CN208204296U - A kind of transition Taper Pipe reinforced structure - Google Patents
A kind of transition Taper Pipe reinforced structure Download PDFInfo
- Publication number
- CN208204296U CN208204296U CN201820793016.6U CN201820793016U CN208204296U CN 208204296 U CN208204296 U CN 208204296U CN 201820793016 U CN201820793016 U CN 201820793016U CN 208204296 U CN208204296 U CN 208204296U
- Authority
- CN
- China
- Prior art keywords
- pipe
- bifurcated pipe
- transition
- bifurcated
- cone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Branch Pipes, Bends, And The Like (AREA)
Abstract
Disclosed by the utility model is a kind of transition Taper Pipe reinforced structure for the hydropower station pressure pipeline bifurcated pipe water pressure test of water conservancy and hydropower technical field, the three-way pipe structure that two bifurcated pipe branch pipes of the same end are formed is responsible for including being responsible for by bifurcated pipe and being connected in bifurcated pipe, the free end of the bifurcated pipe supervisor and bifurcated pipe branch pipe is equipped with test bulkhead, the bifurcated pipe is responsible for one end far from bifurcated pipe branch pipe and is bored equipped with transition, half cone-apex angle of the transition cone is 30~60 °, reinforced structure is equipped in the turning point that transition cone is connected with bifurcated pipe supervisor, the reinforced structure includes reinforcing beam and deep floor, the reinforcing beam is vertically arranged between transition cone and bifurcated pipe supervisor, the deep floor is arranged in reinforcing beam two sides, and it is connected respectively with bifurcated pipe supervisor and transition cone.The structure can be such that gradual change cone material more saves, and construction is more convenient, and the water pressure test place needed is smaller, and the design of such channel design is more reasonable, and structure is simpler, be more suitable for the design of water pressure test temporary structure.
Description
Technical field
The utility model relates to water conservancy and hydropower technical fields, more particularly to one kind to be used for hydropower station pressure pipeline bifurcated pipe hydraulic pressure
The transition Taper Pipe reinforced structure of test.
Background technique
With the continuous development of material industry, power station is investment reduction, more and more uses central water supply or grouping
Supply water, bifurcated pipe using more and more extensive.For saving steel, reduce manufacture difficulty, reduction head loss, optimization flow-shape
And whole stress condition etc., it generally requires and carries out the water pressure test before bifurcated pipe comes into operation, to examine bifurcated pipe quality, verifying to set
Meter, while reducing or eliminating generated residual stress in bifurcated pipe forming process, it is ensured that bifurcated pipe operates normally in engineering.Bifurcated pipe
It generally requires before the test and transition cone is set between bifurcated pipe and test bulkhead, and existing transition cone is generally using small as far as possible
Half cone-apex angle does not have to transition cone, avoids excessive turning angle, generates excessive stress and concentrate, to meet the bifurcated pipe water pressure test
Needs.But since half cone corner angle is smaller, the length for causing transition cone to prolong axis is too long, steel plate materials required for transition is bored
More, the test site needed is larger, to increase experimentation cost.
Utility model content
To overcome existing transition to bore above shortcomings, the technical problem to be solved by the utility model is to provide one
The reinforced structure that kind is arranged on the transition Taper Pipe of larger half cone-apex angle.
The technical scheme adopted by the utility model to solve the technical problem is as follows:
A kind of transition Taper Pipe reinforced structure, two bifurcated pipe branch pipes for being responsible for the same end including being responsible for and being connected in bifurcated pipe by bifurcated pipe
The free end of the three-way pipe structure of formation, the bifurcated pipe supervisor and bifurcated pipe branch pipe is equipped with test bulkhead, and the bifurcated pipe supervisor is remote
One end from bifurcated pipe branch pipe is bored equipped with transition, and half cone-apex angle of the transition cone is 30~60 °, is responsible for phase in transition cone and bifurcated pipe
Turning point even is equipped with reinforced structure, and the reinforced structure includes reinforcing beam and deep floor, and the reinforcing beam is vertically arranged in
Between transition cone and bifurcated pipe supervisor, the deep floor is arranged in reinforcing beam two sides, and connects respectively with bifurcated pipe supervisor and transition cone
It connects.
Further, the length of the reinforcing beam insertion bifurcated pipe supervisor is identical as exposed length.
Further, the deep floor includes multipair, and along bifurcated pipe supervisor's even circumferential setting.
The beneficial effects of the utility model are: boring semi-cone angle and benefit to transition by boring in design basis in conventional transition
Strong structure improves and optimizes, using half cone-apex angle of wide-angle gradual change bore, and cone with silently and bifurcated pipe straight pipe transfer
Place carries out structural strengthening, saves gradual change cone material more, the water pressure test place needed is smaller, this body weight of the bifurcated pipe water pressure test
Lighter, the construction of gradual change cone is more convenient, quick, and the design of such channel design is more reasonable, and structure is simpler, is more suitable for
The design of water pressure test temporary structure.
Detailed description of the invention
Fig. 1 is the utility model overall structure diagram.
Fig. 2 is the utility model reinforced structure schematic diagram.
Label is that 1- bifurcated pipe is responsible in figure, 2- bifurcated pipe branch pipe, 3- test bulkhead, 4- transition cone, 5- reinforcing beam, and 6- reinforces
Floor, half cone-apex angle of a-.
Specific embodiment
The present invention will be further described with reference to the accompanying drawing.
As shown in Figure 1, the utility model includes by bifurcated pipe supervisor 1 and two bifurcated pipe branch for being connected in 1 the same end of bifurcated pipe supervisor
The free end of the three-way pipe structure that pipe 2 is formed, the bifurcated pipe supervisor 1 and bifurcated pipe branch pipe 2 is equipped with test bulkhead 3, the bifurcated pipe
Be responsible for 1 one end far from bifurcated pipe branch pipe 2 and be equipped with transition cone 4, half cone-apex angle a of transition cone 4 is 30~60 °, transition cone 4 with
Bifurcated pipe is responsible for 1 connecting place and is equipped with reinforced structure, and the reinforced structure includes reinforcing beam 5 and deep floor 6, and the reinforcing beam 5 is perpendicular
Between transition cone 4 and bifurcated pipe supervisor 1, the deep floor 6 is arranged in 5 two sides of reinforcing beam for straight setting, and respectively with bifurcated pipe master
4 connection of pipe 1 and transition cone.
Traditional transition cone is generally bored using half cone-apex angle (being no more than 10 °) small as far as possible or without transition, is mainly
Excessive turning angle is avoided, excessive stress is generated and concentrates, to meet the needs of the bifurcated pipe water pressure test.But due to half vertex of a cone
Angle angle is smaller, and the length for causing transition cone to prolong axis is too long, and steel plate materials required for transition is bored are more, the test site needed
Ground is larger, thus experimentation cost is higher.The utility model uses biggish half cone-apex angle a, it is possible to reduce transition cone 4 prolongs axis
Length to save steel plate materials, but is concentrated, it is therefore desirable to be arranged in turning point and mend the disadvantage is that having larger stress in turning point
Strong structure, which can dramatically increase the stability that transition cone 4 is connect with bifurcated pipe supervisor 1, to meet the bifurcated pipe water pressure test
Force request.
For the ease of the stability that welding assembly and raising transition cone 4 are connect with bifurcated pipe supervisor 1, the reinforcing beam 5 is inserted
The length for entering bifurcated pipe supervisor 1 is identical as exposed length.
Further, the deep floor 6 includes multipair, and is responsible for the setting of 1 even circumferential along bifurcated pipe.Since bifurcated pipe is responsible for
1 is relatively large in diameter, so the quantity of deep floor 6 is more, can more improve the stability of connection.
The utility model bores semi-cone angle to transition and reinforced structure improves by boring in design basis in conventional transition
And optimization, using half cone-apex angle of wide-angle gradual change bore, and cone with silently and bifurcated pipe straight pipe turning point carry out structural strengthening,
Save gradual change cone material more, the water pressure test place needed is smaller, this body weight of the bifurcated pipe water pressure test is lighter, and gradual change cone is applied
Work is more convenient, quick, and the design of such channel design is more reasonable, and structure is simpler, is more suitable for the water pressure test and temporarily ties
Structure design, has good practicability and application prospect.
Claims (3)
1. a kind of transition Taper Pipe reinforced structure, including being responsible for (1) by bifurcated pipe and being connected in two bifurcated pipes of bifurcated pipe supervisor (1) the same end
The free end of the three-way pipe structure that branch pipe (2) is formed, the bifurcated pipe supervisor (1) and bifurcated pipe branch pipe (2) is equipped with test bulkhead
(3), it is characterized in that: bifurcated pipe supervisor (1) is equipped with transition cone (4) far from the one end of bifurcated pipe branch pipe (2), (4) are bored in the transition
Half cone-apex angle (a) be 30~60 °, it is described in the turning point that transition cone (4) and bifurcated pipe supervisor (1) is connected equipped with reinforced structure
Reinforced structure includes reinforcing beam (5) and deep floor (6), and the reinforcing beam (5) is vertically arranged in transition cone (4) and bifurcated pipe is responsible for
(1) between, the deep floor (6) is arranged in reinforcing beam (5) two sides, and connects respectively with bifurcated pipe supervisor (1) and transition cone (4)
It connects.
2. a kind of transition Taper Pipe reinforced structure as described in claim 1, it is characterized in that: the reinforcing beam (5) is inserted into bifurcated pipe master
The length for managing (1) is identical as exposed length.
3. a kind of transition Taper Pipe reinforced structure as described in claim 1, it is characterized in that: the deep floor (6) includes at least
It is multipair, and along bifurcated pipe supervisor's (1) even circumferential setting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820793016.6U CN208204296U (en) | 2018-05-25 | 2018-05-25 | A kind of transition Taper Pipe reinforced structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820793016.6U CN208204296U (en) | 2018-05-25 | 2018-05-25 | A kind of transition Taper Pipe reinforced structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208204296U true CN208204296U (en) | 2018-12-07 |
Family
ID=64516670
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820793016.6U Active CN208204296U (en) | 2018-05-25 | 2018-05-25 | A kind of transition Taper Pipe reinforced structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208204296U (en) |
-
2018
- 2018-05-25 CN CN201820793016.6U patent/CN208204296U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208204296U (en) | A kind of transition Taper Pipe reinforced structure | |
CN204431470U (en) | A kind of concrete pipe pile tensioning system | |
CN202302366U (en) | Prestressed steel cylinder concrete jacking pipe | |
CN204645703U (en) | A kind of device for changing the main material of electric power pylon | |
CN202591304U (en) | Shape righting aligning machine | |
CN210087341U (en) | Secondary grouting device based on shield construction | |
CN201169751Y (en) | Concrete symmetrical distributor | |
CN210370574U (en) | Special wellhead assembly of oil field fracturing | |
CN203977583U (en) | Regional perfusion's cement slurry Enhanced intersecting joint | |
CN206478348U (en) | Spigot-and-socket steel pipe anticreep mouthful device | |
CN208686096U (en) | Steel core concrete column jacks fixture | |
CN203973133U (en) | A kind of ruggedized construction of penstock docking point | |
CN221004163U (en) | Improved pipeline joint | |
CN204873621U (en) | Adjustable tower crane attaches wall connecting rod | |
CN206769213U (en) | A kind of reinforcing steel bar connecting device being used in precast concrete | |
CN204986035U (en) | Confession, fixed festival of return water be anchor block as an organic whole even | |
CN206550566U (en) | A kind of positioning welding frock of tower crane standard knot main chord adapter sleeve | |
CN206625253U (en) | A kind of attachment structure of prefabricated piping lane | |
CN203529921U (en) | Pipeline structure delivering materials by utilizing siphoning | |
CN205530679U (en) | Assembled circular steel tube truss passes through node mutually | |
CN203249832U (en) | Crossbeam adjusting device of hydraulic testing machine | |
CN212361100U (en) | Hydraulic joint convenient to install | |
CN110587215A (en) | Pull rod device for adjusting gap by assembling large-diameter pipeline welded junction | |
CN218050913U (en) | Water and electricity installation steel pipe fast weld interfacing apparatus | |
CN203273151U (en) | Elbow pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |