CN208233630U - A kind of built-in plastic pallet for reinforcing steel pipe - Google Patents
A kind of built-in plastic pallet for reinforcing steel pipe Download PDFInfo
- Publication number
- CN208233630U CN208233630U CN201820758862.4U CN201820758862U CN208233630U CN 208233630 U CN208233630 U CN 208233630U CN 201820758862 U CN201820758862 U CN 201820758862U CN 208233630 U CN208233630 U CN 208233630U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- pedestal
- slot
- baffle
- right sides
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Pallets (AREA)
Abstract
The utility model discloses the plastic pallets for reinforcing steel pipe built in one kind, including pedestal and through slot, through slot is provided at left and right sides of the inner tip of the pedestal, rubber ring is fixedly connected at left and right sides of the inside of the through slot, elastic piece is fixedly connected on the left of the rubber ring, and the both ends of elastic piece are fixedly linked with through slot, the inner bottom of the pedestal is provided with first through hole.The built-in plastic pallet for reinforcing steel pipe, pass through the cooperation of through slot and stabilizer blade, it can be when not using pallet, facilitate staff that pedestal drive stabilizer blade is inserted into be laminated in previous chassis interior through slot and is stored, greatly reduce the spacing between upper and lower two pedestals, reduce the occupancy in space, staff is facilitated to store, pass through the cooperation of elastic piece and rubber ring, it can be after stabilizer blade be inserted into through slot, extruding clamping is carried out at left and right sides of stabilizer blade under the ability of flexible deformation, meets the demand of client.
Description
Technical field
The utility model relates to plastic pallet technical field, specially a kind of built-in plastic pallet for reinforcing steel pipe.
Background technique
Pallet is a kind of for packaging, stacking, carrying and transport and to place as the goods material of unit load and the water of product
Flat stage apparatus, as a kind of unit load devices similar with container, pallet is widely used in production, transport, storage and circulation
Equal fields, match with fork truck, huge effect are played in modern logistics, such as application No. is 201620974492.9
Utility model patent, the bottom surface both side including bearing plate is respectively and fixedly provided with the first convex block of strip, and the bottom surface of bearing plate is also fixed
There is the second convex block of strip, the second convex block is located at the middle position of two first convex blocks, and patent work personnel are by pallet layer
It is folded since the presence of bottom end stabilizer blade causes the spacing between pallet excessive, to considerably increase the occupancy in space when being stored,
Inconvenient staff stores, while also can not mutually clamp and be fixed between downward two pallets, leads to pallet layer
It is surprisingly collided to be separated from each other when folded storage and fall, be likely to result in the damage of personnel, while the pallet is due to being plastics material
Matter, bearing capacity is poor, may damage, cause not because of unbearable excessive pressure when putting heavier object
Necessary loss is unable to satisfy the demand of client.
Utility model content
The purpose of this utility model is to provide the plastic pallets for reinforcing steel pipe built in one kind, to solve above-mentioned background technique
The problem of middle proposition.
To achieve the above object, the utility model provides the following technical solutions: a kind of built-in plastic pallet for reinforcing steel pipe,
Including pedestal and through slot, through slot is provided at left and right sides of the inner tip of the pedestal, the inside left and right sides of the through slot is
It is fixedly connected with rubber ring, elastic piece is fixedly connected on the left of the rubber ring, and the both ends of elastic piece are fixed with through slot
Be connected, the inner bottom of the pedestal is provided with first through hole, the inside of the first through hole inserted with steel pipe, the steel pipe it is outer
Fixing sleeve is connected to second sleeve among wall, and fixing sleeve is connected to first sleeve, and first set at left and right sides of the outer wall of the steel pipe
Cylinder and second sleeve are fitted closely with the inner wall of first through hole, are threaded with spiral shell at left and right sides of the inside of the steel pipe
Column, and runner is welded on the left of stud, right side and the pedestal of the runner fit closely, and the bottom end quadrangle of the pedestal is solid
It is connected to stabilizer blade, the inside of the stabilizer blade is provided with groove, and the inner bottom of the groove is connected with first baffle, the first baffle
Top be connected with extension spring, the top of the extension spring is connected with gasket, branch is connected among the bottom end of the gasket
Column, and pillar runs through first baffle, the bottom end of the pillar is connected with bottom plate, and the is provided at left and right sides of the inside of the bottom plate
The bottom end left and right sides of two through-holes, the first baffle is connected with latch, and latch runs through a part of the second through-hole.
Preferably, there are two second baffle, the left sides of the second baffle for the fitting of four sides all around of the pedestal
Upper and lower ends are equipped with bolt, and the bolt runs through second baffle and is connected with whorl of base, in the left side of the second baffle
Between be equipped with pull ring, the outer wall top movable sleeve of the pull ring is connected to lantern ring, and lantern ring is fixedly linked with second baffle.
Preferably, the outer wall polishing of the runner has mill line.
Preferably, the outer wall of the extension spring is socketed with silica gel sheath.
Preferably, the outer wall surrounding top of the stabilizer blade is connected with gusset, and gusset is fixedly linked with pedestal.
Compared with prior art, the utility model has the beneficial effects that the built-in plastic pallet for reinforcing steel pipe, by logical
The cooperation of slot and stabilizer blade can facilitate staff that pedestal drive stabilizer blade is inserted into previous pedestal when not using pallet
Stacking is stored in interior channel, is greatly reduced the spacing between upper and lower two pedestals, is reduced the occupancy in space, side
Just staff stores, and by the cooperation of elastic piece and rubber ring, can become after stabilizer blade is inserted into through slot in elasticity
Extruding clamping is carried out under the ability of shape at left and right sides of stabilizer blade, avoids tray stack from being surprisingly collided when storing and is separated from each other
It falls, can be when staff to install steel pipe by the cooperation of first sleeve and second sleeve, guidance steel pipe is inserted into first
The inside of through-hole, eliminates the operation of staff's alignment, while also avoiding generating relatively after steel pipe is inserted into first through hole
The case where shaking, and the bearing capacity of pallet is also considerably increased, by the cooperation of runner and stud, can be damaged in pallet
After facilitate staff to remove steel pipe to repeat using cost is greatly saved, meets the demand of client.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is runner, stud and steel pipe connection structure schematic diagram in Fig. 1;
Fig. 3 is pedestal, second baffle and bolt fastening structure schematic diagram in Fig. 2.
In figure: 1, pedestal, 2, runner, 3, first sleeve, 4, stud, 5, first through hole, 6, steel pipe, 7, second sleeve, 8,
Stabilizer blade, 9, latch, 10, pillar, 11, bottom plate, the 12, second through-hole, 13, first baffle, 14, extension spring, 15, gasket, 16, recessed
Slot, 17, rubber ring, 18, elastic piece, 19, through slot, 20, silica gel sheath, 21, mill line, 22, gusset, 23, bolt, 24, lantern ring, 25,
Second baffle, 26, pull ring.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of built-in plastic pallet for reinforcing steel pipe, packet
Pedestal 1 and through slot 19 are included, is provided with through slot 19, the inside or so of the through slot 19 at left and right sides of the inner tip of the pedestal 1
Two sides are fixedly connected to rubber ring 17, and the material of rubber ring 17 is that can restore to the original state after elastic rubber deforms, the rubber
The left side of circle 17 is fixedly connected with elastic piece 18, and the both ends of elastic piece 18 are fixedly linked with through slot 19, and elastic piece 18 is bullet
Property iron plate material, can restore to the original state, the inner bottom of the pedestal 1 is provided with first through hole 5, the first through hole 5 after deformation
Inside inserted with steel pipe 6, fixing sleeve is connected to second sleeve 7, the outer wall or so of the steel pipe 6 among the outer wall of the steel pipe 6
The equal fixing sleeve in two sides is connected to first sleeve 3, and the inner wall of first sleeve 3 and second sleeve 7 with first through hole 5 fits closely,
First sleeve 3 and second sleeve 7 can be inserted into the inside of first through hole 5 by the mobile steel pipe 6 in inclined-plane, the steel pipe 6 it is interior
Stud 4 is threaded at left and right sides of portion, and the left side of stud 4 is welded with runner 2, the right side of the runner 2 and pedestal 1 are tight
Closely connected conjunction, runner 2 are able to drive stud 4 and rotate the inside for being tightened in steel pipe 6, and the outer wall polishing of the runner 2 has mill line 21, mill
Line 21 can increase frictional force, facilitate staff's rotating wheel 2, and the bottom end quadrangle of the pedestal 1 is connected with stabilizer blade 8, institute
The outer wall surrounding top for stating stabilizer blade 8 is connected with gusset 22, and gusset 22 is fixedly linked with pedestal 1, and gusset 22 can play branch
Support effect, increases the bearing capacity of stabilizer blade 8 and 1 junction of pedestal, the inside of the stabilizer blade 8 is provided with groove 16, the groove 16
Inner bottom be connected with first baffle 13, the top of the first baffle 13 is connected with extension spring 14, the extension spring
14 top is connected with gasket 15, and the pulling force of extension spring 14 is slightly larger than the weight of pedestal 1, the energy under the pulling force of extension spring 14
Enough gasket 15 is pulled to be moved downwards, the outer wall of the extension spring 14 is socketed with silica gel sheath 20, and silica gel sheath 20 can play
The effect of extension spring 14 is protected, pillar 10 is connected among the bottom end of the gasket 15, and pillar 10 runs through first baffle 13,
The bottom end of the pillar 10 is connected with bottom plate 11, and gasket 15 can push bottom plate 11 to be moved downwards by pillar 10, described
It is provided with the second through-hole 12 at left and right sides of the inside of bottom plate 11, is connected with latch at left and right sides of the bottom end of the first baffle 13
9, and latch 9 runs through a part of the second through-hole 12, and pedestal 1 is able to drive under the pressure of article and is pressed downwards, thus
Latch 9 can be made to move down the second through-hole 12 of stretching and be stuck on the ground of relative coarseness and increase frictional force, before the pedestal 1
There are two second baffles 25, the left side upper and lower ends of the second baffle 25 to be equipped with bolt 23, institute for the fitting of left and right four sides afterwards
It states bolt 23 to be connected through second baffle 25 with 1 screw thread of pedestal, bolt 23 can pass through second baffle 25 and be fixed on pedestal 1
On, pull ring 26 is equipped among the left side of the second baffle 25, the outer wall top movable sleeve of the pull ring 26 is connected to lantern ring 24, and
Lantern ring 24 is fixedly linked with second baffle 25, and pull ring 26 can be rotated around lantern ring 24, and staff can be incited somebody to action by rope
Article is wound binding, and then by rope, tangled up and knotted is fixed on pull ring 26.
Steel pipe 6 will be driven first sleeve 3 and second sleeve 7 to be inserted into first through hole 5 by staff before using pallet
In, first sleeve 3 and second sleeve 7 can guide steel pipe 6 extend into the inside of first through hole 5 by the inclined-plane at its outer wall,
Then the drive stud 4 of runner 2 is inserted into the inside of steel pipe 6 and rotated by staff, and runner 2 drives the rotation of stud 4 to twist
It is tightly fixed in the inside of steel pipe 6, after pallet long-time service failure, staff can also will be driven by runner 2
The rotation of stud 4 is removed, and is repeated so that steel pipe 6 be removed using when weight is placed on the top of pedestal 1, in the work of gravity
Stabilizer blade 8 is pulled down with lower bottom base 1, so that bottom plate 11 be made to be recovered to the inside of groove 16, so that latch 9 is passed through the second through-hole 12 and stretches
Out with ground face contact, the card of latch 9 increases frictional force on the ground when so as in the plane of relative coarseness, when the bottom of without using
When seat 1, staff can drive next pedestal 1 stabilizer blade 8 be inserted into the inside of through slot 19 for elastic piece 18 to the left and right two
Side pushes, and then under the ability of 18 flexible deformation of rubber ring 17 and elastic piece, can squeeze stabilizer blade 8 and be clamped, thus
Staff can be facilitated to store the stacking of pedestal 1.
In the description of the present invention, it should be understood that term " coaxial ", " bottom ", " one end ", " top ", " in
The orientation of the instructions such as portion ", " other end ", "upper", " side ", " top ", "inner", " front ", " center ", " both ends " or position are closed
System is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of describing the present invention and simplifying the description, rather than
The device or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation, therefore cannot
It is construed as a limitation of the present invention.
In the present invention unless specifically defined or limited otherwise, term " installation ", " setting ", " connection ", " Gu
Calmly ", the terms such as " being screwed on " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;
It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, can also indirectly connected through an intermediary, it can be with
It is the interaction relationship of the connection or two elements inside two elements, unless otherwise restricted clearly, for this field
For those of ordinary skill, the concrete meaning of above-mentioned term in the present invention can be understood as the case may be.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of built-in plastic pallet for reinforcing steel pipe, including pedestal (1) and through slot (19), the inner tip of the pedestal (1)
The left and right sides is provided with through slot (19), it is characterised in that: is fixedly connected to rubber at left and right sides of the inside of the through slot (19)
It encloses (17), is fixedly connected with elastic piece (18) on the left of the rubber ring (17), and the both ends of elastic piece (18) are and through slot
(19) be fixedly linked, the inner bottom of the pedestal (1) is provided with first through hole (5), the inside of the first through hole (5) inserted with
The outer wall centre fixing sleeve of steel pipe (6), the steel pipe (6) is connected to second sleeve (7), at left and right sides of the outer wall of the steel pipe (6)
Equal fixing sleeve is connected to first sleeve (3), and the inner wall of first sleeve (3) and second sleeve (7) with first through hole (5) closely pastes
It closes, is threaded with stud (4) at left and right sides of the inside of the steel pipe (6), and be welded with runner (2) on the left of stud (4),
The right side of the runner (2) is fitted closely with pedestal (1), and the bottom end quadrangle of the pedestal (1) is connected with stabilizer blade (8), described
The inside of stabilizer blade (8) is provided with groove (16), and the inner bottom of the groove (16) is connected with first baffle (13), the first gear
The top of plate (13) is connected with extension spring (14), and the top of the extension spring (14) is connected with gasket (15), the gasket
(15) it is connected among bottom end pillar (10), and pillar (10) runs through first baffle (13), the bottom end of the pillar (10) is solid
It is connected to bottom plate (11), is provided with the second through-hole (12) at left and right sides of the inside of the bottom plate (11), the first baffle (13)
It is connected with latch (9) at left and right sides of bottom end, and latch (9) runs through a part of the second through-hole (12).
2. a kind of built-in plastic pallet for reinforcing steel pipe according to claim 1, it is characterised in that: the pedestal (1)
There are two second baffle (25), the left side upper and lower ends of the second baffle (25) to be equipped with bolt for four sides fitting all around
(23), the bolt (23) is connected through second baffle (25) with pedestal (1) screw thread, in the left side of the second baffle (25)
Between be equipped with pull ring (26), the outer wall top movable sleeve of the pull ring (26) is connected to lantern ring (24), and lantern ring (24) and second baffle
(25) it is fixedly linked.
3. a kind of built-in plastic pallet for reinforcing steel pipe according to claim 1, it is characterised in that: the runner (2)
Outer wall polishing has mill line (21).
4. a kind of built-in plastic pallet for reinforcing steel pipe according to claim 1, it is characterised in that: the extension spring
(14) outer wall is socketed with silica gel sheath (20).
5. a kind of built-in plastic pallet for reinforcing steel pipe according to claim 1, it is characterised in that: the stabilizer blade (8)
Outer wall surrounding top is connected with gusset (22), and gusset (22) is fixedly linked with pedestal (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820758862.4U CN208233630U (en) | 2018-05-22 | 2018-05-22 | A kind of built-in plastic pallet for reinforcing steel pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820758862.4U CN208233630U (en) | 2018-05-22 | 2018-05-22 | A kind of built-in plastic pallet for reinforcing steel pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208233630U true CN208233630U (en) | 2018-12-14 |
Family
ID=64580474
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820758862.4U Expired - Fee Related CN208233630U (en) | 2018-05-22 | 2018-05-22 | A kind of built-in plastic pallet for reinforcing steel pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208233630U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110529716A (en) * | 2019-09-16 | 2019-12-03 | 温州承玥机械设备有限公司 | A kind of mobile bearing base based on traffic engineering road drilling device |
CN117068562A (en) * | 2023-10-13 | 2023-11-17 | 梁山三星机械有限公司 | Packaging structure of traction seat |
-
2018
- 2018-05-22 CN CN201820758862.4U patent/CN208233630U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110529716A (en) * | 2019-09-16 | 2019-12-03 | 温州承玥机械设备有限公司 | A kind of mobile bearing base based on traffic engineering road drilling device |
CN117068562A (en) * | 2023-10-13 | 2023-11-17 | 梁山三星机械有限公司 | Packaging structure of traction seat |
CN117068562B (en) * | 2023-10-13 | 2024-01-09 | 梁山三星机械有限公司 | Packaging structure of traction seat |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208233630U (en) | A kind of built-in plastic pallet for reinforcing steel pipe | |
CN210156841U (en) | Cable fixing and connecting device for broadcast and television engineering | |
CN207558982U (en) | A kind of pressue device of green lithium cell | |
CN201989563U (en) | Auxiliary device for assembling and disassembling explosion-proof wheel | |
CN205872762U (en) | Device packaging box | |
CN207157252U (en) | Hold the shelf of the left reinforcing plate of front panel | |
CN209276068U (en) | A kind of logistics hanging device | |
CN108673908B (en) | Processing equipment for winding glass fiber reinforced plastic on pipeline | |
CN206317758U (en) | Electro-tricycle rack and its electro-tricycle of application | |
CN216301803U (en) | Transportation tray based on dangerous goods are used | |
CN208560081U (en) | A kind of plastic tray for fork truck | |
CN214609416U (en) | Container for road transportation | |
CN205131491U (en) | Guardrail can be dismantled in tricycle carriage | |
CN204416770U (en) | Steel wire pay off rack | |
CN211767627U (en) | Shockproof packaging carton with buffer structure | |
CN210285580U (en) | Reinforced gravity slide rail | |
CN210635409U (en) | Clamp for stacking device | |
CN200951947Y (en) | Forklift protecting apparatus | |
CN110329802B (en) | Auxiliary device is used in automobile parts transportation | |
CN211393070U (en) | Grape wine production is with automatic case pile up neatly device that falls | |
CN209600533U (en) | A kind of chemical raw material barrel cart | |
CN215793818U (en) | Simple carrying tool vehicle | |
CN208683187U (en) | A kind of transport device for handicraft product packaging | |
CN209455416U (en) | A kind of breakables logistics transportation container | |
CN209064557U (en) | The practical packed and transported frame of fiber cable cross connection box SMC material |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181214 Termination date: 20200522 |
|
CF01 | Termination of patent right due to non-payment of annual fee |