CN208235563U - A kind of stiffening device on power transmission tower basis, power transmission tower basis and power transmission tower - Google Patents

A kind of stiffening device on power transmission tower basis, power transmission tower basis and power transmission tower Download PDF

Info

Publication number
CN208235563U
CN208235563U CN201820482006.0U CN201820482006U CN208235563U CN 208235563 U CN208235563 U CN 208235563U CN 201820482006 U CN201820482006 U CN 201820482006U CN 208235563 U CN208235563 U CN 208235563U
Authority
CN
China
Prior art keywords
power transmission
transmission tower
basis
flange
stiffening device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820482006.0U
Other languages
Chinese (zh)
Inventor
张志强
黄增浩
龚博
吴新桥
孟晓波
刘昌�
李锐海
廖永力
张贵峰
冯瑞发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southern Power Grid Co Ltd
Research Institute of Southern Power Grid Co Ltd
Original Assignee
China Southern Power Grid Co Ltd
Research Institute of Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Southern Power Grid Co Ltd, Research Institute of Southern Power Grid Co Ltd filed Critical China Southern Power Grid Co Ltd
Priority to CN201820482006.0U priority Critical patent/CN208235563U/en
Application granted granted Critical
Publication of CN208235563U publication Critical patent/CN208235563U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)
  • Electric Cable Installation (AREA)

Abstract

The utility model relates to high voltage power transmission technical fields, disclose stiffening device, power transmission tower basis and the power transmission tower on a kind of power transmission tower basis, the stiffening device on power transmission tower basis includes flange, flange includes the first half flanges being mutually butted and the second half flanges, by docking the cavity formed for connecting column foot plate between the first half flanges and the second half flanges;Flange is equipped with the bolt hole for mounting foot bolt.When installing the stiffening device on power transmission tower basis, foundation bolt is passed through into the bolt hole on flange and is installed on ground, and the cavity formed between the first half flanges and the second half flanges is connected on column foot plate, the stiffening device on power transmission tower basis is securely mounted on the basis of power transmission tower to realize, it is insufficient by the intensity for reinforcing improved power transmission tower basis to make up, and then improve the resistance to plucking and resistance to capsizing on power transmission tower basis.

Description

A kind of stiffening device on power transmission tower basis, power transmission tower basis and power transmission tower
Technical field
The utility model relates to high voltage power transmission technical field, more particularly to a kind of stiffening device, defeated on power transmission tower basis Electric tower foundation and power transmission tower.
Background technique
Important carrier of the power transmission tower as overhead transmission line undergos wind and frost sleet etc. due to long-term outer operation out of office The test of severe natural conditions, therefore under the excitation of external load, usually power transmission tower can be made by big and small impact, especially It is under the catastrophic weather such as typhoon, serious ice damage, and power transmission tower often topples the dangerous or even accident of falling tower, serious prestige Coerce the safe and stable operation of electric system.In order to reduce this loss, grid company uses a variety of strengthening measures, but this A little measures are often all embodied in the improvement to power transmission tower main body, are such as partly or wholly reinforced pylon main material, though The probability that buckling occurs under external force destruction for pylon main body can so be reduced, but the gravity of the whole tower of power transmission tower and tower material rule at this time Lattice size can all increase accordingly, so that its full payload carried also can accordingly become larger under wind load effect, cause power transmission tower original The resistance to plucking and resistance to capsizing and the improved power transmission tower of reinforcement on basis mismatch.
It in order to avoid such case, generally requires and is checked by design, take necessary measure to improve power transmission tower basis Resistance to plucking and resistance to capsizing.But since power transmission tower basis is just ready in construction, the tower on the power transmission tower basis of design Sole and inbuilt foundation bolt can not change, so as to cause the resistance to plucking and antidumping that can not improve power transmission tower original base Ability.
Utility model content
The purpose of the utility model is to provide a kind of stiffening device on power transmission tower basis, power transmission tower basis and power transmission tower, with It solves to lead to not the resistance to plucking and resistance to capsizing that improve power transmission tower original base since power transmission tower original base can not change The technical issues of, it is insufficient by the intensity for reinforcing improved power transmission tower basis to make up, to improve the anti-of power transmission tower basis It pulls out and resistance to capsizing.
In order to solve the above-mentioned technical problem, the utility model provides a kind of stiffening device on power transmission tower basis, including flange, The flange includes the first half flanges being mutually butted and the second half flanges, the first half flange and the second half flange it Between cavity for connecting column foot plate formed by docking;The flange is equipped with the bolt hole for mounting foot bolt.
Preferably, the shape of the cavity and the shape of the column foot plate match, the size of the cavity with The size of the column foot plate matches.
Preferably, the bolt hole is multiple.
Preferably, the bolt hole is 3.
Preferably, multiple bolt hole circumference uniform distributions are on the flange.
Preferably, the stiffening device on the power transmission tower basis further includes the ribs for welding with column foot plate Plate, the deep floor are connected on the flange.
Preferably, the deep floor is welded on the flange.
In order to solve identical technical problem, the utility model also provides a kind of power transmission tower basis, including column foot plate and The stiffening device on above-mentioned power transmission tower basis, the cavity loop around and be connected on the lateral wall of the column foot plate.
Preferably, the cavity is welded on the lateral wall of the column foot plate.
In order to solve identical technical problem, the utility model also provide latter power transmission tower, including power transmission tower ontology with And above-mentioned power transmission tower basis, the power transmission tower ontology are connected on the basis of power transmission tower.
The utility model provides a kind of stiffening device on power transmission tower basis, including flange, and flange includes be mutually butted Half flange and the second half flanges, by docking the sky formed for connecting column foot plate between the first half flanges and the second half flanges Chamber;Flange is equipped with the bolt hole for mounting foot bolt.When installing the stiffening device on power transmission tower basis, by foundation bolt Bolt hole on flange is simultaneously installed on ground, and the cavity formed between the first half flanges and the second half flanges is connected On column foot plate, thus realize the stiffening device on power transmission tower basis is securely mounted to power transmission tower on the basis of, with make up by The intensity for reinforcing improved power transmission tower basis is insufficient, and then improves the resistance to plucking and resistance to capsizing on power transmission tower basis.In addition, by Stiffening device in power transmission tower basis is directly reinforced on former power transmission tower basis, therefore does not need to remove former transmission of electricity Tower foundation is constructed again, so as to shorten construction period and reduce raw material waste loss.
Detailed description of the invention
Fig. 1 is the top view on the power transmission tower basis in the utility model embodiment;
Fig. 2 is the front view on the power transmission tower basis being installed on ground in the utility model embodiment.
Wherein, 1, flange;11, the first half flanges;12, the second half flanges;13, cavity;14, bolt hole;2, deep floor;
100, the stiffening device on power transmission tower basis;200, column foot plate;300, foundation bolt;400, ground.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail.Below Embodiment is not intended to limit the scope of the present invention for illustrating the utility model.
Referring to figs. 1 and 2, the stiffening device 100 on a kind of power transmission tower basis of the preferred embodiment in the utility model, packet Include flange 1, flange 1 includes the first half flanges 11 being mutually butted and the second half flanges 12, the first half flanges 11 and the second half methods By docking the cavity 13 formed for connecting column foot plate 200 between orchid 12;Flange 1, which is equipped with, is used for mounting foot bolt 300 Bolt hole 14.
In the utility model embodiment, when installing the stiffening device 100 on the power transmission tower basis, by the lower margin spiral shell Bolt 300 passes through the bolt hole 14 on the flange 1 and is installed on ground 400, and by the first half flange 11 and the institute It states the cavity 13 formed between the second half flanges 12 to be connected on the column foot plate 200, to realize the power transmission tower The stiffening device 100 on basis is securely mounted on the basis of power transmission tower, to make up by reinforcing the improved power transmission tower foundation The intensity of plinth is insufficient, and then improves the resistance to plucking and resistance to capsizing on the power transmission tower basis.Further, since power transmission tower basis Stiffening device 100 is directly reinforced on former power transmission tower basis, therefore does not need to remove former power transmission tower basis and carry out weight New construction so as to shorten construction period and reduces the waste losses of raw material.
As shown in Figure 1, in order to improve the bonding strength of the cavity 13 and the column foot plate 200, it is preferable that the present embodiment In the shape of the cavity 13 and the shape of the column foot plate 200 match, the size of the cavity 13 and the column foot plate 200 size matches.By the way that the shapes and sizes of the cavity 13 are designed to match with the column foot plate 200, thus Enable the cavity 13 to be adjacent to the lateral wall of the column foot plate 200, is connected to the column foot plate to improve the cavity 13 Intensity on 200.Specifically, the cross-sectional shape of the cavity 13 in the present embodiment is rectangular;Correspondingly, in the present embodiment The column foot plate 200 cross-sectional shape be it is rectangular.
Referring to figs. 1 and 2, in order to improve the bonding strength of the flange 1 with the ground 400, it is preferable that this reality It is multiple for applying the bolt hole 14 in example.
In the utility model embodiment, the quantity of the bolt hole 14 can be arranged according to actual operation requirements, and such as 2 A, 3 and 4 etc..In order to make to simplify the structure while ensuring the bonding strength of the flange 1 and the ground 400, To reduce cost, it is preferable that the bolt hole 14 in the present embodiment is 3.
Referring to figs. 1 and 2, in order to enable the foundation bolt 300 be the flange 1 uniform fastening is provided Power, it is preferable that multiple 14 circumference uniform distributions of bolt hole of the present embodiment are on the flange 1, so that the flange 1 is everywhere Stress is relatively uniform, to further increase the bonding strength of the flange 1 and the ground 400.
As shown in Fig. 2, in order to further increase the bonding strength of the flange 1 with the column foot plate 200, in the present embodiment The stiffening device on power transmission tower basis further include deep floor 2 for being welded with column foot plate 200, the deep floor 2 It is connected on the flange 1.By adding the deep floor 2 between the flange 1 and the column foot plate 200, to have Effect improves the intensity that the flange 1 is connected on the column foot plate 2.
In the utility model embodiment, the connection type of the deep floor 2 and the flange 1 can be according to actually making With requiring to be arranged, such as screw connection, welding, bonding.In order to ensure the connection between the deep floor 2 and the flange 1 Intensity, it is preferable that the deep floor 2 in the present embodiment is welded on the flange 1.
In order to solve identical technical problem, the utility model also provide a kind of power transmission tower basis, including column foot plate 200 with And the stiffening device 100 on above-mentioned power transmission tower basis, the cavity 13 surround and are connected to the lateral wall of the column foot plate 200 On.
In the utility model embodiment, the connection type of the cavity 13 and the column foot plate 200 can be according to reality Requirement setting, such as screw connection, welding, bonding.In order to ensure the company between the cavity 13 and the column foot plate 200 Connect intensity, it is preferable that the cavity 13 in the present embodiment is welded on the lateral wall of the column foot plate 200.
In order to solve identical technical problem, the utility model also provide latter power transmission tower, including power transmission tower ontology with And above-mentioned power transmission tower basis, the power transmission tower ontology are connected on the basis of power transmission tower.
The specific design of the stiffening device on the power transmission tower basis in this example is as follows with installation process: firstly, compound Calculate the quantity and diameter of the newly-increased foundation bolt 300, then calculate multiple foundation bolts 300 distribution it is straight Diameter;Then, the inner sidewall of the inner sidewall of the first half flange 11 and the second half flange 12 is fitted in the column foot plate On 200 lateral wall, to mark position of the bolt hole 14 on the flange 1, and the spiral shell is processed on turntable Keyhole 14;Then, then by the second half flange 12 after the inner sidewall of the first half flange 11 after processing and processing Inner sidewall is fitted on the lateral wall of the column foot plate 200, to mark the punch position on the ground 400, and to described Ground 400 drills, to process ground mounting hole;Finally, the foundation bolt 300 is implanted to by strength anchoring adhesive In the ground mounting hole, and after the pull-out test of the foundation bolt 300 passes through, the first half flange 11, institute are carried out The second half welding between flange 12, the deep floor 2 and the column foot plate 200 is stated, to be finally completed the power transmission tower The installation of the stiffening device on basis.
To sum up, the utility model provides a kind of stiffening device 100 on power transmission tower basis, power transmission tower basis and power transmission tower, defeated The stiffening device 100 of electric tower foundation includes flange 1, and flange 1 includes the first half flanges 11 being mutually butted and the second half flanges 12, By docking the cavity 13 formed for connecting column foot plate 200 between the first half flanges 11 and the second half flanges 12;It is set on flange 1 There is the bolt hole 14 for mounting foot bolt 300.When installing the stiffening device 100 on power transmission tower basis, by foundation bolt 300 Bolt hole 14 on flange 1 is simultaneously installed on ground 400, and will be formed between the first half flanges 11 and the second half flanges 12 Cavity 13 be connected on column foot plate 200, the stiffening device 100 on power transmission tower basis is securely mounted to power transmission tower to realize On the basis of, it is insufficient by the intensity for reinforcing improved power transmission tower basis to make up, and then improve the resistance to plucking on power transmission tower basis with Resistance to capsizing.Further, since the stiffening device on power transmission tower basis is directly reinforced on former power transmission tower basis, because This does not need to remove former power transmission tower basis is constructed again, so as to shorten construction period and reduces the waste damages of raw material It loses.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art For art personnel, without deviating from the technical principle of the utility model, several improvement and replacement can also be made, these change It also should be regarded as the protection scope of the utility model into replacement.

Claims (10)

1. a kind of stiffening device on power transmission tower basis, which is characterized in that including flange, the flange includes first be mutually butted Half flange and the second half flanges are formed by dock for connecting column foot between the first half flange and the second half flange The cavity of plate;The flange is equipped with the bolt hole for mounting foot bolt.
2. the stiffening device on power transmission tower basis as described in claim 1, which is characterized in that the shape of the cavity and the tower The shape of sole matches, and the size of the cavity and the size of the column foot plate match.
3. the stiffening device on power transmission tower basis as claimed in claim 1 or 2, which is characterized in that the bolt hole is multiple.
4. the stiffening device on power transmission tower basis as claimed in claim 3, which is characterized in that the bolt hole is 3.
5. the stiffening device on power transmission tower basis as claimed in claim 3, which is characterized in that multiple bolt hole circumference uniform distributions On the flange.
6. the stiffening device on power transmission tower basis as claimed in claim 1 or 2, which is characterized in that the power transmission tower basis adds Intensity device further includes the deep floor for welding with column foot plate, and the deep floor is connected on the flange.
7. the stiffening device on power transmission tower basis as claimed in claim 6, which is characterized in that the deep floor is welded on described On flange.
8. a kind of power transmission tower basis, which is characterized in that including column foot plate and such as the described in any item transmissions of electricity of claim 1-7 The stiffening device of tower foundation, the cavity loop around and be connected on the lateral wall of the column foot plate.
9. power transmission tower basis as claimed in claim 8, which is characterized in that the cavity is welded on the lateral wall of the column foot plate On.
10. a kind of power transmission tower, which is characterized in that including power transmission tower ontology and power transmission tower foundation as claimed in claim 8 or 9 Plinth, the power transmission tower ontology are connected on the basis of power transmission tower.
CN201820482006.0U 2018-04-03 2018-04-03 A kind of stiffening device on power transmission tower basis, power transmission tower basis and power transmission tower Active CN208235563U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820482006.0U CN208235563U (en) 2018-04-03 2018-04-03 A kind of stiffening device on power transmission tower basis, power transmission tower basis and power transmission tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820482006.0U CN208235563U (en) 2018-04-03 2018-04-03 A kind of stiffening device on power transmission tower basis, power transmission tower basis and power transmission tower

Publications (1)

Publication Number Publication Date
CN208235563U true CN208235563U (en) 2018-12-14

Family

ID=64587312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820482006.0U Active CN208235563U (en) 2018-04-03 2018-04-03 A kind of stiffening device on power transmission tower basis, power transmission tower basis and power transmission tower

Country Status (1)

Country Link
CN (1) CN208235563U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109869034A (en) * 2019-01-31 2019-06-11 南方电网科学研究院有限责任公司 A kind of vibration absorber for power transmission tower
CN112065138A (en) * 2020-07-30 2020-12-11 中国通信建设集团设计院有限公司 Wireless communication tower reinforcing method and reinforcing structure
CN113882424A (en) * 2021-11-12 2022-01-04 贵州电网有限责任公司 Reinforcing method for newly added foundation bolts of tower foot plates of old line iron tower

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109869034A (en) * 2019-01-31 2019-06-11 南方电网科学研究院有限责任公司 A kind of vibration absorber for power transmission tower
CN109869034B (en) * 2019-01-31 2024-02-13 南方电网科学研究院有限责任公司 Vibration damper for power transmission tower
CN112065138A (en) * 2020-07-30 2020-12-11 中国通信建设集团设计院有限公司 Wireless communication tower reinforcing method and reinforcing structure
CN113882424A (en) * 2021-11-12 2022-01-04 贵州电网有限责任公司 Reinforcing method for newly added foundation bolts of tower foot plates of old line iron tower

Similar Documents

Publication Publication Date Title
CN208235563U (en) A kind of stiffening device on power transmission tower basis, power transmission tower basis and power transmission tower
CN204130682U (en) A kind of Novel belt lightning rod antenna tower
CN102135077A (en) Stretched type multi-segment concrete wind power tower frame
CN203924098U (en) Hang adjustable type prestressing force crab-bolt cage
CN102192112A (en) Piecewise concrete wind power tower
CN106567598A (en) Electric pole assembly capable of being dismounted rapidly and assembling method thereof
US6799401B1 (en) Hollow pole anchoring system
CN104405734B (en) The buckle-type flange connection of windmill tower frame and pedestal and method of attachment
CN205502711U (en) Wire pole unable adjustment base structure of easy installation
CN205828638U (en) A kind of modular antenna based on suspension rod installs anchor ear group
CN202031370U (en) Concrete-steel structure composite wind power tower
CN204507798U (en) Novel concrete feed bin structure
CN204271590U (en) A kind of Novel shockproof hammer
CN202017584U (en) Tension multi-section concrete wind power tower
CN104533115B (en) For the outlet of 500kV transformer station, inlet wire, the integrated form framework of transition
CN209586591U (en) A kind of wind power tower drum
CN105977606A (en) Combined-type antenna installation hoop set based on suspension rod
CN207004140U (en) A kind of anchor ear pole
CN219769668U (en) Direct current fills electric pile top structure
CN201437646U (en) Climbing prevention device of ultra-high voltage power transmission tower and power transmission tower
CN203403432U (en) Wind power tower without foundation ring
CN205688923U (en) A kind of wire rounded projections arranged two circuit tower
CN103606871B (en) Release type suspension clamp
CN210003451U (en) Tower drum system and wind turbine generator system tower drum foundation structure
CN208310385U (en) A kind of steel structure support for preventing power transmission rod from toppling over

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant