end in duct 15 is connected to joint filling board 13, the other end protrudes on the inside of ring-like assembled overlapping piping lane, joint filling Sealant 12 is filled in plate 13.
The connecting relation of other components and components is same as Example 1, and working principle is same as Example 1.
The above, the only preferred embodiment of the utility model, are not intended to limit the protection of the utility model Range.

Claims (7)

1. a kind of ring-like assembled overlaps piping lane, ring-like assembled overlapping piping lane is at least connected by 2 ring-like prefabricated component piping lanes, Be characterized in that: the ring-like prefabricated component piping lane is made up of the prefabricated piping lane segment of circumference in equal parts attachment device connection, Stepped port, other two prefabricated pipe docked with the both ends of prefabricated piping lane segment are processed on one of them prefabricated piping lane segment The processing of corridor segment and overlapped for ladder port another ladder port, bottom setting passageway (7) in ring-like prefabricated component piping lane, Insertion end (5) are set in one end of ring-like assembled overlapping piping lane, another ring-like assembled overlapping piping lane one end setting is inserted Mouth end (4), is arranged sealing device between insertion end (5) and socket end (4).
2. ring-like assembled according to claim 1 overlaps piping lane, it is characterised in that: set on the prefabricated piping lane segment Set hanging ring.
3. ring-like assembled according to claim 1 overlaps piping lane, it is characterised in that: the attachment device is prestressing force Steel strand wires (2).
4. ring-like assembled according to claim 1 overlaps piping lane, it is characterised in that the stepped port are as follows: one Setting inner side step (9), intermediate setting intermediate step (10), outside setting outside step on the inside of the both ends of a prefabricated piping lane segment (11), water-proof strip (8) are set in the groove of intermediate step (10).
5. ring-like assembled according to claim 4 overlaps piping lane, it is characterised in that: the intermediate step (10) and water Angle between plane is 20 °~35 °, and inner side step (9), the height of outside step (11) be 105~125mm, width 110 ~130mm, gradient 105:75~130:60.
6. ring-like assembled according to claim 1 overlaps piping lane, it is characterised in that the sealing device are as follows: duct (15) steel loop (14) are set on, the one end of duct (15) is connected to joint filling board (13), the other end protrudes into ring-like assembled overlapping pipe On the inside of corridor, sealant (12) are provided in joint filling board (13).
7. ring-like assembled according to claim 6 overlaps piping lane, it is characterised in that: the joint filling board (13) is foaming Polyethylene joint filling board, the sealant (12) is polysulfide sealant.
CN201820258197.2U 2018-02-14 2018-02-14 Ring-like assembled overlaps piping lane Expired - Fee Related CN208235584U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820258197.2U CN208235584U (en) 2018-02-14 2018-02-14 Ring-like assembled overlaps piping lane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820258197.2U CN208235584U (en) 2018-02-14 2018-02-14 Ring-like assembled overlaps piping lane

Publications (1)

Publication Number Publication Date
CN208235584U true CN208235584U (en) 2018-12-14

Family

ID=64587046

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820258197.2U Expired - Fee Related CN208235584U (en) 2018-02-14 2018-02-14 Ring-like assembled overlaps piping lane

Country Status (1)

Country Link
CN (1) CN208235584U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110616647A (en) * 2019-09-26 2019-12-27 苏交科集团股份有限公司 Full-prefabricated sliding assembled culvert and construction process thereof
CN114250806A (en) * 2021-12-09 2022-03-29 中交二公局第六工程有限公司 Construction method of comprehensive pipe gallery and long-section pipe gallery

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110616647A (en) * 2019-09-26 2019-12-27 苏交科集团股份有限公司 Full-prefabricated sliding assembled culvert and construction process thereof
CN110616647B (en) * 2019-09-26 2021-08-10 苏交科集团股份有限公司 Full-prefabricated sliding assembled culvert and construction process thereof
CN114250806A (en) * 2021-12-09 2022-03-29 中交二公局第六工程有限公司 Construction method of comprehensive pipe gallery and long-section pipe gallery

Similar Documents

Publication Publication Date Title
CN206052779U (en) A kind of prefabricated pipe gallery splicing structure
CN103835283A (en) All-wet-joint precast prestressed underground continuous wall and construction method thereof
CN108149706A (en) A kind of cast-in-place hidden girder and the prefabricated assembled pipe gallery and its construction method of superimposed sheet splicing
CN205742265U (en) Complete prefabricated overlapping assembled underground pipe gallery and connection node thereof
CN208235584U (en) Ring-like assembled overlaps piping lane
CN107023032A (en) A kind of cast-in-place method of pipe gallery
CN108166525A (en) A kind of half prefabricated assembled pipe gallery spliced with cast-in-place hidden girder and its construction method
CN208586722U (en) Precast concrete assembled piping shaft
CN105350581A (en) Advanced sealing structure for basement top slab settlement post-cast strips
CN205776342U (en) A kind of prefabricated pipe gallery tube coupling attachment structure
CN105401593A (en) Assembly type square underground pipe gallery
CN108086353A (en) A kind of hollow wallboard spliced with cast-in-place hidden girder mixes prefabricated assembled pipe gallery and its construction method
CN109914644A (en) A kind of assembled heat insulation masonry wall and preparation method thereof
CN207998860U (en) A kind of assembled pipe gallery
CN204040062U (en) Prefabricated wedge shape flexible interface assembling piping lane
CN205297593U (en) Prefabricated cable tunnel module of combined type
CN204825993U (en) Underground continuous wall stagnant water, lap guard stream joint design
CN208934007U (en) A kind of connection structure of pipe gallery
CN202559382U (en) Concrete prefabricated combined duct with stepped conical spigot and socket
CN205369299U (en) Pin -connected panel precast reinforced concrete piping lane
CN107269940A (en) A kind of many Pipe racks of assembled waterproof
CN208136954U (en) Precast splice type Pipe rack
CN204551897U (en) With the steel framework post of joint type linkage
CN207362885U (en) A kind of prefabricated piping lane system being freely combined
CN204098066U (en) The square underground pipe gallery of assembling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181214