CN203403432U - Wind power tower without foundation ring - Google Patents

Wind power tower without foundation ring Download PDF

Info

Publication number
CN203403432U
CN203403432U CN201320485310.8U CN201320485310U CN203403432U CN 203403432 U CN203403432 U CN 203403432U CN 201320485310 U CN201320485310 U CN 201320485310U CN 203403432 U CN203403432 U CN 203403432U
Authority
CN
China
Prior art keywords
splicing
wind power
upper flange
ground anchor
flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320485310.8U
Other languages
Chinese (zh)
Inventor
崔志忠
杨晓冬
修彦合
石秀莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dajin Heavy Industry Co ltd
Original Assignee
LIAONING DAJIN HEAVY INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIAONING DAJIN HEAVY INDUSTRY Co Ltd filed Critical LIAONING DAJIN HEAVY INDUSTRY Co Ltd
Priority to CN201320485310.8U priority Critical patent/CN203403432U/en
Application granted granted Critical
Publication of CN203403432U publication Critical patent/CN203403432U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • Y02E10/722

Abstract

The utility model belongs to wind power equipment, in particular to a wind power tower without a foundation ring. The wind power tower without the foundation ring comprises a first concrete layer (8), a second concrete layer (7) and a tower bottom section (4); a splicing upper flange (3) is fixedly installed on the tower bottom section (4), reinforcing ribs (2) are fixed to the tower bottom section (4) and the splicing upper flange (3) for reinforcement, the lower ends of ground anchor bolts (5) are embedded in the first concrete layer (8), wherein the ground anchor bolts (5) are installed in a splicing lower flange (1) and the splicing upper flange (3) in a penetrating mode respectively and fixed through nuts (6) in a locked mode, and the upper ends of the ground anchor bolts (5), the splicing lower flange (1), the splicing upper flange (3), the nuts (6) and the reinforcing ribs (2) are all embedded in the second concrete layer (7). By the improvement of a traditional foundation ring installation process, a first tower section is installed directly, so that installation steps are reduced, and the number of forged flanges is reduced by one.

Description

Foundation-free ring wind power tower
Technical field
The utility model belongs to wind power plant, particularly a kind of foundation-free ring wind power tower.
Background technology
Wind-power electricity generation is the renewable energy resource of tool practicality potentiality in new forms of energy, wind-force pylon is one of wind-power electricity generation equipment chief component, wind power tower is generally comprised of discharge ring and three sections of shell rings, during construction by the Installation and Debugging of discharge ring part qualified rear with concreting to basis, other shell ring is installed on top, the weak point of this kind of structure is subject to the restriction of discharge ring field time while being to construct, the impact of evolution during discharge ring installation after-pouring concrete, and the secondary of installing after discharge ring is built duration impact etc.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned technical deficiency, and a kind of convenient installation is provided, and reduces installation period, and can reduce the foundation-free ring wind power tower of manufacturing cost.
The technical scheme that the utility model technical solution problem adopts is: foundation-free ring wind power tower comprises section at the bottom of first floor concrete, second layer concrete, pylon, being characterized in splicing upper flange is installed at the bottom of pylon in section, at the bottom of reinforcing rib is fixed to pylon, section is reinforced with splicing on upper flange, implant in first floor concrete ground anchor bolt lower end, ground anchor bolt is installed on respectively on splicing lower flange and splicing upper flange and nut check is fixed, and ground anchor bolt upper end, splicing lower flange, splicing upper flange, nut, reinforcing rib are all implanted in second layer concrete.
The beneficial effects of the utility model are: utilize the technique of conventional mounting discharge ring to be improved, become direct installation first paragraph pylon, reduce fixing link and save a slice forged flange.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, with embodiment, illustrate.
Fig. 1 is foundation-free ring wind power tower lower junction composition.
Fig. 2 splices lower flange structure chart in Fig. 1.
Fig. 3 splices upper flange and reinforcing rib johning knot composition in Fig. 1.
In figure, 1-splices lower flange; 2-reinforcing rib; 3-splices upper flange; Section at the bottom of 4-pylon; 5-ground anchor bolt; 6-nut; 7-second layer concrete; 8-first floor concrete.
The specific embodiment
Embodiment, with reference to accompanying drawing 1 ~ 3, the ground anchor bolt 5 of foundation-free ring wind power tower is implanted respectively in first floor concrete eight, nut 6 contour levelling are threaded on ground anchor bolt 5, splicing upper flange 3 is welded at the bottom of pylon in section 4, at the bottom of reinforcing rib 2 is welded to pylon, section 4 is reinforced with splicing on upper flange 3, at the bottom of splicing lower flange 1 is fixedly mounted on pylon, section 4 bottoms weld, section 4 at the bottom of the pylon that splices upper flange 3 and splicing lower flange 1 is housed is sling, ground anchor bolt 5 is respectively through splicing upper flange 3 and the installing hole that splices lower flange 1, with nut 6, be locked, on first floor concrete eight, build second layer concrete seven, make to splice on lower flange 1 and splicing lower flange 1 thereof, the nut 6 on lower two sides, the top of ground anchor bolt 5, reinforcing rib 2, splicing upper flange 3 is all placed in second layer concrete seven, after reaching intensity, residue cylinder section can be installed.

Claims (1)

1. a foundation-free ring wind power tower, comprise first floor concrete (8), second layer concrete (7), section at the bottom of pylon (4), it is characterized in that splicing upper flange (3) is installed at the bottom of pylon in section (4), reinforcing rib (2) is fixed at the bottom of pylon section (4) and splicing upper flange (3) is upper reinforces, implant in first floor concrete (8) ground anchor bolt (5) lower end, ground anchor bolt (5) is installed on respectively splicing lower flange (1) and splicing upper flange (3) is upper and nut (6) is locked, ground anchor bolt (5) upper end, splicing lower flange (1), splicing upper flange (3), nut (6), reinforcing rib (2) is all implanted in second layer concrete (7).
CN201320485310.8U 2013-08-09 2013-08-09 Wind power tower without foundation ring Expired - Lifetime CN203403432U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320485310.8U CN203403432U (en) 2013-08-09 2013-08-09 Wind power tower without foundation ring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320485310.8U CN203403432U (en) 2013-08-09 2013-08-09 Wind power tower without foundation ring

Publications (1)

Publication Number Publication Date
CN203403432U true CN203403432U (en) 2014-01-22

Family

ID=49939370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320485310.8U Expired - Lifetime CN203403432U (en) 2013-08-09 2013-08-09 Wind power tower without foundation ring

Country Status (1)

Country Link
CN (1) CN203403432U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10815969B2 (en) 2016-11-10 2020-10-27 General Electric Company Methods and apparatus for refurbishing wind turbine foundations

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10815969B2 (en) 2016-11-10 2020-10-27 General Electric Company Methods and apparatus for refurbishing wind turbine foundations

Similar Documents

Publication Publication Date Title
US8307593B2 (en) Tower with adapter section
EP2402529A2 (en) Tower with tensioning cables
CN204024928U (en) One can assemble self-erecting type wind power generating set prestressed concrete steel combination pylon
CN203755778U (en) Assembly external pre-stress reactive powder concrete wind power tower
CN103114604A (en) Prestressed concrete tubular type wind generating set foundation
CN206015707U (en) A kind of prestressed bolt blower foundation bracing means
CN102102643A (en) Lattice hollow-concrete-filled steel tube tower for wind generating set
CN103195668B (en) Novel wind power generation precast concrete tower component seaming structure and method
CN203403432U (en) Wind power tower without foundation ring
CN204024929U (en) A kind of steel concrete combination pylon prestressed concrete steel transformation segment
CN202402220U (en) Damping wind power generation tower
CN203896264U (en) Single column photovoltaic assembly support
CN102182343A (en) Hollow steel tube concrete tower drum for wind generating set
CN202031370U (en) Concrete-steel structure composite wind power tower
CN211777820U (en) Steel pipe concrete tower
CN203977443U (en) Pile foundation land wind-powered electricity generation tower foundation ring
CN204163937U (en) A kind of wind power generating set concrete pylon prestressing with bond Shu Zhangla bindiny mechanism
CN201963021U (en) Post-tensioning prestressing-force multi-section concrete wind-power generation tower frame
CN203977444U (en) Triangle basis land breeze electricity tower foundation ring
CN203189209U (en) Novel seam-joint structure of wind power generation precast concrete tower components
CN201915822U (en) External staircase of wind power generator tower
CN204024188U (en) A kind of concrete pylon external prestressing anchor Shu Pingheng screw stretching anchor device
CN218760234U (en) Wind driven generator tower
CN220687492U (en) Reinforced wind power tower
CN218597205U (en) Reinforcing apparatus suitable for basic ring type fan unit foundation structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 123000 Fuxin city in Liaoning province Xin Qiu District Xinqiu Street No. 155

Patentee after: Dajin Heavy Industry Co.,Ltd.

Address before: Fuxin City, Liaoning Province, 123000 New Street No. 155

Patentee before: LIAONING DAJIN HEAVY INDUSTRY Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140122