隧道工程横穿暗河横向临时排水构造 Download PDFInfo
- Publication number
- CN208220838U CN208220838U CN201820596806.5U CN201820596806U CN208220838U CN 208220838 U CN208220838 U CN 208220838U CN 201820596806 U CN201820596806 U CN 201820596806U CN 208220838 U CN208220838 U CN 208220838U
- Authority
- CN
- China
- Prior art keywords
- tunnel
- channel structure
- sewage
- underground river
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
隧道工程横穿暗河横向临时排水构造,以保证施工人员及设备安全,避免对暗河下游造成断流或水质污染,并确保隧道工程正常施工。包括连接暗河通道的排水明渠结构和引排施工污水的排污预制管,排水明渠结构沿隧道衬砌断面横向设置,排污预制管纵向设置于排水明渠结构以下的隧道仰拱填充层内。排水明渠结构靠近隧道洞口侧的边墙顶部设置溢流口。排污预制管的进水端和出水端分别设置进口集水井、出口集水井,出口集水井内设置单向过水装置。排水明渠结构横向两侧设置由洞渣回填形成的运输坡道,排水明渠结构的顶部设置横跨其断面的栈桥。
Description
技术领域
本实用新型涉及隧道工程,特别涉及一种横穿隧道,同时具备运输、清污水分流、引排暗河水、防洪倒灌功能的横向临时排水构造。
背景技术
暗河涌水呈现明显的季节性特征,尤其在雨季期间具有瞬时水量大、变化快等特点。当隧道横穿暗河时,通常采用在上游设置泄水洞截排暗河水的方法,以保证正洞施工安全。
在泄水洞揭穿暗河前,隧道仍然是暗河水的唯一排水通道。隧道施工仍然面临着安全风险高、运输作业环境差等问题,且施工极易污染暗河水,可能会影响周边居民的用水。因此,如何快速、有效地解决施工期间的安全和水质污染问题将显得极其关键。
实用新型内容
本实用新型所要解决的技术问题是提供一种隧道工程横穿暗河横向临时排水构造,以保证施工人员及设备安全,避免对暗河下游造成断流或水质污染,并确保隧道工程正常施工。
本实用新型解决其技术问题所采用的技术方案如下:
本实用新型隧道工程横穿暗河横向临时排水构造,其特征是:包括连接暗河通道的排水明渠结构和引排施工污水的排污预制管,排水明渠结构沿隧道衬砌断面横向设置,排污预制管纵向设置于排水明渠结构以下的隧道仰拱填充层内;所述排水明渠结构靠近隧道洞口侧的边墙顶部设置溢流口;所述排污预制管的进水端和出水端分别设置进口集水井、出口集水井,出口集水井内设置单向过水装置;所述排水明渠结构横向两侧设置由洞渣回填形成的运输坡道,排水明渠结构的顶部设置横跨其断面的栈桥。
本实用新型的有益效果是,具备运输、清污水分流、防倒灌功能,维持暗河水从原暗河通道排泄,并做到清、污水分流,避免对暗河下游造成断流或水质污染,确保周边居民用水不受影响;在明渠顶部设置洞外侧溢流口,避免暗河水淹没隧道,保证施工人员及设备安全;排污管的单向过水装置防止暗河水倒灌至隧道内部;利用洞渣和明渠顶栈桥形成运输通道,确保隧道工程正常施工,且利于后期拆除。
附图说明
本说明书包括两幅附图:
图1是本实用新型隧道工程横穿暗河横向临时排水构造的横断面示意图。
图2是隧道工程横穿暗河横向临时排水构造中排污管的单向过水结构细部图。
图中构件、部位名称及所对应的标记:隧道衬砌11、隧道仰拱填充层12、排水明渠结构21、溢流口22、栈桥23、运输坡道24、排污预制管31、进口集水井32、出口集水井33、单向过水装置40、挡水板41、转轴42。
具体实施方式
下面结合附图和实例对本实用新型进行进一步说明。
参照图1,本实用新型隧道工程横穿暗河横向临时排水构造,包括连接暗河通道的排水明渠结构21和引排施工污水的排污预制管31,暗河水与施工污水从不同过水通道引排,施工污水无法进入暗河水通道。维持暗河水从原暗河通道排泄,并做到清、污水分流,避免对暗河下游造成断流或水质污染,确保周边居民用水不受影响。排水明渠结构21沿隧道衬砌11断面横向设置,排污预制管31纵向设置于排水明渠结构21以下的隧道仰拱填充层12内。
参照图1,所述排水明渠结构21靠近隧道洞口侧的边墙顶部设置溢流口22。利用排水明渠结构21作为暗河水的引水通道以临时维持暗河的原有过水通道,当雨季暗河水量过大时,通过明渠顶部洞外侧的溢流口22将水自动溢流至隧道洞外侧,保证洞内施工安全。
参照图1和图2,为避免雨季期间暗河水从排污预制管31倒灌至隧道洞内,所述排污预制管31的进水端和出水端分别设置进口集水井32、出口集水井33,出口集水井33内设置单向过水装置40。
参照图1,所述排水明渠结构21横向两侧设置由洞渣回填形成的运输坡道24,排水明渠结构21的顶部设置横跨其断面的栈桥23。利用运输坡道24和明渠顶运输栈桥23形成施工期间的运输通道,该通道与隧顶之间的空间、坡道的坡度均应满足过车的要求。
参照图2,为避免雨季期间暗河水从排污预制管31倒灌至隧道洞内,在排污管出口集水井33处设置排污管单向过水装置40。该装置包括单向挡水板41和挡水板转轴42,单向挡水板41为单向开启,避免暗河水从洞外倒灌至洞内。
以上所述只是用图解说明本实用新型隧道工程横穿暗河横向临时排水构造的一些原理,并非是要将本实用新型局限在所示和所述的具体结构和实用范围内,故凡是所有可能被利用的相应修改及等同物,均属于本实用新型所申请的专利范围。
Claims (2)
1.隧道工程横穿暗河横向临时排水构造,其特征是:包括连接暗河通道的排水明渠结构(21)和引排施工污水的排污预制管(31),排水明渠结构(21)沿隧道衬砌(11)断面横向设置,排污预制管(31)纵向设置于排水明渠结构(21)以下的隧道仰拱填充层(12)内;所述排水明渠结构(21)靠近隧道洞口侧的边墙顶部设置溢流口(22);所述排污预制管(31)的进水端和出水端分别设置进口集水井(32)、出口集水井(33),出口集水井(33)内设置单向过水装置(40);所述排水明渠结构(21)横向两侧设置由洞渣回填形成的运输坡道(24),排水明渠结构(21)的顶部设置横跨其断面的栈桥(23)。
2.如权利要求1所述的隧道工程横穿暗河横向临时排水构造,其特征是:所述单向过水装置(40)由挡水板(41)和安装于其上部边缘的转轴(42),挡水板(41)遮盖排污预制管(31)的出水端端口,转轴(42)通过支座安装于出口集水井(33)的侧壁上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820596806.5U CN208220838U (zh) | 2018-04-24 | 2018-04-24 | 隧道工程横穿暗河横向临时排水构造 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820596806.5U CN208220838U (zh) | 2018-04-24 | 2018-04-24 | 隧道工程横穿暗河横向临时排水构造 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208220838U true CN208220838U (zh) | 2018-12-11 |
Family
ID=64513020
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820596806.5U Expired - Fee Related CN208220838U (zh) | 2018-04-24 | 2018-04-24 | 隧道工程横穿暗河横向临时排水构造 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208220838U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108343468A (zh) * | 2018-04-24 | 2018-07-31 | 中铁二院工程集团有限责任公司 | 隧道工程横穿暗河横向临时排水构造 |
-
2018
- 2018-04-24 CN CN201820596806.5U patent/CN208220838U/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108343468A (zh) * | 2018-04-24 | 2018-07-31 | 中铁二院工程集团有限责任公司 | 隧道工程横穿暗河横向临时排水构造 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104963322B (zh) | 一种水利枢纽设施 | |
CN103410130B (zh) | 一种多用途隧洞布置结构 | |
JP2017002528A (ja) | ダム、河川、取水路の沈砂収集装置 | |
CN104594496A (zh) | 用于高污染雨水及旱流污水的分质分量导流池 | |
CN208220838U (zh) | 隧道工程横穿暗河横向临时排水构造 | |
CN112502092A (zh) | 水闸与泵站双层一体化结构及其运行方法 | |
CN209686556U (zh) | 一种截流量可控的底流式截流井 | |
CN204959682U (zh) | 一种区域内河涌水位降低及内涝防治设施 | |
CN105672208A (zh) | 用于拦断沟谷修建渣场的排水结构及其施工方法 | |
CN213390415U (zh) | 一种雨污分流井和排水系统 | |
CN102505749B (zh) | 一种合流制污水管网错时分流控制系统及控制方法 | |
CN204644994U (zh) | 一种泄水建筑物结构 | |
CN206903689U (zh) | 一种兼输水和交通功能的高速铁路隧道 | |
CN116537129A (zh) | 用于输水主洞检修的交通和排水方法 | |
CN201459903U (zh) | 一种雨水、污水复合双层排水检查井 | |
CN104264642A (zh) | 用于沟水处理的排水洞和排水方法 | |
CN209975479U (zh) | 一种新型输水建筑物 | |
CN203878541U (zh) | 一种拦冰坝装置 | |
CN209493909U (zh) | 一种输水管道跨水库分取水结构 | |
CN210737725U (zh) | 一种滑雪场地下阶梯式蓄水池群 | |
CN209227711U (zh) | 雨水舱及具有雨水舱的综合管廊 | |
CN109208733B (zh) | 雨水舱及具有雨水舱的综合管廊 | |
CN222500128U (zh) | 一种南水北调渠道防倒流的排水装置 | |
CN115584701B (zh) | 城市长距离输水隧洞工程分段排水分段检修系统及方法 | |
CN104805811A (zh) | 景观式悬挂水闸布置结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181211 |
|
CF01 | Termination of patent right due to non-payment of annual fee |